Loading...
HomeMy WebLinkAboutNCC190352_ESC Approval Submitted (7)_201905221 '--LIMIT OF l f •' ��r�s' ' 5iLT FENCE RISER STOCKPILE AREA M51NATION TREE 4 SKIM MEi ' 51LT., ..NCE �...] Zoo PE)zMANENT SLOPE FA5EMENT [BM 20.1 2, PG 245) ""_` - • ` 30 / _. i - - - „r------- I N V. = 298.0 _ 15'LXb W CLA5� 2 � / EX r� ' - .._ RIP- _P PAD d {D524"} yra LIMIT OF , 015TURBANCE U15TING � \� - � �W :: --� � � � WALL MH -� _ r _.... TREE ' PROTECTION ...- = 7' 4C rA'� -� 4 I R C=01.3j 223 5 i 7:4 CF5 �1, 1 X•43 590 - �OG ok { . '`AC�,OO CFIAC) IZ I EX 38�D KimICE SIZE=Q.,5 �f ,5iZE= Itl y � ; � • .,�� ,,ram' - � � � � - � � �_.. ...- � ,� _ _ _- � s' { �- oz RAP J'AD 12") .._t a// RISER2 - I $ RCP�(�'2:9%a' I ""-mow � �� -•- p Il 4" SKIM EIR _..... _ _............... f DIVER51ON DITCH {TYP.) D_r OVERHEAD POWER LINE5 COIRI/ UMENT FRIVE / STaNs~ MON BAt<re�s � %•` I �� � = � � [,=XISTING7 L- F�' _ m Ex t MIi- - _ _ - -- " X IFs�C. EX, 8" BAN. SEWER {TYP.] _�� MN�� fir- MN Mh EX. 5" S/0 ru=5. DIW SOIL _-�_ �j- `- STOCKPILE w F-� ' . r AREA L -� �-- 2U DIV151ON riN IIKATvL-r- EXi5Tlf�iG CREEK _rvµ �- - _ COMBINATION TRPF RMANENT SLOPE 4 SILT FENCF MT.)� ' `{BM 2012, PG 245} fl 1 GENERAL NOTES+ I . ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO TOWN OF WAKE FOREST STANDARDS AND SPECIFICATIONS. 2. BOUNDARY AND EXl5TING CONDITIONS INFORMATION FOR THE 5ITF WERE TAKEN FROM A DIGITAL F1LE PROVIDED BY FLINGBURG LAND 5URVFY COMPANY, 3. TOPOGRAPHIC INFORMATION FOR THE 51TE WAS TAKEN FROM A DIGITAL FILE PROVIDED 15Y ELINGBURG LAUD SURVEY COMPANY. TH15 5URVEY DATA WAS 5LFNDED WITH NORTH CAiROLINA LIDAR TOPO AT THE PROPERTY BOUNDARY TO CREATE THE TOPOGRAPHY SHOWN HEREON. 4. WETLAND AND NFU5E RIVER BUFFER DELINEATIONS WERE DETERMINED BY 5AGE ECOLOGICAL SERVICES, INC. 5. THE FEMA MAP REFERENCE FOR TH15 51TE 15 PANEL 3720183000J DATED MAY 2, 200G. G. ALL NFCE55ARY PERMITS 5HALL BE OBTAINED FROM NGDENR, DWR, THE ARMY CORPS OF ENGINEERS OR OTHER AUTHORIZED AGENCIE5 PRIOR TO CONSTRUCTION DRAWING APPROVAL. 7. THE AKEA5 SHOWN ON THE RECORDED PLAT IDENTIFIED A5 NEU51= RIVER RIPARIAN BUFFER SHALL BE MAINTAINED 1N PERPETUITY IN THEIR NATURAL OR MITIGATED CONDITION. NO PERSON OR ENTITY SHALL FILL, GRADE, EXCAVATE, OR PERFORM ANY OTHER LAND-DI5TURBING ACTIVITIES; NOR CUT, REMOVE, OR HARM ANY VEGETATION; NOR CONSTRUCT ANY 5TRUCTURE5 NOR ADD ANY ADDITIONAL IMPERVIOUS SURFACE, NOR ALLOW ANIMAL GRAZING OR WATERING OR ANY OTHER AGRICULTURAL USE ON 5UCH PROTECTED AREAS WITHOUT WRITTEN AUTHORIZATION OF THE DIVISION OF WATER QUALITY (DWO) OR COMPLIANCE WITH THE RIPARIAN BUFFER PROTECTION RULES [ 15A NCAC 215 .0233 OR .0259}. TH15 COVENANT 15 TO RUN WITH THE LAND, AND SHALL BE BINDING ON THE OWNER, AND ALL PARTIES CLAIMING UNDER IT. 8. THE 51TE 15 PROPOSED TO BE MA55 GRADED. ALL APPLICABLE REQUIREMENT5 OF UDO 5ECTION 12 SHALL APPLY. 9. THE TOTAL DISTURBED AKFA 15 15.2 ACKE5. 10. PHASE 15HALL CON515T OF LAND D15TUKDANCE NECE55ARY TO INSTALL ER05ION CONTROL MEASURES ONLY, ONCE COMPLETED, THE CONTRACTOR SHALL CONTACT THE TOWN OF WAKE FOREST TO COMPLETE A 51TE INSPECTION AND 155UE A CERTIFICATE OF COMPLIANCE BEFORE STARTING PHASE 2. 1 1. EROSION CONTROL MEA5URE5 SHALL BE INSTALLED IN THE BEST LOCATION BASED UPON FIELD CONDITIONS. 12, THE DEVELOPER 15 RE&ON51BLE FOR INSTALLATION AND MAINTENANCE OF FRO510N CONTROL DEVICE5. 13, RETAINING WALL APPROVALS SHALL BE HANDLED AS A SEPARATE SUBMITTAL. 14. 501L 5TOCKPILE5 5HALL BE NO HIGHER THAN 35 FEET AND HAVE 5LOPF5 NO 5TI;EPER THAN 2: 1. 15. THE LIGON MILL ROAD DISTURBED LIMITS (R/W) 5HALL BE STABILIZED WITHIN 7 DAY5 OF FINAL ROUGH GRADING. 1 G. NO CONSTRUCTION TRAFFIC SHALL ENTER OR MT ONTO 5TONE MONUMENT DRIVE AND LONGBOURN DRIVE. 17. CONSTRUCTION VEHiCLE5/EQUIPMENT SHALL NOT PARK ON STONE MONUMENT DRIVE AND LONG50URN DRIVE. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL 51 KEPT ON SITE. EROSION PERMIT NOTES 1. A LAND DISTURBING (E&5C) PERMIT IS REQUIRED FOR PROJECTS OVER 0.50 ACRE. IF MULTIPLE LOTS WITH LAND DISTURBANCE OVER 0.50 ACRE TOTAL ARE EITHER CONTIGUOUS OR NON-CONTIGUOUS 1N THE SAME SUBDIVISION, BEING TAKEN DOWN BY THE SAME BUILDER/OWNER, A LAND DISTURBING PERMIT IS REQUIRED. THE COST OF THE PLAN REVIEW AND PERMIT IS $500/ACRE ROUNDED UP. THE FEE 15 DUE AT TIME OF PLAN SUBMITTAL. DEVELOPER IS RESPONSIBLE FOR INFORMING BUILDER OF E&SC PERMIT REQUIREMENTS ON INDIVIDUAL LOTS. 2. IF ADDITIONAL ACREAGE IS ADDED TO AN EXISTING PERMIT REVISED FORMS, PLANS, AND ANY ADDITIONAL FEES MUST BE SUBMITTED, 3. IF OWNERSHIP OF A PROPERTY HAS CHANGED A REVISED FRO MUST BE SUBMITTED. 4. IF A PROPERTY 15 TAKEN OVER BY THE BANK, THE BANK SHALL CONTACT THE TOWN AND REPAIR ALL EROSION CONTROL MEASURES TO TOWN/NCDENR STANDARDS. THEY SHALL ALSO SUBMIT A NEW FRO FORM. 5. IF A PROJECT IS NOT COMPLETE WITHIN TWO YEARS, THE PLANS MUST BE RENEWED AT $250/ACRE. A REVISED SET OF PLANS MAY BE SUBMITTED IF ACREAGE HAS ALREADY BEEN DEVELOPED AND A CERTIFICATE OF OCCUPANY HAS BEEN ISSUED. 6. AN EROSION PRECONSTRUCTION MEETING MUST BE HELD WITH THE TOWN OF WAKE FOREST PR10R TO START OF ANY WORK, INCLUDING INSTALLATION OF EROSION CONTROL MEASURES, DEMOLITION, CUTTING TREES, AND GRUBBING. CALL ENGINEERING AT (919) 435-9442 TO SET UP A MEETING. ALL PLANS MUST BE SIGNED AND COPIES RETURNED BACK TO THE TOWN 1 WEEK PRIOR TO PRECONSTRUCTION MEETING. 7. THE OWNER, GENERAL CONTRACTOR, GRADING COMPANY, AND EROSION CONTROL INSTALLER MSUT BE PRESENT AT THE PRECONSTRUCITON MEETING. B. THE E&SC PERMIT AND NPDES GENERAL STORMWATER PERMIT WILL BE GIVEN OUT AT THIS MEETING. CONSTRUCTION SEQUENCE NOTES 1, AFTER THE PR ECONSTR U CITON MEETING IS HELD, THE CONTRACTOR CAN INSTALL INITIAL EROSION CONTROL MEASURES ONLY. TH15 INCLUDES BUT 15 NOT LEMITEDTO CONSTRUCTION ENTRANCE, SILT FENCE, PERIMETER DIVERSION DITCH, CHECK DAMS (ROCK OR WADDLE TYPE), TREE PROTECTION FENCE, EXISITNG INLET PROTECTION, SKIMMER SEDIMENT BASINS, AND SEDIMENT TRAPS. CLEAR ONLY AS NECESSARY TO INSTALL THESE MEASURES. 2. CONTRACTOR IS RESPONSIBLE FOR E&5C WEEKLY INSTALLATION AND MAINTENANCE LOG INCLUDING DATES OF TEMPORARY/PERMANENT GROUND COVER,A RAIN GAGE, COPY OF TOWF SIGNED PLANS ON51TE, REVISE D SIGNED PLANS, NPDES LOG, AND CONSTRUCTION SOX MUST BE PRESENT AND EASILY ACCESSABLE ONSITE. 3.ONCE MEASURES ARE INSTALLED, CONTRACTOR/FRO TO CALL TOWF FOR AN INITIAL INSPECTION. IF SITE PASSES INSPECTION, A CERTIFICATE OF COMPLIANCE WILL BE ISSUED, CONTRACTOR CAN NOW BEING CLEARING, GRUBBING, AND GRADING. 4. CONTRACTOR TO MAINTAIN ACCESS ROAD FOR EMERGENCIES AT ALL TIMES. S.PHASE PROJECT TO LEAVE A5 LITTLE GROUND OPEN A5 POSSIBLE. 6. TEMPORARILY SEED, STRAW AND TACK OR HYDROSEED WtTHiN 14 DAYS OF ANY PHASE OF GRADING, INCLUDING SLOPE5. SEED BASINS AND DITCHES IMMEDITEALY AFTER CONSTRUCT#ON. 7.PRlOR TO REMOVAL OF TEMPORARY MEASURES, TOWN MUST APPROVE REMOVAL. ALL AREAS ABOVE TEMPORARY MEASURE MUST HAVE 85% GROUND COVER. 8.THE TOWN OF WAKE FOREST CONSTRUCTION INSPECTOR WILL EVAULATE THE SITE ATLEAST ONCE A MONTH. A COPY OF THE INSPECTION FORM WILL BE EMAILED TO THE FRO, THE WEEKLY EROSION LOG AND NPDES LOG MUST BE ON51TE AND AVAILABLE FOR REVIEW. 9. IF THE SITE IS FOUND OUT OF COMPLIANCE A NOTICE OF VIOLATION WILL BE ISSUED GIVING THE CONTRACTOR/FRO 7 WORKING DAYS TO REMEDY THE PROBLEM. IF THE SITUATION IS NOT RESOLVE WITHIN THE TIME PERIOD A FINE MAY BE ISSUED. 10. IF SEDIMENT LEAVES THE SITE A FINE MAYBE ISSUED UP TO $5,000 PER DAY PER VIOLATION. IF SEDIMENT ENTERS BUFFER, STREAM, OR WETLAND NCDWQ WILL BE NOTIFIED. THEY MAY ISSUE FINES UP TO $25,000 PER DAY PER VIOLATION. 11. CALL THE TOWN UPON COMPLETION FOR A FINAL EROSION INSPECTION. A PUNCHLIST MAYBE GENEREATED ADDRESSING ANY REMAINING ITEMS. THERE MUST BE 85%GROUNDCOVER ON THE ENTIRE SITE PRIOR TO A CERTIFICATE OF OCCUPANCY. IF THE SITE IS FOUND TO BE IN COMPLIANCE AN EROSION CERTIFICATE OF COMPLETION WILL BE ISSUED. LEGEN D DIVER5ION DITCH TREE PROTECTION FENCE AND 51LT FENCE TREE PROTECTION FENCE LIMfT-9 Of D15TURBANCE m I m I R Ire I m f m I W 4 mm 101a CUSTOM BA5IN r/00MEM/ CONSTRUCTION ENTRANCE Q 20 40 80 GRAPHIC SCALE THESE P 5 HA A VIPPROVED FOR CONSTRUCTION BY Tf1F OF WAKE FOREST ENGINEERING DEPARTMENT DATE CE551 L DATE 1/11� I CA� 41-lot PUBLIC ORK5 DEPA DATE IVANNIN&DEPARTMENT DATE EROSION AND 5EDIMENT CONTROL DATE CITY OF RALEIGH PUBLIC UTILITIES DATE DEPARTMENT FIRE PREVENTION DATE ---� 4 URBANORE5TER DATE J C .c J CL CL c 5 Z -5 C6 w E Lu Z C r 1'� �Z rca C 0 C 0 Lu u IV U 221 N. SALEM ST. SUITE 001 Pa Box 1062 APEX, NC 27502 Offios: 919-M-1174 Registration: P-0151 EQy►��e�3rr����,� CAyDf�'o. r �aQ` -` o of s 5E L -VG INee- Q z U ` 1r--n z o LLJ U J V J �[ z D U Q L.L O L �z (s) <z z � Q L Q o __j rr�� (n U O LJ �z � Q o U z 0 Q) _j L 0 Ili !T) q) z o LL O CL/ D uu z D I JULY 19, 2015 PEV1510N I I / 1 5/ 18 1 st T1RC COMMENTS 02/01 / 19 51GNATURE SET