HomeMy WebLinkAboutNCC190488_ESC Approval Submitted (2)_20190605 Iredell County Planning & Development Erosion Control. Section 349 North Center Street Box 788 Statesville, NC 28687 Date:. April 26, 2019 LETTER OF APPROVAL Matt. Santomenna Race City Marine, LLC 123-A Doolie Road Mooresville, NC 28117 RE: Project Name: Race City Marine Acres Approved: C.6 Project ID: IREDE-20119-024 Project Location: PIN 463810 327.000 Submitted.By: Blue Ridge Engineering PLLC Date Received: April 16, 2019 Plan Type: Revised/Additional Disturbance Dear Mr. Santomenna: This office has reviewed the subject erosion and sedimentation control plan. We fired the plan to be acceptable and hereby issue this letter of.approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval as is required by"title 15A NCAC 4B.0129 and Section 9.6.6 of the Iredell County Land Development Code. Title 15 . l'NCAC 4B 0118(a) and Section 9.6.9 of the Iredell County Land. Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 11.3A-61.1(a) and Section 14.2.2 of the Iredell County Land. Development Code, of our right of periodic 'inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following, the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedirnentation Pollution Control Act of 1973, (North Letter of Approval Race City Marine April 26, 2019 Page 2 of 2 Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NO]) f6iin requesting a Certificate of Coverage (COC), under the NCGO I C?�000 Construction Ston-nwater General Peri-nit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOL Please direct questions about the NOI forni to Annette Lucas at Aniiette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Fon-11, a COC will be emalled to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO I permit. However, on or after May 1, 2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Fon-n, which you provided. You are requested to file an amended fonm if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, e6-1-���----_— Randall Moore, CESSWI, CFM Erosion Control Inspector 11 Enclosures: Fact Sheet on the New NCG01 Permit PERMITS/IISTSP PAYMENT RECEIPT4 490020 COUNTY OF IREDELL PO BOX 788 200 SOUTH CENTER STREET' Central Permitting Center STATESVILLE NC 28687 2019 DATE: 04/26/19 TIME : 14 : 06 CLERK: chrystal . sloan PAID BY: RACE CITY MARINE APPLICATION # : ----- --- -- - ------------ -- - ----- - - - -- - - - -- - -- -- - - - - ---- - -- - - ------------- - ------- PERMIT ALLOCATION: 1 104563 460003 175 . 00 Erosion Control Permit/Fees PEC TOTAL RECEIPT AMOUNT: 175 . 00 ------- ------- - - - ---- -- - ----- - -- ----------- - -------- -- - - - ------- ----------- ----- AMOUNT PAID: 175 . 00 PAID BY: RACE CITY MARINE PAYMENT METHOD: MULTIPLE METHOD: CH CHECK/REP: QTY- I ADD' L REP: RACE CITY MARINE AMT: 125 . 00 METHOD: CH CHECK/REF': QTY: 1 ADD' L REF: RACE CITY MARINE AMT: 50 . 00 APPLICATION # : AMT TENDERED: 175 . 00 AMT APPLIED: 175 . 00 CHANGE ; . 00 NCGO1 Peiri""iAt 2019 The NC Construction General Permit (also known as "NCGOI") was renewed on March 1, 2019. The updated permit does not signiflcantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is nevv process in which construction sites will obtain official coverage under an NCGOI permit through an electronic process, DEMLR worked w th a broad team of stakeholders to make all of these updates,, If you have clUestions, contact Annette Lucas at Armiet jUCa-11!L em g�tLv,or (919) 707-6369. The nev,, pernn'st: COC: Certificate of Coverage, proof of obtaining an NCG01 permit o Repc3ats state reQLdroments for E&SC DDIALRI: NC D i vision of Energy, Minerel, and Land Resources Plans and organizes thorn with, federal E&SC, Erosion & Sedimentation Control construction activity requirements; e-F�10i: Notice of Intent, apphcaVon form for the NCGO1 perrnit o Is clearly organized by topic; and &NOTA Notice of Termination, form for closing OL1+L the NICGOI perrylit Has less text and more tables, SWPPP. Storrs water Pollution Preven'lon Nan, required by the NCGO1 J c'7 R A in it'. t j V.')cl at es; The new perm t: c Requires that the F&SC Plan r-neet SWPPP requirements (p. 2); Provides a If'st of iterns that must be A, ir)ClUded in the SVYPPP, Such as the Cons tRlCt��On sequence, plans, A", Cc,31CLflatlOnS, etc. (p. 2-4); �(gg'' ca Has updated language on bypasse.5 and upsets that is tailored to construction '0' actMties (p. 10); Nllt-s A timOrarnes for inspe,tifpi.s, recorddkeepEng and reporting in NCG"m11 .calendar days" for clarity arid The nevv AJCGO1 applies to perrnis apprGved or,or after A4arch 1, 20;9. consistency (p. 11-1.4);' Perrvittees will no longer receive a copy of the NCGOI permit in the rn IiN CharIges the inspection frequency (during business hours) to at least %v th their E&.SC Plan approvals and be cons4iered as covered under the once per 7 ca9endar days and after permit, Federal rLJ11-s require that DEMLR receive an NOI on each every storm > 1.0 inch (previously O.S construction project and issue each construction project its ovin COC, inch);' and Under the new NCGO1 Process, construction sites vJH continue to o Excludes weekends, state and fetderal, receive approval for E&SC Plans fror-n either DEIVLR or the da@e0gated holidays frorri norma' business hours, local E&SC program just like before. After receiving E&SC Pian approval, unless construction activitipH ta!<p permittees wI! officially obtain coverage under the NCGO1 by place (p, 23). completing an e-NOI (aval[able at dc The e--NO1 wil€ only take about 20 rnlnutes to fill out and submit on-line. This list is based on website gUidance Initially, there will be tic)charge associated with applyint,g for an NCGOI by the DEMLR Sedirnent Program. The number of calendar days vvas permit but on or around May 1, 2019, DEMLR �;%,N begin charging a $100 selected to be as equivalent as annual general permit fee as required per §143-21S.3D. possible with the previous perrnft. DEfVL.R is working on creating a Single application form that will aliow an The intent is to provide predictability applicant to SiMUltaneously apply for an E&SC permit and an NCGOI to the inspection schedule, COC. That effort is part of a larger Permit Transformation project at DEMLR. IREDELL COUNTY PLANNING&DEVELOPMENT PO BOX 788 / 349 N. Center Street STATESVILLE NC 28687-0788 (704) 878-3118/ FAX 928-2025 Thank You for completing this Planning & Development survey to help us serve you better Return To: Matthew Todd, Planning& Development Director, E-mail: mtodd_@co.iredell.nc.us Mail: 349 N. Center Street, Statesville, NC 28677 or Fax:704-928-2025 You may also complete this survey online though our Planning & Development web page: http:llwww.co.iredell.nc.us/236/Planning-Development Please provide the name,of the Staff member who assisted you: .......... Method of Contact- Personal Visit E-mail Contact Phone Contact Type of Service Provided —General Information/Land Development Code Rezoning/Special Use/Variance —Residential information Addressing —Commercial Zoniing Permit Erosion Control —Zoning Enforcement/Complaint Subdivisions Floodplain Other Tell us how satisfied you were with our levels of service. Please circle your response I=Very Dissatisfied 2=Dissatisfied 3=Neutral 4=Satisfied 5=VerV Satisfied Overall, how satisfied were you with the services we provided? 1 2 3 4 5 Staff was knowledgeable about the services being provided. 1 2 3 4 5 Staff was pollite and professional. 1 2 3 4 5 Staff provided enough education to help you understand the rules. 1 2 3 4 5 Staff provided information in a timely manner. 1 2 3 4 5 How fully did you understand the materials and/or information given to you? 1 2 3 4 5 Staff thoroughly addressed your questions and concerns. 1 2 3 4 5 Is this the first time you have used our service? Yes No If you have used our services before, how many times in the past year? Please provide additional Feedback about your experience working with us (Concerns, Compliments, Etc.) *This form is not used for official complaints* Iredell County Planning&Development 349 N.Center Street Statesville,NC 28677