HomeMy WebLinkAbout20051298 Ver 1_Complete File_20050706Michael F. Easley, Govemor
William G. Russ Jr., Secretary
North Carolina Department of Environment and Namral Resources
Alan W. Kiimek, P.E. Director
Division of Water Quality
July 25, 2005
Paul Leek, County Manager
Clay County P.O. Box 118
Hayesville, NC 28904
Subject Property:
Shooting Creek EWP (Don Strickland)
DWQ Project # 05-1298
Clay County
E???0 W_ ILE P
AUG 1 - 2005
Approval of 401 Water Quality Certification with Additionai CondfliftWkTc.R QuaL;l-v
WETLANDS AND STORMWATER BRANCN
Dear Mr. Wiseman: .
; You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 500 feet of streams for the purpose of
streambank stabilization and woody debris removal / trash removal at the subject
properties, as described within your application received by the N.C. Division of Water
_ Quality (DWQ) on July 14, 2005. After reviewing your application, we have decided that
the impacts are covered by General Water Quality Certification Number(s) 3367 (3367).
The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US
Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply
, with any other required federal, state or local permits before you go ahead with your
project including (but not limited to) Erosion and Sediment Control, Non-discharge, and
stormwater regulations. Also, this approval to proceed with your proposed impacts
or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose that you described in your application. (Nothing in this
approval should be interpreted as giving permission to remove bedload material
from the existing channel, nor allowing for the construction of berms which
would not allow the stream access to it's floodplain.) As "stable" and "pre-storm"
are not interchangeable terms, all work must be to ensure stability, regardless of
channel location. Additionally, channels cannot be returned to it's pre-storm location
unless there is documented instability is submitted and approved as part of the
application package. If you change your project beyond the approval here, you must
notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is
thereby responsible for complying with all conditions. If total fills for this project (now or
in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory
mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval
requires you to follow the conditions listed in the attached certification and any
additional conditions listed below.
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, NoRh Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
?hone: 919-733-1786/ FAX 919-733-6893! Intemet• htto://h2o.enr.state.nc,uslncwetlands
4n Equal Opportunity/AffirmaGve Action Empbyer- 50% Recycledl10% Post Consumer Paper
Page2of6
JuIY 25, 2oos,
The Additionai Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Amount
Approved (Units) Plan Location or Reference
Stream 500 feet) Shootin Creek
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to protect surface
waters standards:
_
--a: =The erosion - and sediment confrol -measures -for the project must _be_
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Contro! Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d.. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state wa#er quality standards, statutes,
or rules occur.
-:.-16
%-Lay '-Uu11Ly.
Page 3 of 6
Ju(y 25, 2005
.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidabie, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401NVetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Construction in this creek and disturbance within a 25-foot trout buffer, where
applicable, should be avoided during the October 15 to April 15 trout spawning
period to avoid adverse effects of sediment on eggs and larvae, where applicable.
However, Wildlife Resources Commission will not object to construction of Natural
Resources Conservation Service "urgent and compelling" sites during the spawning
period provided these projects are, to the extent appropriate and practical,
constructed by: (1) using flow diversion structures such as sand bags, (2) placing
large-sized rock toes and filter cloth backing for stabilization sites before backfilling,
and (3) excavating new channel alignments in dry areas. Construction at the other
I non=`urgent and compelling" sites should not occur during the spawning period to
minimize the potential adverse effects of multiple construction activities on trout
resources in this creek.
7. Sediment and erosion control measures must be implemented prior to construction
and maintained on the sites to minimize sediment in downstream areas. Seeding for
a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous
cover should occur on all bare soil within five (5) days of ground disturbing activities
to provide long-term erosion control. The projects should be accomplished in stages
instead of leaving large tracts exposed to further storm events. Erosion control
matting should be used in conjunction with appropriate seeding on disturbed soils in
steep slope and riparian areas. Matting should be secured in place with staples,
stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall
fescue should not be used in riparian areas. In addition, because of an anticipated
; difficulty in establishing ground cover during the winter, reseeding should be
conducted, as necessary, in the spring-time with a native annual and perennial seed
mix with a temporary nursery crop of wheat, millet or other-grain.
?.uy %,.,LL11Ly.
Page 4 of 6
July 25, 2045? _
8. Only clean, large, angular rock, large woody material, or other natural stream design
materials and techniques should be used for bank stabilization. Rock should not be
placed in the stream channel in a manner that constricts stream flow or that will
impede aquatic life movements during low flow conditions. Filter cloth should be
placed behind large rock that is used for bank stabilization. Properly designed rock
vanes should be constructed wherever appropriate on bank stabilization and
channel realignment stream reaches to improve channel stability and to improve
aquatic habitat. Root wads should be installed low enough in the bank so that a
significant portion (at least one-third) the root wad is inundated during normal flows.
9. The channel should be restored to a more stable condition. However, under no
circumstances should river rock, sand or other materials be dredged from the
stream channel under authorization of this permit except, if necessary, in the
immediate vicinity of the eroding banks for the explicit purpose of anchoring
stabilizing or flow/grade control structures or for reestablishing the natural
and more stable stream channel dimensions. Stream bed materials are unstable
in flowing-water situations and are unsuitable for bank stabilization. In stream
dredging has catastrophic effects on aquatic life and disturbance of the natural form
of the stream channel can cause downstream erosion problems. The natural
dimension, pattern, and profile of the stream upstream and downstream of the
permitted area should not be modified by widening the stream channel or changing
its depth.
10.Stabilization _measures should _only be_ applied- on or near-existing erosion sites,
leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where
possible to ensure long term availability of stream bank cover for aquatic life and
wildlife. Backfill materials should be obtained from upland sites except in cases
where excess stream bed materials are available. Berms should not be permitted
because they block the floodplain, constrict and accelerate flood flows, and often fail
and sometimes impede drainage during large flood events.
11. Repairs to eroded banks should be conducted in a dry work area where possible.
Sandbags or other clean diversion structures should be used where possible to
minimize excavation in flowing water. Channel realignments should be constructed
by excavating the new channel from downstream to upstream before connecting it to
the old channel.
12. Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of stream waters from fuels,
lubricants, hydraulic fluids or other toxic materials. Equipment used in stream
channel must be clean, new or low hour equipment.
13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is
practical under the site conditions, should be restored along the construction sites to
natural riparian conditions with native trees and shrubs (e.g., silky dogwood,
rhododendron, dog hobble, red maple, silky willow, tag alder, alack willow,
sycamore) to provide long-term bank stability and stream shading. Note, silky
dogwood, silky willow and black willow can be planted as live stakes collected during
the dormant growing season. Cuttings should be randvmly planted on four (4) foot
centers from the waters edge to the top of the bank. Trees should be planted on ten
(10) to twelve (12) foot centers. Stream banks in these areas should also be
Clay County:
Page 5 of 6
July 25, 2005
seeded with a native annual and perennial seed mix with a temporary nursery crop
of wheat, millet or other grain.
14. If pasture along the stream is to be used for grazing, a fence must be constructed
outside of the riparian zone and the stream to prevent livestock from entering these
areas.
15. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected riparian zones
such that it will not re-concentrate befare discharging into a stream. If this is not
possible, it may be necessary to provide stormwater facilities that are considered
to remove nitrogen. This may require additional approval from this Office.
16. Riparian Zone Replanting
Replanting of vegetation within disturbed areas located within 30 feet of the
streambank associated with any land disturbing activity, repair, replacement
and/or maintenance must be done in a manner consistant with the Guidelines
for Riparian Buffer Restoration immediately following construction. (Please
' see attached.)
7. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective woody riparian zones in order to
assure compliance for future wetland, water and buffer impact. These
mechanisms shall be put in place prior to impacting any wetlands, waters and/or
buffers approved for impact under this Certification Approval and Authorization
Certificate. A sample deed notification can be downloaded from the
401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of
, the sample deed notification may be modified as appropriate to suit to this
project.
18. Turbidity Standard
The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
19. No Sediment and Erosion Control Measures in Wetlands
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
, natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
..iuy ?vuuty.
Page 6 of 6
July 25, 2005 ??,. .
' ?.
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings; 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
Sincerely, --
?J
?
AlanQ. ? . Klimek, P.E., Director
Division of Water Quality
AW Klkhb
Enclosures: GC 3367
Certificate of Completion
Guidelines for Riparian Buffer Restoration
cc: Jason Wheatley, District Conservationist
NRCS - Clay County
Post Office Box 57
Hayesville, NC 28904
USACE Asheville Regulatory Field Office
DWQ Asheville Regional Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: 05-1298.EWP.CIayCounty.ShootingCreek.Approval
Triage Check List
Date: 07/15105 Project Name: Shooting Creek EWP - Don Strickland
DWQ #:05-1298
County: Clay
Kevin Barnett, Asheville Regional Office
To:
60-day Processing Time: 7/6/05 to 9/4/05
From: Cyndi Karoly Telephone :(919) 733-9721
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
Fl Stream length impacted
E:i Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
F Pond fill
Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
F? Check drawings for accuracy
Is the application consistent with pre-application meetings?
?
? Cumulative impact concern
?
?
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a"second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
?
?
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. 2 005 i 2 98
(If any particular item is not applicable to this project, please enter "Not Applicable" or'T1/A".)
' I. Processing
1. Check all of the approval(s) requested for this project:
Z Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
Z 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide #37
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
U. App6cant Information
1. Owner/ApplicantInformation UOUROW1@1
NDon Strickland Mailing Address: 2333 Old Hi wav 64 005
Ha esville NC 28904 b
fyc DSAIJOSTORI f7Y
H
Telephone Number: Fax Number:
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:_ Jason Wheatlev, District Conservationist
Company Affiliation: NRCS- CIaY Countv
Mailing Address: PO Boz 57
Havesville, NC 28904
Telephone Number: 828-389-9695
E-mail Address:
Fax Number: 828-389-0262
Page 5 of 13
• 4-28-1995 5:58AM FROM
III. Project Informatian
P. 2
Attach a vicinity map alearly showiEng the lpcation of the propert?- wi.th respect to local
landmarks such as tawns, rivers, and roads. Aiso provide a detailed site pian showing pzoperty
boundaries and deveIopment plans in relation to sumaunding praperties. Both the rricinity map
and site plazx must include a scale aud narth arrow. The specific foatprints of all build'uags,
imperviaus surfaces, ar other facilities must be included. If passible, the znaps and plans shouid
include the appropriate USGS Topographzc Quad Map and NRCS Soil Survey with the praperty
bown,daries outaiued. Flan dra.wings, or other maps may be included at the applicant's discretion,
' so long as the property is clearly defined. For adraruzustaradve and distribution purposes, the
'C.J SACE requires inforniativn ta be submitted on sheets no Iarger thari 11 by 17-ineh fortnat;
however, l]WQ may accept paper"woric af any size. DWQ prefers full-size construction
-size plans. If full-siz? piams a?
. drawings rather than a sequential sheet version of the full
reduced to a small scale such that tkze final vezsiozi is illegible, the applicant will be informed that
the prpject has been placed on hold until decipherablE maps are provided.
2. T.I.P. Project Nwmber or State Project Number
onlyj: ? - - - - - - -- . -
3. Pmperty Identificataon Num.bez (Tax PIN): 549000554824
4. T,ocation
County: C7a? Nearest Town: Haye.rville, NC
, Subdivisian name (include phase/lot number): n/a
17irections to site (include road numbers, Iandmarks, etc.): (see attached vicinity man)
5. Site coordinates, if available (tJTM or Lat/Long): 03500I '1 d.36"1V 483641 '42.60"W
(N4te - T£pmject is linear, such as a xoad Qr utility Iane, attacb a s}aeet that sepaz-ately lists the
coordinates for each crossing af a distinct waterbody.)
' 6. Property size (acres): An»roximtstelv 2 ucTes
7. Nearest body of water (streamlriver/sound/ace=/lake): Shooting Creek
$. River $asin: Hiwassee River Basin
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin xnap is avaxlable at http?/laa2o.enr.state_xzc.us/adxnin/znaps/.)
9. Describe the existing canditions on the site azad general Iand use ux the viainity of the project
, at the tima of this application: See attached Stabilization Plan and Summary.
I .
Page 6 of 13
JUL-15-2005 FRI 14:44 TEL:9197336893 NAME:DWQ-WETLANDS P. 2
10. Describe the overall project in detail, including the type of equipment to be used: See
attached Stabilization Plan and Summaa for proiect description. Equipment will include
one ezcavator with hvdraulic thumb and one dump truck
11. Explain the purpose of the proposed work: Stabilize eroding streambanks resulting from
heavy rains in late 2004 along Shooting Creek reduce overall sedimentation, and enhance
aquatic habitats.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including a11 prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe pernuts issued for prior segments of the same T.I.P. project, along with
construction schedules.
Not applicable
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Not applicable
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
a.nd temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page7of13
1. Provide a written description of the proposed impacts: TemporM impacts will result from
the construction and installation of rock structures and rootwad revetments. The structures
and revetments will ultimately enhance the overall condition o Shoating Creek in
accordance with the conditions prior to the oods of late 2004.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
(acres I.ocated within
100-yeaz Floodplain*'
es/no Distance to
Nearest Stream
linear feet
Type of Wetland**'
• List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, gading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
"• 100-Yeaz floodplains are identified through the Federat Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http:!/www.femafzov.
*'?R List a wedand type that best describes wet(and to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: n/a
Total azea of wetland impact proposed: n/a
3. Individually list all intermittent and perennial streazn impacts below:
Stream Impact
Site Number
indicate on m)
Type of Impact* Length of
Impact
lineaz feet
Stream Name** Average Width
of Stream
Before Im act Perennial or
Intermittent?
lease specify)
Shooting Creek Temporary <500 Shooting Creek SO feet Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include lineaz feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. [f stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
*t Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.aov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapguest.com, etc.).
Cumulative impacts (lineaz distance in feet) to a11 streams on site: less than 500 feet (one
side)
Page 8 of 13
4. Individually list a11 open water impacts (including lakes, ponds, estuaries, sounds, Atla.ntic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
ba , oce
an, etc.
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads. etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check a11 that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): not applicable
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): not applicable
, Size of watershed draining to pond: n/a Expected pond surface azea: n/a
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Stream_stabiliza#ion will only be conducted in areas exhibitinQ active erosion. This work is
being conducted under the Natural Resources Conservation Service (NRCS) Qrant for
EmerQencv Watershed Protection (EWP) and will be constructed according, to the rules set forth
in the grant. Minor channel work is anticipated to restore the site to pre-flood conditions. Rock
structures and revetments (where feasible) will be constructed to divert shear stresses away.from
the adiacent streambanks to allow for newlv planted vegetation to becomeproperly established.
Construction will be conducted durinR low flow events. Arrv rises or increases in 11ows will
require that equipment exit the channel. Streambanks disturbed via stabilization activities will
be seeded and covered immediatelv.
Page 9 of 13
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 lineaz feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concunence sha11 be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Cazolina, available at
http://h2o.enr.state.nc.us/ncwetlands/stnTigide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a sepazate sheet if more space is needed.
Not apnlicable
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): n/a
Page 10 of 13
Amount of buffer mitigation requested (square feet): n/a
Amount of Riparian wetland mitigation requested (acres): n/a
Amount of Non-riparian wetland mitigation requested (acres): n/a
Amount of Coastal wetland mitigation requested (acres): n/a
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federaUstate) funds or the use of public
(federaUstate) land?
Yes Z No ?
If yes, does the project require prepazation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No E
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map a11 impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Taz-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No Z If you answered "yes", provide the following information:
Page I 1 of 13
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mirigation by applying the buffer
multipliers.
Zone' ?,e??t Multiplier MiRequired
ati n
1 3
2 1.5
Total
' Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additionat 20 feet &om the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach a11 appropriate information as
identified within 15A NCAC 2B.0242 or.0260.
Not applicable
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Imnervious acreaQe is limited to the existinQ residence on site. Stormwater controls will include
the application of coir flber (excelsior) matting, seeding and planting alon aping and/or
disturbed areas. Geotextile fabric will also be placed along the upstream side of each rock
structure.
XII. Sewage Disposal (required by DWQ)
Cleazly detail the ultimate treatment methods and disposition (non-discharge or dischazge) of
wastewater genera.ted from the proposed project, or available capacity of the subject facility.
Not applicable
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No Z
Is this an after-the-fact permit application?
Yes ? No 0
XIV. Other Circumstances (Optional):
Page 12 of 13
J%dfl 1.7 v.i v- • - vo uv.. ..... ?.+..?.....?
•Jun 20 OS 09:25a usda
828-389-0262
p.2
It is ihe applicant's respoi,sibility to submit thc application suHiciently in advance
of desircd
constructioa dates to allow processing time for these permits. However, an appiicant may
choose to list constraints associated with construction or sequencing that may imj?ose limits on
work schedules (e.g., draw-down sc6edulcs for lakes, dales aRsociated with Endangered and
Threatened Species, accxssibility Drob]ems, or other i.ssucs outsid$ of the applicani's control).
Pmnncodrnne?n..?:.,..:?.,),....__.s.,--'-- '--'-- - • ' _.•-- - -
/
Applicsnt/Ag ?natare D tt /
(AgCDf's sigoature is vaiid on1y if an authorizatioa klter frQm the applicant is prcvid•:.ci.)
Page 13 of 13
?
DESIGN SUMMARY JLIL 0 6 2005
UENR - Wq•fER QUqLITY
??? AND STOFtMyyqJER BRWH
Emergency Watershed Protection
and Rehabilitation Project
Prepared for:
Clay County
55 Riverside Circle
Hayesville, NC 28904
June 3, 2005
Prepared by
+Shooting Creek - Strickland Site
Clay County, NC
1.0 INTRODUCTION
This emetgency ivatershed protection and rehabilitation plan addresses proposed channel
improvements to Shooting Creek in Clay County, North Carolina. The plan is being
completed in conjunction with an Emergency Watershed Protection (EWP) grant provided
by the Natural Resources Conservation Service for the Shooting Creek watershed. The
pxoject area covers approximately 4501inear feet of Shooting Creek on the Strickland
property. Specifically, the pxoject area is situated south of US 64 approximately eight miles
east of Hayesville, NC (see attached vicinity map). Landuse throughout the study area is
predominately rural.
Mulkey Engineers and Consultants (Nlulkey) was retained by Clay County to design and
oversee the implementation of emergency stabilization techniques using natural channel
design methodologies. Implementation is planned for July and August 2005.
Shooting Creek is located within the
Hiwassee River Basin in western North
Carolina. It is part of USGS Basin
0600002 and Subbasin 04-05-01. The
Shooting Creek watershed originates along
the southeastern face of Chunky Gal
Mountain near the Clay/Macon County
Line and flows in a westerly direction
approximately six miles before emptying
into Chatuge Lake. Accord.ing to the NC
. .._., ??.
Division of Watet Quality (NCDWQ
I j
2002), water quality in this subbasin is ? ? ? ? ? :•='" "`' i = ? ``? ;i
Good. The headwaters of Shooting Creek are within the Nantahala National Forest and are somewhat undisturbed, due to slope
constraints. However, once the slopes begin to decrease, disturbance begins to become
evident. Most of the d.isturbances are the result of development and agricultural practices,
which have negatively affected the stream system. The minimal riparian zones throughout
these areas have also added to an increase in sedimentation. According to NCDWQ,
sedimentation in Shooting Creek was noted in the 1997 basin plan. Although the stream
received a Good classificarion in 1999, DWQ biologists noted excessive sedunentarion in die
pools and severe bank erosion. The Shooting Creek arm of the lake is altnost completely full
of sediment (NCDWQ, 2002). Recent flooding attributed to the heavy rain events
encountered during the fall of 2004 has only exacerbated the overall problems.
2.0 OBJECTIVE
The objective of this project is to reduce erosion and sedimentation originating through this
reach and improve the overall habitat values. This objective will be met by establishment of
tock structures (xeferred to as vanes) Within noted problem areas to divert the shear stresses
away from the eroding streambanks. This project is being funded and implemented as
Emergency Watershed Protection and Rehabilitation (EWP) through a grant from the
Natural Resources Conservation Service (NRCS). Natural channel design methodologies
will be implemented to ma.Yimum extent pracricable to ensuxe the channel dimension,
pattern, and profile remain consistent and the reach does not continue to aggrade or
degrade. Based on the available funding, this project does not provide the amount or degree
of detail normally wimessed with a typical stream restoration or enhancement project. Its
primary goal is to xeturn the existing stream channel to its condition prior to the floods of
late 2004. Additional protection measures are provided to ensure overall bank stability;
however, they are somewhat limited due to available funds.
3.0 EXISTING CONDITIONS
Overall, Shooting Creek appears moderately
unstable through this reach. Vextical, eroding banks
exist along both sides of the channel at several
locations. Active scouring was evident throughout
most of these areas. These areas are primarily
restricted to the outsides of ineander bends, both
upstream and downstream of debxis, and near
control (or niche) points consisting of either large
boulders or bedrock. Bankfull indicators were
difficult to recognize in these areas, relating to the
overall instability of the channel at these locations.
In addition, center bars wexe noted, further attribu
side of the channel.
- "'-3
;¢.
a ° {
. :
ting to excessive bank erosion along either
Based on the surveys, Shooting Creek is characterisric of a"C4" stream type. Accozding to
the morphological description presented in Applied Flarvial Geomorphology (Rosgen, 1996), C4
stream types are slighdy entrenched, meandering, riffle/pool, ,gxavel-dominated channels
with well developed floodplains. C4 channels exhibit gende gradients of less than 2%,
display high Nvidth/depth rarios, and are slightly more sinuous and have higher meander
width ratios than the C1, C2 and C3 stream types. The riffle/pool sequence generally
averages between 5 and 7 bankfull channel widths; however, past channel alterations have
caused degradation, bank instability and consequendy, the pools to fill Nvith sediment. This
channel type is susceptible to accelerated bank erosion depending on the absence of riparian
vegetation.
4.0 DESIGN RECOMMENDATIONS
Based on the existing condition surveys and interpretation of the data, this ieach of Shooting
Creek appears to be relatively unstable with minor degradation in several areas. The
presence of center bars and lateral bars indicate aggradation. Aggradation processes are
associated with the following channel adjustments: increase in width/depth ratio; increase in
sediment storage; increase in bank erosion rates; decrease in pool quality and other fishery
habitat features; increase in the loss of riparian land and associated sediment availability from
bank erosion and latexal migration; and increase in over-bank flooding. Most of these
processes were observed along the approximately 4501ineax-foot xeach. Mulkey proposes
the folloNving recommendations for the emergency rehabilitation of Shooting CYeek:
1. According to the NC Rural Mountain Regional Curves (NCSRI, 2005) and a known
drainage area of approximately 32 square miles, the bankfull cross sectional area
should average apptoximately 228.1 square feet along the riffle sections of this
channel. The bankfull width and mean depth should average approxitnately 68.7 feet
and 3.3 feet, respectively. The banlcfull discharge is estimated at approximately 1,400
cubic feet per second.
2. The contractor will begin by constructing a rock cross vane within the upstream
portion of the project area. This cross vane will help to redirect flows to the center
of the channel, thus removing the majority of the shear along the adjacent
streambanks. Geotextile fabric and excavated material will be placed along the
upstream edges of the structure to restrict fines and other material from passing
through any gaps between the boulders. Upon completion of the structure, the
adjacent streambanks will be graded, seeded and covered with etosion control
matting.
3. Debris upstream of the bedrock outcropping will be removed and stockpiled along
the left streambank, facing downstream. The contractor will attempt to relocate the
boulder outcropping against the right streambank.
4. A rock j-hook vane will be constructed downstream of the outcropping along the left
streambank. The debris will be placed downstream of the structure for aquatic
habitat. Once the structure has been constructed, the contractor will reshape and
redefine the left streambank. The j-hook structure will redirect the thalweg away
from the bank and help to maintain the existing pool situated at the end of the
project atea. Geotextile fabric and excavated material will be placed along the
upstream edges of the structure Nvithout compromising the overall function of the
structure. Upon completion of the structure, the newly fortned streambanks will be
graded, seeded and covered with eYOSion control matting.
5. The remaining centex bars/lateral baxs upstteam of the j-hook structute will be
removed and the material will be placed along the adjacent streambanks. The
dimension of the channel will remain consistent with Regional Curve data.
6. Once construction activities have been completed, the contractor will seed all
distutbed areas. Bare-rooted and live-staked vegetation will be installed according to
the buffer guidelines presented with the grant.
5.0 DESIGN IMPLEMENTATION
Implementation will follow the design sequence
listed on the plan sheet. The installation of
structures will pxoceed fxom upstream to
downstream. As a result, shifts in the flows can be
addressed xvith the placement of structures
downstream. The actual locations of the structures
may be adjusted, depending on site conditions.
Implementation must take place prior to September
1, 2005 and is anticipated to take less than five total
days.
- - ? . ?,t •; -?
V //?t f j ? •- .-' ? r-? t •. r /
??`1 f ??j ' 3\? _ ? i '' ? /-.?? :
?-
?
_7 ;
L?
? .s ?
lI . (?
./
, j ?J i ,,. ? ? ; _ ? i ? ? ? _,r. r ? ? J t ? irt ? f 'C ?--, i i„? ( ,? ; ( ??. . ? L ? ? l i? i ? ? f( ? ? ?
:• /?,/l? / ? °.? ?l?l ! ?1 ?-? ?i f ??; ?(?-- , ? tiE,?? ? i( ? ? ? 1? ?ti , !r,-/ ?? \< < 1, ,? ; , ., ? ? J; ( ?/ ?f,%,r f, t ?? ? (:N' ? siJ ?s ^: ?i?, ;ti ?? ? l
Q l
t;
J
V
j t ?._./ • ? i f '? r`,? 1 ? ??` ? a - f? ti ? ? r ? i ?, ? ?-' ? t <??.
/ ! 1 : ? f",..) `.J 1. ? ? ? r'. ,?'"?? ?"1 .?`, 1????.J C? +? ? {},13 ? /%.? ?? ?\ \t`? ? ,1?• ? ?-- _ ti,. .
? '`? '"'?x?'31 `???` ? t 1 ?„ ? '?????????y ? ?iS??/i?. /,?/ ? ? ??j? S '? ?"?•?' `??- ??"? __.-?
V '`' /\•,F fvi I ????feitVi?` !+?i? ?' t--• f ? ? f j ?"\} ? ?'f? ? ( ? ?' `-7??? 1 ? .r/?L--,,? '?-J
%
+?•.-- 1= ? '`) .r• _i? i:tr. ?F Jj ,? Je?
f + , ?, -: _ 1 7 4 ! ? ..
? ? ? ? r !' / ? t ?f /?? )? ??`', '?#! ( ? ?? ? ? -..s?' '' t i ?? ?lll ?1 a ?? t } r "? ? ( ?? -?? E,
':? ?. ? Ij '?t j /' ??, I ` ' '1?../ +.'?`e i?, ? ? ,, /f?' / t•, 1?f ;? ?' ?,;??`-`fti -?r _ _r +,?
'S'I2001Lri ? i? -??s r: ??1 ,? ??/ `??r"f '`r i? ?`?;f 7,;?? ?? ?? ?>
? M P2$,--;
,A
a sk?A c«??--'-:? .} PROJECT SITE
?
9.? SWr 10
?"'1 ?,: .". ? 1. ?i ? /? `,? ? •.?T-?..,._?.. ??:..-_=_? .,i/..? GJ al1o«ay HiII em
. \-?? . ?y j1 ? ,t • „? _ ? / ?' ,? i? ? ?'r,r- '?„_-„?4-. ' ? . 'I •? ^ ?t ,_?a J ? r-l
=1::ft-L. ?- -_„?, ?r ??.-?,,y•? j ?-.?
? ,. ,----- - .
?.._?/`?? ? {`u ?? ?? i ? i /???` , ?? iti `i? rj ??-?'`--??%'??? r ?•,f?P ? ?•:L'??r..???
?? f
o^s
':.t
.-? . y . ? ?? r:-'? t /;, !I • a ?` // }
? . • -? _J \ ?j?l ? ? ? r i?1??1,? i ?? \``
N'
?
?? ? ??_? j ?-, ? ' ? r , :,.' ?-,? f ; ??t f ?. it, ?!?tp ?ta-ir?r--- ?? ?.? ',? ? ,ti-/?????_.. /r!
'h
?/? ? ?l?`?=-.? ? ????j?i} ??? /r'? A?j??? L )) (? ``?--,``?--?l,;'?r ?• , , ? ?,?? ?!? '%l'l'?,' ?
" ?,/ `j?---t'?l? Sr? ,?Jl i i,?j?l? J?t.? _%' "? ?` ? ? ?? ?j?.%'L;7?. ,1`,? ?r ??? •1 } `, ?--? l--? ?'! ?;%??'Jli ((? `l??
l!} ? '? l.' ? ? f}. ? "? . { ? ,? t r ?it ?--? ? ? -? ? ? a ? ?--,. r ? ? ?1 ? ' ? ? z ? ?,? ?--
? ?.?
? ? ? r`?f?'? ?I?'? Itj•_t?'J i ?1J? ??-?`? ? a--? '-"? ; ?.,?` ?\,/? ?'il?. ?ti?? ???? `?... C??'? ?'' lii'f /?Y 1 ` ??t
? ?.
?l,.?J ? t 1 i ?-? ? ? ? }1 ? { F Z $ ?"?1 j '? ?'_"? ? 1' `"? ' r^--?-`•--' ?' . ,,,?! \ r yr, ? J r Jr`?? A'
' j /s 'f/ ??(!?'.?`?-` `?ti?:1}\\ \',11????} l, l ? ? r _•?l?/ / _??\\, ,• - ?_': • ??{ ?' ?-???,"? \I 1 j}?C ??t?' ??? ?,???
L ?,r,?
i ?J(?? tt r
L
?r('t
1?
A
77
'' ?
A'?ttFl ?
A
H? A iL? q
T5
y
?J,_='?
PROJECT VICINITY
R L - ? Shooting Creek EWP Project
Strickland Site
?
_'! ?--' Clay County, North Carolina
Prepared For. iza,ooo
Clay Feet
0 750 1,500 3,000 4,500 6,000
COUllty USGS 7.5- Minute Topographic Quadrangles:Shooting Creek 8 Macedonia
Contour Interval 40 Feet
PLRN VIEW
RETAIN EXISTING ?
VEGETATION TO THE MARIMUM REPOSITION THALWEG
P7XTENT PRACTICABLE
REMOVE
CENTER BARS
, r,
;
J-HOOK VANE O
REMOVE EXISTING DEBRIS JAM AND
? ATTEMPT TO RELOCATE BOULDER
p OUTCROP TO ADJACENT BANK,
\? \ \
UTILIZE DREDGED
O MATERIAL TO RESHAPE
STREAM BANKS ?
I
EXISTING i EXISTSNG THALWEG
? REMOVE VEGETATION
CENTER BAR (APPROX. LOCATION) /- i
wooos
FLOW
EXISTING
? ?• WATERS EOGE
J-HOOK VANE DETAILS
??????J?js????[?rw;x?e-?
y?(?Yfy'J?f{'f?(Yf?y? o ?m
l.j'M?4M_
1 ?
w ? A':
.or?emcw ?o e?..mi wwEe ao.
n[ w?iai?°cB°oes"?°"o? w maw ?n
9100MIXW??YIZ
xoos wr,n m ttxrt? .d rrr m?
IW1FP M]l5 9YID Y. YIYM
?8 IF? 51?(w¢
4atRttf r.W[ 9cLL? Y YJ[fn w ?rs1Rr
mE ai lOIGGi lYC 9WD BE 01AIn P
? pI1IqS Yp bpFp !0 i rYY
! rt a?S p?ECtfp rt Oi 9R ?OR
a?n [IIFlO IRilfw 1 rYY
iucmvo?n.aaamme?wvrt
emi?e ini.+ sn rrw°W?Q um °M
?r?rcvrusmncwn
? i
sEttia A-A
CROSS SECTION VIEW
?? ?o
SECiIQV B-B
CRQSS SEC710N vlEw
?
?DETAIL Of GEOTE%iILE FABAIC
-?
seoor ct
PAOFILE VIEW
?
SfCTNw D-D
PAOFILE VIEW
p W3169YYCE?urt,[auWprAF
K.YII 9ot ..Vq W]IY YO SuG ?rtll
iK YLP11L 01[IIN!
9W RL.r[]IS
b]5 99I0 fll Mlhl RX I?WI 9?
mi wm aouo ? ? wm
s? rrs x? aum ? sn?.uu
¢omnt rws vwe s ru? a iesmu.
? n ewrt.a rrc aan a owa. a
car? eoama wo ai[o io ? ww
v?s:?.muvcrncnavrtr?u
sia6umuc ?rmwa"?
?sm? enLO1Dw? ??"
k Yt6 6S iQ 9G4Ti[ ARt
?._.__'.'.._.'"____________________" _'.'_._______...____?___'.._.____..'..._________._...._
; QUANTITIES ; CONSTRUCTION SEQUENCE
SCALE:
I' _ $p' APPROXIMATE '
CROSS VANE ?
'
NORTH ?
'-----------------------------------------------------------------------------" --?
CROSS SECTION
10 ?
------------? --------
5
0 ?_ ?----?-? - -?--?
75 50 25 0 25 50 75 ?
ITEM
I i DESCRIPTION
AMOllNT
BOULOERS 4X3X2 i? 224 TONS
? CONSISTENT WiAMOGO BRAND
GEGTEXT[LE FFBRIC ; STYLE 4551, Ft POLYPRDPYLENE I 230 SY
NONWOVEN NEEOLE-PUNCHED i
? FABR[C
I
i ? SPECIFICATIONS FOLLOW WESTERN
COIR F[BER I EXCELSIOR SUPER DUTY ERCELSIOR
I
(EXCELSIOR) S0-3 EROSION CONTROL BLANKET OR 470 SY
MATTiNG ', WESiERN EXCELSIOR I00% COCONUT
I CC-4 EROSION CONTROL BLANKET I
? TEMPORARY SEEDING ORCHFRO GRASS 0
5 AC I
i ANNUAL RYE GRAtN .
i
?
AMERICAN ELM
GREEN ASH
( BARE-FOOTED I SYCAMORE 320 STENS
? VEGETaTION I RED MAPLE
R[VER BIRCH
I
LIVE-STAKEO
SILKY DOGw000
130 S?En5
VEGETa7iON BLACK VILLOV
-----------------------------------------------------------------------------------------------------------------------------------------
PROPOSED CHANNEL INFORMATION;KX
CONTRACTORNOTES:
I. CINJTRACTOR WILL MINIMIZE DITURBANCE OF E%ISTING VEGETAiION TO THE MN(IMUM FXTEM PRACTICABLE. 2. CONSTRUCTION WILL PROCEED FROM UPSTREAM TO DOWNSTREAM. 3. ALL BARE-ROOTED VEGETATION WILL BE INSTALLED DURING TFE OORMANCY SEASON ,
(OCT-MARCH) UNlESS OTHERWISE OIRECTEI). ,
4. VEGETATION DISNRBED DURING CONSTRUCTION ACTIVfTES N1LL BE UTILIZED ON SfTE AS DIRECfEO BY ONSfTE ENGINEER S. ANY REMNNING BOULDERS WILL BE UTILIZED ON SfTE AS DIRECTED BY ONSITE ENGINEER. '
DESCRIPTION
DRAINAGE AREA 32.0 SO, Mi.
BANKFULL CROSS SECTIONAL AREA 228.1 S0. FT.
BANKFULL WIDTH 68.7 FT.
BANKFULL MEAN DEPTH 3.25 FT.
BANKFULL OISCHARGE 1400 CFS
°DATA BJSED ON NC RURAL M WMAIN REGIONAL CURVES, NCSRI, 2005
DETRILS
PLF+NS PREPRRED POR:
I. CONTRACTOR AND PROPERTI' OWNER WILL IDENTIFY STAGING AREAS FOR MATERIALS
AND EQUIPMENT.
2. CAMRUCT ROCK CROSS VANE NEAR BEGINING OF PROJECT.
3. RESHAPE STREAM BANKS IN AREA NEAR CROSS VANE.
4. UPON COMPLETION OF GRADING 8ANK5, INSTALL EROSION CONTROL MATTING AND PLACE
TEMPORARY SEEDING ON ALL DISTUR6ED AREAS IN VICINITY OF CROSS VANE.
5. MOVE DOWNSTREAM AND REMOVE EXISTING DEBRIS JAM AND RELOCATE BOULDER OUTCROP
TO ADJACENT BANK. REMOVE OTHER DEBRIS AND DISPOSE ON-SITE.
6. REPOSITION THALVJEG AS SHOWN ON THE PLAN VIEW.
7. CONSTRUCT ROCK J-HOOK VANE STRUCTURE.
0. UPON COMPLETICN OF ROCK J-HOOK, RESHAPE BANKS IN VICINITY OF STRUCTURE.
9. INSTALL EROSION CONTRaL MATTING AND PLACE TEMPORARY SEED ON ALL DISTURBED AREAS.
10. PIANi BARE-R00?ED VEGEfATION WITHIN BUFFER AREA
CROSS VANE ROCK WEIR DETAILS
(Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]]
From: Cyndi Karoly <cyndi.karoly@ncmail.net>
Date: Wed, 16 Mar 2005 15:58:57 -0500
To: Laurie J Dennison <Laurie.J.Dennison@ncmail.net>
fyi - so please note that fees are waived when you create these files - perhaps a
brief handwritten note in the file jacket, or we can add a copy of this message
Subject: [Fwd: [Fwd: STream Clearing Activities]]
From: Tom Reeder <tom.reeder@ncmail.net>
Date: Wed, 16 Mar 2005 15:43:18 -0500
To: Cyndi Karoly <cyndi.karoly@ncmail.net>
Cyndi - In answer to your question yesterday it appears that the fees are being
waived for the EWP associated 401s.
5ubject: [Fwd: STream Clearing Activities]
From: Alan Klimek <alan.klimek@ncmail.net>
Date: Wed, 16 Mar 2005 15:37:40 -0500
To: Tom Reeder <Tom.Reeder@ncmail.net>
\
,
?
Yes, the fees are being waived. See attachment.
Alan
------- Original Message --------
Subject:STream Clearing Activities
Date:Mon, 28 Feb 2005 09:40:08 -0500
From:"Robin W. Smith" <robin.w.smith(ancmail.net>
Organization:NC DENR
To:Alan Klimek <Alan.Klimek cz,ncmail.net>, Jim Simons <Jim.SimonsPncmail.net>,
David Vogel <David.VogelPncmail.net>
CC:Johanna Reese <Johamia.Reesep
ncmail.net>, Nann Guthrie
<Nann.Guthrie cr,ncmail.net>
r.
`}? •
?W'11: Attached is an electronic copy of the letter and information sheet
sent to the 19 counties and one town that have contracts with NRCS for
stream clearing projects. Those letters went out over the Secretary's
signature on Friday. We will hand-deliver a memo containing the same
basic information to the mountain area legislators tomorrow. We are
; also working with the Governor's Office on a news release; I am not sure
how soon that will go out. Give me a call if you have any questions.
Thanks for workiizg toward getting meetings set up. Robin.
[Fwd: [Fwd: [Fwd: STream Clearing Acrivities]]]
Robin W. Smith <robin.w.smith r.,ncmail.net> ,
Assistant Secretary of Planning & Policy '
Office of the Secretary
NC DENR
; Content-Type: messagehfc822
[Fwd: [F?vd: STream Clearing Activities]Content-Encoding: 7bit
Content-Type: message/rfc822 !
; [Fwd: STream Clearing Activities] ? i
; Content-Encoding: 7bit i
I Content-Type: application/msword
EWP letter to counties.doc;l
i Content-Encoding: base64
_---- -- _-?------------ ----?---- -------------------_------
- .---- ; ---------- --
? Content-Type: application/msword
Stream-Clearing Activities-3.doc;'
:; Content-Encoding: base64
d'
February 25, 2005
Page 1 of 2
February 25, 2005
RE: Emergency Watershed Protection Stream-Clearing Projects
Dear
?.
I know that County experienced stream damage as a result of the fall
hurricanes. Our department would like to work closely with your county to insure that
stream restoration proj ects receiving state and federal funds under the Emergency
Watershed Protection (EWP) program move as smoothly as possible through the
environmental review and permitting process. I have enclosed for your information a
, brief summary of the types of permits and approvals that may be required for these
projects. For projects that involve work directly affecting the streambed, the United
States Army Corps of Engineers will be the primary environmental permitting agency.
For those projects, our staff in the Division of Water Quality and the Division of Land
Resources play a supporting role and issue related state approvals.
I have asked our staff to meet with all of the western counties, either individually or in
small groups, to talk about each county's proposed stream restoration projects and answer
' your questions about permit requirements. Our staff will ask the Corps of Engineers and
Soil and Water Conservation staff to join in those meetings in an effort to put together a
plan of action for reviewing and approving stream restoration projects as quickly as
possible. You should receive a telephone call from DENR staff soon to talk about a date
and time that would be convenient to meet and talk about your projects.
I have also directed our staff to waive fees for state water quality certifications (under
Section 401 of the Clean Water Act) and for approval of erosion and sedimentation
• \
February 25, 2005
Page 2 of 2
control plans for stream-clearing projects funded under EWP. Fees will be waived for all
EWP permit s requested by Septernber l, 2005.
I hope these efforts will ease the burden on county governments already challenged by
the demands of reconstruction and recovery. If we can help you in any other way, please
do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a- primary
contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The
enclosed information sheet also provides contact information for DENR staff in both the
Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in
Asheville.
Sincerely,
William G. Ross, Jr.
?
?
?,