Loading...
HomeMy WebLinkAbout20190745 Ver 1_PCN Form Submission_20190620DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Oange only if needed. BIMS # Assigned 20190745 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Joanne Steenhuis:eads\jhsteenhuis Information for Initial Review 1a. Name of project: Southport Spoil Site Shoreline Stabilization 2019 1a. Who is the Primary Contact?* Brian Doliber 1b. Primary Contact Email:* bcdoliber@ncdot.gov Date Submitted 6/20/2019 Nearest Body of Water Cape Fear River Basin Cape Fear Water Classification Cape Fear Version# * 1 Reviewing Office* Wilmington Regional Office - (910) 796-7215 1c. Primary Contact Phone:* (252)232-8025 Site Coordinates Latitude: Longitude: 39.932887-77.991897 FA. Processing Information u County (or Counties) where the project is located: Brunswick Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS#M 16.71001 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) W Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r' Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? C Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: 01147,1145 2c. Responsible party: 2d. Address Street Address 159 Lucinda Lane Address Line 2 City State / Rovince / fbgion Powells Point NC Rstal / Zip Code Country 27966 USA * r Yes r No r Yes r No 2e. Telephone Number: (252)232-8025 2g. Email Address:* bcdoliber@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Brian Doliber 3b. Business Name: 3c.Address Street Address 159 Lucinda Lane Address Line 2 CKY Povnells Point Fbstal / Zip Code 27966 3d. Telephone Number: (252)232-8025 3f. Email Address:* bcdoliber@ncdot.gov 2f. Fax Number: State / Province / Region NC O�untry USA 3e. Fax Number: C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1 c. Nearest municipality / town: Southport 2. Project Identification 2a. Property Identification Number: 22200009 2c. Project Address Street Address 1650 Ferry Road SE Address Line 2 DtY Southport Fbstal / Zip Cide 28401 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Cape Fear River 3b. Water Resources Classification of nearest receiving water:* Cape Fear 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300050803 4. Project Description and History 2b. Property size: 12.18 State / Province / Region NC O�untry USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land in the vicinity of this project is used for disposal of dredging material. No development writs on the piece of land being used for the spoil site. The ferry terminal is adjacent to the spoil site and includes paved roads, ferry operations buildings and ferry ramps. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* G Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2005-9988983 Project History Upload 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) NC_ Kure_ Beach _20160621_TM_geo.pdf 21.71MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 20190606_09121109582_84_Soil_Report.pdf 708.28KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 1700 4h. Explain the purpose of the proposed project:* Recent storms have damaged the spoil site berm around the perimeter of the site and impacted the shoreline. The existing rip rap does not extend far enough south to prevent additional damage to the shoreline and spoil site. The 78' of additional rip rap will stabilize the shoreline and prevent further erosion/damage. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The NCDOT Ferry Division is looking to stabilize a 78.59' section of the spoil site berm on the eastern side of the Southport spoil site. Rip rap already exists along the perimeter of much of the spoil site but the section being referenced has never been stabilized and significant erosion has occurred as a result of recent storm events. Class 2 rip rap would extend 78.59' to the southwest from the current rip rap, with the toe following the CAMA stakes that were placed during the pre -application meeting and be placed on filter fabric. The width of the new rip rap would be 20' and the overall length of both new and existing rip rap would be 515.57'. Following placement of the rip rap, the section of the berm that has a)Perienced significant erosion would be brought back to its pre -storm profile to match the rest of the spoil site by backfilling with material located on site. 4j. Please upload project drawings for the proposed project. SOUTHPORT RIPRAP_5-21-19.pdf 3.27MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? LD. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): F Wetlands r Streams -tributaries r Buffers W Open Waters r Pond Construction 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type 4e. Waterbody We 4f. Impact area Southport Spoil Shoreline Stabilization P Cape Fear Stabilization Estuary 0.03 Site 4g. Total temporary open water Impacts: 4g. Total permanent open water impacts: 0.00 0.03 4g. Total open water impacts: 0.03 4h. Comments: Approximately 200 cubic yards of rip rap will be placed below MHW along the 78' section of shoreline in need of stabilizing. E. Impact Justification and Mitigation v 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The extension of the rip rap was designed to limit its placement to only the area in which damage has occurred and is likely to continue to occur in the future if shoreline stabilization is not performed. Site visits were conducted with field officers for DCM, ACE and DWR in order to receive guidance prior to final drawings being created and permit applications submitted. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All equipment will perform the work while stationed on a stable, benched berm above MHW. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Land disturbance will be minimal and construction activities will temporary and brief. CStormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Cape Fear River directly adjacent to shoreline/spoil site 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes t^ No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments: Minor modification to an wasting permit 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* f Yes r No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? r Yes r- No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Consultation with permitting agencies, limited/brief open water impacts and no major land disturbances will occur. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r- No Are there submerged aquatic vegetation (SAv) around the project vicinity?* r Yes r No r Unknown 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://vmw.habitat.noaa.gov/protection/efh/efhniapper/ Familiarity with construction practices involved in shoreline stabilization 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r- Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The land will not be disturbed in a manner that could impact any potential nearby areas that have such designations. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r- No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* https://msc.fema.gov/portal/search?AddressQuery=southport% 20nc#searchresultsanchor Miscellaneous Comments Miscellaneous attachments not previously requested. Signature u m By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Brian Doliber Signature &,&k Ae(ua Date 6/20/2019