August 24, 2009
PLANNING
Ms. Cyndi Karoly
N.C. Department of Environment and Natural Resources
Raleigh Regional Office
40 I Oversight/Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
ENGINEERING
ARCHITECTURE
Re: Edgecombe Co. WSD #5 Wastewater Collection System for NC 97/Leggett
Community
TWC No. 2488-DV
Project Name: Wastewater Collection System Extension for Edgecombe County
Water and Sewer District No.5 - Phase II NC 97 Corridor/Leggett Community
Location: NC 97, NC 33, New Hope Church Rd., & Battleboro-Leggett Rd.
County: Edgecombe
River Basin: Tar-Pamlico
DWQ Project Number: 09-0847
Ms. Karoly:
Per your request for more information dated August 20, 2009, responses to your
requests follow,
1. Please verify that the USACE will be permitting this project under solely
a Nationwide Permit 12, and not a Nationwide Permit 12 and a
Nationwide Permit 39 and/or Nationwide Permit 29.
This project will not create any new residential, commercial, or institutional
development, therefore, only a Nationwide Permit 12 is required for this
project. The project is intended to solve problems with existing septic tanks in
the project area and not provide services for any new development.
301 West 14th Street
Greenville NC 27834
2. Please provide a qualitative indirect and cumulative impact analysis for
the project. Please see DWQ's policy for guidance on our web site at:
h Up:/ /h20.en r .sta te. n c. us/ ncwetlands/ docu men ts/I n terimln ternalPolicyCu
mulativeImpact.doc Will any undeveloped parcels be served by this
sanitary sewer project?
252.757.1096
fax 252.757.3221
No indirect or cumulative impacts to water quality are expected by the
proposed project. The project is proposed to improve water quality standards
by redirecting flow from failing septic systems to a central wastewater
collection system,
. ..
Undeveloped parcels in Leggett will have access to the proposed project, but
no new development is planned due to this new construction.
3. Please note that your buffer impacts are considered permanent, and not
temporary, by the DWQ.
Page 7 of the PCN form has been updated and five (5) copies are attached to
this letter.
If you have any questions, please do not hesitate to contact our office.
Best regards,
THE WOOTEN COMPANY
tF~
Enclosures: PCN Form pg. 7
Cc: Mike Matthews, Director of Water & Sewer, Edgecombe County
TWC File
t>,\-oca4-1
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitiQation, then you MUST fill out Section D of this form.
6a. D Neuse 181 Tar-Pamlico D Other:
Project is in which protected basin? D eatawba D Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) for impact Stream name mitigation (square feet) (square feet)
or Temporary required?
rf)
Sewer DYes 83.5 LF * 8 LF = 48 LF * 8 LF =
B1 181 pDT Line Leggett eanal ~No 668 Sq Ft 384 Sq Ft
Installation
Sewer Unnamed Tributary to DYes 74 LF * 8 LF = 46 LF * 8 LF =
B2 181 pDT Line
Installation Leggett eanal 181 No 592 Sq Ft 368 Sq Ft
B3 D pDT DYes
DNo
6h. Total butTer impacts 1 ,260 Sq Ft 752 Sq Ft
6i. eomments: The buffers will be restored to original quality and appearance after construction is complete.
Page 7 of 12
peN Form - Version 1.3 December 10, 2008 Version