HomeMy WebLinkAbout20041905 Ver 1_Approval Letter_20051129/~'F~W A TF,q
~ ~~,~""QG
~? Michael F. Easley, Governor
~
"
r William G. Ross Jr., Secretary
~ ~ North Carolina Derartment of Environment and Natural Resources
-~~
' Alan W. Klimek, P.E. Director
'
Y Division of Water Quality
e~:t;=~_ ~.
November 22, 2005
Watauga County
DWQ Project No. 04-1905
SR 1127 (Shawnee Rd)
Correction of APPROVAL of 401 Water Quality Certification (~;
Mr. Mike Pettyjohn, P.E. ~ ~~LS ~~~
Division Engineer, Division 11 D
N C Department of Transportation NO V 2 9 2005
Post Office Box 250
North Wilkesboro, North Carolina 28659 WETLA pS~DSTTE~~1~
Dear Mr. Pettyjohn:
This letter is a correction to the Water Quality Certification issued for the referenced project. This letter should be attached to the
existing WQC for the referenced project and is valid solely for the correction of the expiration date of the WQC. The expiration of the
WQC is corrected as follows:
1. This Water Quality Certification will expire with the accompanying 404 permit issued by the US Army Corps of Engineers.
This conditions supersedes Condition 19 of General Certification 3404 and Condition 12 of General Certification 3366 issued
on March 21, 2005.
2. All the authorized activities and conditions of the certification associated with the original Water Quality Certification dated
March 21, 2005 and all other corresponding modifications still apply except where superseded by this certification.
Should your project change, you must notify the DWQ and submit a new application for a WQC modification. If the property is sold,
the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the
conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the
future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2II .0506 (h) (6) and (7).
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days
of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North
Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification
and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any
questions, please contact Sue Homewood at 336-771-4600 extension 287 or at Sue.Homewood@ncmail.net.
Sincerely,
~ c'r~~
Alan W. Klimek, P.E.
cc: Wilmington District Corps of Engineers
John Thomas, USACE Raleigh Field Office
Heath Slaughter, Division 11, Division Environmental Officer
DWQ Wetlands/401 Unit
DWQ Winston Salem Regional Office
DWQ Central Files
North Carolina Division of Water Quality 585 Waughtown Street
Internet: h2o.enr.state.nc.us Winston-Salem, NC 27107
Noe Carolina
~aturally
Phone (336) 771-4600 Customer Service
FAX (336) 771-4630 1-877-623-6748
An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper
November 22, 2005
DWQ# 04-1905 correction
Page 2
DWQ Project No.:
County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent
modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1621 Mail Service Center, Raleigh, NC, 27699-1621. This form maybe returned to DWQ by the applicant, the applicant's authorized
agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
I, ,hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North Carolina, having
been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature
Registration No.
Date