HomeMy WebLinkAboutNCC190416_ESC Approval Submitted_20190531Ill
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
February 20, 2019
LETTER OF APPROVAL
State of North Carolina
North Carolina Central University
Attn: Cornelius Wooten, Vice Chancellor Administration and Finance
1801 Fayetteville Street
Durham, NC 27707
RE: Project Name: Chidley South
Acres Approved: 3.31
Project ID: DURHA-2019-010
County: Durham, City: Durham, Address: 1400 S. Alston Ave.
River Basin: Cape Fear, Stream Classification: Jordan Reservoir Watershed
Submitted By: Dewberry Engineers Inc.
Date Received by LQS: January 29, 2019
Plan Type: New
Dear Mr. Wooten:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
Please be aware that your project will be covered by the enclosed NPDES Construction
Stormwater General Permit NCG010000. Please become familiar with all the requirements
and conditions of this permit in order to achieve compliance.
Title 1SA NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on
file at the job site. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right
of periodic inspection to insure compliance with the approved plan.
D North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
.p 919,791.4200
Letter of Approval
State of North Carolina
North Carolina Central University
February 20, 2019
Page 2 of 2
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project. Please
notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES Permit
cc: Patrick L. Covil, PE (Vcovii@dewberry.com )- Electronic Copy
DEMLR - Raleigh Regional Office File