Loading...
HomeMy WebLinkAboutNCC190608_ESC Plan Sheet C1_20190613SHED (SEE SITE PLANS) GENERAL NOTES 1. HAVENER PARCEL: DB 6385/PG 195, PIN 9970-13-2218, 29.12 ACRES, ZONING: AR LD/TP SEE SITE 2. PARCEL IS LOCATED WITHIN THE LITTLE RIVER PROTECTED WATERSHED OVERLAY DISTRICT. LD/TP PLANS LDITP 3. ALL EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION TAKEN FROM ORANGE COUNTY GIS AND AERIAL ) UGE PHOTOGRAPHS. ACTUAL FIELD LOCATIONS AND ELEVATIONS MAY VARY FROM THOSE SHOWN AND ANY UG`E PROPOSED LOCATIONS AND ELEVATIONS MAY NEED TO BE FIELD ADJUSTED TO ACCOMMODATE THE EXISTING DATA. N IP LID �� >� 4. THIS PLAN IS FOR EROSION AND SEDIMENT CONTROL DESIGN ELEMENTS ONLY. REFER TO THE PLANS TITLED "HAVENER RESIDENCE" FOR ALL GRADING, STORM DRAINAGE AND UTILITIES. \ IP / EROSION CONTROL LEGEND: EXIST / PROPOSED 4 M CURB INLET ® N DROP INLET ® C JUNCTION BOX 191 FLARED END SECTION (FES) SW STRAW WATTLE IP CATCH BASIN INLET PROTECTION PIPE INLET PROTECTION PROPOSED STORM PIPE SFO sF SILT FENCE OUTLET EXISTING STORM PIPE ss ss SANITARY SEWER oHE oHE ABOVEHEAD POWER uGe —UGE UNDERGROUND POWER LD LD LD LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE & LD/TP — LDiTP— LD(TP- TREE PROTECTION FENCE SF SF SF SILT FENCE goo EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR goo PROPOSED MAJOR CONTOUR 99 PROPOSED MINOR CONTOUR PROPOSED WOODS LINE EXISTING WOODS LINE NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TREE/WOOD TO BE REMOVED TD TEMPORARY DIVERSION DITCH STABILIZATION TIMEFRAMES Site Area Description Stabilization Timeframe Exceptions Perimeter dikes, swales, 7 days None ditches and slopes High Quality Water (HQW) 7 days None Zones If slopes are 10' or less in length Slopes steeper than 3:1 7 days and are not steeper than 2:1, 14 days are allowed Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length All other areas with slopes 14 days None, except for perimeters and flatter than 4:1 HOW Zones WHERE SILT FENCE AND TREE PROTECTION FENCE COINCIDE, CONSTRUCT ONLY ORANGE SILT FENCE AND ADHERE TO THE SIGNAGE AND DIMENSIONAL REQUIREMENTS SHOWN ON TREE PROTECTION DETAIL (SEE DETAIL THIS SHEET). FOR STAKING AND CONSTRUCTING SILT FENCE, USE LOCATION OF "LD/TP" LINE, AS "SF" LINE IS OFFESET ONLY FOR LEGIBILITY --ACTUAL LOCATION IS AT "LD/TP" (TYP.) CONSTRUCTION SEQUENCE: 1. OBTAIN LAND DISTURBANCE PERMIT FROM ORANGE COUNTY EROSION CONTROL OFFICES AND APPROVED SET OF CONSTRUCTION DRAWINGS FROM THE OWNER/ENGINEER. KEEP A COPY OF BOTH ITEMS ONSITE THROUGHOUT CONSTRUCTION. CONTACT EROSION CONTROL OFFICER @ (919) 245-2580 PRIOR TO INITIATING LAND DISTURBING ACTIVITY. 2. SCHEDULE AND CONDUCT A PRE -CONSTRUCTION MEETING WITH ALL AGENCIES AND NEIGHBORS AS REQUIRED BY PERMITS AND EROSION CONTROL OFFICER. 3. CLEAR ONLY AS NECESSARY TO INSTALL THE EROSION CONTROL DEVICES SHOWN ON THIS PLAN. 4. THE STONE THAT WILL BE USED FOR THE DRIVEWAY WILL ALSO ACT AS THE CONSTRUCTION ENTANCE/EXIT AND MAINTAIN PER THE NOTES ON THIS SHEET, AND IN ACCORDANCE WITH ALL APPLICABLE LOCAL AND STATE GUIDELINES. ALL CONSTRUCTION TRAFFIC IS TO ENTER AND EXIT THE PROPERTY FROM THIS LOCATION. 5. EXERCISE EXTREME CAUTION NEAR ALL STREAM AND BUFFER AREAS TO ENSURE DISTURBANCE RELATED TO CONSTRUCTION ACTIVITIES DOES NOT CONVEY SEDIMENT LADEN RUNOFF INTO THE ADJACENT STREAM OR BUFFER. THE CONTRACTOR SHALL MAKE EVERY EFFORT POSSIBLE TO PROMOTE AND RE-ESTABLISH SHEET FLOW FROM THE DISTURBED AREAS FOR RUNOFF FLOWING TO AND THROUGH THE ADJACENT BUFFERS. 6. TEMPORARILY SEED, MULCH, ANCHOR AND STABILIZE ALL DISTURBED AREAS AND EROSION CONTROL DEVICES IMMEDIATELY AFTER CONSTRUCTION. 7. CONTINUE MAINTENANCE AND INSPECTION OF EROSION CONTROL DEVICES AFTER RUNOFF PRODUCING STORM EVENTS. NO DISTURBED AREA IS TO BE LEFT WITHOUT PROTECTIVE COVER (MULCH OR STRAW / TACK) FOR MORE THAN 15 WORKING DAYS OR 21 CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION OR DEVELOPMENT ACTIVITIES. 8. COMPLETE FINAL SITE GRADING, THEN INSTALL PERMANENT SEEDING AND PLANTINGS. ALL TEMPORARY AND PERMANENT STABILIZATION MEASURES SHALL BE IN ACCORDANCE w/ THE MOST RECENT PLANTING AND SOIL PREPARATION REQUIREMENTS ISSUED BY NCDENR. 9. ONCE SITE IS STABILIZE AND WITH THE APPROVAL OF THE EROSION CONTROL OFFICER REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, FINE GRADE, PERMANENTLY SEED AND STABILIZE THESE AREAS AS NEEDED. Know what's below. Call before you dig. PATIO AREA S S (SEE SITE PLANS) al O SFO SEE SITE SF �+ i PLANS HOUSE (SEE SITE PLANS) SW GRAVEL DRIVE 4� , (SEE SITE PLANS) SVV p \ \ v68s SFO \ SW o i TD \ \ 6(90 SFO O� \ \ / LD J 6" MAPLE � \ 65PROTECTED / \ \ BUFFER,NO S O DISTURBANCE \ \ PERMITTED I ' AMORE LD/T o� IPLE MAPLE / l 1 MAP L p� e SFO SFO POOL ELEVATION AT TIME OF SURVEY \ \ ELEV. 667.05' I I \ \ \\ \\ \ RISER ELEVATION = 669.12' I \ J i SFO 'A \ \ \ oft \ z � 65PROTECTED BUFFER,NO DISTURBANCE PERMITTED SEE CONSTRUCTION SEQUENCE FOR ENTRANCE NOTES SFO X, ` SF SEE SITE PLAN SW SF PROPERTY LINE LD/TP c 0 co SF co C \ C \ U \ CO PIPE INLET \ SEE SITE PROTECTION PLANS � m TD C: � m C / p c 0 / d cl I m I J W I c m (n 24" OAK SEE SITE PLANS 7 SEE SITE PLANS PIPE INLET I� I fT1 2 0 k 1 8' 0 I ;I C, I �I <? co 6a to �I I i if I I i I i r^i SEE SITE Ir PLAN PROPERTY 1 d,j O LINE r SW DISTURBED AREA = 90)650 SF (2.08 AC) 20' SEPTIC LINE EASEMENT SFO WHERE SILT FENCE (SF) LINE AND LIMITS OF DISTURBANCE (LD) LINE COINCIDE, USE LOCATION OF LIMITS OF DISTURBANCE. USE LOCATION OF "LD" LINE, AS "SF" LINE IS OFFSET ONLY FOR LEGIBILITY --ACTUAL LOCATION IS AT "LD" LINE (TYP.) JRN/ / EXISTING TREELINE EROSION CONTROL & MAINTENANCE PLAN NOTES: MEASURES OR ADDITIONAL MEASURES WITHIN SEVEN DAYS. REPEATED FAILURE OF A CONTROL MEASURE REQUIRES INSTALLATION OF A MORE SUITABLE DEVICE TO PREVENT DISCHARGED OF POLLUTANTS FROM THE CONSTRUCTION SITE. 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS, SPECIFICATIONS AND DETAILS OF THE NC EROSION AND SEDIMENT CONTROL 5. INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE PLANNING AND DESIGN MANUAL AND BE APPROVED BY NORTH CAROLINA DEPARTMENT OF CITY/TOWN, COUNTY AND/OR STATE. CONTRACTOR TO VERIFY REQUIREMENTS PRIOR TO ENVIRONMENTAL AND NATURAL RESOURCES AND/OR LOCAL AUTHORITIES PRIOR TO ANY AND BEGINNING ANY WORK ON PROJECT SITE. ALL GRADING AND/OR CONSTRUCTION OF PROPOSED SITE. THE APPLICANT HAS THE RESPONSIBILITY TO CONTACT, VERIFY AND ADHERE TO ALL NCDENR / LOCAL SPECIFICATIONS 6. CARE SHALL BE TAKEN TO MINIMIZE THE ENCROACHMENT OF SEDIMENT INTO ALL STORM DRAIN AND CHECKLIST REQUIREMENTS, WHICH CAN BE REVIEWED AT THE NCDENR WEBSITE. APPURTENANCES, PUBLIC STREETS, AND ONTO PRIVATE PROPERTY UNTIL IMPERVIOUS WWW.DLR.ENR.STATE.NC.US MATERIAL (ROAD/PARKING AREA SURFACE) IS APPLIED OR UNTIL PROPOSED LANDSCAPE HAS BEEN ESTABLISHED. 2. RETAIN FLOATABLE WIND BLOWN MATERIALS ON SITE BY STORING ALL TRASH AND BUILDING MATERIAL WASTE IN ENCLOSURES UNTIL DISPOSAL AT OFF -SITE FACILITIES. CHECK ADJACENT 7 REFER TO DETAILS ON THIS SHEET FOR SILT FENCE CONSTRUCTION. AREAS DAILY AND PICK UP CONSTRUCTION WASTE MATERIALS AND DEBRIS THAT HAVE BLOWN OR WASHED OFF SITE. 8. ALL AREAS NOT SHOWN AS PAVEMENT OR BUILDING UNDER FINAL CONSTRUCTION SHALL BE TEMPORARILY AND PERMANENTLY SEEDED AS REQUIRED. 3. PERMANENTLY STABILIZE ALL SURFACE AREA WITHIN AND ADJACENT TO THIS SITE THAT IS DISTURBED BY VEHICLES, GRADING AND OTHER CONSTRUCTION FOR THE PROPOSED FACILITY. 9 ALL GRASS SLOPES WHICH EXCEED 4:1 (H:V) SHALL UTILIZE NORTH AMERICAN GREEN (NAG) STABILIZATION IS OBTAINED WHEN THE DISTURBED SURFACE IS COVERED WITH STRUCTURES, CONSTRUCTION PRODUCTS TURF REINFORCEMENT MATS SC150 OR APPROVED EQUAL UNLESS PAVING AND OR PERENNIAL VEGETATION HAVING A UNIFORM COVERAGE DENSITY OF AT LEAST OTHERWISE SPECIFIED ON PLANS. MATS SHALL BE INSTALLED PER MANUFACTURER'S 70%. STABILIZATION OF ALL DISTURBED AREA IS REQUIRED BEFORE TERMINATION OF SPECIFICATIONS AND STANDARDS. CONTRACTOR SHALL COORDINATE INSTALLATION MAINTENANCE AND REMOVAL OF EROSION CONTROL MEASURES. INSPECTION WITH MANUFACTURER. 4. CONTRACTORS SHALL INSPECT POLLUTION CONTROL MEASURES AT LEAST ONCE EVERY 15 DAYS AND WITHIN 24 HOURS AFTER A STORM EVENT OF 1/2 INCH OR GREATER. DAMAGED MEASURES THAT PROVE TO BE INEFFECTIVE SHALL BE REPLACED WITH MORE EFFECTIVE OC MAX --I NOTES: 1) TOTAL DRAINAGE AREA FLOWING TO THE SO FENCE - FENCE MAY NOT EXCEED 1 ACRE. 2) SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW OF FLOW I \ I I I 1 STORAGE P\1 WATER (CREEKS, DITCHLINES, SWALES ETC.) �Vp� SEO�MENT� INCREASE E OF THE SILT FENCE,S RAGE CAPACITY IT AND NG v THE LGENERALLY r ADVISABLE TO DIG A SEDIMENT PIT IN FRONT OF YOUR SILT FENCE WHENEVER POSSIBLE. 12 GAUGE 4"X4" OR 2"X4" WELDED WIRE HOOKED ONTO PERFORMED CHANNELS ON STEEL POSTS. (NO WOOD POSTS) ULTRAVIOLET RESISTANT (BLACK) MIRIFI FABRIC OR EQUIVALENT SECURED TO WIRE W/ METAL CLIPS OR WIRE AT 8" OFF ° CENTER. MAX. SEDIMENT STORAGE LEVEL. REMOVE CDj ° 08, ° - SEDIMENT WHEN THIS LEVEL IS REACHED OR AS DIRECTED BY CONSERVATION INSPECTOR. _ - _ - _ - _ - TRENCH, COVER W/ SOIL & TAMP BACKFILL. SHEET DRAINAGE (ONLY) III —Ili = NATURAL GRADE �_ CARRY APPROX.12" OF FABRIC INTO TRENCH ? � 1J1 L=111=III=III=1� J.J1 J.J1 ' 2 �f�-1T(=1T(=1��77�I�77�I N ��7777 i!! TIT TIT TIT i!! ll CARRY 5U_�_ _ 6" OF WIRE INTO TRENCH. T STEEL POSTS @ 8' O.C. MAX.. (NO WOOD POSTS) MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REPLACE BURLAP EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE ARE TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. , k TEMPORARY SILT FENCE NM IGE PLASTIC FENCING 5' METAL POSTS 5' MIN / I f/ z 12' MAX NOTES: 1. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. 2. SIGNS IN BOTH ENGLISH AND SPANISH SHALL BE BE PLACE IN TREE PROTECTION AREAS. THE SIGNS SHOULD READ, "TREE PROTECTION AREA/NO TRESPASSING" AND "ZONA PROTECTORA PARA LOS ARBOLES/ PROHIBIDO ENTRA". 3. WHERE TREE PROTECTION FENCE COINCIDES WITH SILT FENCE, USE ORANGE SILT FENCE AND ADHERE TO SIGNAGE AND DIMENSIONAL REQUIREMENTS ABOVE. TREE PROTECTION FENCE NTS GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET) I inch = 60 ft. SEDIMENT CONTROL STONE EXCAVATE SMALL PIT IN FRONT OF ROCK OUTLET. 12"+/-� I —I 12"+/- I— U O a SIL INSTALL ROCK OUTLET AT LOW POINTS ALONG SILT FENCE, AND IN LOCATIONS SHOWN ON THE PLAN. l SILT FENCE 18" MIN. hMAX. ��Z` 8" MIN. STRUCTURALSTONE I-_ U) O STRUCTURAL STONE SHALL BE CLASS "B" STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE NO.5 OR NO.57 NCDOT WASHED STONE. SILT FENCE WITHOUT ROCK OUTLETS HAS A CAPACITY OF 1/4 DRAINAGE ACRE PER 10OLF FENCE. SILT FENCE WITH ROCK OUTLETS AT 100' SPACING HAS A CAPACITY OF 1/2 DRAINAGE ACRE PER 10OLF FENCE. TEMPORARY SILT FENCE ROCK OUTLET NTS rW 0 W OO J�z0a Fx WZ¢00Z— >Ucn -2 a-cn 0UWz JWO¢o io Q p ¢Ww~O-wZZDWO Ri �C7 W F W Es0U¢¢�_O W W O=aQWQwW0Zz< � x W Z ¢ W F QccvaQ}D ax ¢ w Z 0 m� C7Q W¢ 0 0 ¢coo�W W�r��o W oxxocc Z Wxa ZO P. Z a 0zQ¢�ZF��o i Qrp >�W,-, �a Q� C7 C, 0 Q W W j 7 W O Z W K OU)ZwUU JFOxU u Z W > O W Z o 0¢ F co ¢wc»Zo ¢¢00 z w< U)= J 0 mz00, LU w z w w LU o z LU =o U U) co OfU) _ LLU U Zm � _ Q� o Q Z� ZZD Q= LU Cf) o W Q? � Z } � Lu =) w O U m Z> :Z Cl) 0-3U �2 o LU Q0 LU p c�j U �2 dQ <�? dQ C) (D o ,,.•oFEsS/ % SEAL = a U LLI N X w T Wm Z U `z N W U N � � Z I- rn a Z X W LL W 0 � M W C � -0 N M N c` c) � T M CU O �ZIco `a) > a0CM E - m 2—=, m ��-0 N N N V U U _3L6x>3 W U W A V J NW W7 Z U W J Q� of J � 2 (PROJECT NO. 19-0054 DRAWING NAME: 19-0054_EC SHEET NO. C-1 Z Q 0- O/ L.L Z O U Z LU 2 0 LLI v! Q Q Z �O w vJ Oz LU Q