Loading...
HomeMy WebLinkAboutWQ0040079_Site Plans/Maps_20190618ITEM DESCRIPTION ISIZE VOLUME/CAPACITY 1 INFLUENTSCREEN NO. 1 6'-0" Lx 2'-0" W x 5'-0" H 2 MM OPENING 2 INFLUENTSCREEN NO.2 6'-0" Lx 2'-0" W x 5'-0" H 2 MM OPENING 3 ANOXIC TANK 61' Lx 15' W x 14' H 71,125 GAL 4 ANOXIC MIXER NO. 1 - 2.8 HP 5 ANOXIC MIXER NO.2 - 2.8 HP 6 AEROBIC TANK NO.1 61'-0" L x 19'- 0" W x 14' H 113,000 GAL 7 AEROBIC TANK NO.2 (HYDROPONIC TANK) 21'-9" Lx 17' W x 14' H 65,000GAL 8 AEROBIC BLOWER NO.1 4'-5" L x 4'-1" W x 3'-9" H 675 CFM 9 AEROBIC BLOWER NO.2 4'-5" L x 4'-1" W x 3'-9" H 675 CFM 10 AEROBIC BLOWER NO.3 3'-9" L x 3'-0" W x 4'-2" H 337 CFM 11 MEMBRAN E TAN K N 0. 1 16'-0" L x 8'-0" W x 14' H 10,003 GAL 12 MEMBRAN E TAN K N0.2 16-0" L x 8'-0" W x 14' H 10,003 GAL 13 MEMBRANE BLOWER NO. 1 3'-9"L x 3'-Q" W x 4'-2" H 111 CFM 14 MEMBRANE BLOWER NO.2 3'-9"Lx 3'-0" W x 4'-2" H 111 CFM 15 PERMEATE PUMP NO. 1 8'-0" L x 5'-0" W x 6'-0" H 52 GPM 16 PERMEATE PUMP NO.2 8'-0" L x 5'-0" W x 6'-0" H 52 GPM 17 PERMEATE TRANSFER PUMP NO.1 4'-0" L x 4'-0" W x 5'-0" H 34 GPM 18 PERMEATE TRANSFER PUMP NO.2 4'-0" L x 4'-0" W x 5'-0" H 34 GPM 19 PERMEATE TANK 6-0" DIA x 11'-0" H 1,200 GAL 20 SODIUM HYPOCHLORITE DOSING SKID 2'-0" L x 1'-0" W x 3'-0" H 2 GPH 21 SODIUM HYDROXIDE DOSING SKID 2'-0" L x 1'-0" W x 3'-0" H 2 GPH 22 AMMONIA DOSING SKID 2'-0" L x 1'-0" W x 3'-0" H 2 GPH 23 ANTISCALANT DOSING SKID 2'-0" L x 1'-0" W x 3'-0" H 2 GPH 24 CITRIC ACID DOSING SKID 2'-0" L x 1'-Q" W x 3'-0" H 2 GPH 25 RAS/WAS PUMP NO. 1 6'-4" Lx 4'-2" W 417 GPM 26 RAS%WAS PUMP NO.2 6'-4" L x 4'-2" W 417 GPM 27 RO MEMBRANE SKID 18'-3" L x 4'-3" W x 8'-0" H 34 GPM 28 RO BOOSTER PUMP NO. 1 3'-7" L x 3'-2" W 60.3 GPM 29 RO BOOSTER PUMP NO.2 3'-7" L x 3'-2" W 60.3 GPM 34 RO CIP SKID 7'-8" L x 2'-7" W x 5'-0" H 80 GPM 31 ODOR CONTROL UN IT 5'-7" L x 4'-3" W x 7'-3" H 300 SCFM 14'-0" 54'-0u ZlL -V COPYRIGHT Q 2019 SUMMIT DESIGN AND ENGINEERING SERVICES aQ4lQ�p4000QOppa¢�� oQ�q t` C A l TpO a�°o o ao � °oa a a ° o 0 0 0° o c+ o SEAL _o 0 0 0 0 a 1q o a o ° 1 1 0 0 o ° j o a a ° 0 0 O °O 0 C)O ° 4 O ,(, o°QO 'i a� Q °00004°oa O L; ENGINEER OF RECORD MICHAEL C. WICKER, PE PROJECT MANAGER` MICHAEL C. WICKER, PE DRAWN BY FIRST ISSUE DATE PAP 04/16/2019 rn W I� z 0 W tz f Cf uj c.� Z Q Z