Loading...
HomeMy WebLinkAboutNCC190601_ESC Approval Submitted_20190613ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality June 5, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Progress, LLC ATTN: Mr. Rodney Hutcherson 410 S. Wilmington Street Raleigh, NC 27601 RE: Project Name: DUKE CANE RIVER -SPRUCE PINE STREAMBANK RESTORATN Acres Approved: 1 Project ID: MITCH 2O19-005 County: Mitchell City: Spruce Pine Address: US Highway 19E River Basin: French Broad Stream Classification: UT Brushy Creek — C;Trout Submitted By: Mr. Greg Jennings, PE Date Received by LQS: May 17, 2019 Plan Type: Other (Streambank Restoration) Dear Mr. Hutcherson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all financially responsible parties for new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Ms. Annette Lucas at Annette.lucas@ncdenr.gov or Mr. Paul Clark at Paul.clark@ncdem.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Letter of Approval with Modifications Duke Energy Progress, LLC June 5, 2019 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Note that the Sediment Pollution Control Act (113A-54.1(e)) states that "The record shall be maintained until permanent ground cover is established...." Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Melissa J. King E Assistant Regio a ngineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet ec: Mr. Greg Jennings, PE greg@jenningsenv.com Letter of Approval with Modifications Duke Energy Progress, LLC June 5, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: DUKE CANE RIVER -SPRUCE PINE STREAMBANK RESTORATN Project ID: MITCH 2O19-005 County: Mitchell 1. Prior to any disturbance at this site, the Certificate of Coverage for NCGO1 Construction Stormwter General Permit must have been received. {NCGO1 Construction Stormwater General Permit) 2. All surface waters must be protected from sediment -laden runoff with adequate erosion sediment control devices and an adequate buffer. {G.S. 113A-571{ 15A NCAC 04B .01061 {15A NCAC 04B .0109) { 15A NCAC 04B .0 125) 3. Comply with trout buffer zone waiver (TB-MITCH-2019-003) approved on June 4, 2019. (G.S. 113A-57.1) {15A NCAC 04B .01251