Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3190505_Calcs_20190607
YARBROUGH -WILLIAMS& HOULE, INC. Planning • Surveying • Engineering NCBELS C-0475 SC COA332 STORMWATER MANAGEMENT CALCULATIONS FOR The Courtvards on Lawyers Road FAV I 7637 ° IL t., T . U May 24, 2019 CONTENTS: • STORM DRAINAGE CALCULATIONS • SPREAD CALCULATIONS • DROP INLET DEPTH CALCULATIONS • EROSION CONTROL SKIMMER BASIN CALCULATIONS • EROSION CONTROL SEDIMENT BASIN CALCULATIONS • EROSION CONTROL TEMPORARY DITCH CALCULATIONS • DETENTION SUMMARY • WET POND #1- CALCULATIONS, HYDROCAD REPORT • WET POND #2- CALCULATIONS, HYDROCAD REPORT 730 Windsor Oak Court, Charlotte, NC 28273 • P.O. Box 1198, Pineville, NC 28134 • 704.556.1990 • fax 704.556.0505 STORM DRAINAGE CALCULATIONS ON LAWYERS ROAD REV. PROJECT NAME: THE COURTYARDS STORM DRAINAGE CALCULATIONS P. O .BOX 7007 CHARLOTTE, N.C. 28241 Phone: 704-556-1990 YARBROUGH-WILLIAMS & HOULE� Planning • Surveying • Engineering INC. REV. REV. REV. VERSION 7.26.13 DATE: JANUARY 15, 2019 SLOPE % 9.25 2.24 5 0.97 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.97 0.50 1.52 1.57 1.84 1.57 1.33 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.80 0.97 0.50 0.50 Fax: 704-556-0505 SURFACE LATERAL DRAINAGE PIPES AREA AREA 17.33 3.33 4 0.63 1.10 4.85 2.09 1.24 4.85 0.29 1.65 5.78 1.70 0.70 0.69 0.64 0.39 0.50 0.39 0.34 0.77 0.08 0.35 0.14 0.34 0.38 0.83 0.12 0.32 0.19 0.49 0.18 0.46 0.16 1.98 DRAINAGE AREA TOTAL 17.33 20.66 21.72 22.82 22.82 22.82 22.82 22.82 27.67 209 3.33 4.85 0.29 1.94 7.72 8.87 9.57 10.26 10.26 10.26 10.26 10.26 10.26 10.26 0.64 0.64 0.39 0.89 1.28 2.39 2.82 3.30 4.51 4.95 5.63 6.27 8.41 OUTPUT FOR SUBMITTAL DESIGN RUNOFF SECTION ACCUM. Tc FREQUENCY MANNING'S COEFF. FLOW TIME FLOW TIME USED 10/25/50/100 n C MINUTES MINUTES MINUTES 012 0.40 0.01 43.00 43.00 012 0.40 0.16 43.01 43.01 .4 4 a5O.012 0.40 0.14 43.44 43.44 25 0.012 0.40 0.08 43.58 43.58 25 0.012 0.40 0.23 43.66 43.66 25 0.012 0.40 0.16 43.89 43.89 25 0.012 0.40 0.27 44.05 44.05 25 0. 112 0.40 0.41 44.32 44.32 25 0.012 0.40 0.18 44.73 44.7373.43 50 0.012 0.60 0.23 5.00 500 50 0.012 0.60 0.29 5.23 5.23 25 0.012 0.40 0.74 50 0.012 0.60 0.08M35.8735.87 25 0.012 0.40 0.42 25 0.012 0.40 0.28 25 0.012 0.40 0.29 36.15 36.15 25 0.012 0.40 0.32 36.44 36.44 25 0.012 0.40 0.51 36.75 36.75 25 0.012 0.40 0.30 37.26 37.26 25 0.012 0.40 0.23 37.56 37.56 25 0.012 0.40 0.19 37.78 37.78 25 0.012 0.40 0.24 37.98 37.98 25 0.012 0.40 0.22 38.21 38.21 25 0.012 0.40 0.1275.67 50 0.012 0.60 0.67 50 0.012 0.60 0.23 d;E 10 0.012 0.60 0.10 5.00 5.00 10 0.012 0.60 0.15 5.10 5.10 10 0.012 0.60 0.08 5.25 5.25 10 0.012 0'60 0.14 5.33 5.33 10 0.012 0.60 0.28 5.47 5.47 10 0.012 0.60 0.75 5.75 5.75 10 0.012 0.60 0.26 6.51 6.51 10 0.012 0.60 0.35 6.77 6.77 10 0.012 0.60 0.25 7.12 7.12 10 0.012 0.60 0.24 7.36 7.36 10 1 0.012 0.60 1 0.16 7.60 7.60 RAINFALL INTENSITY 10,25,50,100 3.53 3.53 5 3.53 3.53 3.53 3.53 3.43 3.43 8.85 9.00 3.96 3.91 3.91 3.86 3.86 3.86 3.82 3.82 3.82 3.82 3.77 7.03 6.91 6.91 6.91 6.91 6.79 6.55 6.55 6.44 6.44 6.32 RUNOFF Q(CFS) 24.46 29.16 30.65 32.20 32.20 32.20 31.33 31.33 37.99 11.29 17.68 26.19 0.46 3.04 12. 88 13.71 14.79 15.86 15.66 15.66 15.66 15.66 15.46 15.46 3.46 3.34 1.65 3.69 5.31 9.91 11.69 13.45 17.74 19.47 21.74 24.21 31.87 FES / HW Q MAX HW/D: 1.2 49.32 31.27 PIPE DIAMETER REQUIRED 15.79 22.00 26.23 30.25 30.25 30.25 29.94 29.94 32.18 20.42 21.34 27.99 4.99 10.07 16.41 17.72 18.82 23.19 23.08 23.08 23.08 23.08 22.97 22.97 12.14 12.50 9.58 12.97 14.87 18.79 19.99 21.07 23.37 22.95 23.07 27.18 30.13 PIPE DIAMETER DESIGNED 36 36 36 36 36 36 36 36 36 24 24 30 15 15 24 24 30 30 30 30 30 30 30 30 15 15 15 15 15 24 24 24 24 24 30 30 36 AREA OF FLOW (SF) 1.23 2.29 3.17 4.25 4.25 4.25 4.16 4.16 4.86 1.93 2.12 3.67 0.13 0.13 1.25 1.45 1.65 2.52 2.45 2.45 2.45 2.45 2.45 2.45 0.69 0.72 0.43 0.78 1.06 1.65 1.85 2.08 2.60 2.49 2.45 3.44 4.25 WETTED PERIMETER FT 2.17 3.39 5. 4.33 5.46 5.46 5.46 5.37 5.37 612 3.71 4.02 5.50 0.63 1.61 2.64 2.95 2.90 4.00 3.93 3.93 3.93 3.93 3.93 3.93 2.16 2.24 1.49 2.39 3.18 3.27 3.58 3.96 4.84 4.65 3.93 5.18 5.46 DESIGN VELOCITY FPS 19.91 12.73 7.4 9.65 7.58 7.58 7.58 7.53 7.53 7.81 5.85 8.33 7.14 3.62 6.41 9.65 9.45 8.96 6.30 6.38 6.38 6.38 6.38 6.30 6.30 5.00 4.62 3.84 4.71 4.98 6.00 6.32 6.45 6.83 7.81 8.86 7.04 7.50 FROM STRUCTURE STRUCTURE TYPE TO STRUCTURE PIPE COVER AT STRUCT. LENGTH FEET 1 2 4 5 6 7 8 9 10 HW MH DI DI MH MH MH MH MH 2 3 4 5 6 7 8 9 10 11 2.0 1.0 1.0 2.2 2.0 1.2 2.6 5.5 8.00 124.88 82.59 36.80 74.41 74.41 120.72 184.95 85.91 137 13 DI DI 13 2 2.0 4.2 81.57 142.45 12 HW 10 34.09 15 16 17 18 19 20 21 22 23 24 25 25A DI DI DI DI DI DI MH MH MH MH MH MH 16 17 18 19 20 21 22 23 24 25 25A 256 1.0 1.0 1.0 1.0 1.0 0.6 3.5 2.1 3.4 3.3 1.3 1.7 161.67 163.27 163.20 162.00 169.52 192.49 113.58 87.29 73.10 90.86 81.73 44.23 26 27 DI MH 27 28 2.0 1.0 200.45 64.00 29 30 31 32 33 34 35 36 37 38 39 CB CB CB CB CB CB CB CB CB CB DI 30 31 32 33 34 35 36 37 38 39 40 2.0 2.1 2.3 2.5 4.1 3.8 2.6 2.3 2.0 2.0 2.7 24.00 41.34 24.00 51.65 106.49 290.68 108.00 162.00 132.07 100.02 73.51 LTHEOURTYARDS OI ERS ROAD P. CHARL41REV. Phone0Planning YARBROUGH-WILLIAMS & HOULE, • Surveying • EngineerinK INC. REV. REV.DATE: REV.Fax: PROJECT NAME: STORM DRAINAGE CALCULATIONS VERSIOI�I 7.26.13 JANUARY15,2019 LENGTH FEET 47.73 24.00 50.00 187.71 266.27 166.27 112.58 24.00 216.00 216.00 143.42 24.00 81.00 24.00 59.18 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 SLOPE % 0.50 0.50 0.50 0.85 0.95 1.08 1.51 0.60 0.88 0.87 0.84 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.60 0.60 0.60 0.60 0.60 SURFACE DRAINAGE AREA 0.11 0.45 0.65 0.23 0.53 0.71 0.51 0.39 0.31 0.48 0.48 0.26 0.31 0.33 0.11 0.49 0.48 0.46 0.49 0.32 0.35 0.35 0.34 0.35 0.40 LATERAL DRAINAGE PIPES AREA AREA TOTAL 3.64 12.16 12.61 0.30 13.56 al.47 0.39 0.70 0.49 1.67 0.48 2.63 0.44 3.33 3.64 0.33 0.44 0.49 0.48 0.46 0.49 0.32 0.48 0.83 0.34 0.35 EO. OUTPUT DESIGN FREQUENCY 10/25/50/100 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 1 MANNING'S n 0.012 0.012 0.012 0.012 0.012 0012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 FOR RUNOFF COEFF. C 0.60 0.60 0.60 0.60 0.60 060 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 SUBMITTAL SECTION ACCUM. FLOW TIME FLOW TIME MINUTES MINUTES 0.05 7.86 0.05 7.86 0.10 7.91 0.86 5.00 0.68 5.86 043 654 0.24 6.97 0.10 5.00 0.70 5.10 0.58 5.81 0.35 6.39 0.06 6.73 0.20 6.80 0.11 5.00 0.25 5.11 0.10 5.00 0.10 5.00 0.10 5.00 0.10 5.00 0.11 5'00 0.44 5.00 0.09 5.44 0.11 5.00 0.11 5.00 0.11 5.00 Tc USED MINUTES 7.76 7.86 7.91 5.00 5.86 ...13.74 6.97 5.00 5.10 5.81 6.39 6.73 6.80 5.00 5.11 5.00 5.00 5.00 5.00 5.00 5.00 5.44 5.00 5.00 5.00 RAINFALL INTENSITY 10,25,50,100 6.32 6.32 6.32 7.03 6.79 6.55 7.03 6.91 6.79 6.67 6.55 6.55 7.03 6.91 7.03 7.03 7.03 7.03 7.03 7.03 6.91 7.03 7.03 7.03 RUNOFF Q(CFS) 46.08 47.79 51.39 0.97 3.10 7.79 1.65 2.90 6.81 10.53 13.09 14.31 1.39 1.82 2.07 2.02 1.94 2.07 1.35 2.02 3.44 1.43 1.48 1.69 FES / HW Q MAX HW/D: 1.2 PIPE DIAMETER REQUIRED 34.60 35.07 36.04 7.36 11.15 14.44 9.58 11.04 15.23 18.04 20.86 21.57 9.00 9.96 10.44 10.36 10.19 10.44 8.90 9.29 12.64 9.10 9.20 9.67 PIPE DIAMETER DESIGNED 36 36 42 15 15 15 15 15 15 24 24 24 24 15 15 15 15 15 15 15 15 15 15 15 15 1 AREA OF FLOW (SF) 5.69 5.84 6.03 0.27 0.58 0.89 0.99 0.43 0.57 1.10 1.53 2.05 2.16 0.38 0.46 0.50 0.50 0.49 0.50 0.38 0.41 0.74 0.40 0.40 0.44 WETTED PERIMETER FT 7.07 7.25 6.59 1.06 1.88 2.67 2.94 1.49 1.84 2.39 3.08 3.89 4.08 1.37 1.57 1.69 1.69 1.65 1.69 1.37 1.45 2.28 1.41 1.41 1.53 PIPE FROM STRUCTURE TO COVER DESIGN STRUCTURE TYPE STRUCTURE AT STRUCT. VELOCITY FPS 41 41 42 DI CB DCB 41 42 43 2.9 2.4 8.5 8.10 8.18 8.53 44 45 46 DI DI DI DI 45 46 47 39 2.0 2.0 2.0 2.0 3.63 5.32 6.5147 6.51 89 48 49 50 51 52 53 DCB CB DCB CB CB CB 49 50 51 52 53 40 2.0 2.1 2.0 2.0 2.0 2.3 3.84 5.12 6.21 6.21 88 6.40 6.62 3.64 3.98 4.10 4.01 3.97 4.10 3.53 4.90 4.66 3.61 3.71 3.81 54 55 CB CB 55 52 2.0 2.1 56 DCB 50 2.0 57 CB 51 2.0 58 DCB 38 2.0 59 DCB 37 2.0 60 DCB 36 2.0 61 62 CB CB 62 35 2.0 2.0 63 DCB 34 2.0 64 CB 33 2.0 65 CB 66 2.0 PROJECT NAME: STORM DRAINAGE CALCULATIONS VERSION 7.26.13 DATE : JANUARY 15, 2019 PIPE FROM STRUCTURE I TO I COVER STRUCTURE TYPE I STRUCTURE I ATSTRUCT THE COURTYARDS ON LAWYERS ROAD YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering REV. P. O .Box 7007 REV. CHARLOTTE, N.C. 28241 REV. Phone: 704-556-1990 REV. Fax: 704-556-0505 - OUTPUT FOR SUBMITTAL SURFACE LATERAL DRAINAGE DESIGN RUNOFF T SECTION ACCUM. Tc LENGTH SLOPE DRAINAGE PIPES AREA FREQUENCY MANNING'S COEFF. FLOW TIME FLOW TIME USED FEET % AREA AREA TOTAL 10/25/50/100 n C MINUTES MINUTES MINUTES I RAINFALL INTENSITY 10,25,50,100 RUNOFF Q(CFS) FES / HW PIPE PIPE AREA WETTED DESIGN Q MAX HW/D: 1.2 DIAMETER DIAMETER OF PERIMETER VELOCITY REQUIRED DESIGNED I FLOW (SF) I FT I FPS 66 CB 32 2.1 259.24 0.60 0.37 0.77 10 0.012 0.60 0.96 5.11 5.11 6.91 3.19 67 68 69 70 71 72 73 74 75 76 77 78 79 80 80A 81 82 83 84 85 CB CB CB CB CB CB CB CB DCB DCB DCB CB CB CB CB DI MH CB CB MH 68 69 70 71 72 73 74 75 76 77 78 79 80 80A 81 82 83 84 85 86 2.0 2.1 2.0 2.0 2.3 2.0 2.3 3.1 3.5 3.0 3.3 6.4 6.2 6.3 6.4 7.7 9.5 8.7 7.0 4.5 24.00 105.08 108.00 24.00 130.76 24.00 40.04 24.00 155.12 24.00 367.20 95.99 134.24 24.00 34.83 141.10 235.74 152.26 200.00 22.69 0.60 0.67 0.81 0.60 0.69 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.33 0.32 0.28 0.28 0.35 0.23 0.46 0.10 0.33 0.82 0.67 0.39 0.20 1 0.19 0.45 0.04 0.10 0.11 0.84 1.17 0.35 0.48 0.99 4.33 5.72 0.16 0.11 0.80 2.39 0.33 0.65 0.93 1.21 2.40 2.63 3.09 4.36 4.69 5.86 6.53 7.40 8.59 13.11 13.56 19.32 19.48 19.69 20.60 22.99 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.11 0.39 0.34 0.08 0.34 0.07 0.10 0.06 0.36 0.05 0.80 0.21 0.30 0.05 0.07 0.26 0.43 0.28 0.37 0.04 5.00 5.11 5.50 5.84 5.92 6.26 6.32 6.43 6.48 6.85 6.90 7.70 7.91 8.20 8.25 8.32 8.58 9.01 9.30 9.66 5.00 5.11 5.50 5.84 5.92 6.26 6.32 6.43 6.48 6.85 6.90 7.70 7.91 8.20 8.25 8.32 8.58 9.01 9.30 9.66 7.03 6.91 6.91 6.79 6.79 6.67 6.67 6.67 6.67 6.55 6.55 6.32 6.32 6.20 6.20 6.20 6.08 5.96 5.96 5.84 1.39 2.70 3.86 4.93 9.78 10.53 22.37 17.46 18.78 23.04 25.68 28.04 32.55 48.75 50.42 71.84 71.04 70.40 73.65 80.56 87 88 88A 89 DI DI DI DI 88 88A 89 74 2.0 2.0 2.0 2.0 231.44 165.13 133.49 137.44 0.86 1 0.85 1 0.90 0.60 .15 0.40 0.30 0.32 0.15 0.55 0.85 1.17 10 10 10 10 0.012 0.012 0.012 0.012 0.60 0.60 0.60 0.60 1.22 0.59 0.42 0.47 5.00 6.22 6.81 7.23 5.00 6.22 6.81 7.23 7.03 6.55 6.67E4.52 6.4490 0.63 HW 71 34.36 4.34 0.84 0.84 10 0.012 0.60 0.06 5.00 5.00 7.03 91 DCB 76 2.0 100.52 1.20 1 0.35 0.35 10 0.012 0.60 0.35 5.00 5.00 7.03 1.48 92 DCB 78 2.0 24.00 0.79 0.48 0.48 10 0.012 0.60 0.09 5.00 5.00 7.03 2.02 93 DI 79 2.0 34.13 1.55 0.99 0.99 10 0.012 0.60 0.08 5.00 5.00 7.03 4.18 94 CB 83 2.0 24.00 0.79 0.11 0.11 10 0.012 0.60 0.14 5.00 5.00 7.03 0.46 95 96 DI CB 96 84 3.0 2.0 44.46 24.00 4.09 0.60 0.36 0.44 0.36 0.80 10 10 0.012 0.012 0.60 0.60 0.10 0.09 5.00 5.10 5.00 5.10 7.03 6.91 1.52 3.32 97 DI 98 2.0 47.51 1.96 1.91 1 1 1.91 1 10 0 012 0.60 0.09 7.03 I 8.06 VV �� 12.29 15 1 0.71 2.20 4.52 0.38 1.37 3.64 E1446 a15 0.60 1.92 4.51 0.72 2.24 5.34 0.99 2.94 4.99 18.24 24 1.53 3.08 6.39 19.22 24 1.73 3.39 6.08 20.42 24 1.93 3.71 6.41 23.24 30 2.52 4.00 6.94 23.88 36 2.64 3.77 7.11 25.79 36 3.09 4.24 7.47 26.85 42 3.35 4.18 7.65 27.76 42 3.59 4.40 7.80 30.37 42 4.32 5.06 7.53 35.34 42 5.79 6.37 8.42 35.79 42 5.91 6.48 8.54 40.87 42 7.95 8.46 9.04 40.70 42 7.85 8.35 9.05 40.56 42 7.85 8.35 8.97 41.25 42 8.15 8.68 9.03 42.66 48 8.49 8.04 9.48 6.25 15 0.20 0.86 3.16 10.02 15 0.47 1.61 4.65 11.59 15 0.63 2.00 5.31 14.00 15 0.92 2.75 4.92 0.37 1.33 9.63 M8.08 a150.31 1.18 4.77 9.83 15 0.46 1.57 4.42 11.37 15 0.60 1.92 6.98 5.66 15 0.16 0.75 2.86 6.49 15 0.21 0.90 7.12 12.47 15 0.72 2.24 4.59 13.93 15 1 0.92 2.75 8.78 YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering FOR SUBMITTAL RUNOFF SECTION ACCUM. Tc RAINFALL PROJECT NAME : THE COURTYARDS ON LAWYERS ROAD STORM DRAINAGE CALCULATIONS P. O .BOX 7007 W VERSION 7.26.13 CHARLOTTE, N.C. 28241 DATE: JANUARY15,2019 Phone: 704-556-1990 PIPE Fax: 704-556-0505 SURFACE LATERAL DRAINAGE OUTPUT DESIGN FES / HW PIPE PIPE AREA WETTED DESIGN FROM STRUCTURE STRUCTURE TYPE TO STRUCTURE COVER AT STRUCT. LENGTH FEET SLOPE % DRAINAGE AREA PIPES AREA AREA TOTAL FREQUENCY 10125/50/100 MANNING'S n COEFF. C FLOW TIME MINUTES FLOW TIME MINUTES USED MINUTES INTENSITY 10,25,50,100 RUNOFF Q(CFS) Q MAX HW/D: 1.2 DIAMETER REQUIRED DIAMETER DESIGNED OF PERIMETER VELOCITY FLOW (SF) FT FPS 98 99 CB CB 99 85 2.0 2.3 24.00 55.79 0.60 1.80 0.34 0.14 2.25 2.39 10 10 0.012 0.012 0.60 0.60 0.07 0.10 5.09 5.16 5.09 5.16 6.91 6.91 9.33 9.91 18.37 15.29 24 24 5.94 1.57 3.14 1.10 2.39 9.05 100 101 102 103 104 105 106 107 CB CB CB DCB CB CB CB DCB 101 102 103 104 105 106 107 80 2.0 2.0 2.0 2.0 2.0 2.0 5.1 5.4 72.66 105.00 169.39 147.48 99.47 171.19 24.00 39.60 1.18 0.85 1.00 0.99 0.90 0.50 0.50 0.50 0.32 0.20 0.32 0.49 0.47 0.29 0.30 0.53 0.33 0.33 0.35 0.40 0.32 0.85 1.50 2.34 3.21 3.50 3.80 4.33 10 10 10 10 10 10 10 10 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.27 0.33 0.44 0.35 0.22 0.47 0.07 0.11 5.00 5.27 5.59 6.04 6.38 6.61 7.08 7.14 5.00 5.27 5.59 6.04 6.38 6.61 7.08 7.14 7.03 6.91 6.79 6.67 6.67 6.55 6.44 6.44 1.35 3.52 6.11 9.37 .85 .7 g14.67 .72 7.83 11.94 14.26 16.76 19.20 221.99 22.53 23.66 15 15 15 0.30 1.14 4.57 0.66 2.08 5.34 0.96 2.87 6.37 18 24 24 1.32 3.30 7.09 1.73 3.39 7.43 2.27 4.27 6.05 24 24 2.39 4.46 6.15 2.66 4.96 6.28 109 CB 101 2.0 24.00 0.60 0.33 0.33 10 0.012 0.60 0.11 5.00 5.00 7.03 1.39 9.00 15 0.38 1.37 3.64 110 CB 102 2.0 24.00 0.60 0.33 0.33 10 0.012 0.60 0.11 5.00 5.00 7.03 1.39 9.00 15 0.38 1.37 3.64 111 112 CB CB 103 104 2.0 2.0 24.00 24.00 0.60 0.60 0.35 0.40 0.35 0.40 10 10 0.012 0.012 0.60 0.60 0.11 0.11 5.00 5.00 5.00 5.00 7.03 7.03 1.48 1.69 9.20 M54 15 0.40 1.41 3.71 15 0.44 1.53 3.81 122 123 124 125 114 115 116 117 118 108 CB CB CB CB CB CB CB DCB CB CB 123 124 125 114 115 116 117 118 108 81 2.0 2.1 2.0 2.3 2.0 2.0 2.0 5.6 5.9 6.2 24.00 162.57 24.00 169.20 112.00 99.99 108.83 55.38 24.00 29.04 0.60 3.02 0.60 2.54 0.94 0.74 0.55 0.50 0.50 0.50 0.64 0.29 0.23 0.16 0.47 0.32 0.28 0.44 0.21 0.18 0.44 0.49 0.33 0.34 0.64 0.64 0.93 1.16 1.76 2.72 3.37 3.99 5.07 5.28 5.46 10 10 10 10 10 10 10 10 10 10 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.09 0.31 0.08 0.30 0.25 0.24 0.28 0.14 0.06 0.07 5.00 5.09 5.40 5.48 5.78 6.03 6.27 6.55 6.69 6.74 5.00 5.09 5.40 5.48 5.78 6.03 6.27 6.55 6.69 6.74 7.03 6.91 6.91 6.91 6.79 6.67 6.67 6.55 6.55 6.55 2.70 3.86 4.81 7.30 11.08 13.49 15.98 19.94 20.76 21.47 14.33 12.78 18.00 20.30 22.84 25.27 25.66 25.98 15 0.61 1.96 4.40 15 15 0.44 1.53 8.70 0.97 2.90 4.94 15 0.77 2.36 9.49 24 24 1.49 3.01 7.44 1.93 3.71 7.00 24 2.46 4.58 6.50 30 30 2.95 4.55 6.75 3.08 4.71 6.75 30 3.14 4.79 6.85 126 DI 125 2.0 33.60 0.60 0.44 0.44 10 0.012 0.60 0.14 5.00 5.00 7.03 1.86 10.03 15 0.47 1.61 3.92 113 CB 114 2.0 24.00 0.60 0.49 0.49 10 0.012 0.60 0.10 5.00 5.00 7.03 2.07 10.44 15 0.50 1.69 4.10 119 DCB 117 2.0 24.00 0.60 0.64 0.64 1 10 0.012 0.60 1 6.09 5.00 5.00 7.03 2.70 11.54 15 0.61 1.96 4.40 120 CB 116 2.0 24.00 0.60 0.34 0.34 1 10 0.012 0.60 0.11 5.00 5.00 7.03 1.43 9.10 15 0.40 1.41 3.61 THE COURTYARDS ON LAWYERS ROAD P. O .BOX 7007 CHARLOTTE, N.C. 28241 Phone: 704-556-1990 Fax: 704-556-0505 YARBROUGH-WILLIAMS & HOULE, INC. Planning •Surveying •Engineering PROJECT NAME : REV. STORM DRAINAGE CALCULATIONS REV. VERSION 7.26.13 REV. DATE. JANUARY 15, 2019 REV. OUTPUT FOR SUBMITTAL FROM STRUCTURE TO PIPE COVER LENGTH SLOPE SURFACE DRAINAGE LATERAL PIPES DRAINAGE AREA DESIGN FREQUENCY MANNING'S RUNOFF COEFF. SECTION FLOW TIME ACCUM. T- FLOW TIME USED RAINFALL INTENSITY RUNOFF Q(CFS) FES / HW Q MAX HW/D: 1.2 PIPE DIAMETER REQUIRED PIPE DIAMETER DESIGNED AREA OF FLOW (SF) WETTED PERIMETER FT DESIGN VELOCITY FPS STRUCTURE TYPE STRUCTURE AT STRUCT. FEET % AREA AREA TOTAL 10/25/50/100 n C MINUTES MINUTES MINUTES 10,25,50,100 121 CB 115 2.0 24.00 0.60 0.33 0.33 10 0.012 0.60 0.11 5.00 9.00 15 0.38 1.37 3.64 5.00 7.03 1.39 132 133 134 HW DCB CB 133 134 135 1.2 1.6 29.97 61.00 49.58 4.14 0.60 0.60 5.18 0.66 0.56 0.36 5.18 6.20 6.76 10 10 10 0.012 0.012 0.012 0.60 0.60 0.60 0.04 0.15 0.12 26.60 26.64 26.79 26.60 26.64 26.79 3.89 3.89 3.89 12.08 14.46 15.76 17.90 14.09 21.65 22.36 24 24 24 0.94 2.20 2.35 2.14 2.14 4.40 2.8 12.82 6.71 136 CB 133 2.0 113.48 0.60 0.36 0.36 10 0.012 0.60 0.51 5.00 5.00 7.03 1.52 9.30 15 0.41 1.45 3.68 138 CB 42 2.0 109.40 0.59 0.30 0.30 10 0.012 0.60 0.51 5.00 5.00 7.03 1.27 8.70 15 0.35 1.30 3.58 0 .. z s. fsi CIO C) O 3 �MM C Aa aO a 4-0 4) o6AeLlosrfl SDI Oi I t . 005'0 r=14MI l t 1 +' '--�._ tom) aaaeweip -did 4'1 i �'a M iall�C7 m M N P. O .BOX 7007 CHARLOTTE, N.C. 28241 wl Phone: 704-556-1990 YARBROUGH-WILLIAMS & HOULE, INC. Fax: 704-556-0505 Planning • Surveying • Engineering PROJECT NAME : i THE COURTYARDS ON LAWY DATE: JANUARY 15, 2019 NEW YORK STANDARDS RIP RAP APRON NOMOGRAPH [ Tw < 0.5(Do) ] R.R.I.F.P = Rip Rap For Inlet Protection RIP RAP APRON DESIGN MINIMUM RIPRAP RIP RAP OUTLET STRUCTURE VEL. I APRON I RIP RAP DEPTH (IN) FLOW NO. FT/SEC DIMENSIONS D50(IN) W/FABRIC CFS WIDTH X LENGTH 1 R.R.-F.I.P. 11 7.8 23.0 X 20.0 9.0 13.5 38.0 12 R.R.F.I.P. 25B 6.3 18.5 X 16.0 6.0 10.0 15.5 28 4.6 11.3 X 10.0 6.0 10.0 3.3 Phone: 704-556-1990 YARBROUGH-WILLIAMS & HOULE, INC. Fax: 704-556-0505 Planning • Surveying • Engineering PROJECT NAME : THE COURTYARDS ON LAWYI DATE : JANUARY 15, 2019 NEW YORK STANDARDS RIP RAP APRON NOMOGRAPH [ Tw < 0.5(Do) R.R.I.F.P = Rip Rap For Inlet Protection RIP RAP APRON DESIGN MINIMUM RIP RAP I RIP RAP OUTLET STRUCTURE VEL. APRON RIP RAP DEPTH(IN) FLOW NO. FT/SEC DIMENSIONS I D 50 (IN) W/ FABRIC CFS WIDTH I X I LENGTH 1 43 1 8.5 1 25.5 1 X 1 22.0 1 9.0 1 13.5 1 51.4 1 Phone: 704-556-1990 YARBROUGH-WILLIAMS & HOULE, INC. Fax: 704-556-0505 Planning • Surveying • Engineering PROJECT NAME : THE COURTYARDS ON LAWY] DATE: JANUARY 15, 2019 NEW YORK STANDARDS RIP RAP APRON NOMOGRAPH [ Tw < 0.5(Do) ] R.R.I.F.P = Rip Rap For Inlet Protection RIP RAP APRON DESIGN MINIMUM RIP RAP I RIP RAP OUTLET STRUCTURE VEL. APRON I RIP RAP DEPTH (IN) FLOW NO. FT/SEC DIMENSIONS D 50 (IN) W/ FABRIC CFS WIDTH I X LENGTH 1 86 1 9.5 1 30.0 1 X 1 26.0 1 12.0 1 18.0 1 80.6 1 90 1 R.R.F.I.P. Phone: 704-556-1990 YARBROUGH-WILLIAMS & HOULE, INC. Fax: 704-556-0505 Planning a Surveying • Engineering PROJECT NAME: THE COURTYARDS ON LAWY DATE: JANUARY 15, 2019 NEW YORK STANDARDS RIP RAP APRON NOMOGRAPH [ Tw < 0.5(Do) ] R.R.I.F.P = Rip Rap For Inlet Protection RIP RAP APRON DESIGN MINIMUM RIP RAP RIP RAP OUTLET STRUCTURE VEL. I APRON j RIP RAP DEPTH (IN) FLOW NO. FP/SEC DIMENSIONS. D 50 (IN) W/FABRIC CFS WIDTH X LENGTH 132 R.R.F.I.P. 135 6.7 16.0 X 14.0 6.0 10.0 15.8 SPREAD CALCULATIONS INLET SPREAD CHART ,`'C�`�� Version 9. SP 7.12 730 Windsor Oak Ct. VGK Charlotte, NC 28273 Project Parameters YARBROUGH-WILLIAMS & HOULE,, INC. Phone: 704-556-1990 Intensity: 4.00 Planning • Surveying • Engineering Fax: 704-556-0505 C: 1 0.60 Crown: 0.0208 1 - Input 0.0208 or 0.0313 = input cells VGK I Project Name: THE COURTYARDS ON LAWYERS ROAD Date: FEB. 3, 2019 Inlets on Slope INLET DRAINAGE SLOPE BYPASS TYPE SURF Q BYPASS Q SURF Q INLET BYPASS SLOPE AREA AC- LONG. % TO INLET = INLET K SUB RECEIVED TOTAL Qcap QSENT TRANS- n SPREAD c REMARK 65 0.40 1.78 100 S 24 0.96 0.00 0.96 0.79 0.17 0.0208 0.016 6.2 100 0.32 1.18 101 S 21 0.77 0.17 0.93 0.78 0.16 0.0208 0.016 6.6 101 0.20 1.18 102 S 21 0.48 0.16 0.64 0.61 0.03 0.0208 0.016 5.8 109 0.33 1.18 110 S 21 0.79 0.00 0.79 0.70 0.09 0.0208 0.016 6.2 102 0.32 1.18 103 S 211 0.77 0.03 0.791 0.70 0.091 0.0208 0.0161 6.3 110 0.33 L 18 1111 S 21 0.79 0.09 0.88 0.75 0.13 0.0208 0.016 6.5 103 0.49 1.18 104 D 21 1.18 0.09 1.27 1.65 0.00 0.0208 0.016 7.5 111 0.35 1.18 112 S 21 0.84 0.13 0.97 0.80 0.18 0.0208 0.016 6.8 104 0A7 1.18 105 S 21 1.13 0.00 L 13 0.87 0.25 0.0208 0.016 7.1 112 0.40 1.18 107 S 21 0.96 0.18 1.14 0.88 0.26 0.0208 0.016 7.2 105 0.29 1.18 106 S 21 0.70 0.25 0.95 0.78 0.17 0.0208 0.016 6.7 1061 0.30 2.39 119 S 27 0.721 0.17 0.89 0.771 0.11 0.02081 0.016 5.7 107 0.53 2.391 119 D 1 27 1.271 0.26 1.531 1.91 0.00 0.0208 0.016 7.0 78 0.39 1.00 79 S 21 0.94 0.00 0.94 0.82 0.12 0.0208 0.016 6.9 92 0.48 1.00 80A D 21 1.15 0.00 L 15 1.63 0.00 0.0208 0.016 7.4 79 0.20 1.00 80 S 21 0.48 0.12 0.60 0.62 0.00 0.0208 0.016 5.8 80 0.19 1.00 119 S 21 0.46 0.00 0.46 0.52 0.00 0.0208 0.016 5.2 80A 0.45 1.00 117 S 21 1.08 0.00 1.08 0.90 0.18 0.0208 0.016 7.2 122 0.64 4.00 125 S 33 1.54 0.00 1.54 L 14 0A01 0.0208 0.016 6.4 123 0.291 4.00 124 S 331 0.70 0.00 0.70 0.69 0.001 0.0208 0.016 4.7 125 0.16 3.00 114 S 30 0.38 0.40 0.78 0.74 0.04 0.0208 0.016 5.2 124 0.23 3.00 113 S 30 0.55 0.00 0.55 0.60 0.00 0.0208 0.016 4.6 114 0.47 2.00 115 S 27 1.13 0.04 1.17 0.97 0.20 0.0208 0.016 6.5 113 0.49 2.00 121 S 27 1.18 0.00 1.18 0.98 0.20 0.0208 0.016 6.6 115 0.32 1.00 116 S 21 0.77 0.20 0.96 0.83 0.13 0.0208 0.016 6.9 121 0.33 1.00 120 S 21 0.79 0.20 0.99 0.85 0.14 0.02081 0.016 7.0 116 0.28 1.00 117 S 21 0.67 0.13 0.80 0.74 0.06 0.0208 0.016 6.5 120 0.341 1.00 1191 S 211 0.82 0.14 0.96 0.83 0.13 0.0208 0.016 6.9 118 0.21 1.20 117 S 211 0.50 0.00 0.50 0.53 0.00 0.0208 0.016 5.3 108 0.18 1.20 117 S 211 0.43 0.00 0.43 0.48 0.00 0.0208 0.016 5.0 94 0.11 1.56 96 S 24 0.26 0.00 0.26 0.37 0.00 0.0208 0.016 3.9 83 0.10 1.56 84 S 24 0.24 0.00 0.24 0.35 0.00 0.0208 0.016 3.8 96 0.44 1.31 98 S 21 1.06 0.00 1.061 0.81 0.24 0.02081 0.016 6.8 84 0.11 1.31 99 S 21 0.261 0.00 0.26 0.34 0.00 0.0208 0.016 4.1 98 0.341 1.06 1-361 S 21 0.82 0.24 1.06 0.87 0.19 0.0208 0.016 7.1 99 0.14 1.06 134 S 21 0.34 0.00 0.34 0.42 0.00 0.0208 0.016 4.6 136 0.36 1.06 133 S 21 0.86 0.19 1.06 0.87 0.19 0.0208 0.016 7.1 Inlets at Sag INLET DRAINAGE SURF Q BYPASS Q SURF Q SLOPE SINGLE _ "S" DEPTH 9 AREA SUB RECEIVED TOTAL TRANS. DOUBLE ="D" (D) SPREAD REMARKS 117 0.44 1.06 0.24 1.30 0.0208 D 0.12 5.60 119 0.64 1.54 0.24 1.78 0.0208 D 0.14 6.89 133 0.66 1.58 0.19 1.77 0.0208 D 0.14 6.88 134 0.56 1.34 0.00 1.34 0.0208 S 0.15 7.26 S S S S S S S S S S S S S INLET SPREAD CHART Version 9.27.12 Intensity: I 4.0 1 C: j 0.60 Crown: 1 0.0208 1 -Input 0.0208 or 0.0313 I'�Xh3 YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering cells WKD I Project Name: ITHE COURTYARDS ON LAWYERS ROAD 730 Windsor Oak Ct. Charlotte, NC 28273 Phone: 704-556-1990 Fax: 704-556-0505 Date: FEB. 3, 2019 Inlets on Slope INLET DRAINAGE SLOPE BYPASS TYPE SURF BYPASS SURFQ INLET BYPASS SLOPE It AREA AC LONG_ TO INLET- INLET K SUB RECEIVED TOTAL Qcap Q SENT TRANS n SPREAD REMARKS 0.89 0.00 . 66 037 1.78 48 S 24 0.89 0.76 0.13 0.0208 0.016 6.0 32 0.34 1.06 33 S 21 0.82 0.00 0.82 0.74 0.08 0.0208 0.016 6.4 31 0.39 1,06 33 S 21 0.94 0.00 0.94 0.80 0.13 0.0208 0.016 6.8 301 0.50 1.08 33 S 21 1.20 0.00 1.20 0.93 0.271 0.0208 0.016 7.4 29 0.39 1.081 64 S 1 21 0,941 0.00 0.94 1 0.80 0.14 0.0208 0.0161 6.8 33 0.08 1.08 34 S 21 0.19 0.48 0.67 0.65 0.02 0.0208 0.016 6.0 64 0.35 1.08 63 S 21 0.84 0.14 0.98 0.82 0.16 0.0208 0.016 6.9 34 0.14 1.08 35 S 21 0.34 0.02 0.36 0.44 0.00 0.0208 0.016 4.7 63 0.47 1.08 61 D 21 L 13 0.16 1.28 1.70 0.00 0.0208 0.016 7.6 61 0.40 1.08 62 S 21 0.96 0.00 0.96 0.81 0.15 0.0208 0.016 6.8 35 0.29 1.08 36 S 21 0.70 0.00 0.70 0.66 0.03 0.0208 0.016 6.1 62 0351 L08 601 S 21 0.84 0.15 0.99 0.83 0.16 0.0209 0.016 6.9 36 0.53 1.08 37 S 211 1.271 0.03 1.30 0.98 0.32 0.02081 0.016 7.7 60 0.32 1.08 59 D 21 0.77 0.16 0.93 1.39 0.00 0.0208 0.016 6.7 37 0.19 1.08 38 S 21 0.46 0.32 0.78 0.71 0.07 0.0208 0.016 6.3 59 0.49 1.08 58 D 21 1.18 0.00 1.18 1.61 0.00 0.0208 0.016 7.4 38 0.18 1.08 41 S 21 0.43 0.07 0.50 0.54 0.00 0.0208 0.016 5.3 58 0.46 1.08 42 D 21 1.10 0.00 1.10 1.55 0.00 0.0208 0.016 7 2 138 0.30 0.89 42 S 19 0.72 0.06 0.78 0.69 0.10 0.0208 0.016 6.6 55 a I 11 1.03 41 S 21 0.26 0.001 0.26 0.37 0.00 0.0208 0.016 4.2 54 0.33 1.03 138 S 211 0.79 0.00 0.79 0.73 0.06 0.02081 0.016 6.4 48 0.39 1.00 561 D 21 0.94 0.13 1.07 1.56 0.00 0.0208 0.0161 7.2 49 0.31 1.00 50 S 21 0.74 0.00 0.74 0.71 0.03 0.0208 0.016 6.3 56 0.49 1.00 57 D 21 1.18 0.00 1.18 1.65 0.00 0.0208 0.016 7.5 50 0.48 1.00 51 D 21 1.15 0.03 1.19 1.66 0.00 0.0208 0.016 7.5 57 0.48 1.00 53 S 21 1.15 0.00 1.15 0.93 0.22 0.0208 0.016 7.4 51 0.48 1.00 52 S 21 L 15 0.00 1,151 0.93 0.22 0.0208 0.016 7.4 53 0.31 1.00 41 S 21 0.74 0.22 0.96 0.83 0.13 0.0208 0.016 6.9 52 0.261 1.00 41 S 211 0.62 0.22 0.84 0.77 0.08 0.0208 0.016 6.6 67 0.33 1.00 71 S 21 0.79 0.00 0.79 0.74 0.05 0.0208 0,0161 6.4 68 0.32 1.00 69 S 21 0.77 0.00 0.77 0.72 0.04 0.0208 0.016 6A 69 0.28 1.00 70 S 21 0.67 0.04 0.72 0.69 0.02 0.0208 0.016 6.2 70 0.28 1.00 73 S 21 0.671 0.02 0.70 0.68 0.02 0.0208 0.016 6.1 71 0.35 1.00 721 S 21 0.84 0.05 0.89 0.801 0.10 0.0208 6.016 6.7 72 0.23 1.00 77 S 21 0.55 0.10 0.65 0.65 0.00 0.02081 0.016 6.0 73 0.46 1.00 77 S 21 1.10 0.02 L12 0.92 0.20 0.0208 0.016 7.3 74 0.10 1.04 77 S 21 0.24 0.00 0.24 0.35 0.00 0.0208 0.016 4.1 75 0.33 1.04 76 D 21 0.79 0.00 0.79 1.27 0.00 0.0208 0.016 6.4 91 0.35 1.36 76 D 21 0.84 0.00 0.84 1.22 0.00 0.0208 0.016 6.2 Inlets at Sag INLET DRAINAGE SURF Q BYPASS Q SURF Q SLOPE SINGLE = "S" DEPTH # AREA SUB RECEIVED TOTAL TRANS. DOUBLE ="D" (D) SPREAD REMARKS 41 0.45 1.08 0.21 1.29 0.0208 S 0.15 7.05 42 0.65 1.56 0.10 1.66 0.0208 D 0.14 6.57 76 0.82 1.97 0.00 1.97 0.0208 D 0.15 7.38 77 0.67 1.61 0.20 1.81 0.0208 D 0.15 6.98 DROP INLET DEPTH CALCULATIONS m K a LO N M O O N O M N O N N ru d' V N N M NC) c! 00 CO N N 3 o O 000000000000 m o Ln 0 nLnLnU')LOLOLOLOLOLOLOU) 0 0 0 0 0 0 0 0 0 0 0 3 a U z S U P-. .�-7 O a r r W NN N r W 0 (O0 W0M- . WN MO (O O 0 0 0 0 0 0 0 0 0 0 0 O O O U C z o U) a F= T co N W M O co r 00 M (D V J Q cc�GG3o W O. 00000000000 N O O O N O 0 0 0 2 Uo 0 O F w v FS co LO N 0 0 0 N m O N 0 q c% a O O O O C. O O O O O O O O O U U O O O O O O O O O O O O O O O 4 CD K F� F I B O M O W O o0 O W 0 CO 0 W 0 W 0 M 0 W 0 00 0 W O M O W O � 3 � m a v E- �- F z O' CO co (0 o o o M 0 M M cc co co Q z o 0 0 o (0 o o 0 (0 CO (0 o (0 co M c+j Oce Q w U LO r U') (0 r O coo N N M c0 LO M M N M m O M r¢i ce O, NCO r N CO M I- N 00 0 O 0 M 0 r N r- r co N O F) N m r co N V m m r- o V M In r O of M N O f- m m M M r fh Z } ~ a z z N N N N N N N N N N N N N N N N N N N N N N N N N N N Nm co W W oD M M a0 co W W N M M W CO W W M M W W W co W aO � z U J - a U 2 a co M M O O M O co O M M M M co M O Colo co O I O M M O M M O j O M M M M M O O M M M M co CO M M M M M 10 O ID (0 M M M COW O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ W ❑ a Q Q Q M N M (n I� �17 (0 r r r r O N CO d) O) V O O) O o M O't C'M CM o I- O V V d) l0 OD D7 0 N 0 m Q O Z Q w O O O O CD O O O O O O N O O r O O r N r o O N O o rLO r- r 1- O r O M O J Ir aaQ Q U) U) 06 d' W W r O `-'� W H�HF-F-F•F•H W W W W W W W W W W W W CO 00 OO OD O0 OO m m m OO 0] OOP W W LU m� aaaaaaaaaaaaa F•F•Fm� J aaaaaagaaaaaaa J J J J J J J J J J J F-z Q � 0_' CC � Q_' of 0_' a' � 0_' �� �. � Q. O rn v''i C�C7C7C7C7C7C�C7C�C�C7�C� C7(n(ncncncn(ntn(ncn(n(nu�� 0< C7 U 0 ❑Of N LLJ a T W W W W W W J W J W J W J W J W J W W W W W W W W W W W W W W W W d(D J J J J J J J J J J J J J J J J ZH2 �, r U` C7C7U' (Dd('DU` CD CD C7U' C7C7U' U` C7U' (DCDC7C (D( 0-' U F Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ Z_ 000 <U)U)U)U)V)U)U)UJ _Z _Z _Z _Z U)U)U)U)U) _Z V)U)U)U)U)U)V)U)V)U)U)U)U)U) _Z _Z _Z ❑ ❑ W F V LO O r- m O f� 00 O M M N M (O LL0 (0 f� M a1 0 W Z LLI V V V V M t W CO W W W r W a1 ( r N r r N 00 °a z_ cna❑ EROSION CONTROL SKIMMER BASIN CALCULATIONS P. O .BOX 7007 YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering CHARLOTTE, N.C. 28241 Phone: 704-556-1990 Fax: 704-556-0505 PROJECT: THE COURTYARDS ON LAWYERS ROAD DATE: February 27, 2019 SKIMMER BASIN DESIGN - MECK COUNTY STD. 30.02A, STATE STD. DETAIL N 6.64, BAFFLE SPACING 30.19 MARLEE FAIRCLOTH SKIMMER REQUIRED SURFACE AREA REQUIRED STORAGE SKIMMER SKIMMER SKIMMER SKIMMER theoritical BASIN DRAINAGE DENUDED 410 SURFACE AREA PROVIDED STORAGE VOLUME (CF) TOP (Min.) BOTTOM (Min.) DEPTH (FT) MODEL ORIFICE SIZE (IN.) ORIFICE HEAD AT SPILLWAY HEAD (FT) TOP OF SKIMMER spillway Tc NO AREA (AC.) AREA (AC.) Ids) (sf) (sf) VOL. (CF) PROVIDED W(ft) X Lift) W(ft) X Lilt) (H) DIA. (IN) DIA. (IN.) ORIFICE Z (FT) WIDTH (L) (FT) T (FT) W (FT) AT SPILLWAY DAM ELEV. capacity width cfs ft min 3 4.26 3.67 17.97 5839.82 10653.00 6,606 18,724 64 X 168 52 X 155 2 1 1.50 2.00 1.60 0.13 5.0 10 3.0 10.0 0.5 680 0.072 10 5 5 4.12 4.12 17.38 5647.90 6841.00 7,416 11,869 78 X 89 65 X 77 2 1 1.50 2.00 1.70 0.13 5.0 10 3.0 10.0 0.5 680 0.046 10 5 6 0.75 0.76 3.16 1028.14 3727.00 1,350 6,099 59 X 61 47 X 48 2 NIA NIA 1.50 0.80 0.00 6.0 10 3.0 10.0 0.5 682 0.024 10 6 7 2.71 1 2.71 11.43 3715.00 4326.00 4,878 6,826 54 X 82 34 X 71 2 1 1.00 1.50 1.50 0.00 5.0 10 3.0 10.0 0.5 679 0.026 10 6 SKIMMER BASIN #3 Calculate Skimmer Size Basin Volume in Cubic Feet 6,606 Cu.Ft Skimmer Size 2.0 Inch Days to Drain* 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.6 Inch[es] `In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet SKIMMER BASIN #5 Calculate Skimmer Size Basin Volume in Cubic Feet 7,416 Cu.Ft Skimmer Size 2.0 Inch Days to Drain* 3 Days Orifice Radius 0.8 Inch[es] Orifice Diameter 1.7 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet SKIMMER BASIN #6 Calculate Skimmer Size Basin Volume in Cubic Feet 1,350 Cu.Ft Skimmer Size 1.5 Inch Days to Drain* 3 Days Orifice Radius 0.4 Inch[es] Orifice Diameter 0.8 Inch[es] 'In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet SKIMMER BASIN #7 Calculate Skimmer Size Basin Volume in Cubic Feet 4,878 Cu.Ft Skimmer Size 1.5 Inch Days to Drain* 3 Days Orifice Radius 0.7 Inch[es] Orifice Diameter 1.5 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Skimmer Basin # 3 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 6,625 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 49,555 Pond Top Length, ft = 82.5 Pond Top Width, ft = 80 Pond Bottom Length, ft = 30 Pond Bottom Width, ft = 30 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 1,325 cfd to drain in 0.015 cfs 3,313 cfd to drain in 0.038 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 110 Model 1 - 1.0" orifice saddle 1 1.5" 60 Model 1 - 1.5" orifice saddle 1 2.0" 34 no 1 2.5" 22 no 2 3.0" 11 no 2 4.0" 8 no 2 5.0" 6 no 3 5.0" 1 4 no 3 1 6.0" 3 no 3 1 8.0" 1 3 no 120 hrs 48 hrs 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Skimmer Basin # 5 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 7,419 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 55,494 Pond Top Length, ft = 71.7 Pond Top Width, ft = 80 Pond Bottom Length, ft = 40 Pond Bottom Width, ft = 50 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 1,484 cfd to drain in 0.017 cfs 3,710 cfd to drain in 0.043 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 124 no 1 1.5" 68 Model 1 - 1.5" orifice saddle 1 2.0" 39 no 1 2.5" 25 no 2 3.0" 12 no 2 4.0" 9 no 2 5.0" 7 no 3 5.0" 5 no 3 6.0" 3 no 3 8.0" 3 no 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com 120 hrs 48 hrs Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Skimmer Basin # 6 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 1,355 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 10,135 Pond Top Length, ft = 38.5 Pond Top Width, ft = 40 Pond Bottom Length, ft = 10 Pond Bottom Width, ft = 10 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 271 cfd to drain in 0.003 cfs 678 cfd to drain in 0.008 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 23 no 1 1.5" 12 no 1 2.0" 7 no 1 2.5" 5 no 2 3.0" 2 no 2 4.0" 2 no 2 5.0" 1 no 3 5.0" 1 no 3 6.0" 1 no 3 8.0" 1 no 120 hrs 48 hrs 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Skimmer Basin # 7 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 4,879 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 36,495 Pond Top Length, ft = 63 Pond Top Width, ft = 62 Pond Bottom Length, ft = 35 Pond Bottom Width, ft = 35 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 976 cfd to drain in 120 hrs 0.011 cfs 2,440 cfd to drain in 48 hrs 0.028 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 82 Model 1 - 1.0" orifice saddle 1 1.5" 45 no 1 2.0" 26 no 1 1 2.5" 16 no 2 3.0" 8 no 2 4.0" 6 no 2 5.0" 5 no 3 5.0" 3 no 3 6.0" 2 no 3 8.0" 2 1 no 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com EROSION CONTROL SEDIMENT BASIN CALCULATIONS P. O .BOX 7007 CHARLOTTE, N.C. 28241 Phone: 704-556-1990 Fax: 704-556-0505 YARBROUGH-WILLIAMS & HOULE, INC. SEDIMENT BASIN #1 Calculate Skimmer Size Basin Volume in Cubic Feet 57,096 Cu.Ft Skimmer Size 4.0 Inch Days to Drain* 3 Days Orifice Radius 1.9 Inch[es] Orifice Diameter 3.9 Inch[es] ,In NC assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet SEDIMENT BASIN #2 Calculate Skimmer Size Basin Volume in Cubic Feet 40,410 Cu.Ft Skimmer Size 4.0 Inch Days to Drain* 3 Days Orifice Radius 1.6 Inch[es] Orifice Diameter 3.3 Inch[es] In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth in feet Feet Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Sediment Basin # 1 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 57,101 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 427,118 Pond Top Length, ft = 100 Pond Top Width, ft = 379.5 Pond Bottom Length, ft = 80.05 Pond Bottom Width, ft = 250 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 11,420 cfd to drain in 0.132 cfs 28,551 cfd to drain in 0.330 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 955 no 1 1.5" 522 no 1 2.0" 303 no 1 2.5" 189 no 2 3.0" 92 Model 2 - 3.0" orifice saddle 2 4.0" 69 Model 2 - 4.0" orifice saddle 2 5.0" 53 Model 2 - 5.0" orifice 3 5.0" 36 no 3 6.0" 25 no 3 8.0" 23 no 120 hrs 48 hrs 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com Fee Saver Stormwater Services Marlee Float Skimmer Size Selection Report Date Company Engineer Project Name Project Location Basin Description Actual Provided Volume Analysis Other 2 Other 3 March 5, 2019 Yarbrough, Williams & Houle Vincent G. Keene PE COURTYARDS ON LAWYERS ROAD STALLINGS, NC Sediment Basin # 2 Inputs Calculations Max. Time to Drain, hrs = 120 Calculated Pond Volume, ft3 = 40,420 Min. Time to Drain, hrs = 48 Pond Depth, ft = 2 Calculated Pond Volume, gal = 302,342 Pond Top Length, ft = 100 Pond Top Width, ft = 236 Pond Bottom Length, ft = 85 Pond Bottom Width, ft = 200 Minimum Average Flow Rate Allowable Maximum Average Flow Rate Allowable 8,084 cfd to drain in 0.094 cfs 20,210 cfd to drain in 0.234 cfs Marlee Float Selection Chart Model # Orifice Draw down time (hrs) Acceptable for basin 1 1.0" 675 no 1 1.5" 369 no 1 2.0" 216 no 1 2.5" 133 no 2 3.0" 65 Model 2 - 3.0" orifice saddle 2 4.0" 49 Model 2 - 4.0" orifice saddle 2 5.0" 37 no 3 5.0" 26 no 3 6.0" 18 no 3 8.0" 16 no 120 hrs 48 hrs 803 Roper Creek Drive Greenville, SC 29615 www.SWFeeSaver.com EROSION CONTROL TEMPORARY DITCH CALCULATIONS a W N O N N N W aovv,v, g S F- v to N rn 0 = N W W V O N m er+1 o of o .- Q0 U) 6i >> > F- w w w Q x w cl U z 1--I W � a 0 � � �NN 1"I`y • W a Z a' vi Q fn • 13 0� ti O M� W -77 a) cu U N O N co N O U rn Ln 0 � Z o ~ ,n C) 0 4 J O .af O Q 0 x a U w w S h- a W 0 a a_ Z O N J m Q N LL 0 W n 2 a Lli Z z z z r` N 0 U N O v W N W N V M M M M Z O O O O O O O O M M M M m W U ~ � x N N Z 6. N u N M W O � O I I � W w _0 0 77— M N A � N N W EL OJ v N d O O O a O N N Cl) Cl) o I I I-wItI'ILI0' � NONi tr so V w Q Q Q N O O sl I IOIOIOIOIO 1omiii��i1 x U Z tl-H 0 0 o 20222Z> LL Z f- ENGINEERING.com I Open Channel Flow Calculator Page 1 of 1 Other Calculators Air Flow Conversion Calculator �► Atmospheric Calculator -0 Block Wall Calculator Concrete Column Calculator Concrete Volume -0 Calculator Energy Conversion -0 Calculator Isentropic Flow Relations Calculator Laser Real Time Unit r Converter Normal Flow Relations Calculator Oblique Flow Relations -4 Calculator Open -channel Flow Calculator Properties of Welds -► Treated as Lines Calculator Shaft Speed Calculator Torque Transmitted by .+ Clutch Calculator Water Pump Engineering Back to ENGINEERING.com DIVERSION DITCH #1 Open -Channel Flow This calculator uses Chezy and Manning's formula to calculate the wetted perimeter, hydraulic radius, flow area, Chezy coefficient and flow velocity. For experimental values of Manning's n factor, click here Required Information Enter the Slope: 0242 Enter the Channel Top 9 Width (ft): Enter the Channel Bottom Width �� I3 I Enter the Channel (' I (ft): Height (ft): Enter the Flow Depth (ft): [72-7--7 Enter the n value: _03 Results The wetted perimeter is 4.707E ft The flow is 2.8834� ft3/s The flow area is 1.0287 ftZ The flow is 11294.112 gal/min The hydraulic radius is 0.218E ft The velocity is 2.80304 ft/s The C value is 38.546C Calculate Reset i https://www.engineering.com/calculators/open_channel_flow.htm 4/24/2019 ENGINEERING.com I Open Channel Flow Calculator Page 1 of 1 DIVERSION DITCH #2 Other Calculators Open -Channel Flow Air Flow Conversion Calculator This calculator uses Chezy and Manning's formula to calculate the wetted perimeter, hydraulic radius, flow area, Chezy coefficient and flow velocity. � Atmospheric Calculator For experimental values of Manning's n factor, click here �► Block Wall Calculator Required Information Concrete Column Calculator Enter the Slope: .0309 Enter the Channel Top 43 Width (ft): � Concrete Volume Calculator Enter the Channel Bottom 3 Width Enter the Channel (ft): Height (ft): .4 Energy Conversion Calculator Enter the Flow Depth (ft): 11.58 Enter the n value: .03 y Isentropic Flow Relations Calculator Res u Its The wetted perimeter is 11.50E ft The flow is C2.9188J ft'/s Laser Real Time Unit The flow area is 10.981 ftZ The flow is 41701.61_ gal/min Converter 0 The hydraulic radius is .9541 ft The velocity is 18.46171 ft/s Normal Flow Relations Calculator The C value is 49.279� Oblique Flow Relations L.Calculate Reset Calculator y Open -channel Flow Calculator Properties of Welds -� Treated as Lines Calculator Shaft Speed Calculator Torque Transmitted by Clutch Calculator -0 Water Pump Engineering Back to ENGINEERING.com https://www.engineering.com/calculators/open_channel_flow.htm 4/24/2019 ENGINEERING.com I Open Channel Flow Calculator Page I of I Other Calculators Air Flow Conversion Calculator -k Atmospheric Calculator -► Block Wall Calculator Concrete Column y Calculator Concrete Volume Calculator Energy Conversion Calculator -0 Isentropic Flow Relations Calculator Laser Real Time Unit Converter Normal Flow Relations Calculator Oblique Flow Relations Calculator Open -channel Flow Calculator Properties of Welds -► Treated as Lines Calculator �► Shaft Speed Calculator Torque Transmitted by Clutch Calculator .► Water Pump Engineering Back to ENGINEERING.com DIVERSION DITCH #3 Open -Channel Flow This calculator uses Chezy and Manning's formula to calculate the wetted perimeter, hydraulic radius, flow area, Chezy coefficient and flow velocity. For experimental values of Manning's n factor, click here Required Information Enter the Slope: 0149 Enter the Channel Top 40 Width (ft): Enter the Channel Bottom Enter the Channel Width (ft): l�Height (ft): Enter the Flow Depth (ft):295� Enter the n value: 03 Results The wetted perimeter is 10.31 8 ft The flow is 43.671 i ft3/s The flow area is 8.3171 ftZ The flow is 19599.871 gallmin The hydraulic radius is 0.806C ft The velocity is 5.25081 ft/s The C value is 47.913� Calculate Reset https://www.engineering.com/calculators/open_channel_flow.htm 4/24/2019 ENGINEERING.com I Open Channel Flow Calculator Page I of 1 Other Calculators Air Flow Conversion Calculator -+ Atmospheric Calculator �► Block Wall Calculator Concrete Column Calculator Concrete Volume Calculator Energy Conversion Calculator Isentropic Flow Relations Calculator Laser Real Time Unit y Converter Normal Flow Relations Calculator Oblique Flow Relations y Calculator Open -channel Flow y Calculator Properties of Welds -o Treated as Lines Calculator Shaft Speed Calculator Torque Transmitted by Clutch Calculator �► Water Pump Engineering Back to ENGINEERING.com DIVERSION DITCH #4 Open -Channel Flow This calculator uses Chezy and Manning's formula to calculate the wetted perimeter, hydraulic radius, flow area, Chezy coefficient and flow velocity. For experimental values of Manning's n factor, click here Required Information Enter the Slope: F. 0361 1 Enter the Channel Top Width (� � (ft): Enter the Channel Bottom Width 13j� I Enter the Channel (ft): Height (ft): (' I Enter the Flow Depth (ft): 1.382 1 Enter the n value: 03 Results The wetted perimeter is 5.415s ft The flow is 6.5844E ft3/s The flow area is 1.5837 ftZ The flow is 2955.115' gal/min The hydraulic radius is 0.2924 ft The velocity is 4.1574E ft/s The C value is 40.463E Calculate Reset https://www.engineering.com/calculators/open_channel_flow.htm 4/24/2019 ENGINEERING.com I Open Channel Flow Calculator Page I of I Other Calculators Air Flow Conversion Calculator —b Atmospheric Calculator �► Block Wall Calculator Concrete Column Calculator Concrete Volume rt Calculator Energy Conversion Calculator Isentropic Flow Relations Calculator Laser Real Time Unit Converter Normal Flow Relations Calculator Oblique Flow Relations y Calculator Open -channel Flow Calculator Properties of Welds -� Treated as Lines Calculator �► Shaft Speed Calculator Torque Transmitted by Clutch Calculator �+ Water Pump Engineering Back to ENGINEERING.com DIVERSION DITCH #5 Open -Channel Flow This calculator uses Chezy and Manning's formula to calculate the wetted perimeter, hydraulic radius, flow area, Chezy coefficient and flow velocity. For experimental values of Manning's n factor, click here Required Information Enter the Slope: 0177 Enter the Channel Top 15 Width (ft): Enter the Channel Bottom Width (� Enter the Channel 12 � (ft): 13 Height (ft): Enter the Flow Depth (ft): 1.24 Enter the n value: 03 Results The wetted perimeter is F0.842 ft The flow is 46.1974 ft3/s The flow area is 8.3327 ft2 The flow is 20733^43 gal/min The hydraulic radius is 0.768� ft The velocity is 5.5440E ft/s The C value is 47.534E Calculate Reset https://www.engineering.com/calculators/open_channel_flow.htm 4/24/2019 DETENTION SUMMARY -a O Il cn p M � 1 rl � o1Do 0 r-1 r-i k M M oo N Q1 c�I d 00 LLQ lD a❑ N N 1-1 N N M N Ln u `� .4 000 m 1n � m CC m '--I OO Ln Ln N wm M N d• N I� m Ln N O m 00 �: O lO � 0000 Ln Lq Ln kD N 00 O M M r1 tk Q m ❑ 00 d rn w wW N M I� O M Ln N� M rl Ln M N � rl rl N fD � M .4 O O N O N O LO O lO O O1 O 00 O N O 0 O f0 � u LA � LDD O m 0000 d' w O1 rN-I i of m r i ri oo cri -I Ln Ln 4J f� J t/1 > O U U C Gai N z _O ~ z LU Q W f6 C ❑ v v f0 CU 000 •� m ❑ + vi 0 N N W LU ❑ ❑ LU N d O a cr >- 0-4 > LU LU ❑ 0 F— LL cr Ln a 0 a cr- >- Ln N N > LU LU ❑ 4 F- LL cr Ln o O o O O i > Lu Lu Cl ❑ N a 0 a 4J •1 0 W D_ O ^L I..L 0 WET POND #1 CALCULATIONS )LMI YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering Wet Pond Calculations P. O .BOX 7007 References: NCDENR DWQ BMP Design Manual CHARLOTTE, N.C. 28241 Phone: 704-556-1990 Date : 4/26/2019 Fax: 704-556-0505 PROJECT: COURTYARDS ON LAWYERS ROAD Base Data Site Area Post = Total Drainage Area (Ac) = 31.72 ac Pre-dev. Drainage Area ( Ac) 9.58 ac Post Dev. Impervious Area (Ac) Measured Impervious Area - 41 Soils Tvoe& Cecil, Enon, Zoning: Residential Hydrologic Data Pre - CN Land Use Soil Type Hydrologic Grou CN (weighted) CN 4.71 Woods B 55 27.04 1.97 Woods C 70 14.39 2.90 Woods D 77 23.31 9.58 Pre CN,., 65 Post - CN Acres a Land Use Soil Type H drolo is Grou CN wei hted CN 12.88 Bld / vt 98 39.79 3.48 Grass B 61 6.69 7.26 Grass C 74 16.94 8.10 Grass D 80 20.43 31.72 Post CN_t 84 CN 84 Steps 1 Determine if the development site and conditions are appropriate for the use of a Wet Pond and consider any site -specific design considerations. Step 2 Compute Water Quality Volume (WQv) ( WQv for the Goose Creek Watershed shall be the difference in the storm water runoff from the pre -development and post -development conditions Step 3 for the 1-year, 24 hour storm. Pre -development 1-year, 24 hr storm volume = Post -development 1-year, 24 hr storm volume = DIFFERENCE IN 1 YEAR STORM VOLUME _ AT ELEV. 663.13 THE VOLUME TREATED IS = Compute Site Hydrologic Input Parameters Using SCS hydrologic procedures and/or computer models the following data can be determined for the development site. HYDROLOGIC INPUT DATA 11,412 135689 124,277 cf required for treatment 135,689 cf RELEASED GRADUALLY DURING 120 HOURS WITH A PEAK RATE OF Approx. 1.02 cfs Condition Area CN t4 (hours) t, (min) Pre dev 9.58 ac 65 0.47 28.2 Post dev 31.72 ac 84 0.24 14.2 Results of Preliminary Hydrologic Calculations (From Computer Model Results Using SCS Hydrologic Procedures) Condition Runoff Q1.Yexr Q2.y,,, Q10.Y Q25_,,,, Q50.Y cfs cfs cfs cfs cfs Pre -development Flow 1.70 1.67 8.39 12.48 15.95 Post Development Detained 1.02 1.04 3.85 4.60 5.12 The facility would require 2.85 ac-ft for Water Quality Volume (WQv) treatment Q100.y_ cfs 19.18 10.12 Perm Pool Storage -Elevation Data Elevation Area (sf) Area (so) Ht (ft) Inc. Vol (ac-ft) Acc. Vol (ac-ft) Acc. Vol (cf) 651.5 12000.0 0.275 -1.0 0.000 0.000 0 652.5 13000.0 0.298 0.0 0.000 0.000 0 654 15000.0 0.344 1.5 0.482 0.482 21000 656 18000.0 1 0.413 3.5 0.758 1.240 54000 658 21000.0 0.482 5.5 0.895 2.135 93000 660 24000.0 0.551 7.5 1.033 3.168 138000 660.5 29000.0 0.666 8.0 0.304 3.472 151250 Permanent Pool Volume Depth = 8.00 ft PPE Elevation = 660.5 Shelf Elevation = 660 Bottom Elevation = 651.5 Bottom Elevation +1 = 652.5 PPE Surface Area = 29,000 sf Shelf Area = 24,000 sf Surface Area Bol Pond = 13,000 sf Permanent Pool Volume = 151,250 cf Avg. Depth = 6.2 ft Using avg = 6.2 and 41 % impervious cover, Min. SA/DA Ratio From State Table 1) 10.9% Surface area required = 12214 sf Surface area provided = 29000 sf Step 4 Size Flow Diversion Structure - No Diversion Structure Step 5 Compute Release Rates for Water Quality Control Compute the release rate for water quality control. The water quality control volume (WQv) is to be released over a 2-day duration beyond the center of rainfall (48 hours plus 3 hours) period. Release Rate = 2.85 ac-ft X 43560 Oacre / (51 hrs X 3600 sec/hr) = 0.677 cfs Step 6 Compute Forebay Chamber Volume The forebay chamber storage area above the filter media must be sized to hold 20 percent of the water quality volume Required Forebay Chamber Volume = 151250.00 cF x (020) _ 30250 cf = 0.69 ac-ft Proposed Forebay Chamber Volume 1 31500 cf Forebay Chamber Storo e-Elevation Data Elevation Area sf Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol cf 652.5 1500.0 0.034 0.0 0.000 0.000 0.0 654 2200.0 0.051 1.5 0.064 0.064 2775.0 656 3400.0 0.076 3.5 0.129 0.192 8375.0 658 4800.0 0.110 5.5 0.188 0.381 16575.0 660 6400.0 0.147 7.5 0.257 0.638 27775.0 660.5 8500.0 0.195 8.0 0.086 0.723 31500.0 Step 7 Develop Water Quality Storage -Elevation Table Permanent Pond Surface Elev. Water Quality Storage -Elevation Data Elevation Area of Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol 660.5 29000.0 0.666 0.0 0.000 0.0 661 34000.0 0.781 0.5 0.362 0.362 15750.0 663 41000.0 0.941 2.5 1.722 2.083 90750.0 665 48000.0 1.102 4.5 2.043 4.126 179750.0 667 55000.0 1.263 6.5 2.365 6.491 282750.0 669 63000.0 1.446 8.5 2.709 9.200 400750.0 Step 8 Route Runoff Hydrographs through Wet Pond Route all of the appropriate runoff hydrographs through the wet pond facility with the following goals: Release water quality volume (WQV) within 48-120 hours Step 9 Water Quality Release Orifice Sizing A= 3500-0 sf - avg. h = 2.50 C= 0.6 9= 32.2 t = 172800 sec = 48 hrs a = 0.13302 Dia = 5 in Use 5 inch Step 10 Calculation for Anti -flotation Concrete Anchor A. Bouyancy Elevation sf sf 7.5' x 7.5' Top of Dam = 669.00 Top of Box = 667.75 Pond Shelf = 661.00 Bottom of Box = 659.30 Box Area = 25 Anchor Area = 56.25 Anchor thickness = 1 Area of Riser - Inside 16 sf / Outside 25 at V (wetwell) = V (riser) + V(base footing) _ (667.75-659.3) X (25) + 1.0 X (56.25) = 268 cf Floatation = V(wetwell) x V(water) = 267.5 cf x 62.4 Ib/cf = 16692 Ibs B. Counter Bouyancy Conc. Wt. _ (V(conc. riser) + V(conc. Footing)) x Conc. Unit Wt. _ ((25-16) x (667.75-659.30) + (56.25 x 1)) x 150 Ibs/cf = 19845 Ibs Earth Wt. = V(Earth) X Earth Unit Wt. _ (56.25-25) X 1.2X 115 LBS/CF = 4313 Ibs Anti -Floatation = 24158 Ibs C. Safety Factor = 1.4 1.1 required by NCDENR for Anti-floation x 7.5'x WET POND #1 HYDROCAD REPORT is PRE DRAINAGE AREA #1 Subcat Reach on Link Routing Diagram for Wet Pond # 1 Prepared by Microsoft, Printed 5/6/2019 FHydroCADO 10.00-22 s/n 05047 0 2018 HydroCAD Software Solutions LLC Wet Pond # 1 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/6/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 1.70 cfs @ 12.37 hrs, Volume= 0.262 af, Depth= 0.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total Subcatchment 1S: PRE DRAINAGE AREA #1 0 10 2 0 40 .0 o Hydrograph Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Runoff Area=9.580 ac Runoff Volume=0.262 of Runoff Depth=0.33" Flow Len6th=1,480' Tc=28.2 m i n CN=65 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond # 1 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/6/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 1.67 cfs @ 3.60 hrs, Volume= 0.175 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total Subcatchment 1S: PRE DRAINAGE AREA #1 V 1 3 0 LL 0-. 0 10 20 30 40 50 60 70 Hydrograph Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Runoff Area=9.580 ac Runoff Volume=0.175 of Runoff Depth=0.22" Flow Length=1,480' Tc=28.2 min CN=65 80 90 100 110 120 130 140 150 160 170 Time (hours) p Runoff Wet Pond # 1 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/6/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 8.39 cfs @ 3.54 hrs, Volume= 0.695 af, Depth= 0.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total N 3 0 LL Subcatchment 1S: PRE DRAINAGE AREA #1 Hydrograph 7 6 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Runoff Area=9.580 ac Runoff Volume=0.695 of Runoff Depth=0.87" Flow Length=1,480' Tc=28.2 m i n CN=65 0- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ® Runoff Wet Pond # 1 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/6/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 12.48 cfs @ 3.47 hrs, Volume= 1.003 af, Depth= 1.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total Subcatchment 1S: PRE DRAINAGE AREA #1 Hydrograph 13 12.48 cfs 12 Charlotte 6-hr 11 25-yr 10 25 yr Rainfall=4.38" Runoff Area=9.580 ac 7 Runoff Volume=1.003 of 3 LL 6 Rupoff Depth=1.26" 5- Flow Length=1,480' 4 Tc=28.2 m i n 3 CN=65 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) p Runoff Wet Pond # 1 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/6/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 15.95 cfs @ 3.45 hrs, Volume= 1.278 af, Depth= 1.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total Subcatchment 1S: PRE DRAINAGE AREA #1 Hydrograph 171 15.95 cfs 16: Charlotte 6-hr 15 14 50-yr 13 12= 50 yr Rainfall=4.92" 11 Runoff Area=9.580 ac Flo. 9Runoff Volume=1.278 of 3 : LL $= Runoff Depth=1.60" Flow Length=1480' 5 Tc=28.2 m i n 4 CN=65 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ® Runoff Wet Pond # 1 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/6/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: PRE DRAINAGE AREA #1 Runoff = 19.18 cfs @ 3.45 hrs, Volume= 1.504 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Area (ac) CN Description 4.710 55 GROUP B 1.970 70 GROUP C 2.900 77 GROUP D 9.580 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.2 150 0.0470 0.12 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.7 250 0.0320 0.89 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 3.3 1,080 0.0300 5.40 43.24 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 28.2 1,480 Total Subcatchment 1S: PRE DRAINAGE AREA #1 Hydrograph 21 ® Runoff 19 Charlotte 6-hr 18, 100-yr 16_ 15 100 yr Rainfall=5.34" 14' 13 Runoff Area=9.580 ac 12' v 11 Runoff (Volume=1.504 of iZ '9 Runoff Depth=1.88" 8- Flow Length=1480' 7 6 Tc=28.2 m i n 5 4 CN=65 3- 2 - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) POST WP # 1 Subcat Reach on Link Wet Pond # 1 Wet Pond # 1 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCAD@) 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 4S: POST WP # 1 Runoff = 45.27 cfs @ 12.12 hrs, Volume= 3.115 af, Depth= 1.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 50 46 44 w 28 26 0 24 LL 22 20 18 16 14 12 10 4 963 Total Subcatchment 4S: POST WP # 1 Hydrograph Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Runoff Area=31.720 ac Runoff Volume=3.115 of Runoff Depth=1.18" Flow Length=963' Tc=14.2 min CN=84 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond # 1 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 3 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 1.18" for 1 yr event Inflow = 45.27 cfs @ 12.12 hrs, Volume= 3.115 of Outflow = 1.02 cfs @ 19.02 hrs, Volume= 3.111 af, Atten= 98%, Lag= 413.8 min Primary = 1.02 cfs @ 19.02 hrs, Volume= 3.111 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 663.13' @ 19.02 hrs Surf.Area= 41,392 sf Storage= 95,631 cf Plug -Flow detention time= 1,252.6 min calculated for 3.110 of (100% of inflow) Center -of -Mass det. time= 1,252.2 min ( 2,098.8 - 846.6 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routing Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=1.02 cfs @ 19.02 hrs HW=663.13' (Free Discharge) L1=Culvert (Passes 1.02 cfs of 14.76 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.02 cfs @ 7.49 fps) 3=Orifice/Grate ( Controls 0.00 cfs) =Broad -Crested Rectangular Weir ( Controls 0.00 cfs) Wet Pond # 1 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 4 w 3 0 LL Pond 33P: Wet Pond # 1 Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ® Inflow ❑ Primary Wet Pond # 1 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: POST WP # 1 Runoff = 49.23 cfs @ 3.28 hrs, Volume= 2.506 af, Depth= 0.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 55 u 30. .2 25 20 15 10 5 963 Total Subcatchment 4S: POST WP # 1 Hydrograph Time (hours) Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Runoff Area=31.720 ac Runoff Volume=2.506 of Runoff Depth=0.95" Flow Length=963' Tc=14.2 min i p Runoff Wet Pond # 1 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 0.95" for 2 yr event Inflow = 49.23 cfs @ 3.28 hrs, Volume= 2.506 of Outflow = 1.04 cfs @ 6.20 hrs, Volume= 2.503 af, Atten= 98%, Lag= 175.2 min Primary = 1.04 cfs @ 6.20 hrs, Volume= 2.503 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 663.20' @ 6.20 hrs Surf.Area= 41,601 sf Storage= 98,522 cf Plug -Flow detention time= 1,193.0 min calculated for 2.503 of (100% of inflow) Center -of -Mass det. time= 1,192.8 min ( 1,419.3 - 226.5 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routing Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050'/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=1.04 cfs @ 6.20 hrs HW=663.20' (Free Discharge) L1=Culvert (Passes 1.04 cfs of 14.96 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.04 cfs @ 7.60 fps) 3=Orifice/Grate (Orifice Controls 0.00 cfs @ 0.06 fps) =Broad -Crested Rectangular Weir ( Controls 0.00 cfs) Wet Pond # 1 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 7 Pond 33P: Wet Pond # 1 Hydrograph ■ Inflow I El Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond # 1 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 4S: POST WP # 1 Runoff = 103.44 cfs @ 3.27 hrs, Volume= 5.620 af, Depth= 2.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 11 11 10 10 w 65 60 0 55 u- 50 45 40 35 30 25 20 15 10 5 963 Total Subcatchment 4S: POST WP # 1 Hydrograph Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Runoff Area=31.720 ac Runoff Volume=5.620 of Runoff Depth=2.13" Flow Length=963' Tc=14.2 min CN=84 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond # 1 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 9 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 2.13" for 10 yr event Inflow = 103.44 cfs @ 3.27 hrs, Volume= 5.620 of Outflow = 3.85 cfs @ 6.05 hrs, Volume= 5.616 af, Atten= 96%, Lag= 166.8 min Primary = 3.85 cfs @ 6.05 hrs, Volume= 5.616 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 665.58' @ 6.05 hrs Surf.Area= 49,726 sf Storage= 206,862 cf Plug -Flow detention time= 1,047.5 min calculated for 5.616 of (100% of inflow) Center -of -Mass det. time= 1,047.9 min ( 1,268.2 - 220.3 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routing Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050 T Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=3.85 cfs @ 6.05 hrs HW=665.58' (Free Discharge) L1=Culvert (Passes 3.85 cfs of 20.00 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.45 cfs @ 10.62 fps) 3=Orifice/Grate (Orifice Controls 2.40 cfs @ 6.88 fps) =Broad -Crested Rectangular Weir ( Controls 0.00 cfs) Wet Pond # 1 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 10 w u 3 0 LL Pond 33P: Wet Pond # 1 Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ■ Inflow 0 Primary Wet Pond # 1 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 4S: POST WP # 1 Runoff = 130.28 cfs @ 3.23 hrs, Volume= 7.160 af, Depth= 2.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 963 Total Subcatchment 4S: POST WP # 1 Hydrograph 140- 130.28 cfs 13° Charlotte 6-hr 120 110 25-yr 100_ 25 yr Rainfall=4.38" s° Runoff Area=31.720 ac 80 Runoff Volume=7.160 of '° - 60 Runoff Depth=2.71" �. 50 Flow Length=963' 40_ Tc=14.2 min 3°- CN=84 ® Runoff Wet Pond # 1 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 12 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 2.71" for 25 yr event Inflow = 130.28 cfs @ 3.23 hrs, Volume= 7.160 of Outflow = 4.60 cfs @ 6.05 hrs, Volume= 7.156 af, Atten= 96%, Lag= 169.4 min Primary = 4.60 cfs @ 6.05 hrs, Volume= 7.156 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 666.70' @ 6.05 hrs Surf.Area= 53,818 sf Storage= 265,174 cf Plug -Flow detention time= 1,027.2 min calculated for 7.156 of (100% of inflow) Center -of -Mass det. time= 1,027.1 min ( 1,243.7 - 216.5 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routinq Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=4.60 cfs @ 6.05 hrs HW=666.70' (Free Discharge) L1=Culvert (Passes 4.60 cfs of 21.95 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.61 cfs @ 11.79 fps) 3=Orifice/Grate (Orifice Controls 2.99 cfs @ 8.57 fps) =Broad -Crested Rectangular Weir ( Controls 0.00 cfs) Wet Pond # 1 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 13 a 3 0 U. Pond 33P: Wet Pond # 1 Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ® Inflow p Primary Wet Pond # 1 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 4S: POST WP # 1 Runoff = 150.50 cfs @ 3.23 hrs, Volume= 8.452 af, Depth= 3.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 963 Total Subcatchment 4S: POST WP # 1 Hydrograph 16 150.50 cfs 150 Charlotte 6-hr 140 130 50-yr 120 50 yr Rainfall=4.92" 110 Runoff Area=31.720 ac 100 Runoff Volume=8.452 of 80 Runoff Depth=3.20" 6° Flow Length=963' 5 Tc=14.2 min 40 30- CN=84 20 10 0- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond # 1 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 15 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 3.20" for 50 yr event Inflow = 150.50 cfs @ 3.23 hrs, Volume= 8.452 of Outflow = 5.12 cfs @ 6.07 hrs, Volume= 8.447 af, Atten= 97%, Lag= 170.4 min Primary = 5.12 cfs @ 6.07 hrs, Volume= 8.447 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 667.61' @ 6.07 hrs Surf.Area= 57,427 sf Storage= 315,358 cf Plug -Flow detention time= 1,028.0 min calculated for 8.446 of (100% of inflow) Center -of -Mass det. time= 1,028.4 min ( 1,244.1 - 215.7 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routina Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050'/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=5.12 cfs @ 6.07 hrs HW=667.61' (Free Discharge) L1=Culvert (Passes 5.12 cfs of 23.39 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.72 cfs @ 12.65 fps) 3=Orifice/Grate (Orifice Controls 3.39 cfs @ 9.72 fps) =Broad -Crested Rectangular Weir ( Controls 0.00 cfs) Wet Pond # 1 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 16 Pond 33P: Wet Pond # 1 Hydrograph ■ Inflow Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond # 1 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 4S: POST WP # 1 Runoff = 170.20 cfs @ 3.23 hrs, Volume= 9.471 af, Depth= 3.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Area (ac) CN Description 31.720 84 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.2 150 0.0470 0.27 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.50" 3.3 250 0.0320 1.25 Shallow Concentrated Flow, Shallow flow Short Grass Pasture Kv= 7.0 fps 1.7 563 0.0320 5.58 44.66 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 14.2 170 160 150 140 130 120 H 110 100 0 90 LL on 963 Total Subcatchment 4S: POST WP # 1 Hydrograph Runoff Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Runoff Area=31.720 ac Runoff Volume=9.471 of Runoff Depth=3.58" Flow Length=963' Tc=14.2 min 40.1 E CN=84 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond # 1 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Pond 33P: Wet Pond # 1 Inflow Area = 31.720 ac, Inflow Depth = 3.58" for 100 yr event Inflow = 170.20 cfs @ 3.23 hrs, Volume= 9.471 of Outflow = 10.12 cfs @ 4.78 hrs, Volume= 9.466 af, Atten= 94%, Lag= 93.5 min Primary = 10.12 cfs @ 4.78 hrs, Volume= 9.466 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 667.97' @ 4.78 hrs Surf.Area= 58,897 sf Storage= 336,734 cf Plug -Flow detention time= 966.6 min calculated for 9.465 of (100% of inflow) Center -of -Mass det. time= 967.1 min ( 1,181.8 - 214.8 ) Volume Invert Avail.Storage Storage Description #1 660.50' 399,250 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 660.50 29,000 0 0 661.00 34,000 15,750 15,750 662.00 37,000 35,500 51,250 663.00 41,000 39,000 90,250 664.00 44,000 42,500 132,750 665.00 48,000 46,000 178,750 666.00 51,000 49,500 228,250 667.00 55,000 53,000 281,250 668.00 59,000 57,000 338,250 669.00 63,000 61,000 399,250 Device Routing Invert Outlet Devices #1 Primary 659.30' 18.0" Round Culvert L= 59.5' Ke= 0.500 Inlet / Outlet Invert= 659.30' / 659.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 660.50' 5.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 663.20' 8.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 667.75' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=10.09 cfs @ 4.78 hrs HW=667.97' (Free Discharge) L1=Culvert (Passes 10.09 cfs of 23.95 cfs potential flow) 2=Orifice/Grate (Orifice Controls 1.77 cfs @ 12.98 fps) 3=Orifice/Grate (Orifice Controls 3.54 cfs @ 10.15 fps) =Broad -Crested Rectangular Weir (Weir Controls 4.78 cfs @ 1.33 fps) Wet Pond # 1 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 19 1 1 1 1 1 1 1 1 N 1 1 3 0 LL Pond 33P: Wet Pond # 1 Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) IN Inflow p Primary WET POND #2 CALCULATIONS ywi YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering Wet Pond Calculations P. O .BOX 7007 References: NCDENR DWQ BMP Design Manual CHARLOTTE, N.C. 28241 Phone: 704-556-1990 Date: April 26,2019 Fax: 704-556-0505 PROJECT: Courtyards on Lawyers Road Base Data Site Area Post = Total Drainage Area (Ac) = 14.34 ac Pre-dev. Drainage Area ( Ac) 14.34 ac Post Dev. Impervious Area (Ac) = 8.44 Measured Impervious Area - 5g Soils Types: Cecil Enon Zoning: Residential Hydrologic Data Pre - CN Land Use Soil T e H drolo is Groug CN wei hted CN 0.27 Woods/GRASS B 58 1.09 6.91 Woods/GRASS C 72 34.69 7.16 Woods/GRASS D 79 39.44 14.34 Pre CN.,, 75 Post - CN Acrea a Land Use Soil Type Hydrologic Group CN (weighted) CN 8.4 Bid / vt 98 57.68 0.1 Grass B 61 0.47 2.8 Grass C 74 14.66 3.0 Grass D 80 16.46 14.34 Post CNp_ 89 CN 89 Steps 1 Determine if the development site and conditions are appropriate for the use of a Wet Pond and consider any site -specific design considerations. Step 2 Compute Water Quality Volume (WQv) (WQv for the Goose Creek Watershed shall be the difference in the storm water runoff from the pre -development and post -development conditions Step 3 for the 1-year, 24 hour storm. Pre -development 1-year, 24 hr storm volume = Post -development 1-year, 24 hr storm volume = DIFFERENCE IN 1 YEAR STORM VOLUME _ AT ELEV. 665.28 THE VOLUME TREATED IS = Compute Site Hydrologic Input Parameters Using SCS hydrologic procedures and/or computer models the following data can be determined for the development site. HYDROLOGIC INPUT DATA 36,329 B 79366.32 43,037 cf required for treatment 44,997 cf RELEASED GRADUALLY DURING 120 HOURS WITH A PEAK RATE OF Approx. 0.39 afs Condition Area CN t. (hours) t. (min) Pre dev 14.34 ac 75 0.51 30.5 Post dev 14.34 ac 89 0.39 23.4 Results of Preliminary Hydrologic Calculations (From Computer Model Results Using SCS Hydrologic Procedures) Condition Runoff Q, y,,, Q2. ,,, Q10" Q25.r,,, Q50, cfs cfs cis cfs cis Pre -development Flow 7,45 7.48 21.90 29.47 35.54 Post Development Detained 0.93 1.25 17.14 22,84 26.61 The facility would require 0.99 ac-ft for Water Quality Volume (WQv) treatment Perm Pool Storage -Elevation Data Elevation Area (sf) Area (ac) Ht (ft) Inc. Vol (ac-ft) Ace. Vol (ac-ft) Acc. Vol (cf) 651 1000 0.023 -1.0 0.000 0.000 0 652 1300.0 0.030 0.0 0,000 0,000 0 654 2000.0 0.046 2.0 0.076 0.076 3300 656 2900.0 0.067 4.0 0.112 0.188 8200 658 3900.0 0.090 6.0 0.156 0.344 15000 660 5000.0 0.115 8.0 0.204 0.549 23900 662 6300.0 0.145 10.0 0.259 0.808 35200 662.5 8000.0 0.184 1 10.5 1 0.082 1 0.890 38775 Permanent Pool Volume Depth = 10.50 it PPE Elevation = 662.5 Shelf Elevation = 662 Bottom Elevation = 651 Bottom Elevation +1 = 652 PPE Surface Area = 8,000 sf Shelf Area = 1 6,300 sf Surface Area Bot Pond = 1,300 sf Permanent Pool Volume = 38,775 cf Avg. Depth = 6A ft Using avg = 6.1 and 59% impervious cover, Min. SA/DA Ratio Surface area required = 7505 sf Surface area provided = 8000 sf Step 4 Size Flow Diversion Structure - No Diversion Structure Step 5 Compute Release Rates for Water Quality Control Compute the release rate for water quality control. The water quality control volume (WQv) is to be released over a 2-day duration beyond the center of rainfall (48 hours plus 3 hours) period. Release Rate = 0.99 ac-ft X 43560 fe/acre / (51 hrs X 3600 sec/hr) = 0.234 cis Step 6 Compute Forebay Chamber Volume The forebay chamber storage area above the filter media must be sized to hold 20 percent of the water quality volume Required Forebay Chamber Volume = 38775.00 cf x (0.20) _ = 7755 cf = 0.18 ac-ft Proposed Forebay, Chamber Volume= 1 9665 7cf Forebay Chamber Store e-Elevation Data Elevation Areas Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol cf 652 90.0 0.002 0.0 0.000 0.000 0.0 654 300.0 0.007 2.0 0.009 0.009 390.0 656 600.0 0.014 4.0 0.021 0.030 1290.0 658 900.0 0.021 6.0 0.034 0.064 2790.0 660 1400.0 0.032 8.0 0.053 1 0.117 5090.0 662 2000.0 0.046 10.0 0.078 0.195 8490.0 662.5 2700.0 0.062 10.5 0.027 0.222 9665.0 Step 7 Develop Water Quality Storage -Elevation Table Permanent Pond Surface Elev. = 1 662.5 Water Quality Storage -Elevation Data Elevation Areas Area ac Ht ft Inc. Vol ac-ft Acc. Vol ac-ft Acc. Vol c 662.5 8000.0 0.184 0.0 0.000 0.0 663 10000.0 0.230 0.5 0.103 0.103 4500.0 665 12500.0 0.287 2.5 0.517 0.620 27000.0 667 15400.0 0.354 4.5 0.640 1.260 54900.0 669 18500.0 0.425 6.5 0.778 2.039 88800.0 671 21900.0 0.503 8.5 0.927 2.966 129200.0 Step 8 Route Runoff Hydrographs through Wet Pond Route all of the appropriate runoff hydrographs through the wet pond facility with the following goals: _ Release water quality volume (WQV) within 48-120 hours Step 9 Water Quality Release Orifice Sizing A= 10250.0 sf - avg. hr_ 2.50 C= 0.6 g= 32.2 t = 172800 sec = 48 hrs a = 0.03896 Dia = 3 in Step 10 Calculation for Anti -flotation Concrete Anchor A. Bouyancy Elevation Top of Dam = 671.00 Top of Box = 669.49 Pond Shelf = 662.00 Bottom of Box = 660.91 Box Area = 25 sf Anchor Area = 49 sf Tx 7' Anchorthickne:: = 1 Area of Riser - Inside 16 sf / Outside 25 sf V (wetwell) = V (riser) + V(base footing) _ (669.49 - 660.91) X 25 + (1.0 X 49) = 264 Floatation = V(wetwell) x V(water) = 263.5 cf x 62.4 Ib/cf = 16442 B. Counter Bouyancy Conc. Wt. _ {V(conc. riser) + V(conc. Footing)) x Conc. Unit Wt. _ {(25-16) x (669.49-660.91)+ (49 x 1)) x 150 Ibs/cf = 18933 Earth Wt. = V(Earth) X Earth Unit Wt. _ (49-25) X 1.59 X 115 LBS/CF = 4388 Anti -Floatation = 23321 Ibs C. Safety Factor= 1.4 1.1 required by NCDENR forAnti-floation WET POND #2 HYDROCAD REPORT PRE DRAINAGE AREA Subcat Reach on Link Wet Pond #2 Charlotte 24-hr 1-yr 1 yrRainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 7.45 cfs @ 12.34 hrs, Volume= 0.834 af, Depth= 0.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1 S: PRE DRAINAGE AREA Hydrograph 8 7.45 cfs 7- Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Runoff Area=14.340 ac 5 Runoff Volume=0.834 of Runoff Depth=0.70" LL 4 Flow Length=1175' 3 Tc=30.5 m i n CN=75 2 1 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) p Runoff Wet Pond #2 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 7.48 cfs @ 3.56 hrs, Volume= 0.629 af, Depth= 0.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1S: PRE DRAINAGE AREA Hydrograph p Runoff 7- Charlotte 6-hr 2-yr 6 2 yr Rainfall=2.28" 5 Runoff Area=14.340 ac Runoff Volume=0.629 of 4- 'Runoff Depth=0.53" 3 Flow Length=1,175' 2 Tc=30.5 m i n CN=75 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 21.90 cfs @ 3.52 hrs, Volume= 1.744 af, Depth= 1.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1S: PRE DRAINAGE AREA Hydrograph p Runoff 22 21= Charlotte 6-,hr 10-yr 19 10 yr Rainfall=3.72" 18` 17_ Runoff Area=14.340 ac 16 Runoff Volume=1.744 of 14 13: Runoff Depth=1.46" 0 12 Flow Length=1175' 0 11 10: 9 Tc=30.5 m i n 8: 7 CN=75 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 29.47 cfs @ 3.46 hrs, Volume= 2.338 af, Depth= 1.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1S: PRE DRAINAGE AREA Hydrograph p Runoff 28 Charlotte 6-hr 26 _ 25-yr 24 25 yr Rai'nfall=4.38" 22_ 20_ Runoff Area=14.340 ac 18 Runoff Volume=2.338 of ,4 Runoff Depth=1.96" 12 Flow Length=1175' 10- Tc=30.5 m i n 8 6 CN=75 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 35.54 cfs @ 3.46 hrs, Volume= 2.850 af, Depth= 2.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1S: PRE DRAINAGE AREA 34- 32- 30 28- 24 22 a 20- .—o° 18- 16 - 6 10 20 30 • 0 50 60 70 Hydrograph Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Runoff Area=14.340 ac Runoff Volume=2.850 of Runoff Depth=2.38" Flow Length=1175' Tc=30.5 m i n CN=75 80 90 100 110 120 130 140 150 160 170 Time (hours) ® Runoff Wet Pond #2 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: PRE DRAINAGE AREA Runoff = 41.14 cfs @ 3.46 hrs, Volume= 3.260 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Area (ac) CN Description 0.270 58 GROUP B 6.910 72 GROUP C 7.160 79 GROUP D 14.340 75 Weighted Average Tc Length Slope Velocity Capacity Description min (feet) (ft/ft) (ft/sec) (cfs) 23.2 150 0.0330 0.11 Sheet Flow, SHEET FLOW Woods: Light underbrush n= 0.400 P2= 3.50" 4.8 250 0.0300 0.87 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 2.5 775 0.0280 5.22 41.77 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 30.5 1,175 Total Subcatchment 1S: PRE DRAINAGE AREA Hydrograph p Runoff 40 Charlotte r 38 36; /�6-h 100-yr 34° 32: 100 yr Rainfall=5.34" 28 Runoff Area=14.340 ac 26° 24 Runoff Volume=3.260 of 22 20 Runoff Depth=2.73" 16 Flow Length=1,175' 14 12 Tc=30.5 m i n 10' CN=75 6 6 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) POST WP #2 Subcat Reach on Link Wet Pond # 2 Wet Pond #2 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 4S: POST WP #2 Runoff = 21.26 cfs @ 12.22 hrs, Volume= 1.822 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total Subcatchment 4S: POST WP #2 Hydrograph 23_ 22' 2126 cts 21 Charlotte 24-hr 1-yr 20' 19' 1 yr Rainfall=2.58" 18 17' Runoff Area=14.340 ac 16- 15 Runoff Volume=1.822 of 14 oz 13_ 12Ru'noRunoffDepth=1.52" 3 ° 10 Flow Length=430' Tc=23.4 m i n 8' 7- 1: CN=89 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond #2 Charlotte 24-hr 1-yr 1 yrRainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 3 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 1.52" for 1 yr event Inflow = 21.26 cfs @ 12.22 hrs, Volume= 1.822 of Outflow = 0.93 cfs @ 15.52 hrs, Volume= 1.822 af, Atten= 96%, Lag= 197.7 min Primary = 0.93 cfs @ 15.52 hrs, Volume= 1.822 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 666.79' @ 15.52 hrs Surf.Area= 15,090 sf Storage= 51,654 cf Plug -Flow detention time= 952.1 min calculated for 1.822 of (100% of inflow) Center -of -Mass det. time= 952.5 min ( 1,787.9 - 835.5 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routing Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.93 cfs @ 15.52 hrs HW=666.79' (Free Discharge) L1=Culvert (Passes 0.93 cfs of 33.43 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.48 cfs @ 9.83 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) =Orifice/Grate (Orifice Controls 0.45 cfs @ 5.11 fps) =Orifice/Grate ( Controls 0.00 cfs) Wet Pond #2 Charlotte 24-hr 1-yr 1 yr Rainfall=2.58" Prepared by Microsoft Printed 5/7/2019 HydroCAD®10.00-22 s/n 05047 ©2018 HydroCAD Software Solutions LLC Page 4 Pond 33P: Wet Pond # 2 Hydrograph ■ Inflow ® Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 4S: POST WP #2 Runoff = 23.48 cfs @ 3.40 hrs, Volume= 1.511 af, Depth= 1.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total Subcatchment 4S: POST WP #2 Hydrograph 0 Runoff 23 Charlotte 6-hr 22 21 20 2-yr 8 2 yr Rai'nfall=2.28" 17 16,Runoff Area=14.340 ac 15 14 Runoff Volume=1.511 of 3 13 12 Runoff Depth=1.26" '9 Flow Length=430' 7 Tc=23.4 m i n 7 6. 5° CN=89 4- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 1.26" for 2 yr event Inflow = 23.48 cfs @ 3.40 hrs, Volume= 1.511 of Outflow = 1.25 cfs @ 5.83 hrs, Volume= 1.511 af, Atten= 95%, Lag= 146.0 min Primary = 1.25 cfs @ 5.83 hrs, Volume= 1.511 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 667.02' @ 5.83 hrs Surf.Area= 15,426 sf Storage= 55,069 cf Plug -Flow detention time= 943.1 min calculated for 1.511 of (100% of inflow) Center -of -Mass det. time= 943.5 min ( 1,173.3 - 229.8 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routing Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=1.24 cfs @ 5.83 hrs HW=667.02' (Free Discharge) L1=Culvert (Passes 1.24 cfs of 34.19 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.50 cfs @ 10.09 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) =Orifice/Grate (Orifice Controls 0.49 cfs @ 5.60 fps) =Orifice/Grate (Orifice Controls 0.25 cfs @ 1.17 fps) Wet Pond #2 Charlotte 6-hr 2-yr 2 yr Rainfall=2.28" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 7 w u 3 0 LL Pond 33P: Wet Pond # 2 Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ■ Inflow ■ Primary Wet Pond #2 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 4S: POST WP #2 Runoff = 44.77 cfs @ 3.38 hrs, Volume= 3.061 af, Depth= 2.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total Subcatchment 4S: POST WP #2 34 32 _ 30 y 28 —� 26 0 24 LL 22 12- 10 8- 6 4 2 0 10 20 30 40 50 60 70 Hydrograph Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Runoff Area=14.340 ac Runoff Volume=3.061 of Runoff Depth=2.56" Flow Length=430' Tc=23.4 m i n CN=89 80 90 100 110 120 130 140 150 160 170 Time (hours) m Runoff Wet Pond #2 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 9 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 2.56" for 10 yr event Inflow = 44.77 cfs @ 3.38 hrs, Volume= 3.061 of Outflow = 17.14 cfs @ 3.80 hrs, Volume= 3.061 af, Atten= 62%, Lag= 24.9 min Primary = 17.14 cfs @ 3.80 hrs, Volume= 3.061 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 668.24' @ 3.80 hrs Surf.Area= 17,291 sf Storage= 75,130 cf Plug -Flow detention time= 496.2 min calculated for 3.061 of (100% of inflow) Center -of -Mass det. time= 496.6 min ( 721.0 - 224.4 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routing Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=17.14 cfs @ 3.80 hrs HW=668.24' (Free Discharge) L1=Culvert (Passes 17.14 cfs of 38.07 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.56 cfs @ 11.41 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 4=Orifice/Grate (Orifice Controls 0.67 cfs @ 7.73 fps) =Orifice/Grate (Orifice Controls 15.91 cfs @ 4.31 fps) Wet Pond #2 Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 10 Pond 33P: Wet Pond # 2 Hydrograph ■ Inflow p Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 4S: POST WP #2 Runoff = 54.91 cfs @ 3.35 hrs, Volume= 3.802 af, Depth= 3.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total w 35 30 0 LL 25 20 15 10 Subcatchment 4S: POST WP #2 0 10 20 30 40 50 60 70 Hydrograph Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Runoff Area=14.340 ac Runoff Volume=3.802 of Runoff Depth=3.18" Flow Length=430' Tc=23.4 m i n CN=89 80 90 100 110 120 130 140 150 160 170 Time (hours) p Runoff Wet Pond #2 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 12 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 3.18" for 25 yr event Inflow = 54.91 cfs @ 3.35 hrs, Volume= 3.802 of Outflow = 22.84 cfs @ 3.72 hrs, Volume= 3.802 af, Atten= 58%, Lag= 22.4 min Primary = 22.84 cfs @ 3.72 hrs, Volume= 3.802 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 668.91' @ 3.72 hrs Surf.Area= 18,351 sf Storage= 86,934 cf Plug -Flow detention time= 408.1 min calculated for 3.802 of (100% of inflow) Center -of -Mass det. time= 408.5 min ( 629.3 - 220.8 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routing Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=22.84 cfs @ 3.72 hrs HW=668.91' (Free Discharge) L1=Culvert (Passes 22.84 cfs of 40.01 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.59 cfs @ 12.07 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) =Orifice/Grate (Orifice Controls 0.76 cfs @ 8.67 fps) =Orifice/Grate (Orifice Controls 21.49 cfs @ 5.83 fps) Wet Pond #2 Charlotte 6-hr 25-yr 25 yr Rainfall=4.38" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 13 Pond 33P: Wet Pond # 2 Hydrograph ■ Inflow p Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) Wet Pond #2 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 4S: POST WP #2 Runoff = 62.36 cfs @ 3.35 hrs, Volume= 4.416 af, Depth= 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total 60 55 50 45 a 40 3 35 0 LL 30 25 20 15 10- Subcatchment 4S: POST WP #2 1 10 20 30 40 50 .0 74 Hydrograph Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Runoff Area=14.340 ac Runoff 'Volume=4.416 of Runoff Depth=3.70" Flow Length=430' Tc=23.4 m i n CN=89 80 90 100 110 120 130 140 150 160 170 Time (hours) Runoff Wet Pond #2 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 15 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 3.70" for 50 yr event Inflow = 62.36 cfs @ 3.35 hrs, Volume= 4.416 of Outflow = 26.61 cfs @ 3.71 hrs, Volume= 4.416 af, Atten= 57%, Lag= 21.8 min Primary = 26.61 cfs @ 3.71 hrs, Volume= 4.416 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 669.45' @ 3.71 hrs Surf.Area= 19,225 sf Storage= 97,203 cf Plug -Flow detention time= 357.6 min calculated for 4.416 of (100% of inflow) Center -of -Mass det. time= 358.0 min ( 578.0 - 220.0 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routinq Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=26.62 cfs @ 3.71 hrs HW=669.45' (Free Discharge) L1=Culvert (Passes 26.62 cfs of 41.55 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.62 cfs @ 12.58 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) =Orifice/Grate (Orifice Controls 0.82 cfs @ 9.37 fps) 5=Orifice/Grate (Orifice Controls 25.18 cfs @ 6.83 fps) Wet Pond #2 Charlotte 6-hr 50-yr 50 yr Rainfall=4.92" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 16 N V O LL Pond 33P: Wet Pond # 2 Hydrograph 0 1U 10 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) ■ Inflow Primary Wet Pond #2 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 4S: POST WP #2 Runoff = 69.60 cfs @ 3.35 hrs, Volume= 4.897 af, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Area (ac) CN Description 14.340 89 Post -Development Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.3 150 0.0600 0.14 Sheet Flow, SHEET Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 250 0.0280 0.84 Shallow Concentrated Flow, SHALLOW CONCENTRATED Woodland Kv= 5.0 fps 0.1 30 0.0830 8.99 71.92 Channel Flow, CHANNEL Area= 8.0 sf Perim= 16.0' r= 0.50' n= 0.030 23.4 430 Total N 3 0 U. Subcatchment 4S: POST WP #2 65- 60 55 50- 25 20- 15- 0 10 20 30 40 50 60 70 Hydrograph Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Runoff Area=14.340 ac Runoff Volume=4.897 of Runoff Depth=4.10" Flow Length=430' Tc=23.4 min CN=89 80 90 100 110 120 130 140 150 160 170 Time (hours) � Runoff Wet Pond #2 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCAD® 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Pond 33P: Wet Pond # 2 Inflow Area = 14.340 ac, Inflow Depth = 4.10" for 100 yr event Inflow = 69.60 cfs @ 3.35 hrs, Volume= 4.897 of Outflow = 36.04 cfs @ 3.64 hrs, Volume= 4.897 af, Atten= 48%, Lag= 17.5 min Primary = 36.04 cfs @ 3.64 hrs, Volume= 4.897 of Routing by Stor-Ind method, Time Span= 0.00-179.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 669.78' @ 3.64 hrs Surf.Area= 19,756 sf Storage= 103,662 cf Plug -Flow detention time= 326.3 min calculated for 4.897 of (100% of inflow) Center -of -Mass det. time= 326.2 min ( 545.5 - 219.3 ) Volume Invert Avail.Storage Storage Description #1 662.50' 128,950 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 662.50 8,000 0 0 663.00 10,000 4,500 4,500 664.00 11,200 10,600 15,100 665.00 12,500 11,850 26,950 666.00 13,900 13,200 40,150 667.00 15,400 14,650 54,800 668.00 16,900 16,150 70,950 669.00 18,500 17,700 88,650 670.00 20,100 19,300 107,950 671.00 21,900 21,000 128,950 Device Routing Invert Outlet Devices #1 Primary 660.91' 24.0" Round Culvert L= 82.1' Ke= 0.500 Inlet / Outlet Invert= 660.91' / 660.50' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 662.50' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 669.49' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 665.50' 4.0" Vert. Orifice/Grate C= 0.600 #5 Device 1 666.90' 13.0" Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=35.97 cfs @ 3.64 hrs HW=669.78' (Free Discharge) L1=Culvert (Passes 35.97 cfs of 42.45 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.63 cfs @ 12.88 fps) 3=Broad-Crested Rectangular Weir (Weir Controls 7.31 cfs @ 1.55 fps) =Orifice/Grate (Orifice Controls 0.85 cfs @ 9.77 fps) =Orifice/Grate (Orifice Controls 27.17 cfs @ 7.37 fps) Wet Pond #2 Charlotte 6-hr 100-yr 100 yr Rainfall=5.34" Prepared by Microsoft Printed 5/7/2019 HydroCADO 10.00-22 s/n 05047 © 2018 HydroCAD Software Solutions LLC Page 19 Pond 33P: Wet Pond # 2 Hydrograph F1 Inflow ❑ Primary 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours)