L Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Neuse Buffer Impacts
only in conjunction with the greenway trail (i.e., allowable)_
3. If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section.VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information i 17 777-71
,
1. Owner/Applicant Information
Name: Town of Cary DEC 1 9 2005
Mailing Address: P.O. Box 8005 Cary, NC 27512
Telephone Number: (919) 462-3931 Fax Number: (919) 460-4935
E-mail Address: mike.babuin@townofcary.org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: n/a
Company Affiliation:
Mailing Address:
Telephone Number:
Fax Number:
Page 5 of 13
E-mail Address:_
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SW Cary Parkway Sidewalk Improvements
2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a
3. Property Identification Number (Tax PIN): #075305197293
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.):
5.
Site coordinates (For linear projects, such as a road or utility line,
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): -78.8308° 35.7877°_
6. Property size (acres): 286.46 Acres (Note: this is the size of parcel #075305197293 that
TOC owns which constitutes all of Bond Park, including this very small area where the
buffer impacts are located).
7. Name of nearest receiving body of water: Crabtree Creek
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://l12o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed urban area, existing pedestrian tunnel adjacent
attach a sheet that
Page 6 of 13
to stream. No changes to tunnel or stream. No stream impacts, no wetland impacts.
Putting in a sidewalk on either side of tunnel perpendicular to tunnel.
IV.
10. Describe the overall project in detail, including the type of equipment to be used: Manual
labor plus small "Bobcat".
11. Explain the purpose of the proposed work: Install pedestrian sidewalk from tunnel
entrance/exit
Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. n/a
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated-work,
and provide justification for the exclusion of this work from the current application. n/a
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 885 ft2 of zone 1 & 349 ft2 of zone 2
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list imnacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet) Area of
Impact
(acres)
n/a
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: n/a
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43.560.
Stream Impact
Number
indicate on ma
Stream Name
Type of Impact Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
linear feet Area of
Impact
(acres)
i
Total Stream Impact (by length and acreage) n/a 0
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc. n/a
Open Water Impact Name of Waterbody Type of Impact Type of Waterbody Area of
Page 8 of 13
Site Number
(indicate on ma (if applicable) (lake, pond, estuary, sound, bay,
ocean, etc. Impact
(acres)
0
Total Open Water Impact (acres) 0
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation n/a
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See attached drawing sheet
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://'h2o.enr.state.nc.us/ncwetlands/strm.gide.htlul.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed. n/a
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wtp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information: n/a
Amount of stream mitigation requested (linear feet):
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a (allowable/greenwav trail)
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX.
X.
Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? n/a
Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify V Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 885 3 (2 for Catawba) n/a
2 349 1.5 n/a
Total 1234 n/a
* Zone 1 extends out 30 feet perpendicular from the top of the near
additional 20 feet from the edge of Zone 1.
Zone 2 extends an Page 11 of 13
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or.0244, or.0260. n/a allowable use/greenway trail
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. n/a
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility. n/a
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Page 12 of 13
VICINITY MAP
(NOT TO SCALE)
PROJECT
STUDY AREA
STREAM BUFFER IMPACTS
TOWN OF CARY
ENGINEERING DEPARTMENT
316 N. ACADEIIIY STREET
CARY, N.C. 27512
ENVIRONMENTAL PROJECT
SCALE: 140' SPECIALIST ENGINEER
SW CARY PARKWAY
SIDEWALK IMPROVEMENTS
ALONG
CRABTREE CREEK
ZONE 1 (0'-30' BUFFER) IMPACT AREA = 1913 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 1089 SF
PROPOSED IMPERVIOUS AREAS
M ZONE 1 (0'-30' BUFFER) IMPACT AREA = 885 SF
STREAM IMPACT LENGTH = 0 FT
NORTH DEC. 7,2005 MIKEBABUIN KYLE HUBERT EXISTING IMPERVIOUS AREA = 103 SF ® ZONE 2 (30'-50' BUFFER) IMPACT AREA = 349 SF
S'ORiH
y+? CARY TOWN OF ! I
CRY 275 - M I I
PN 077505197297 I
0B 02993
PO 0721 l I
l I
1 1
Office Use Only: Form Version March 05
<20052227
USACE Action ID No. n/a DWQ No.
(1f any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Neuse Buffer Impacts
only in conjunction with the greenway trail (i.e., allowable)
3. If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section-VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information DEC 1 2005
Name: Town of Cary
Mailing Address: P.O. Box 8005 Cary, NC 27512
.;
Telephone Number: (919) 462-3931 Fax Number: (919) 460-4935
E-mail Address: mike.babuin@townofcary.org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: n/a
Company Affiliation:
Mailing Address:
Telephone Number:
Fax Number:
Page 5 of 13
E-mail Address:_
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SW Cary Parkway Sidewalk Improvements
2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a
3. Property Identification Number (Tax PIN): #075305197293
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.):
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): -78.8308° 35.7877°
6. Property size (acres): 286.46 Acres (Note: this is the size of parcel #075305197293 that
TOC owns which constitutes all of Bond Park, including this very small area where the
buffer impacts are located).
7. Name of nearest receiving body of water: Crabtree Creek
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http:Hh2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed urban area, existing pedestrian tunnel adjacent
Page 6 of 13
to stream. No changes to tunnel or stream. No stream impacts, no wetland impacts.
Putting in a sidewalk on either side of tunnel perpendicular to tunnel.
10. Describe the overall project in detail, including the type of equipment to be used: Manual
labor plus small "Bobcat".
11. Explain the purpose of the proposed work: Install pedestrian sidewalk from tunnel
entrance/exit
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. n/a
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application. n/a
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 885 ft2 of zone 1 & 349 ft2 of zone 2
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and floodin,2.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
( es/no) Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
n/a
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: n/a
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage. multinly length X width. then divide by 43.560.
Stream Impact
Number
(indicate on ma
Stream Name
Type of Impact Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
linear feet Area of
Impact
(acres)
Total Stream Impact (by length and acreage) n/a 0
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc. n/a
Open Water Impact Name of Waterbody Type of Impact Type of Waterbody Area of
Page 8 of 13
Site Number
indicate on ma (if applicable) (lake, pond, estuary, sound, bay,
ocean, etc. Impact
acres
0
Total Open Water Impact (acres) 0
6. List the cumulative impact to all Waters of the U.S. resulting from the nroiect:
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation n/a
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See attached drawing sheet
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http : //h2o. enr.state.ne.us/ncw etland s/stnn gide. html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed. n/a
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http:/ih2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information: n/a
Amount of stream mitigation requested (linear feet):
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a (allowable/greenwav trail)
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? n/a
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buf fer multipliers.
Zone* Impact Multiplier Required
(square feet) Mitigation
1 885 3 (2 for Catawba) n/a
2 349 1.5 n/a
Total 1234 n/a
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an -
additional 20 feet from the edge of Zone 1.
Page 11 of 13
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B.0242 or.0244, or.0260. n/a allowable use/2reenway trail
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. n/a
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility. n/a
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes El No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/newetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Page 12 of 13
VICINITY MAP
(NOT TO SCALE)
PROJECT
STUDY AREA
?i = { -- -
L 7--
%
Irk 'y' ! ! -`?J(?f,•` ,r,? I {... /-.,`i- - J, ?.lR• ?? ?? j ?? _``. q ? ??\; ( iii ???(( -^?u?'??? ?(i ` 4 ,1?. ' ?y1-C31S1???''ti?? ?",,1
,
j/
lt'i• ~'? n'l??y- ?? f ? .,'? J , r ? ?fl' ` ??_I ?? l ::, ?' ' ?.?B.II l''?,??''i
,.i---Q- -j?•?;J ll,f .'', ?r ?l_?/"- /,-- ?l v'? ?r?`?\j1j'4?) ??<A }C, } ` ?_ qc+,\ C ?t{i
v ,r ''lr.•?? if r?1 { C r `?.- _ f '? V i? J? ?? -? ?;r?
?v ,111 ? ? 3? . ? ? ?_ •?A ?? ,'i `_?--;,,.?? ??
Q
1
{I1 ttt
?? I .fir - }?j?°J r?• f ??/? j 1
1
•, r a,
f, ilJ
- 31"
z= l l
?' { y
k - ?? r }
I ??tf 17
?.?,5? , t ? , i 9 1 ? • , 1 C r ?, ?,,?
.?r ? r?F.t •'? t}.. S?.t ?i 177 f}ll?y
.-.L: til? 1 ? r st 4
37-
41
Avi, 1 -;
SW CARY PARKWAY
SIDEWALK
IMPROVEMENTS
TOWN OF CARY
ENGINEERING DEPARTMENT
318 N. ACADEMY STREET
CARY, N.C. 27512
SCALE: 1" = 2000' ENVIRONMENTAL
SPECIALIST PROJECT
ENGINEER
'C 1
1 DEC. 7,
2005
MIKE BABUIN
KYLE HUBERT
?fi k?• a.?-° NORTH
PROJECT
STUDY
AREA
TOWN OF CARY
ENGINEERING DEPARTMENT
316 N. ACADEMY STREET
CARY, N.C. 27512
ENVIRONMENTAL PROJECT
SCALE: 1"=40' SPECIALIST ENGINEER
+r
DEC. 7, 2005
ATIVT DADi1ilU VVIClI11OCDT
SW GARY PARKWAY
SIDEWALK IMPROVEMENTS
ALONG
CRABTREE CREEK
STREAM BUFFER IMPACTS
EIZONE 1 (0'-30' BUFFER) IMPACT AREA = 1913 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 1089 SF
STREAM IMPACT LENGTH = 0 FT
CVICT1Al/' III0CDI1l/111C ADCA - 1!1"L CC
PROPOSED IMPERVIOUS AREAS
® ZONE 1 (0'-30' BUFFER) IMPACT AREA = 885 SF
KM ZONE 2 (30'-50' BUFFER) IMPACT AREA = 349 SF
s+? CARY 70M a I I
Po BOX am
CARP NC =12-a=
B7tl3 I
M oan I I
I
I 1
Office Use Only: Form Version March 05
USACE Action ID No. n/a DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Neuse Buffer Impacts
only in conjunction with the greenway trail (i.e., allowable)_
3. If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section-VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
is f
1. Owner/Applicant Information s. "= `?-
Name: Town of Cary ?OG5
Mailing Address: P.O. Box 8005 Cary, NC 27512
Telephone Number: (919) 462-3931 Fax Number: (919) 460-4935
E-mail Address: mike.babuin@townofcary.org -
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: n/a
Company Affiliation:
Mailing Address:
Telephone Number:
Fax Number:
Page 5 of 13
E-mail Address:
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans ihould
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SW Cary Parkway Sidewalk Improvements,
2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a
3. Property Identification Number (Tax PIN): #075305197293
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.):
5. Site coordinates (For linear projects, such as a road or utility line,
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): -78.8308° 35.78770
attach a sheet that
6. Property size (acres): 286.46 Acres (Note: this is the size of parcel #0 753 051 9 7293 that
TOC owns which constitutes all of Bond Park, including this very small area where the
buffer impacts are located).
7. Name of nearest receiving body of water: Crabtree Creek
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://l12o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed urban area, existing pedestrian tunnel adjacent
Page 6 of 13
to stream. No changes to tunnel or stream. No stream impacts, no wetland impacts.
Putting in a sidewalk on either side of tunnel perpendicular to tunnel.
10. Describe the overall project in detail, including the type of equipment to be used: Manual
labor plus small "Bobcat".
11. Explain the purpose of the proposed work: Install pedestrian sidewalk from tunnel
entrance/exit
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. n/a
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application. n/a
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 885 ft2 of zone 1 & 349 ft2 of zone 2
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
sevarately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
n/a
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: n/a
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage- multinly length X width- then divide by 41560
Stream Impact
Number
indicate on ma
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
Linea feet) Area of
Impact
(acres)
Total Stream Impact (by length and acreage) n/a 0
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc. n/a
Open Water Impact Name of Waterbody Type of Impact Type of Waterbody Area of
Page 8 of 13
Site Number
indicate on ma (if applicable) (lake, pond, estuary, sound, bay,
ocean, etc. Impact
acres
0
Total Open Water Impact (acres) 0
6. List the cumulative impact to all Waters of the U.S. resulting from the proiect:
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation n/a
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See attached drawing sheet
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
ht!p://h2o.enr.state.nc.us/ncwetlands/stnngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed. n/a
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information: n/a
Amount of stream mitigation requested (linear feet):
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a (allowable/2reenway trail)
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? n/a
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify V Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 885 3 (2 for Catawba) n/a
2 349 1.5 n/a
Total 1234 n/a
* Zone 1 extends out 30 feet perpendicular from the top of the near
additional 20 feet from the edge of Zone 1.
extends an Page 11 of 13
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or.0244, or.0260. n/a allowable use/greenway trail
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. n/a
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility. n/a
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Page 12 of 13
VICINITY MAP
(NOT TO SCALE)
PROJECT
STUDY AREA
nl(
t L r?'
v
fit
r ! 7
1 ? I r? /? ?Y C e? i71? i^ 1?? :"`ti1t rp "', 1},? -
8 OQ i? ?r 1?t?\+ I! v???
J
fry, t '?..• if , 1, ( 11 ,?. ?
Ott ??+ ?? f r g ,l ? s y '' ?! try r l?? ' f y
y
f .
s
{
A
SW CARY PARKWAY
s
SIDEWALK
IMPROVEMENTS
CARY QUADRANGLE
11
'? 1 r /%' w• t ??? NORTH CAROLINA
' 7.5-MINUTE SERIES (TOPOGRAPHIC)
CARY NC
1993
INA,
``? _? -KY
TOWN OF CARY
ENGINEERING DEPARTMENT
316 N. ACADEMY STREET
CARY, N.C. 27512
ENVIRONMENTAL PROJECT
SCALE: 1"=40' SPECIALIST ENGINEER
DEC. 7,200$ ,, nn.mr.u vrcvroenm
SW GARY PARKWAY
SIDEWALK IMPROVEMENTS
ALONG
CRABTREE CREEK
STREAM BUFFER IMPACTS
M ZONE 1 (0'-30' BUFFER) IMPACT AREA = 1913 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 1089 SF
STREAM IMPACT LENGTH = 0 FT
rwcnnic nlocaTnnitc eace - 101 cc
PROPOSED IMPERVIOUS AREAS
M ZONE 1 (0'-30' BUFFER) IMPACT AREA = 885 SF
Fm ZONE 2 (30'-50' BUFFER) IMPACT AREA = 349 SF
vep GWY TOM a I I
po BOX am
I I
GWY Z7512-am
PM 0753MIOM3 I
C8 CM3
n can I I
1
N
Office Use Only: Form Version March 05
2052227
USACE Action ID No. n/a DWQ No. 0
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Neuse Buffer Impacts
only in conjunction with the greenway trail (i.e., allowable)
3. If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here:
1
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section-VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Town of Cary DELL 2005
Mailing Address: P.O. Box 8005 Cary, NC 27512
Telephone Number: (919) 462-3931 Fax Number: (919) 460-4935
E-mail Address: mike.babuin@townofcary.org -
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: n/a
Company Affiliation:
Mailing Address:
Telephone Number:
Fax Number:
Page 5 of 13
I
E-mail Address:_
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SW Cary Parkway Sidewalk Improvements
2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a
3. Property Identification Number (Tax PIN): #075305197293
4. Location
County: Wake Nearest Town: Cary
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.):
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): -78.8308° 35.7877°
6. Property size (acres): 286.46 Acres (Note: this is the size of parcel #0 753 051 9 7293 that
TOC owns which constitutes all of Bond Park, including this very small area where the
buffer impacts are located).
7. Name of nearest receiving body of water: Crabtree Creek
8. River Basin: Neus
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed urban area, existing pedestrian tunnel adjacent
Page 6 of 13
to stream. No changes to tunnel or stream. No stream impacts, no wetland impacts.
Putting in a sidewalk on either side of tunnel perpendicular to tunnel.
10. Describe the overall project in detail, including the type of equipment to be used: Manual
labor plus small "Bobcat".
11. Explain the purpose of the proposed work: Install pedestrian sidewalk from tunnel
entrance/exit
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. n/a
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated-work,
and provide justification for the exclusion of this work from the current application. n/a
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 885 ft2 of zone 1 & 349 ft2 of zone 2
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
(linear feet Area of
Impact
(acres)
n/a
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: n/
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must he inrluded_ To calculate acreage- multinly length X width. then divide by 43.560.
Stream Impact
Number
(indicate on ma)
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
linear feet) Area of
Impact
(acres)
Total Stream Impact (by length and acreage) n/a 0
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc. n/a
Open Water Impact Name of Waterbody Type of Impact Type of Waterbody Area of
Page 8 of 13
Site Number
(indicate on ma (if applicable) (lake, pond, estuary, sound, bay,
ocean, etc.) Impact
(acres)
0
Total Open Water Impact (acres) 0
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation n/a
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See attached drawing sheet
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http:/ih2o.enr.state.nc.us/ncwetlands/stn-ngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed. n/a
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.eni.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information: n/a
Amount of stream mitigation requested (linear feet):
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a (allowable/2reenway trail)
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? n/a
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify, )? Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact Multiplier
(square feet
1 885 3 (2 for Catawba)
2 349 1.5
Total 1234
* Zone 1 extends out 30 feet perpendicular from the top of the near
additional 20 feet from the edge of Zone 1.
Required
n/a
n/a
n/a
of channel; Zone 2 extends an
Page 11 of 13
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. n/a allowable use/greenwav trail
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. n/a
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility. n/a
XIII. Violations (required by DWQ)
XIV.
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr. state. nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Page 12 of 13
P?
.-? r---"r
VICINITY MAP
(NOTTO SCALE) '? r 1 1 F /!( I?t ;i = -? 1 .1 y r 1 _?
rr \ ?.
ltij,'.
1Zly Y _ x'7;/4 +?
PROJECT
STUDY AREA
Tk'
??` `!. {CC? i? •1(? /r/\ °?? ,/`3??ij` ,w J. f\
r 1' ? t i ? ? ' ,?? __i f/1 ?? ! ? I r,f ?7 ? . (t i = -'?+k''•. r? ;!,r7t
v1 1 s
if `'? ? ?? eEl?l?r' ?'ti ? r hj 1 ?''??{ih ? ? ?,?j' "r ? ? ??' ??i? ,,??•,?\? ?r y„ ??..!(t 11,.E ? ??/? ? t??
01
t'?y) ? ? , ., + , ???. .?f?? ? it ; , , r. ?? ':`- ?.,r? + '?.;', I,• •?? '?-? C,{ry?'ti? ????
77
/ ?? ?'ej4 ?4 1??f ?fr1r r '7/ ?t' \_.... l?7', .r\. 1??^?l??,r" •1 I ?/
,J
e Ile
r
? rI
TOWN OF CARY
ENGINEERING DEPARTMENT
318 N. ACADEMY STREET
Jr !
-
CARY, N.C. 27512
'- -^
`
SCALE: 1" = 2000' ENVIRONMENTAL
SPECIALIST PROJECT
ENGINEER
DEC. 7, 2005
MIKE BABUIN
KYLE HUBERT
?
'`
?
h I
r
>-- soxrx
}1?
PROJECT
STUDY
AREA
MAP REFERENCE:
USGS
iEPARTMENT OF THE INTE;,
U.S. GEOLOGICAL SURVEY
CARY QUADRANGLE
NORTH CAROLINA
7.5-MINUTE SERIES (TOPOGRAPHIC)
CARY,NC
1993
TOWN OF CARY
ENGINEERING DEPARTMENT
316 N. ACADEMY STREET
CARY, N.C. 27512
ENVIRONIIIENPAL PROJECT
SCALE: 1" = 40' SPECIALIST ENGINEER
DEC. 7, 2005
xrrv>• n nrnxr vxn o unncnm
SW GARY PARKWAY
SIDEWALK IMPROVEMENTS
ALONG
CRABTREE CREEK
STREAM BUFFER IMPACTS
ZONE 1 (0'-30' BUFFER) IMPACT AREA = 1913 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 1089 SF
STREAM IMPACT LENGTH = 0 FT
CWiC'Mfr IIIOCOWInf IC AOCA - 1712 CC
PROPOSED IMPERVIOUS AREAS
® ZONE 1 (0'-30' BUFFER) IMPACT AREA = 885 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 349 SF
gxal C/AY TOM CF
I 1
Po Box am
CAR NC 27512-4k= ?I
PIN 075305177227 I
Ce 02283
PO 0" I I
I
1
Office Use Only: Form Version March 05
20.;,' 5'2227
USACE Action ID No. n/a DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
? 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Neuse Buffer Impacts
only in conjunction with the greenway trail (i.e., allowable)_
3. If this notification is solely a courtesy copy because written approval for the 401
Certification is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section.VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information D -C 2005
Name: Town of Cary
Mailing Address: P.O. Box 8005 Cary, NC 27512 ??, taw v ?_ G+, y?, i
Telephone Number: (919) 462-3931 Fax Number: (919) 460-4935
E-mail Address: mike.babuin@townofcary.org
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: n/a
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
Page 5 of 13
E-mail Address:_
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SW Cary Parkway Sidewalk Improvements
2. T.I.P. Project Number or State Project Number (NCDOT Only): n/a
3. Property Identification Number (Tax PIN): #075305197293
4. Location
County: Wake Nearest Town: Cart/
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.):
5
Site coordinates (For linear projects, such as a road or utility line, attach a
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): -78.8308° 35.7877°
6. Property size (acres): 286.46 Acres (Note: this is the size of parcel #075305197293 that
TOC owns which constitutes all of Bond Park, including this very small area where the
buffer impacts are located).
7. Name of nearest receiving body of water: Crabtree Creek
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed urban area, existing pedestrian tunnel adjacent
sheet that
Page 6 of 13
to stream. No changes to tunnel or stream. No stream impacts, no wetland impacts.
Putting in a sidewalk on either side of tunnel perpendicular to tunnel.
10. Describe the overall project in detail, including the type of equipment to be used: Manual
labor plus small "Bobcat".
11. Explain the purpose of the proposed work: Install pedestrian sidewalk from tunnel
entrance/exit
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. n/a
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated -work,
and provide justification for the exclusion of this work from the current application. n/a
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
Page 7 of 13
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: 885 ft2 of zone 1 & 349 ft2 of zone 2
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding-
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet) Area of
Impact
(acres)
n/a
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: n/a
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage- multiniv length X width- then divide by 43560
Stream Impact
Number
indicate on ma
Stream Name
Type of Impact Perennial or
Intermittent? Average
Stream Width
Before Impact Impact
Length
linear feet Area of
Impact
(acres)
Total Stream Impact (by length and acreage) n/a 0
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc. n/a
Ooen Water Impact Name of Waterbodv Tvne of Impact Tvne of Waterbodv Area of
Page 8 of 13
Site Number
(indicate on ma) (if applicable) (lake, pond, estuary, sound, bay,
ocean, etc.) Impact
(acres)
0
Total Open Water Impact (acres) 0
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation n/a
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
I
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See attached drawing sheet
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
htt]2://h2o.enr.state.ne.us/ncwetlands/strm.gide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed. n/a
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at htlp://h2o.enr.state.nc.us/wm/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information: n/a
Amount of stream mitigation requested (linear feet):
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a (allowable/2reenway trail)
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? n/a
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify V Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact Multiplier Required
(square feet Mitigation
1 885 3 (2 for Catawba) n/a
2 349 1.5 n/a
Total 1234 n/a
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1.
Page 11 of 13
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 213.0242 or.0244, or.0260. n/a allowable use/greenway trail
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. n/a
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility. n/a
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Page 12 of 13
Tz-
j 1 t T%
''1;i+ SW CARY PARKWAY
SIDEWALK
IMPROVEMENTS
`V g ? l
it
t J JJj 1
t031/1 - ilS?? /11 y "-'?`?• `????},m??? 1i J } ,y?`}, ? ??'``a% ? 4,'rl_? "?,#?????,1"??!?3????_ J ? /'.?, ?
VICINITY MAP
(NOT TO SCALE)
?`.•"??'?#,t; -,' , ? ?$ ? 1 f( L ?? ?C , `- =' ? t rte` r + - ? ? II
'?- Ef --'-
PROJECT ,?,,yy,t ?.`-;1? ?; :, ` -=f?- -"f? -:,?'?,• tt-J
STUDY AREA
, 047'
\-?\, J 1 O I J J ?.,,? J Tn ? l
;?-?\ \ ?? ? 'z .? j?_ ? ??} " . ? rrr l?. r'?i +; ? ?.!? l \`•.. ? 11.:6 ?1,? y =? ? ? ?? --?_-!,
k (
?,? ?? - IJ'?? •1 F'? ?. it ,i ?? 'fir ?, k' ? f. ? ? ? 1t,?, ? ? ? ,? +-? L,?"??`•?--y
1..-!'?
/j1 ?f r r p} ?_•?
i i ? t F G \ . ! ,^''?,..e ? ? 1 .?, ? ? sue! ? r /'? `" \ ?'1 1 p',?
ld"
t J !._ ??,./ ! -, \ , ' f t !f•.?? ?f l r?J,, ?1 I ! ? Ij r f ,t??'.S ?: //?'('? ? +. x "`?.,? `h??1?'? ? l ???
1
?J ?•`? ?' ! j' t ??\? ??i ? ? ??? ?1 r \`ri? ? i 1. "'S 1) t f .. e 11...?r
`sue / 1y'f/` Q
Nm-,?''?
Q''`om"?
r' 1 1 ?' r r 1 ?l r?? 2{n 111 (4 i
?j 1 ice;} ? n.??r7 r'-' t,?l x ?'\'`? ?! ?• --;,. ?
?i r'? ? rf{ ? t f?l ! /.?''? ,-._'? vi"-t I I'f i?\.?? 3 ?'?"`,????3M f ?.-?/ .? ?i?? i
% } 4$ t 4 ( tr lt\ /r ?t
Z? ?r t +? +?
? ?'.?i
r 1(3v%R ?I ? r ,? ?? I t 04 ? • ? ? l i
VN'
;} ?i? `t? r??` ?,?. ?°ta v /'?°-',> f` ?i?%'?j J?j/fl r? ti•.lt?`` _} ???' \.?` ? -? 1 \',1.
f
<i?? J, r ,. ?•.. •iL t?,
TOWN OF CARY
{
ENGINEERING DEPARTMENT
(? j, r 318 N. ACADEMY STREET
CARY, N.C. 27512
ENVIRONMENTAL PROJECT
SCALE: 1 ° = 2000' SPECIALIST ENGINEER
DEC. 7, 2005
y.-? MIKE BABUIN KYLE HUBERT
TOWN OF CARY
ENGINEERING DEPARTMENT
316 N. ACADENIY STREET
CARY, N.C. 27512
ENVIRONDIEN'TAL PROJECT
SCALE: 1"=40' SPECIALIST ENGINEER
1} DEC. 7, 2005
nuvc "A oI nv vvS c unucolr
SW GARY PARKWAY
SIDEWALK IMPROVEMENTS
ALONG
CRABTREE CREEK
STREAM BUFFER IMPACTS
ZONE 1 (0'-30' BUFFER) IMPACT AREA = 1913 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 1089 SF
STREAM IMPACT LENGTH = 0 FT
rvicnkir ?ADC-MAniic AorA - In-4 CC'
PROPOSED IMPERVIOUS AREAS
® ZONE 1 (0'-30' BUFFER) IMPACT AREA = 885 SF
ZONE 2 (30'-50' BUFFER) IMPACT AREA = 349 SF