HomeMy WebLinkAboutNCC190393_NOI Application_20190524Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 5/24/2019 3:06:35 PM (NCG01 NOI Submission)
Approve by Georgoulias, Bethany 5/28/2019 8:40:13 PM (Review- Construction NOI 11397)
* Applicant did not upload signed NOI Certification Form, but the applicant provided it via email after
submittal to complete the application. That form will be added to the permit record. Also, the applicant
entered the E&SC Project Number assigned by Burlington for the Pre -Construction Meeting instead of 643
listed on the Land Disturbing Permit. The Pre -Con meeting document will be included with the final permit
record.
• The task was assigned to Georgoulias, Bethany by round robin distribution 5/24/2019 3:07 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 28, 2019 5:00 PM
5/24/2019 3:07 PM
Submit by Georgoulias, Bethany 5/28/2019 8:41:26 PM (Payment Verification - NCG01-2019-0393)
• The task was assigned to Georgoulias, Bethany. The due date is: May 29, 2019 5:00 PM
5/28/2019 8:40 PM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * Eastbrooke Apartments Phase 3
2. County* Alamance
3. Highway or Street 2007 and 2011 Morningside Dr.
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township* Burlington
5. State * NC
1r-i)iTII1T7G)MF11if_T1IIa10141
6. Zip Code* 27217
7. Latitude * Enter the latitude in decirral degrees
36.1034
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-79.4020
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
05/30/2019
Estimated Construction Project Start Date
10. Date to End*
08/01 /2020
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Other
than SFE (1522)
Standard Industrial Gassification for Development
12. Acres to be
2.10
disturbed*
(including off -site borrow and waste areas)
13. Total site area
12.91
(acres)*
14. Post-
1.48
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-ALAMA-2019-Eastbrooke Apartments Phase 3
Tracking ID
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Service Creek
Wate rbody* Nsrre of waterbody into which storawater runoff will discharge
15b. Waterbody 16-15
Index No.* NC Waterbody Index Number
Stormwater rJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC f No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization DeBoer & Gabriel Builders, Inc.
Name *
2. First Name* Jason
ff Corporation, enter Registered Agent First l\b e
3. Last Name * DeBoer
ff Corporation, enter Registered Agent Last Barre
3b. Title president
4. Permitee E-mail jldeboer@yahoo.com
Address*
5. Permittee 3365165048
Telephone No.*
6. Permittee Mailing Street Address
Address* PO Box767
Address Line 2
2400 Eric Ln
City
Burlington
Postal / Zip Code
27216
Check box if the r Yes
street address the
same as mailing
address
7. Permittee Street Street Address
State / Province / Region
NC
Country
United States
Address* 2400 Eric Ln
Address Line 2
City State / Province / Region
Burlington NC
Postal / Zip Code Country
27215 United States
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Non -Government
Ownership*
2. Primary Site Jason
Contact - First
Name *
3. Primary Site DeBoer
Contact - Last
Name *
4. Title president
5. Site Contact E- jldeboer@yahoo.com
mail Address*
6. Site Contact 3365165048
Telephone No.*
7. Organization DeBoer & Gabriel Builders, Inc.
Name
8. Site Contact Street Address
Mailing Address* 2400 Eric Ln
Address Line 2
city
Burlington
Fbstal / Zip Code
27215
State / Province / Region
NC
Country
United States
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 03/22/2019
Approved *
2. E&SC Plan Project 4446-19
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* City of Burlington
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan 5-6-19-EASTBROOK-SITE-SET Final.pdf 10.14MB
Approval Mist be PCFfornat
letter/documentation
6. NOI Certification E& SC Approval.pdf 1.25MB
Form Mist be R7Ffornat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
Type Name* Jason L. De Boer
Title president
Organization DeBoer & Gabriel Builders, Inc.
Date * 05/24/2019
F. Tracking and COC Info
NOI Tracking No. 11397
NC Reference No. NCG01-2019-0393
Uses 'count number variable (incremrented by SP)
Certificate of NCC190393
Coverage (COC) Uses 'count _nunber'variable (increrrented bySP)
No. *
Count Number 393
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)