HomeMy WebLinkAboutWQ0040079_Site Plans/Maps_20190618ITEM
DESCRIPTION
ISIZE
VOLUME/CAPACITY
1
INFLUENTSCREEN NO. 1
6'-0" Lx 2'-0" W x 5'-0" H
2 MM OPENING
2
INFLUENTSCREEN NO.2
6'-0" Lx 2'-0" W x 5'-0" H
2 MM OPENING
3
ANOXIC TANK
61' Lx 15' W x 14' H
71,125 GAL
4
ANOXIC MIXER NO. 1
-
2.8 HP
5
ANOXIC MIXER NO.2
-
2.8 HP
6
AEROBIC TANK NO.1
61'-0" L x 19'- 0" W x 14' H
113,000 GAL
7
AEROBIC TANK NO.2 (HYDROPONIC TANK)
21'-9" Lx 17' W x 14' H
65,000GAL
8
AEROBIC BLOWER NO.1
4'-5" L x 4'-1" W x 3'-9" H
675 CFM
9
AEROBIC BLOWER NO.2
4'-5" L x 4'-1" W x 3'-9" H
675 CFM
10
AEROBIC BLOWER NO.3
3'-9" L x 3'-0" W x 4'-2" H
337 CFM
11
MEMBRAN E TAN K N 0. 1
16'-0" L x 8'-0" W x 14' H
10,003 GAL
12
MEMBRAN E TAN K N0.2
16-0" L x 8'-0" W x 14' H
10,003 GAL
13
MEMBRANE BLOWER NO. 1
3'-9"L x 3'-Q" W x 4'-2" H
111 CFM
14
MEMBRANE BLOWER NO.2
3'-9"Lx 3'-0" W x 4'-2" H
111 CFM
15
PERMEATE PUMP NO. 1
8'-0" L x 5'-0" W x 6'-0" H
52 GPM
16
PERMEATE PUMP NO.2
8'-0" L x 5'-0" W x 6'-0" H
52 GPM
17
PERMEATE TRANSFER PUMP NO.1
4'-0" L x 4'-0" W x 5'-0" H
34 GPM
18
PERMEATE TRANSFER PUMP NO.2
4'-0" L x 4'-0" W x 5'-0" H
34 GPM
19
PERMEATE TANK
6-0" DIA x 11'-0" H
1,200 GAL
20
SODIUM HYPOCHLORITE DOSING SKID
2'-0" L x 1'-0" W x 3'-0" H
2 GPH
21
SODIUM HYDROXIDE DOSING SKID
2'-0" L x 1'-0" W x 3'-0" H
2 GPH
22
AMMONIA DOSING SKID
2'-0" L x 1'-0" W x 3'-0" H
2 GPH
23
ANTISCALANT DOSING SKID
2'-0" L x 1'-0" W x 3'-0" H
2 GPH
24
CITRIC ACID DOSING SKID
2'-0" L x 1'-Q" W x 3'-0" H
2 GPH
25
RAS/WAS PUMP NO. 1
6'-4" Lx 4'-2" W
417 GPM
26
RAS%WAS PUMP NO.2
6'-4" L x 4'-2" W
417 GPM
27
RO MEMBRANE SKID
18'-3" L x 4'-3" W x 8'-0" H
34 GPM
28
RO BOOSTER PUMP NO. 1
3'-7" L x 3'-2" W
60.3 GPM
29
RO BOOSTER PUMP NO.2
3'-7" L x 3'-2" W
60.3 GPM
34
RO CIP SKID
7'-8" L x 2'-7" W x 5'-0" H
80 GPM
31
ODOR CONTROL UN IT
5'-7" L x 4'-3" W x 7'-3" H
300 SCFM
14'-0"
54'-0u
ZlL -V
COPYRIGHT Q 2019
SUMMIT DESIGN AND
ENGINEERING SERVICES
aQ4lQ�p4000QOppa¢��
oQ�q t` C A l TpO a�°o
o ao � °oa a
a ° o 0
0 0° o c+
o SEAL _o 0
0
0
0 a 1q o a
o ° 1 1 0 0
o ° j o a
a ° 0 0
O °O 0 C)O ° 4
O ,(,
o°QO
'i a� Q
°00004°oa
O L;
ENGINEER OF RECORD
MICHAEL C. WICKER, PE
PROJECT MANAGER`
MICHAEL C. WICKER, PE
DRAWN BY FIRST ISSUE DATE
PAP 04/16/2019
rn
W
I�
z
0
W
tz
f
Cf
uj
c.�
Z
Q
Z