HomeMy WebLinkAboutNCC190568_ESC Approval Submitted_20190611 Ww.'uruuwa i wm.i,
9 6
ROY COOPER
Governor k
ICFiAEL S.REGAN
w
sL'Cd'lfary W^.;waa"av,w.^o,vxgrw,am"';s""
S.DANI L SMITH OR'1711 CAR011! II NA
Interim Director n'rrtmalr°rar mental Quality
June 7, 2019
LETTER OF APPROVAL WITHMODIFICATIONS
NC Department of Tr nsport tion
Attn„ Rennie Keeter, PE, NCIIOT Division Engineer
PO Box 15
Wilson, SIC 2795
RE: Project Name: Triangle Tyre
Project ID: EOGC-301E- 3
Acres Approved-, 29
County: Ed ecombe, City: Tarboro Address. US 64 All west
River basin; Tar Pamlico, Stream Classification: Other
Submitted By: PFI of North Carolina, P
Bate Received by LQS. June 5, 2019
Plan Type: Reprised
Dear Mr. Keeler:
This office has reviewed the subject erosion and sedimentation control plan, We find the plan to be
acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3)years following the
date of approval,if no land-disturbing activity has been undertaken,as is required byTitle 15A N AC
4 B3 0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the N G 100O0
Construction Stormwater General Permit, This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project, The NO1 form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NO] form to Annette Lucas at
Annette.Iuma i�nccienr. o+�or Paul Clark at.P'il!iu.l,I&„j,,a„t,,,j,c„ :` �Mll�ulr.,,Qy. After you submit a complete and
correct NO1 form, a CPOC will be entailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCG01 permit. However,on or after June 1, 2019,a 100
fee will be charged annually. This fee is to be sent to the DEMLR Storrnwater Central Office staff in
Raleigh.
North Carolina Dgmrtment o lE nvi ronmenta9 Quality IDIvislo n of Energy,Miner all and Lind rResawces
=.o r
I L. NN�nl�6�lu Reaglonal Office V l6 28 iMail service cerateir 3800(Barrett Drive I IRtallelgilh,North Carolina27609
W,aleC .7�YN 4 .610
Setter of Approval with Modifications
C Department ofTransportation
June 7, 2019
Pugs 2 of 3
Titl '15 INCAC . 118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
1, The approved IP SC plan as well as any approved deviation.
4 The NCGO1. permit and the C C,ounce of is received.
3. Records of inspection made during the previous 30 days.
Also, this letter gives the notice required by C.S. 11.3A... 1.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973(North Carolina General Statute p p 3 -5 p through Ca),this office may require
revisions to the plain and implementation of the revisions io insure compliance with tlae Act,
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or males may also apply to
this land-disturbing activity. This approval dares not supersede any other permit orapproval.
Please omits that this approval is baased, in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to pile an arneanded form if
Miners is any change inn the information included on the forma. In addition, it would be helpful if you
notify this office of the proposed startling date for this project. Please notify us ifyou plan to have a
preconstrnactionn conference.
'Your cooperation is appreciated.
Sincerely,
Sally Caastf,e. Cp
Regional Engineering Associate
DE MLR
Enclosures: Certificate of Approval
I' CGOI Fact Sheet
L. l C C Martin, ) �
: �t::���rMartin, Ill � �
��mnaann,�iu�pif�r¢s.nii� � ri�anp!�u!_ra���n:u..n.n E ectn.,rarnpc nnpny
Cla d C hies 'nnnrin°rc�ruu ua::nnt l :Di p�u�c:n::r itr:�caa. l.i a°'snu:a a�at. a y _ Electronic Copy
l;;Dlla@41,11 - Raleigh Regional File
Letter of Approval with Modifications
NC Department of Transportation
June 7, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Triangle Tyre
Project ID: EDGEC-2018-003
County: EDGECOMBE
1® Verbal approval has been issued by the USA CE for the repair associated with the failure
of on 2. Provide a copy of the USA 404 pen-nit once it is issued. Include any
additional measures, construction specifications, maintenance requirements and
construction sequencing as required by the 404 permit on the plan sheets. (GS 113A-
54.1(c))
2. Provide the original signature Letter of Consent Forrn. (GS I 13A-54.I(a))
3. If the 401 pen-nit requ ire ds modifications to the existing repair plan, provide two
copies of the plan repair sheets (one full-size and one half-size), showing the
modifications required for approval. To facilitate DE MLR review, bubble, highlight,
or otherwise identify the changes to your resubmittal. Provide one copy of additional
items (such as design calculations). Provide a cover letter referencing the project
name, project ID, and purpose for submittal. (G.S. I I 3A-57(4))