Loading...
HomeMy WebLinkAboutNCC190577_ESC Approval Submitted_20190611County of Buncombe PLANNING AND DEVELOPMENT Nathan Pennington 46 Valley Street Telephone 82&2504830 PJanniF06 Director Erosion and Sedimentation Control Telephone: (828)-2504848 LETTER OF APPROVAL WITH MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS June 10, 2019 DT Retail Properties, LLC Mr. Chris Teeter 500 Volvo Parkway Chesapeake, VA 23320 Mr. Teeter, This office has reviewed the Erosion and Sedimentation Control Plan submitted for the project listed below. We find the plan to be acceptable with the attached modifications and/orperformance reservations and hereby issue this Letter of Approval. Please be advised that Section 26-228 requires that a copy of the approved Soil Erosion Control Plan be on file at the job site. The Buncombe County Soil Erosion and Sedimentation Control Ordinance is a performance oriented program requiring protection ofthe natural resources and adjoining properties. H. following commencement ofthis project it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation. The approval for this project is good for the time frame stated on the original land disturbing permit. This permit shall become null and void if you have not made progress to begin construction activities on the site within six months after the date of approval. Renewal of the land disturbing permit will require a newplan review submittal with associated fees. The approval of an erosion plan is conditioned on the applicant's compliance with federal and state water quality laws, regulations, and rules. A copy of the erosion control plan for any land disturbing activity that involves the utilization of ditches for the purpose of de -watering or lowering the water table must be forwarded to the director of water quality. *As ofApril 1, 2019, all ne►v construction activities are required to complete and submit an electronic Notice oflntent (NOI) for requesting a Certificate of Coverage (COC) under the NCG01000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the below named project. The NOI form may be accessed at deq.nc.gov1WCG01. Please direct all questions about the NOIform or the process to Annette Lucas at Annette.lucasnancdenr.Qov or Paul Clark at Paul,clarWncdenngov. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh and is not collected by this local program. Once the NCG01 permit has been completed and approved by DEMLR, a project permit number will be given for this project that must be written on the Buncombe County Land Disturbing Permit, which must be on site throughout the construction phase of the project. When the project is complete, the financially responsible party or their representative will contact Buncombe County Erosion and Sedimentation Control Office to close out the Erosion and Sedimentation Control Plan. A Certificate of Compliance will be issued for the project once the site meets the requirement as stated in the original Letter of Approval and standards stated in the Buncombe County Soil Erosion and Sedimentation Control Ordinance. The responsible party will then be instructed to visit deg.nc.gov/NCG01 to submit an e-NOT (electronic Notice of Termination) form for closing out the NCG01 permit. Please refer to the attached NCG01 Fact Street. Page 2 A Combined Self -Monitoring and Self -Inspection Form for the NCG01 is enclosed. Please review all pertinent documents prior to starting construction. We look forward to working with you on this project. Sincerely, W. Jason Guess for Doug Sharp Erosion Control Officer cc: Mr. Michael Cain, PE -Civil Design Concepts, PA Mr. Robert Melchiorre-Corporation Service Company Project name: Dollar Tree-Brevard Road (ER02019-00033) Location: 1125 Brevard Road Date received: June 3, 2019 Date approved: June 10, 2019 Permitted Disturbance: 1.48 Acres Pelson financially responsible: Mr. Chris Teeter MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS FOR *Prior to sc/:edtrling the pre -construction meeting, the financially responsib/e party or aut/rorized agent must submit an electronic copy of the Letter of Approval with Modifications and/or Performance Reservations for requesting a Certificate of Coverage (COC) under the NCG01000 Construction Stormwater General Permit to DEMLR. Once the NCGOl COC# has been obtained, the contractor, authorized agent or owner mast contact Buncombe County Erosion Control Office to schedule an on - site pre -construction: meeting before beginning any grading activity. Contractor must have a copy of the latest set of plans marked "Construction Documents" and showing any revisions and/or details. Approved plans must be available at the construction site at all times for inspection by inspectors and any other governing regulatory agent. A copy of the Erosion Control Permit, a copy of the Letter CA I with Modification and/o�• Performance Reservations, and a copy of the Combined Self -Monitoring and Self -Inspection Foi•m must be available on -site in a job box or contractor's trailer at all times. These documents must be reviewed and understood by all parties involved prior to any land disturbing activities. A worldng rain gauge must also be present and installed at the site for monitoring. Contractor to insure that any import or export material be from a permitted site. Erosion control measures must be installed in accordance with the approved engineering plans and maintained at all times. Alternate measures must first be approved with the engineer of record and regulatory site inspector prior to installation. Clearing limits for grading must be clearly delineated in the field as shown on the approved engineering plans. Any additional clearing or land disturbing activity that disturbs the ground surface outside of those limits will constitute a violation of the County's Ordinance and will be subject to penalties. Additional erosion control measures and BMP devices will be required if approved measures are not sufficient to contain and control sediment and runoff on the project site. Additional measures to help control and reduce on -site runoff during construction will be discussed at pre -construction meeting. Page 3 Areas of construction left bare for more than 21 days without temporary ground cover could delay building construction inspections and cause possible delays in issuance of building occupancy letters. Notification must be given to this office for inspection at the completion of site stabilization of the project prior to the removal of any perimeter/pertinent erosion control measures at the site. Any deviations in the original approved construction plans or design changes to land clearing to the overall site must first be submitted for review to this regulatory office and approved prior to continuation of construction. Failure to resubmit could result in possible issuance of stop work orders, holding of any building inspections, or issuance of certificates of occupancy. Erosion control measures must be inspected and repaired if needed on a regular basis and maintained at all times. Failure to maintain erosion control measures can result in delayed building inspections, revocation of permits or possible civil penalties. Approval of this project is in accordance with the t•egttit•ements set forth by the Buncotnbe CountJ� Soil Erosion and Sedimentation Control Ordinance and inforrnation provided in the approved construction plans, construction sequence, construction details, and documentation. Any modification of this approval in regards to soil erosion and sedimentation control must be made aware to the Buncombe County Erosion Control Office prior to any changes.