HomeMy WebLinkAbout960162_Plan of Action_20190624PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION ✓G .`
d OAmr�QGc'/ `Q�O
Facility Number: 96-162 County:
Facility Name: Sanderson Farm
Certified Operator Name: Steven Stewart Operator #: 1002865^�
"Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note: A certified Sludge Management Plan may be submitted in lieu of this POA.
La oon 1
Lagoon 2
Lagoon 3
La oon 4
Lagoon 5
Lagoon 6
a. Lagoon Name/ Identifier
SAW
b. Total Sludge Depth (ft)
6.3
c. Sludge Depth to be
Removed for Compliance
.8
ft
d. Sludge Volume to be
Removed (gallons)
80,177
e. Sludge PAN
(Ibs/1000 gal)
10
f. Liquid PAN
(Ibs/1000 gal)
g. PAN of Sludge (Ibs)
(d x e)/1000
c
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SB
Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to
DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance
with NRCS Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed
within 90 days and compliance with MRCS Standard 359 must be achieved within two years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in
sludge levels, DWR may require the owner to develop a sludge management plan that meets the
requirements of SB Interagency Group Guidance Document 1.27.
SPOA 9-15-2016 Page 1 of 3
NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge
depth. If microbe use Is planned, specify the product to be used.
Sludge Management/Operation Plan
Sludge Management Guide
Lagoon evaluation data developed by NCSU and a review of lagoon management records of several lagoons
showed that treatment capacity of the swine lagoons evaluated in NC was not significantly adversely affected
by sludge accumulations of 50% or more.of the planned treatment volume of the lagoon . Therefore It is felt
that it is permissible to allow sludge accumulation Into the planned treatment zone of properly monitored and
managed lagoons provided that:
• Nutrient values of the lagoon effluent are within the normaloperating range.
• There Is no noticeable Increase In lagoon odor.
• Nutrients land applied from the lagoon are properly accounted for in the application plan (WUP)
Sludge Management
Sludge in my lagoon will be managed by the following
• Adequately monitor to define sludge volume, location, and rate of accumulation by conducting an
annual sludge survey.
• Maintain a minimum 2.5 feet deep zone, free of sludge at the pump Intake during Irrigation.
• Position the pump intake and manage the Irrigation operation such that the material irrigated Is not
more concentrated than the nutrient analysis samples.
• Sufficient monitoring to address concems that nutrients are not over applied.
• Other Items as required by DWO.
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and
correct
Maxwell Foods, LLC
Facility Owner/Manager (print)
Facility ner/Manager (signature)
Phone: (919)778-3130
Date: 5/6/19
Return this form to:
NC Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
SPOA 5-18-04 Page 2 of 2