10 June 2019
LETTER OF APPROVAL OF REVISED PLAN WITH MODIFICATIONS
Enka Partners of Asheville, LLC
ATTN: Mr. Martin Lewis
1091 Hendersonville Road
Asheville, N.C. 28803
RE: Project Name: Enka Project
Acres Approved: 20.0 acres originally approved. 26.37 acres this revision.
46.37 acres total.
Project ID: BUNCO-2010-014
County: Buncombe
City: Asheville
Address: Sandhill Rd. (NC 112)
River Basin: French Broad
Stream Classification: Hominy Creek, 'C'
Submitted By: Mr. William R. Buie, P.E.
Date Originally Received by LQS: 26 February 2010
Date this Revision Received by LQS: 4 June 2019
Plan Type: Industrial/Commercial
Dear Mr. Lewis,
This office has reviewed the subject revised erosion and sedimentation control plan. We find
the plan revision to be acceptable and hereby issue this Letter of Approval with Modifications.
The Modification required for plan approval are attached
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage
(COC) under the NCGO10000 Construction Stormwater General Permit. This form
MUST be submitted and COC issued prior to the commencement of any land
disturbing activity on the above -named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
AnnetteducasOncdenr.gov or Paul Clark at Paul. clarkOncdenr. gov. After you submit
a complete and correct NOI Form, a CDC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to
be sent to the DEMLR Stormwater Central Office staff in Raleigh.
�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
D_E Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
nomHcwouNn
o:wruo:mm mm�oom.�uia�,nw 828.296.4500
Letter of Approval of Revised Plan with Modifications
Mr. Martin Lewis
10 June 2019
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form.
Your cooperation is appreciated.
to 4 L
MAael Smith
Assistant Regional Engineer
Land Quality Section
ec: Mr. William R. Buie, P.E. wbuieC@wgla.com
Letter of Approval of Revised Plan with Modifications
Mr. Martin Lewis
10 June 2019
Page 3 of 3
Project Name: Enka Project
Project ID: BUNCO-2010-014
County: Buncombe
MODIFICATIONS REQUIRED FOR APPROVAL
In order for this office to approve the revised plan, on or before Tuesday June
18'th. 2019, please provide the additional or revised information in accordance
with the following comments:
1. Please consider adding (or calling out) a temporary construction entrance to the
erosion control plan sheet. This measure is shown as detail 6.06 on plan sheet C-301.
{G.S. 113A-57 (3)}.
2. Please consider including the entirety of proposed Sediment Basin 1 within the
limits of disturbance. It is noted that this area has been previously permitted by
Buncombe County. {G.S.113A-57 (3)}.
3. Please consider not routing the outlet of the skimmer basins directly into the storm
sewer drain system. {NCG010000}
4. For use in decommissioning operations, please consider locating a soil stockpile by
the sediment basins that are to not to be converted to stormwater detention ponds
after the site is permanently stabilized. If soil stockpiles are used please show the
location on the grading and erosion control plan sheet. {G.S.113A-57 (3)1.
5. Please indicate on the plans or in the project narrative which temporary sediment
basins (if any) are to be converted into post construction stormwater detention
measures. If these measures are to be used please provide a detail in the plan sheets.
{G.S. 113A-57 (3)}.