Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
High Hampton Golf Maintenance and Back of House - Supplemental Geotechnical Information
107 DRAWN: JRH DATE: 1-25-19 IM I BUNNELL FIGURE M LAMMONS BORING LOCATION PLAN CHECKED: SCALE: 1"=250' 0 ENGINEERING HIGH HAMPTON WASTEWATER TREATMENT PLANT 130 Oval Rood, Ste 2001 Arden, NO 28704 CASHIERS, NORTH CAROLINA 2 APPROVED: JOB No: J18-12228-05 Phone: (828) 277-0100 Fax: (828) 277-0110 IBLIBINC. Soil Borings NO. B-109 PROJECT: High Hampton Wastewater Treatment Plant PROJECT NO.: J18-12228-05 CLIENT: Daniel Communities START: 1/9/19 END: 119/19 BUNNELL- MONS ENGINEERING, INC. LOCATION: Cashiers, North Carolina ELEVATION: Approximate GEOTECHNICALANDENVIRONNENTAL DRILLER: B. Jordan LOGGED BY: J. Hoglen CONSULTANTS DRILLING METHOD: 2 1/4" Hollow Stem Augers DEPTH TO - WATER> INITIAL: V 10 AFTER 24 HOURS: 1 8 CAVING>M 13 ELEVATION/ SOIL DESCRIPTION SOIL ii STANDARD PENETRATION RESULTS DEPTH (FT) TYPE a BLOWS/FOOT Q 2 5 10 20 30 40 50 70 90 Gravel 12 inches 25 ...................... :........ .:.. No Recovery $ 2 ......®............................ Soft, moist, brown and gray, slightly micaceous sandy CLAY (CL) with trace organics - (Fill/Colluvium) • • • . • • • • • • 5 1 5 .....:.. :....:...:...:...... .....;...;..;..;..;.. Very loose, wet, brown and gray, silty SAND (SM) with trace gravel - :::•. (Residuum) 2 : �.. z Very loose, moist, gray and tan, silty coarse SAND (SM) with trace mica 2 ' i 10 1 Very loose to loose, moist, black and gray, slightly micaceous SAND (SP)mWi •: th trace rock fragments "'' ' '' ' 9 ...ar Partially Weathered Rock which was sampled very dense, moist, SAND 15 50/51 :...:..........................:. ..964; 50/3" Auger Refusal at 18.7 feet below ground surface. Groundwater was 20 encountered at 8 feet after drilling. ;..,;.,,,;,.• 25 :...:....:..:.......:....:....:...:..:..: 30 ••• 35 i...i.......:.......:....:.............. 40 : ..... .... :............................ Soil Borings NO. B-109 Sheet 1 of 1 IBLISINC. Soil Borings NO. B-108 PROJECT: High Hampton Wastewater Treatment Plant PROJECT NO.: J18-12228-05 CLIENT: Daniel Communities START: 1l9/19 END: 1/9/19 BUNNELL-CANNONS ENGINEERING, INC. LOCATION: Cashiers, North Carolina ELEVATION: Approximate GEOTECHNICALANDENVIRONYENTAL DRILLER: B. Jordan LOGGED BY: J. Hoglen CONSULTANTS DRILLING METHOD: 2 1/4" Hollow Stem Augers DEPTH TO - WATER> INITIAL: V 8 AFTER 24 HOURS: t 8 CAVING> 77 18 ELEVATION/ SOIL DESCRIPTION SOIL a STANDARD PENETRATION RESULTS DEPTH (FT) TYPE 2 BLOWS/FOOT Q 2 5 10 20 30 40 50 70 90 Topsoil 1.2 feet a yy Very loose to loose, moist, brown and tan, slightly micaceous silty fine ... :::•.:•. 2 3 ...:....:..................:.......:.....:..... SAND (SM) - (Fill) 2 ........:......:....:....:...:...:....... 2 5 1 2 :....:.................. ........... .:..:...:.. Very loose, moist, gray and tan, silty coarse SAND (SM) with trace gravel - (Residuum) �.. IF z... . '� 10 2 ... .....................:....:....:...:. Soft, moist, orange and brown, sandy SILT (ML) With trace mica and rock fragments 1 15 :... 2 :.......................... ..:..:..:..:.. Partially Weathered Rock which was sampled hard, moist, sandy SILT ML) ....;...:. :...:...........:. . • '�oi2^ 50/2 Auger Refusal at 18.7 feet below ground surface. Groundwater was 20 encountered at 8 feet after drilling. 25 ..........% _..........:...:...; ..:..:..:. . 30 35 ....i...c.........................:....:.........>. 40 .............: .....:........:....:..... Soil Borings NO. B-108 Sheet 1 of 1