HomeMy WebLinkAboutWQCS00037_Compliance Evaluation Inspection_20190531ROY COOPER VZ
Governor
MICHAEL S. REGAN -
Secretary
LINDA CULPEPPER -4
Director NORTH CAROLINA
Enwh'enm-orttrrt Qeterrry
31 May 2019
Mr. Rick Howell, City Manager
City of Shelby
P.O. Box 207
Shelby, North Carolina 28151
Subject: Compliance Evaluation Inspection
Permittee: City of Shelby Waste Water Collection System
Permit No. WQCS00037
Cleveland County
Dear Mr. Howell:
Mr. Tony Parker of the Mooresville Regional Office of the NC Division of Water
Resources (DWR or the Division) conducted a compliance evaluation inspection (CEI) of
the City's wastewater collection system (WWCS) on May 29, 2019. The assistance of Mr.
Adam Howell, Mr. Mark Swink, Mr. Brad Greene and Mr. David Hux during the
inspection was greatly appreciated. A copy of the inspection report is attached for your
records and inspection findings are summarized below.
Site/System Review
2. The following system components were inspected:
a. Four pump stations were inspected.
b. Ten manholes were inspected.
C. One right of way was inspected.
d. Three aerial crossings were inspected.
3. As you are aware, owners of permitted collection systems must comply with their permit
and all rules listed under NC Administrative Code 15A NCAC 02T .0400, et seq. The
Town's compliance status with each of these rules is summarized below:
a. 15A NCAC 02T .0403(a)(1): Requires that the system be effectively maintained
and operated at all times to prevent discharge to land or surface waters and any
contravention of ground or surface water standards.
Observations: Each pump station appeared to well maintained and operated.
Compliance Status: Compliant
North Carolina Department of Environmental Quality I Division of Water Resources
610 East Center Avenue I Suite 3011 Mooresville, North Carolina 28115
704-663-1699
b. 15A NCAC 02T .0403(a)(2): Requires that a map of the wastewater collection
system be developed and actively maintained.
Observations: The City has digital mapping showing locations of lines, direction
of flow, force mains, pump stations, manholes and other information.
Compliance Status: Compliant
C. 15A NCAC 02T .0403(a)(3): Requires that an operation and maintenance (O&M)
plan be developed and implemented, which includes pump station inspection
frequency, preventative maintenance schedule, spare parts inventory and overflow
response.
Observations Pump station logs were available. Records were available for
generator maintenance. Spare parts and pumps are kept in stock. An overflow
response plan was available.
Compliance Status: Compliant
d. 15A NCAC 02T .0403(a)(4): Requires that the permittee or its representative
inspect pump stations that are not connected to a telemetry system (i.e., remote
alarm system) every day (i.e., 365 days per year) and pump stations that are
connected to a telemetry system at least once per week.
Observations: The pump station inspection logs indicate that the pump stations
are visited as required.
Compliance Status: Compliant
e. 15A NCAC 02T .0403(a)(5): Requires that the permittee or its representative
inspect high -priority sewers (HPS - as defined in 15A NCAC 02T .0402(2)) at least
once every six months and document the inspections.
Observations: All lines are checked and documented.
Compliance Status: Compliant
f. 15A NCAC 02T .0403(a)(6): Requires that the permittee or its representative
conduct a general observation of the entire wastewater collection system at least
once per year and document same.
Compliance Status: Compliant.
g. 15A NCAC 02T .0403(a)(7): Requires that overflows and bypasses from the
system be reported to the Division's Mooresville Regional Office in accordance
with 15A NCAC 02B .0506(a), and that public notice must be provided as required
by G.S. 143-215.1C.
Observations: SSO's have been reported as required with this system during this
review period. The NC regulations and statutes, which cover the reporting
requirements for SSOs, are found in NC Administrative Code 15A NCAC 02B
.0506(a) and NC General Statute 143-215.1C, respectively. You may access the
NC regulations online at the NC Office of Administrative Hearings (OAH) website
at: http://www.oah.state.nc.us/rules/ and the NC General Statutes online at the NC
General Assembly's website at:
http://www.nega.state.nc.us/aascripts/Statutes/StatutesTOC.1I. You may wish to
review them to ensure you are fully familiar with all requirements.
When reporting SSOs to DWQ, you must call the Mooresville Regional Office
(MRO) at 704-663-1699 during normal business hours. If outside normal business
hours, you must report the spill to the NC Division of Emergency Management at
1-800-858-0368. Please note that all reportable SSOs must be reported within 24
hours of the occurrence, or first knowledge, of the SSO. Please also note that voice
mail or faxed messages are not considered as the initial verbal report. You must
talk to and report the spill to a live person.
Compliance Status: Compliant
h. 15A NCAC 02T .0403(a)(8): Requires that a grease control program be developed
and implemented as follows:
1. For publicly owned collection systems, the Grease Control Program shall
include at least bi-annual distribution of grease education materials to users
and the legal means to require grease interceptors. The Program shall also
include legal means for inspections, enforcement, and legal means to
control grease entering the system from other public and private satellite
sewer systems.
2. Grease education materials shall be distributed more often than required
above if necessary to prevent grease -related sanitary sewer overflows.
Observations: Educational materials are mailed out to all customers. Information
is available upon request and at The City's Utility Operations Center. Information
is also detailed on the City's Annual Wastewater Report and distributed at Fair
Booth set ups.
Compliance Status: Compliant.
15A NCAC 02T .0403(a)(9): Requires that right-of-ways (ROW) and easements
be maintained to allow for personnel and equipment accessibility.
Observations: Records were reviewed documenting that the right-of-ways were
mowed, inspected and maintained to provide accessibility.
Compliance Status: Compliant.
15A NCAC 02T .0403(a)(10): Requires that documentation be kept for all
activities you undertake to comply with the requirements of 15A NCAC 02T .0403,
subparagraphs (a)(1) through (a)(9), for a minimum of three years, with the
exception of the map, which shall be maintained for the life of the system.
Observations: Records were reviewed for right of way mowing, high -priority line
inspections, and observation of the entire system.
Compliance Status: Compliant
The inspection report should be self-explanatory; however, if you have any questions
regarding the inspection report or this letter please contact Tony Parker at 704-663-1699
or tony_.parker(kncdenr.gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger, Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Attachments:
BIMS Inspection Report
CC: MRO
Central Files
PERCS Unit (e-copy)
Compliance Inspection Report
Permit: WQCS00037
SOC:
County: Cleveland
Region: Mooresville
Contact Person: David W Hux
Directions to Facility:
Effective: 07/01/15 Expiration: 06/30/23 owner: City of Shelby
Effective: Expiration: Facility: Shelby Collection System
PO Box 207
System Classifications: CS3,
Primary ORC: Adam Maurice Howell
Secondary ORC(s):
On -Site Representative(s):
Title: Asst. Utilities Director
Certification: 985584
Related Permits:
NC0024538 City of Shelby - First Broad River WWTP
Inspection Date: 05/29/2019 Entry Time: 09:30AM
Primary Inspector: Tony Parker
Secondary Inspector(s):
Shelby NC 281510207
Phone: 704-484-6840
Phone: 704-484-6840
Exit Time: 01:30PM
Phone: 704-663-1699
Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling
Permit Inspection Type: Collection system management and operation
Facility Status: Compliant Not Compliant
Question Areas:
Miscellaneous Questions Performance Standards Operation & Maint Reqmts
Records Monitoring & Rpting Reqmts Inspections
Pump Station Manhole Lines
(See attachment summary)
DocuSigned by:
• 5/31/2019
A14CC681AF27425...
Page 1 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Inspection Summary:
Page 2 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Performance Standards Yes No NA NE
Is Public Education Program for grease established and documented? 0 ❑ ❑ ❑
What educational tools are used?
Bill stuffers ref FOG 2/year, fair booth FOG presentation, FOG info on Annual Report and available at City Utility
Operation Center and on request.
Is Sewer Use Ordinance/Legal Authority available? ❑ ❑ ❑
Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ ❑
Is Grease Trap Ordinance available? ❑ ❑ ❑
Is Septic Tank Ordinance available (as applicable, i.e. annexation) ❑ ❑ ❑
List enforcement actions by permittee, if any, in the last 12 months
Has an acceptable Capital Improvement Plan (CIP) been implemented?
❑ ❑ ❑
Does CIP address short term needs and long term \"master plan\" concepts?
❑ ❑ ❑
Does CIP cover three to five year period?
❑ ❑ ❑
Does CIP include Goal Statement?
❑ ❑ ❑
Does CIP include description of project area?
❑ ❑ ❑
Does CIP include description of existing facilities?
❑ ❑ ❑
Does CIP include known deficiencies?
❑
❑ ❑
Does CIP include forecasted future needs?
❑ ❑ ❑
Is CIP designated only for wastewater collection and treatment?
❑ ❑ ❑
Approximate capital improvement budget for collection system?
Total annual revenue for wastewater collection and treatment?
CIP Comments
CIP is up to date and the City is reinvesting in their infastructure
Is system free of known points of bypass?
❑ ❑ ❑
If no, describe type of bypass and location
Is a 24-hour notification sign posted at ALL pump stations?
❑ ❑ ❑
# Does the sign include:
Instructions for notification?
❑ ❑ ❑
Pump station identifier?
❑ ❑ ❑
24-hour contact numbers
❑ ❑ ❑
If no, list deficient pump stations
# Do ALL pump stations have an "auto polling" feature/SCADA?
❑ ❑ ❑
Number of pump stations
21
Number of pump stations that have SCADA
21
Number of pump stations that have simple telemetry
0
Number of pump stations that have only audible and visual alarms
0
Page 3 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Number of pump stations that do not meet permit requirements 0
# Does the permittee have a root control program? 0 ❑ ❑ ❑
# If yes, date implemented?
Describe:
Find and cut out.
Comment:
Inspections
Yes No NA NE
Are maintenance records for sewer lines available?
❑ ❑ ❑
Are records available that document pump station inspections?
❑ ❑ ❑
Are SCADA or telemetry equipped pump stations inspected at least once a week?
❑ ❑ ❑
Are non-SCADA/telemetry equipped pump stations inspected every day?
❑
❑ ❑
Are records available that document citizen complaints?
❑ ❑ ❑
# Do you have a system to conduct an annual observation of entire system?
❑ ❑ ❑
# Has there been an observation of remote areas in the last year?
❑ ❑ ❑
Are records available that document inspections of high -priority lines?
❑ ❑ ❑
Has there been visual inspections of high -priority lines in last six months?
0
❑ ❑ ❑
Comment: Good documentation of all activities noted.
Operation & Maintenance Requirements
Yes No NA NE
Are all log books available?
❑ ❑ ❑
Does supervisor review all log books on a regular basis?
❑ ❑ ❑
Does the supervisor have plans to address documented short-term problem areas?
❑
❑ ❑
What is the schedule for reviewing inspection, maintenance, & operations logs and problem areas?
Daily, weekly, monthly, quarterly, and annually.
Are maintenance records for equipment available? ❑ ❑ ❑
Is a schedule maintained for testing emergency/standby equipment? 0 ❑ ❑ ❑
What is the schedule for testing emergency/standby equipment? Weekly, quarterly &
annually.
Do pump station logs include
Inside and outside cleaning and debris removal?
0
❑ ❑ ❑
Inspecting and exercising all valves?
❑ ❑ ❑
Inspecting and lubricating pumps and other equipment?
❑ ❑ ❑
Inspecting alarms, telemetry and auxiliary equipment?
❑ ❑ ❑
Is there at least one spare pump for each pump station w/o pump reliability?
❑ ❑ ❑
Are maintenance records for right-of-ways available?
❑ ❑ ❑
Are right-of-ways currently accessible in the event of an emergency?
❑ ❑ ❑
Are system cleaning records available?
❑ ❑ ❑
Has at least 10% of system been cleaned annually?
❑ ❑ ❑
Page 4 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
What areas are scheduled for cleaning in the next 12 months?
As determined based on priority, age of lines, reports and other crieteria determined by the ORC.
Is a Spill Response Action Plan available?
0
❑ ❑ ❑
Does the plan include:
24-hour contact numbers
❑ ❑ ❑
Response time
❑ ❑ ❑
Equipment list and spare parts inventory
❑ ❑ ❑
Access to cleaning equipment
❑ ❑ ❑
Access to construction crews, contractors, and/or engineers
❑ ❑ ❑
Source of emergency funds
❑ ❑ ❑
Site sanitation and cleanup materials
❑ ❑ ❑
Post-overflow/spill assessment
❑ ❑ ❑
Is a Spill Response Action Plan available for all personnel?
❑ ❑ ❑
Is the spare parts inventory adequate?
❑ ❑ ❑
Comment:
Records Yes No NA NE
Are adequate records of all SSOs, spills and complaints available? ❑ ❑ ❑
Are records of SSOs that are under the reportable threshold available? ❑ ❑ ❑
Do spill records indicate repeated overflows (2 or more in 12 months) at same location? ❑ ❑ ❑
If yes, is there a corrective action plan? ❑ ❑ ❑
Is a map of the system available? ❑ ❑ ❑
Does the map include:
Pipe sizes
❑ ❑ ❑
Pipe materials
❑ ❑ ❑
Pipe location
❑ ❑ ❑
Flow direction
❑ ❑ ❑
Approximate pipe age
❑ ❑ ❑
Number of service taps
❑ ❑ ❑
Pump stations and capacity
❑ ❑ ❑
If no, what percent is complete?
100%
List any modifications and extensions that need to be added to the map
# Does the permittee have a copy of their permit?
0
❑ ❑ ❑
Comment: The City has a detailed digital mapping system and color codes line maintenance activities.
Monitoring and Reporting Requirements Yes No NA NE
Are copies of required press releases and distribution lists available? ❑ ❑ ❑
Are public notices and proof of publication available? ❑ ❑ ❑
Page 5 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
# Is an annual report being prepared in accordance with G.S. 143-215.1 C? 0 ❑ ❑ ❑
# Is permittee compliant with all compliance schedules in the permits? ❑ ❑ 0 ❑
If no, which one(s)?
Comment: Although the City is not free of spills, they have done a good job of monitoring and reporting. The
City is also doing a good iob operating and maintaining thier system.
KINGSBURY P/S - 714 Kinc
Pump Station
Yes No NA NE
Pump station type
Duplex
Are pump station logs available?
❑ ❑ ❑
Is it accessible in all weather conditions?
❑ ❑ ❑
# Is general housekeeping acceptable?
❑ ❑ ❑
Are all pumps present?
❑ ❑ ❑
Are all pumps operable?
❑ ❑ ❑
Are wet wells free of excessive debris?
❑ ❑ ❑
Are upstream manholes free of excessive debris/signs of overflow?
❑ ❑ ❑
Are floats/controls for pumps/alarms operable?
❑ ❑ ❑
Is "auto polling" feature/SCADA present?
❑ ❑ ❑
Is "auto polling" feature/SCADA operational?
❑ ❑ ❑
Is simple telemetry present?
❑
❑ ❑
Is simple telemetry operational?
❑
❑ ❑
Are audio and visual alarms present?
❑ ❑ ❑
Are audio and visual alarms operable?
❑ ❑ ❑
Is the Pump station inspected as required?
❑ ❑ ❑
Are backflow devices in place?
❑
❑ ❑
Are backflow devices operable?
❑
❑ ❑
Are air relief valves in place?
❑
❑ ❑
Are air relief valves operable?
❑
❑ ❑
# Is an emergency generator available?
❑ ❑ ❑
Can the emergency generator run the pumps?
❑ ❑ ❑
Is the pump station equipped for quick hook-up?
❑ ❑ ❑
Is the generator operable?
❑ ❑ ❑
# Is fuel in tank and sufficient?
❑ ❑ ❑
Is the generator inspected according to their schedule?
❑ ❑ ❑
Is a 24-hour notification sign posted?
❑ ❑ ❑
Does it include:
Instructions for notification?
❑ ❑ ❑
Page 6 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Pump station identifier? 0 ❑ ❑ ❑
Emergency phone number 0 ❑ ❑ ❑
Is public access limited? 0 ❑ ❑ ❑
Is pump station free of overflow piping? 0 ❑ ❑ ❑
Is the pump station free of signs of overflow? 0 ❑ ❑ ❑
Are run times comparable for multiple pumps? yes
Comment:
FAIRGROUND P/S - 1833 E
Pump Station
Yes No NA NE
Pump station type
Duplex
Are pump station logs available?
❑ ❑ ❑
Is it accessible in all weather conditions?
❑ ❑ ❑
# Is general housekeeping acceptable?
❑ ❑ ❑
Are all pumps present?
❑ ❑ ❑
Are all pumps operable?
❑ ❑ ❑
Are wet wells free of excessive debris?
❑ ❑ ❑
Are upstream manholes free of excessive debris/signs of overflow?
❑ ❑ ❑
Are floats/controls for pumps/alarms operable?
❑ ❑ ❑
Is "auto polling" feature/SCADA present?
❑ ❑ ❑
Is "auto polling" feature/SCADA operational?
❑ ❑ ❑
Is simple telemetry present?
❑
❑ ❑
Is simple telemetry operational?
❑
❑ ❑
Are audio and visual alarms present?
❑ ❑ ❑
Are audio and visual alarms operable?
❑ ❑ ❑
Is the Pump station inspected as required?
❑ ❑ ❑
Are backflow devices in place?
❑
❑ ❑
Are backflow devices operable?
❑
❑ ❑
Are air relief valves in place?
❑
❑ ❑
Are air relief valves operable?
❑
❑ ❑
# Is an emergency generator available?
❑ ❑ ❑
Can the emergency generator run the pumps?
❑ ❑ ❑
Is the pump station equipped for quick hook-up?
❑
❑ ❑
Is the generator operable?
❑ ❑ ❑
# Is fuel in tank and sufficient?
❑ ❑ ❑
Is the generator inspected according to their schedule?
❑ ❑ ❑
Is a 24-hour notification sign posted?
❑ ❑ ❑
Page 7 of 11
Permit: WQCS00037
Inspection Date: 05/29/2019
Owner - Facility: City of Shelby
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Does it include:
Instructions for notification?
0
❑ ❑ ❑
Pump station identifier?
0
❑ ❑ ❑
Emergency phone number
❑ ❑ ❑
Is public access limited?
❑ ❑ ❑
Is pump station free of overflow piping?
❑ ❑ ❑
Is the pump station free of signs of overflow?
❑ ❑ ❑
Are run times comparable for multiple pumps?
yes
Comment:
THE MALL P/S - 1892 E Di)(
Pump Station
Yes No NA NE
Pump station type
Duplex
Are pump station logs available?
❑ ❑ ❑
Is it accessible in all weather conditions?
❑ ❑ ❑
# Is general housekeeping acceptable?
❑ ❑ ❑
Are all pumps present?
❑ ❑ ❑
Are all pumps operable?
❑ ❑ ❑
Are wet wells free of excessive debris?
❑ ❑ ❑
Are upstream manholes free of excessive debris/signs of overflow?
❑ ❑ ❑
Are floats/controls for pumps/alarms operable?
❑ ❑ ❑
Is "auto polling" feature/SCADA present?
❑ ❑ ❑
Is "auto polling" feature/SCADA operational?
❑ ❑ ❑
Is simple telemetry present?
❑
❑ ❑
Is simple telemetry operational?
❑
❑ ❑
Are audio and visual alarms present?
❑ ❑ ❑
Are audio and visual alarms operable?
❑ ❑ ❑
Is the Pump station inspected as required?
❑ ❑ ❑
Are backflow devices in place?
❑
❑ ❑
Are backflow devices operable?
❑
❑ ❑
Are air relief valves in place?
❑
❑ ❑
Are air relief valves operable?
❑
❑ ❑
# Is an emergency generator available?
❑ ❑ ❑
Can the emergency generator run the pumps?
❑ ❑ ❑
Is the pump station equipped for quick hook-up?
❑
❑ ❑
Is the generator operable?
❑ ❑ ❑
# Is fuel in tank and sufficient?
❑ ❑ ❑
Page 8 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
Is the generator inspected according to their schedule?
0
❑ ❑ ❑
Is a 24-hour notification sign posted?
0
❑ ❑ ❑
Does it include:
Instructions for notification?
0
❑ ❑ ❑
Pump station identifier?
0
❑ ❑ ❑
Emergency phone number
❑ ❑ ❑
Is public access limited?
❑ ❑ ❑
Is pump station free of overflow piping?
❑ ❑ ❑
Is the pump station free of signs of overflow?
❑ ❑ ❑
Are run times comparable for multiple pumps?
Comment:
BALDOR - 4351 E Dixon BIN
Pump Station
Yes No NA NE
Pump station type
Duplex
Are pump station logs available?
❑ ❑ ❑
Is it accessible in all weather conditions?
❑ ❑ ❑
# Is general housekeeping acceptable?
❑ ❑ ❑
Are all pumps present?
❑ ❑ ❑
Are all pumps operable?
❑ ❑ ❑
Are wet wells free of excessive debris?
❑ ❑ ❑
Are upstream manholes free of excessive debris/signs of overflow?
❑ ❑ ❑
Are floats/controls for pumps/alarms operable?
❑ ❑ ❑
Is "auto polling" feature/SCADA present?
❑ ❑ ❑
Is "auto polling" feature/SCADA operational?
❑ ❑ ❑
Is simple telemetry present?
❑
❑ ❑
Is simple telemetry operational?
❑
❑ ❑
Are audio and visual alarms present?
❑ ❑ ❑
Are audio and visual alarms operable?
❑ ❑ ❑
Is the Pump station inspected as required?
❑ ❑ ❑
Are backflow devices in place?
❑
❑ ❑
Are backflow devices operable?
❑
❑ ❑
Are air relief valves in place?
❑
❑ ❑
Are air relief valves operable?
❑
❑ ❑
# Is an emergency generator available?
❑ ❑ ❑
Can the emergency generator run the pumps?
❑ ❑ ❑
Is the pump station equipped for quick hook-up?
❑
❑ ❑
Page 9 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
Is the generator operable?
0
❑ ❑ ❑
# Is fuel in tank and sufficient?
0
❑ ❑ ❑
Is the generator inspected according to their schedule?
0
❑ ❑ ❑
Is a 24-hour notification sign posted?
0
❑ ❑ ❑
Does it include:
Instructions for notification?
0
❑ ❑ ❑
Pump station identifier?
0
❑ ❑ ❑
Emergency phone number
❑ ❑ ❑
Is public access limited?
❑ ❑ ❑
Is pump station free of overflow piping?
❑ ❑ ❑
Is the pump station free of signs of overflow?
❑ ❑ ❑
Are run times comparable for multiple pumps?
yes
Comment:
714 KINGSBURY - At P/S
Lines/Right-of-Ways/Aeriel Lines
Yes No NA NE
Is right-of-way accessible for emergency?
0
❑ ❑ ❑
Is right-of-way free of sinkholes or depressions?
❑ ❑ ❑
Is line/right-of-way free of evidence of leakage?
❑ ❑ ❑
# Are there areas of exposed line?
❑ ❑ ❑
# Is any exposed line constructed of ductile iron or other approved material?
❑ ❑ ❑
Are water crossing and supports in good condition?
❑ ❑ ❑
# Is right-of-way free of non -utility motorized traffic?
❑ ❑ ❑
Is line free of visible damage?
❑ ❑ ❑
# Are there siphons in this system?
❑
❑ ❑
If yes, are they maintained and documented?
Comment:
FAIRGROUND AERIAL - A
Lines/Right-of-Ways/Aeriel Lines
Yes No NA NE
Is right-of-way accessible for emergency?
❑ ❑ ❑
Is right-of-way free of sinkholes or depressions?
❑ ❑ ❑
Is line/right-of-way free of evidence of leakage?
❑ ❑ ❑
# Are there areas of exposed line?
❑ ❑ ❑
# Is any exposed line constructed of ductile iron or other approved material?
❑ ❑ ❑
Are water crossing and supports in good condition?
❑ ❑ ❑
# Is right-of-way free of non -utility motorized traffic?
❑ ❑ ❑
Is line free of visible damage?
❑ ❑ ❑
Page 10 of 11
Permit: WQCS00037 Owner - Facility: City of Shelby
Inspection Date: 05/29/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
# Are there siphons in this system?
If yes, are they maintained and documented?
Comment:
❑❑■❑
SUMTER ST. OUTFALL -
Lines/Right-of-Ways/Aeriel Lines
Yes No NA NE
Is right-of-way accessible for emergency?
❑ ❑ ❑
Is right-of-way free of sinkholes or depressions?
❑ ❑ ❑
Is line/right-of-way free of evidence of leakage?
❑ ❑ ❑
# Are there areas of exposed line?
❑ ❑ ❑
# Is any exposed line constructed of ductile iron or other approved material?
❑ ❑ ❑
Are water crossing and supports in good condition?
❑ ❑ ❑
# Is right-of-way free of non -utility motorized traffic?
❑ ❑ ❑
Is line free of visible damage?
❑ ❑ ❑
# Are there siphons in this system?
❑
❑ ❑
If yes, are they maintained and documented?
Comment: This is a 12" DIP 100' crossing. All supports appeared in
good with each side of crossing well
maintained.
Page 11 of 11