Loading...
HomeMy WebLinkAboutNCC190393_NOI Application_20190524Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/24/2019 3:06:35 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 5/28/2019 8:40:13 PM (Review- Construction NOI 11397) * Applicant did not upload signed NOI Certification Form, but the applicant provided it via email after submittal to complete the application. That form will be added to the permit record. Also, the applicant entered the E&SC Project Number assigned by Burlington for the Pre -Construction Meeting instead of 643 listed on the Land Disturbing Permit. The Pre -Con meeting document will be included with the final permit record. • The task was assigned to Georgoulias, Bethany by round robin distribution 5/24/2019 3:07 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 28, 2019 5:00 PM 5/24/2019 3:07 PM Submit by Georgoulias, Bethany 5/28/2019 8:41:26 PM (Payment Verification - NCG01-2019-0393) • The task was assigned to Georgoulias, Bethany. The due date is: May 29, 2019 5:00 PM 5/28/2019 8:40 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Eastbrooke Apartments Phase 3 2. County* Alamance 3. Highway or Street 2007 and 2011 Morningside Dr. Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Burlington 5. State * NC 1r-i)iTII1T7G)MF11if_T1IIa10141 6. Zip Code* 27217 7. Latitude * Enter the latitude in decirral degrees 36.1034 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.4020 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/30/2019 Estimated Construction Project Start Date 10. Date to End* 08/01 /2020 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial Gassification for Development 12. Acres to be 2.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 12.91 (acres)* 14. Post- 1.48 construction (Estimated) impervious area (acres) * NCC Project NCC-ALAMA-2019-Eastbrooke Apartments Phase 3 Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Service Creek Wate rbody* Nsrre of waterbody into which storawater runoff will discharge 15b. Waterbody 16-15 Index No.* NC Waterbody Index Number Stormwater rJ No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization DeBoer & Gabriel Builders, Inc. Name * 2. First Name* Jason ff Corporation, enter Registered Agent First l\b e 3. Last Name * DeBoer ff Corporation, enter Registered Agent Last Barre 3b. Title president 4. Permitee E-mail jldeboer@yahoo.com Address* 5. Permittee 3365165048 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box767 Address Line 2 2400 Eric Ln City Burlington Postal / Zip Code 27216 Check box if the r Yes street address the same as mailing address 7. Permittee Street Street Address State / Province / Region NC Country United States Address* 2400 Eric Ln Address Line 2 City State / Province / Region Burlington NC Postal / Zip Code Country 27215 United States C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Jason Contact - First Name * 3. Primary Site DeBoer Contact - Last Name * 4. Title president 5. Site Contact E- jldeboer@yahoo.com mail Address* 6. Site Contact 3365165048 Telephone No.* 7. Organization DeBoer & Gabriel Builders, Inc. Name 8. Site Contact Street Address Mailing Address* 2400 Eric Ln Address Line 2 city Burlington Fbstal / Zip Code 27215 State / Province / Region NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/22/2019 Approved * 2. E&SC Plan Project 4446-19 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* City of Burlington Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan 5-6-19-EASTBROOK-SITE-SET Final.pdf 10.14MB Approval Mist be PCFfornat letter/documentation 6. NOI Certification E& SC Approval.pdf 1.25MB Form Mist be R7Ffornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Jason L. De Boer Title president Organization DeBoer & Gabriel Builders, Inc. Date * 05/24/2019 F. Tracking and COC Info NOI Tracking No. 11397 NC Reference No. NCG01-2019-0393 Uses 'count number variable (incremrented by SP) Certificate of NCC190393 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 393 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)