HomeMy WebLinkAbout20181589 Ver 1_More Information Received_20190611Staff Review
Does this application have all the attachments needed to accept it into the review process?
r Yes r No
ID#*
20181589
Version* 1
Is this project a public transportation project?* r Yes
r No
Reviewer List:*
Select Reviewing Office:*
Submittal Type:*
Application Attachments
Zan Price:eads\gaprice
Asheville Regional Office - (828) 296-4500
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r New Project
r Pre -Application Submittal
r More Information Response
r Other Agency Comments
r For the Record Only (Courtesy Copy)
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Alea Tuttle
Who is subrritting the inforrration?
Email Address: alea@cwenv.com
Project Information
Existing ID #: Existing Version:
18-1589 1
20170001 (no dashes)
Project Name: Biltmore French Broad and Swannanoa River Bank Stabilization
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Buncombe
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
1001 Permit Modification Letter SAW-2018-
819.74KB
02171.pdf
Only pdf or Igm files are accepted.
Describe the attachments:
The attached is a permit modification request for an additional stream crossing on the Swannanoa river.
USACE Permit ID SAW -2018-02171
V By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the online form."
Signature:
Submittal Date: Is filled inautorretically.