Loading...
HomeMy WebLinkAboutSW6190602_Engineering Calculations (Storm Drains)_20190619NAME 7Ed.rton Industrial Park Storm Pond DATE )5-23-19 PROJECT NO 1479 DESIGN PHASE PRELIMCT CONSTR / X REVISIONION North Carolina BY CSB RECORDon, OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO RI-1 FES-2 RI-1 Storm Drainage.As 10-YEAR Date: 6/19/2019 Time: 7:51 PM Page 1 of 4 7NAME 7Ederton Storm Pond DATE 5-23-19 DESIGN PHASE PRELIM CONSTR / Xark REVISION PROJECT NO 1479 BY CSB RECORDlina OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO RI-1 FES-2 39.49 0.00 0.0089 36 62.9 8.9 112 0.21 146.00 145.00 150.00 Starm Drainage.As 10-YEAR Date: 6/19/2019 Time: 7:51 PM Page 2 of 4 NAME 7Ed.rton Industrial Park Storm Pond DATE 05-23-19 DESIGN PHASE PRELIMCT CONSTR / X REVISIONION PROJECT NO 1479 North Carolina BY CSB RECORDon, OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION Hf (FT) (FT) (CFS) 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K CONTINUED FRICTION FRICTION SLOPE VELOCITY (FT/FT) (FPS) FROM TO RI-1 FES-2 7.0686 0.7500 0.00 0.39 0.12 0.17 0.13 0.81 0.28 0.0035 5.55 Starm Drainage.As 10-YEAR Date: 6/19/2019 Time: 7:51 PM Page 3 of 4 "1"DATE 05-23-19 DESIGN PHASE PRELIMCT CONSTR / X REVISIONION NAME 7Ederton Industrial Park Storm Pond PROJECT NO 1479 North Carolina BY CSB RECORDon, OTHER CHECKED BY CSB (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) RI-1 FES-2 147.40 148.21 148.85 148.85 INLET 1.15 Starm Drainagexls 10-YEAR Date: 6/19/2019 Time: 7:51 PM Page 4 of 4