Loading...
HomeMy WebLinkAbout20070302 Ver 2_Certification of Completion_20090818 RECEIVED N_C DeDt. of ENR Certificate of Completion AUG 1 8 2009 DWQ Project No.: Of -o30Z County: ~R.SW Applicant: _RIY\- Dt;V~L,OPjV'\6Ni) LLC / Project Name: C A(li2..()~t-! CNr~L.L .t Z. Winston-Salem Regional Office Date of Issuance of 401 Water Quality Certification: mAY I, 2007 . Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to ,the Winston-Salem Regional Office, North Carolina Division of Water Quality, 585 Waughtown Street, Winston-Salem NC, 27107, This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these, Applicant's Certification I, ' hereby state that, to the best of my abilities, due care and diligence was used in the observation Of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials, Signature: Date: Agent's Certification I, ' hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent ofthe 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ",,,,,, """ ...\\' ,~ COra "," ~ _'-0\............. ~ ~ .:' "'..- 0\98S/ol'J. -.. 0 ~ i L' </,' o.')':~ ~ - Seat - ~ 15360 ~ ~ ~ ~ I, ---1\ ~ 'I2R\S 1S. Gl V'f+VN ,as a duly registered Professional E"N '" oS! '.. ~~~~fl' Engineer, Landscape Architect, Surveyor, etc,) in the State of North Carolina, having been aut~~ , "\\,,, observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buft: les, t p roved plans and specifications, and other supporting materials. Date: If this project was designed by a Certified Professional =<::.---Registration No,: 53(PD Date: 8//2./2009 . I