Loading...
HomeMy WebLinkAboutNCC190577_NOI Application_20190611Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/11/2019 2:29:47 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 6/11/2019 2:42:54 PM (Review- Construction NOI 12058) • The task was assigned to Georgoulias, Bethany by round robin distribution 6/11/2019 2:30 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 13, 2019 5:00 PM 6/11/2019 2:30 PM Submit by Georgoulias, Bethany 6/11/2019 2:43:10 PM (Payment Verification - NCG01-2019-0577) • The task was assigned to Georgoulias, Bethany. The due date is: June 12, 2019 5:00 PM 6/11/2019 2:43 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Dollar Tree Asheville, NC-Brevard Road 2. County* Buncombe 3. Highway or Street 1125 Brevard Road Address * Street name only is acceptable if no address nurrber assigned yet 4. City or Township* Asheville 5. State * NC 1r-G)ff&T7i)MfiIif_TiIa10141 6. Zip Code* 28806 7. Latitude * Enter the latitude in decirral degrees 35.5214 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -82.6068 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/30/2019 Estimated Construction Project Start Date 10. Date to End* 09/30/2019 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 1.48 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.37 (acres)* 14. Post- 0.71 construction (Estimated) impervious area (acres) * NCC Project NCC-BUNCO-2019-Dollar Tree Asheville, NC-Brevard Road Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Boring Mill Branch Wate rbody* Nacre of waterbody into which stormuater runoff will discharge 15b. Waterbody 6-68 Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization DT RETAIL PROPERTIES, LLC Name * 2. First Name* Chris ff Corporation, enter Registered Agent First l\b e 3. Last Name * Teeter ff Corporation, enter Registered Agent Last Barre 3b. Title Vice President of Store Design and Construction 4. Permitee E-mail cteeter@dollartree.com Address* 5. Permittee (757) 321-5000 Telephone No.* 6. Permittee Mailing Street Address Address* 500 Volvo Parkway Address Line 2 City Chesapeake Postal / Zip Code 23320 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 500 Volvo Parkway Address Line 2 City Chesapeake Fbstal / Zip Code 23320 State / Province / Region VA Country us State / Province / Region VA Country us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Michael Contact - First Name * 3. Primary Site Cain Contact - Last Name * 4. Title Project Engineer 5. Site Contact E- mcain@cdcgo.com mail Address* 6. Site Contact 8282525388 Telephone No.* 7. Organization Civil Design Concepts Name 8. Site Contact Street Address Mailing Address* 168 Patton Avenue Address Line 2 City Asheville Fbstal / Zip Code 28801-2630 State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/10/2019 Approved * 2. E&SC Plan Project ER02019-00033 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Buncombe County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan 20190610135526164.pdf 2.34MB Approval Land Disturbance Permit 2019-00033.pdf 584.05KB letter/documentation Mist be RJF forrrat 6. NOI Certification DT Brevard Road - NOI Certification Form Form 408.98KB Executed.pdf Mist be RDF format This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ec+� rrd*ti Type Name* Chris Teeter Title Vice President of Store Design and Construction Organization DT Retail Properties, LLC Date * 06/11 /2019 F. Tracking and COC Info NOI Tracking No. 12058 NC Reference No. NCG01-2019-0577 Uses 'count _nunber'variable (increrrented by SP) Certificate of NCC190577 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 577 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)