Loading...
HomeMy WebLinkAboutNCC190585_ESC Approval Submitted_20190611ROY COOPER Governor MICHAEL S. REGAN Secretory S. DANIEL SMITH hlteelmOheotor NORTH CAROLINA Env/ronmental Quality May 23, 2019 LATTER OF APPROVAL WITH MODIFICATIONS Bear Creek Baptist Church of Mitchell County, Inc. ATTN: Mr. Jamie Miller 327 Bear Creek Church Road Bakersville, NC 28705 RE: Project Name: BEAR CREEK BAPTIST CHURCH FAMILY LIFE CENTER Acres Approved: 4.5 Project ID: MITCH 2O19-004 County: Mitchell City: Bakersville Address: Bear Creek Church Road River Basin: French Broad Stream Classification: Bear Creek —C;Trout Submitted By: Mr. Alan Crees, PE Date Received by LQS: May 15, 2019 Plan Type: Other Dear Mr. Miller: This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all financially responsible parties for new construction activities are required to complete and submit an electronic Notice of Intent (NOD form requesting a, Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the. above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Ms. Annette Lucas at Amrette.lucas@nedenr.gov or Mr. Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOl permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. ® North Carolina Department of Environmental QuaBty I Division of Energy, Mineral and Land Resources AshevOle Reglowd Office 12090US.HIghway70 l Swannanoa, North Carolna2.8778 "" "1°1Pi"4 826.296.4500 Letter of Approval with Modifications Bear Creels Baptist Church of Mitchell County, Inc. May 23, 2019 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Note that the Sediment Pollution Control Act (113A-54.1(e)) states that "The record shall be maintained until permanent ground cover is established...." Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring . protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, e ssa L1N1 Assistant eg' nal EnginE�r Land Q ection v Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Mr. Alan Crees, PE creesmesco@bellsouth.net