May 22, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
AND PERFORMANCE RESERVATIONS
NC Air National Guard
Attention: Will Rawdon, Project Manager
4930 Minuteman Way
Charlotte, North Carolina 28208
ROY COOPER
Govemor
MICHAEL S. REGAN
Secrrtary
S. DANIEL SMITH
lntenm Dirwor
RE: Project Name: 19-NC17: C-17 Corrosion Control & Fuel Cell Hangar [Express Review]
Acres Approved: 3.73
Project ID: MECKL-2019-072
County: Mecklenburg
City: Charlotte
Address: 4930 Minuteman Way
River Basin: Catawba
Stream Classification: Other
Submitted By: NC Air National Guard
Date Received by LQS: May 21, 2019
Plan Type: New
Dear Mr. Rawdon:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications and Performance Reservations.
The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by
Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. A $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
State ofNonh Carolina I Environmental Quality I Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115
704 663 1699 T
Letter of Approval with Modifications
NC Air National Guard
May 22, 2019
Page 2 of 3
The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute I BA-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Tamera Epli , PE, CPESC
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval and Performance Reservations
NCGOI Fact Sheet
c via E-mail: Will Rawdon
c: Inspection Department
Letter of Approval with Modifications
NC Air National Guard
May 22, 2019
Page 3 of 3
MODIFICATIONS AND PERFORMANCE RESERVATIONS
Project Name: 19-NC17: C-17 Corrosion Control & Fuel Cell Hangar
Project ID: MECKL-2019-072
County: Mecklenburg
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. The construction sequence should take into account installation of the storm line within the
area of the contruction entrance. [15A NCAC 4B .0106(b)]
2. The utility trenching should only take place such that work is performed in dry weather and
the area uncovered is backfilled by the end of the workday with stabilization. Otherwise,
additional measures are required. [ 15A NCAC 4B .0 115)
3. A continuous perimeter barrier on the downgradient side of the project is necessary to retain
sediment within the limits of disturbance. [G.S. I I3A-57(3)]
4. Any stone outlets in silt fencing should have hardware cloth tied into the steel posts to
prevent transport of washed stone. The placement of stone downstream of the hardware
cloth may result in washout of the stone beyond the limits of disturbance. A depth of 16
inches of washed stone placed at a 1:1 slope is recommended. [G.S. 113A-57(3)]
Performance Reservations:
1. Performance reservations are provided due to non-traditional design. Allowance is given due
to proximity of this project to airport runways, the nature of this project, and flat terrain.
Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control plan
has been approved for this project by the North Carolina Department of Environment
and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and
113A - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c).
This certificate must be posted at the primary entrance of the ,job site before construction
begins and until establishment of permanent groundcover as required by North Carolina
Administrative Code, Title 15A, Chapter 4B.0127 (b).
M-1rc17: G-r7 Co_r osIanI CoN #L 4- �L C 1 G K "30 n014 /Gt4y_ _C#114a7T
Project Name and Location ����,41A11 6 /CoV.vey
MtX - 2sl9 -d yz
Engineer
Enional
Date of Plan Approval '�15�}SSlr Regional g
�?C1�[C�7t'DNS fins�VCaENR
&5L-X VAIMN5 (rXY&-5S �vl�