LETTER OF APPROVAL
NC Div of Parks and Recreation
ATT e Shederick Mole,Park Superintendent
0 State Park Road
Apex NC 223
RE: Project Name: Jordan Lake State Recreation Area - Seaforth Erosion Control Repairs
and Improvements
Project ID: CHATH-2019-008
Acres roved: 3.3
County: CHATHAM,City:Pittsboro, Address: Seaforth Beach Road
RiverBasin: Cape Fear, Stream Classification: Jordan Reservoir Watershet
Submitted By: George Finch/Boney and Associates,P.
A.
Date Received by L a May 1,2019
Plan Type: Revised
Dear Mr.Mole:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
oste at the job site. This plan approval shall expire three (3)years following the date of approval,
if o land-disturbing-activity has been undertaken,as is required by Title 1 A NCAC 4B .0129.
s of April 1,2019,all new construction activities are required to complete and submit an electronic
Notice of Intent ( OI) form requesting Certificate of Coverage ( OC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGOI. Please direct questions a ouit the NOI form to Annette Lucas at
Annette.lucas ncdenr. ov or Paul Clark at Paul Clark ncdenr, ov, After you submit a complete an
correct NOI form, a CPOC will bee ailed to you within three business . Initially, DEMLR will
not charge a fee for the coverage under the NCGO1 permit. However,on or after June 1,2019,a
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
Letter of Approval
NC Div. Parks and Recreation
May 6, 2019
Page 2 of 2
Title 15A NCAC 4B.0118(a)and the NCG01 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC,once it is received.
3. Records of inspection made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is.performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973(North Carolina General Statute 11 3A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations, and rules. In addition,local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended for if
there is any change in the information included on the form. Inaddition, it would be helpful if you
not this office oft e proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle,E
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NCGOI Fact Sheet
cc: George M. Finch, PE (g finch @gfba.net) - Electronic Copy
Melvin W.Burnette, PLA(MburnetteP-gfba.net) -Electronic Copy
DEMLR-Raleigh Regional Office File
lr 4* �w
L
tn
.sCr
H V ^u'
0
let 0 NOW
ra4.4
v
i. Oo..j •
AWk
;,ad OXOW
.r•o V
•C
.F.4 ^ .
1-0
1�T
Cd
.
O
1 A M O
Vt W
Cd
^r
too
L
.m. 7
-. O ®� law
�+ i•1 i_r O (n
r � C
V 1.
r_ ? •r C 1.0
u m CJ
U
CJ L Cd COO
rp) CIO
.�. ....
v .NOW PLO
4-4
CL :J
c
AprilFact Sheet on the New NCG01 Permit
The NC Construction General Permit(also known as C o1")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below, Most notably, there is a new
process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic
process, DE MLR worked with a broad tears of stakeholders.to make all of these updates. If you have questions,
contact Annette Lucas at Annette,lucas ncdenr, ov or(919)707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit
• Repeats state requirements for E&SC L ® NC Division of Enemy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; e® ID Notice of Intent, application form for the NCG01 permit
• Is clearly organized by topic; and e® OT® Notice of Termination,form for closing out the NCG01 permit
• Has less text and more tables, S P Pm Stormwater Pollution Prevention Plan, required by the NCGO1
Technical Updates
The new permit; " s
Requires that the E&SC Plan meet
SWPPP requirements (p, 2); m '
Provides a list of items that must be
included in the SWPPP such as the
construction sequence, lens,
q p
calculations,etc. (p, 2-4),
1
i
G c;
Has updated language on bypasses and
upsets that IS tailored t® construction ' 10
activities(p, 10)°
• Puts all timeframes for inspections,
record-keeping and reporting in The NCG01 Process
"calendar days"for clarity and The new NCG01 applies to permits approved on or after April 1,2019.
consistency(p, 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mail
• Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit Federal rules require that OEMLR receive an N01 on each
once per 7 calendar days and after construction project and issue each construction project its own CC.
every storm > 1.0 inch (previously 0.5
inch);'and Under the new NCGO1 process, construction sites will continue to
• Excludes weekends, state and federal receive approval for E&SC Plans from either DEIVILR or the delegated
holidays from normal business hours local E&SC program just like before,After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCG01 by
place (p, 23), completing an e-N0I (available at eq.nc, ov/NCG01), The e-N01 will
only take about 20 minutes to fill out and submit on-line,
1 This list is based on wesite guidance
by the DE MLR Sediment Program, Initially,there will be no charge associated with applying for an NCG01
z The number of calendar days was permit but on or around June 1, 2019, DE MLR will begin charging a $10
selected to be as equivalent as annual general permit fee as required per 143-21 ,3e
possible with the previous permit. DE MLR is working on creating a single application form that will allow an
3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCGO1
to the inspection schedule, C®C.That effort is part of a larger Permit Transformation project at
DEL ,
i
About the New NCGO1 Permit
Why do construction sites have-to do-thus extra application step? How does the new NCGO1 affect the
DEMl_Ifi is required by the l::'IPA to issue a specific COC to every construction dellegated local IE&SC Programs?
site that disturbs one acre or irnore. DEMLR is working to create a form Local programs will continue to review
that:combines the E&SC plain approval and e.-NOI processes, but that will and approve E&SC plans. However,
take more time. For now, DEIft/111..IR has created an efficient e-NO11 process., they will no longer send copies of the
IMCGOI.with E&SC Plan approvals.,
If an E&SC Plan is approved (before April I.,which permit applies? DEMLR will provide sample language to
Projects with already approved E. SC Plans will autornatiicallly follow the Use in local IE&SC plain approvals to
new NCGO1. permit, but will not need to fill out an e.-IM011 or(pay an annual advise permittees that they roost
permit fee. (However,the permittees should prrint the new permit and the suubrrnirt an e-NOI to DIEMLR.
two standard detail sheets and have them on site.
Will DEIMLR offeir tools to help permittees comply with the new NCGOV
Yes, Dl:::MI..IR will provide two sample plan sheets at j2.9....9c..g2y k CGO1 that
can be placed into the E&SC plan set.The first covers the.site stabilization
and materials handling portions of the permit. 'rhe second sheet covers
D'�ft Wa y
the inspection, record-(keeping and reporting portions of the permit.
� r
How will the new a-N l submittal and COC process work? �atu�
Permirttees will)apply for E&SC Plan approvals from IDEM II..II or the local
I&SC program like before."The E&SC approval letter will instruct the `" :� .....'
errnittee'to visit de nc ov 0�C 01 to submit an e-NOl form to Dl::IVIILIR. local programs are not required to
The permittee may begin the construction activity after receipt of the COC check if permittees have submitted e-
(withlin three days*).The permittee must print and retain a copy of the INNS to I)EMI..E. (However, if they wish
permit and the COC on siite. Iniitially,the COC will be issued for free but on to do this voluntarily,there will Ibe a
or around June t.,2019, a 100 annual general (permit fee will be charged. tooll available on DEM11.11"s web site for
them to view a (list of construction
Who its allowed to submit an a-N l ffoirm? projects that have submitted e..-1 is.
Submittal must be by a responsible corporate officer that owns oir
operates the activity, such as a president, secretary, treasurer,or vice when local programs close out an E&SC
president or a manager that its authorized in accordance with N.B.6 of the Plan,the closet they
letter will submit
advise
NCGO t. perirrnit. Additional signatory options are set forth in 1�d.11�. of true permittees ittees that tibia, vide .ampl rt an e-
permit:. It is possible for consaultant to prepare the e.-IHOI, save it as a draft, �V1�..i..° I�EIVIIL6t will provide sample
and email it to the responsible entity for signature .su.ulbimittal.. language.
programs may approve IES�
Focal
What happens to the COS when the construction activity is complete? Local that meet state sediment laws
When a project its complete,time permittees will contact DEMLR or the local plans
rules even if those (plans are not
delegated (program to close out the IE&SC (Nan.After DEMLR or the local and r i es with all of the ass ar.
E&SC program inform the permittee of the project close out via inspection repauiiileanents. (However, their
report, the permittee will visit de .nc.gov/NCG¢- l .to submit an e V�G l. permittees will be required to add two
Will there Ibe a grace period for adherence to the new process? plan sheets(which will be provided by
DEMLR does not have the authority to grant a grace period from a I IDEIIMLIR)to their E&SC(Plans to ensure
federally mandated perirnl't. Perrnittees will be informed of the new that they foully com plly with the ground
process via web site, E&SC Flan approval letters and list servs. lff a stabilization, materials handling, and
construction activity disturbs one acre or more (or is part of common plain inspection, record-keeping and
of development that disturbs one acre or more)fails to submit an e-NOC reporting portion of the NC OIt. (permit.
after approval of its E&SC Plan,this is a violation of federal permitting
oject
requirements and the perrnittee could be subject to a penalty assessment. * a p pr business r thehou .s BEM R Fxpre
approved under the�3Fn�/7LFt�ur�are.s.s
review program.