Loading...
HomeMy WebLinkAboutNCC190416_ESC Approval Submitted_20190531Ill ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality February 20, 2019 LETTER OF APPROVAL State of North Carolina North Carolina Central University Attn: Cornelius Wooten, Vice Chancellor Administration and Finance 1801 Fayetteville Street Durham, NC 27707 RE: Project Name: Chidley South Acres Approved: 3.31 Project ID: DURHA-2019-010 County: Durham, City: Durham, Address: 1400 S. Alston Ave. River Basin: Cape Fear, Stream Classification: Jordan Reservoir Watershed Submitted By: Dewberry Engineers Inc. Date Received by LQS: January 29, 2019 Plan Type: New Dear Mr. Wooten: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Title 1SA NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. D North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 .p 919,791.4200 Letter of Approval State of North Carolina North Carolina Central University February 20, 2019 Page 2 of 2 North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES Permit cc: Patrick L. Covil, PE (Vcovii@dewberry.com )- Electronic Copy DEMLR - Raleigh Regional Office File