Loading...
HomeMy WebLinkAboutNC0026123_Annual Report_20190612ROY COOPER Governor HCHAEL S. REGAN secretory LINDA CULPEPPER Director Michelle Dawes City of Asheboro P.O. Box 1106 Asheboro, NC 27204 NORTH CAROLINA Environmental Quality June 12, 2019 SUBJECT: Pretreatment Annual Report Review City of Asheboro NPDES# NCO026123 Randolph County Dear Ms. Dawes: The Pretreatment staff of the Division of Water Resources at the Winston-Salem Regional Office has reviewed the Pretreatment Annual Report (PAR) covering January through December 2018. Our review indicates that the PAR is adequate and satisfies the requirements of 15A NCAC 2H .908(b) and the Comprehensive Guidance for North Carolina Pretreatment Programs. Thank you for your continued support of the Pretreatment Program. If you have any questions, please contact meat (336) 776-9704 (Jim. Gonsiewski&ncdenr.goy) or Monti Hassan at (919) 807- 6314 (Monti.Hassan@ncdenr.gov). Sincerely, Dmuftned by: Q0VLW- "s _t' E197B66F179D45F._ James J. Gonsiewski, PG Hydrogeologist Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Monti Hassan Central Files WSRO Files EQ 2� North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 nroam c�aoi.iNa � 336.776.9800 16 Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did thev send anv other submissions with it? Included? ADEQUATE? POTW noted Corrections? ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA ® YES ❑ NO ® YES ❑ NO ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO YES ❑ NO ® NA ❑ YES ❑ NO ® NA ❑ -YES ❑ NO ® NA ❑ YES ❑ NO ® NA lip❑ ® YES ❑ NO ® YES ❑ NO ® YES ❑ NO -ZYES ❑ NO ❑ NA ® YES ❑ NO ❑ NA I ® YES ❑ NO ❑ NA Regional Office: Winston-Salem POTW: City of Asheboro NPDES Permit No. NCO026123 Report Period: 1/1/18 to 12/31/18 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. rf No. check recoonmendaiion below; 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). 2. Were at least 80% of SIUs inspected? (See PPS Form) ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ Nov ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment vote: exceptions snouia De expiainea in the comment secuon Deiow: Reviewed By: Jim Gonsiewski Date: 6/10/2019 Regional Pretreatment Annual Report Review PAR review form 2019 Asheboro.docxl6