May 13, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Piedmont Natural Gas / Duke Energy .
ATTN: S. Pinkney Bynum, Project Manager
4720 Piedmont Row Drive
Charlotte, NC 28210
RE: Project Name: PNG Casing 2272/2278 Retirement
Project ID: NASH-2019-002
Acres Approved: 9.9
County: NASH, City: Sharpsburg, Address: US 301
River Basin: Tar Pamilico, Stream Classification: Other
Submitted By: S&ME
Date Received by LQS: May 2, 2019
Plan Type: Revised
Dear Mr. Bynum:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years following the
date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions abouit the NOI form to Annette Lucas at
Annette.lucasOncdenngov or Paul Clark at Paul.clarkC@ncdenr.gov. After you submit a complete and
correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCG01 permit. However, on or after June 1, 2019, a $100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
raanicu+a.u�n� Q�101
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
919.791.4200
Letter of Approval with Modifications
Piedmont Natural Gas / Duke Energy
May 13, 2019
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspection made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part- on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Cast e, EI
Regional .ngmeenng Associate
DEMLR
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
cc: Liane R. Morgan, PE ( lmorgan@smeinc.com) —Electronic Copy
DEMLR — Raleigh Regional
Letter of Approval with Modifications
Piedmont Natural Gas / Duke Energy
May 13, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: PNG Casing 2272/2278 Retirement
Project ID: NASH-2019-002
County: Nash
1. Note that construction activities that have an E&SC Plan approved on or after April 1,
2019 are required to fill out and submit an electronic Notice of Intent (e-NOI) form.
All construction activities are required to follow the new NCGO1 permit regardless of
when they were approved.
2. Add the following statement to the construction sequence: `Erosion and Sediment
Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before
and land disturbing activities occur." The COC can be obtained by filling out the
electronic Notice of Intent (e-NOI) form at deq.nc.gov/NCGO1. Please note, the e-NOI
form may only be filled out once the plans have been approved. A copy of the E&SC
permit, the COC, and a hard copy of the plan must be kept on site, preferably in a
permits box, and accessible during inspection.
3. Add the following statement to the construction sequence, "When the project is
complete, the permittee shall contact DEMLR to close out the E&SC Plan. After
DEMLR informs the permittee of the project close out, via inspection report, the
permittee shall visit deq.nc.gov/NCGO1 to submit an electronic Notice of Termination
(e-NOT). A $100 annual general permit fee will be charged until the e-NOT has been
filled out."
4. The NCGO1 Ground Stabilization and Materials Handling Plan Sheet must be added to
the plans. A pdf and an AutoCAD version are located at deq.nc.gov/NCGO1.
5. The NCGO1 Inspection, Recordkeeping, and Reporting Plan sheet must be added to the
plans. A pdf and an AutoCAD version are located at deq.nc.gov/NCGO1.
6. Provide two copies of the plan set (one full-size and one half-size), showing the
modifications required for approval. To facilitate DEMLR review, bubble, highlight,
or otherwise identify the changes to your resubmittal. Provide one copy of additional
items (such as design calculations). Provide a cover letter referencing the project name,
project ID, and purpose for submittal. (G.S. 113A-57(4))