Loading...
HomeMy WebLinkAbout20181589 Ver 2_More Information Received_20190619Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* 20181589 Version* 2 Is this project a public transportation project?* O Yes IS No Reviewer List:* Select Reviewing Office:* Submittal Type:* Application Attachments Zan Price:eads\gaprice Asheville Regional Office - (828) 296-4500 Does this project require a request for payment to be sent?* Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Alea Tuttle vbho is subrritting the inforrration? Email Address: alea@cwenv.com Project Information Existing ID #: Existing Version: 18-1589 1 20170001 (no dashes) Project Name: Biltmore River Bank Stabilization Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Buncombe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent sheet 8 rev.pdf 685.72KB Only pdf or Irm files are accepted. Describe the attachments: On June 11, 2019, we submitted a permit modification request for DWR# 18-1589, (Biltmore estate riverbank stabilization), which requested an additional access point (Impact S11 30 ft) across the Swannanoa River. The applicant has found that the neighboring property owner, Norfolk Southern Railway, will not cooperate to provide egress via Meadow Rd. Therefore the applicant has modified the proposed plan to access the bank stabilization location from the Biltmore property instead. The new proposed access point is approximately 400 ft downstream from the proposed bank stabilization (Impact S9), at a gently sloping section of the left bank of the Swannanoa, and would require tracking in the river bed upstream to move equipment and materials to the site, in a similar fashion to impact S-10 bank repair location. I have attached the plan of work from Headwaters Engineering which would replace the plan in the permit modification request Impact S11 with 400 LF of temporary impacts to the streambed. Please let me know if there is any additional information you need to make this determination. Thank you, Alea V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: --e71 &W�e* Submittal Date: Is filled in automatically. W Q 'f o U� m > u cn o v - i y <s CONSTRUCTION ACCESS FROM LEFT BANK; PROTECT TREES AND STABILIZE'r DISTURBED SOILS WHEN WORK IS COMPLETE r,. �raPp `1 REMOVE STUMP BUT CDO PROTECT ALL OTHER TREES Dov LU GNU SVVANNANOA RIVER O z z ' m Ir w =z p W o J r a..r Z TJ C� co G)Lu 0 z TEMP. HAUL ROUTE TRACKED VEHICLES ONLY 7 COURSES GEOLIFTS - `� Z O 0 INSTALL SAFETY FENCE Lu z - AROUND WORK AREA; N ::j � z LANE CLOSURE _ m aLu0 w CU - -- LU YOm m O wmz > > m DATE: JUNE 2019 SCALE: AS SHOWN LEGEND PLAN GEOLIFTS 0 60' 120' 180' SWANNANOA SHEET 8 OF 12