Loading...
HomeMy WebLinkAbout20090766 Ver 1_More Info Letter_20090813affluNA North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freernan Governor Director Secretary August 13, 2009 DWQ Project # 2009-0766 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Agape Word Fellowship, Inc Attn: Mr. Jerry M. Williams 9100 Rhinebeck Court Raleigh, NC 27613 Subject Property: Agape Fellowship Church, Raleigh, NC UT to Walnut Creek [030402, 27-34-(4), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Williams: On July 10, 2009, the Division of Water Quality (DWQ) received your application dated July 10, 2009 to impact 1,695 square feet (ft) of Zone 1 protected riparian buffers and 1,622 square feet (ft) of Zone 2 protected riparian buffers to construct the proposed sanitary sewer at the subject property. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide engineering calculations to show the peak discharge rate from the proposed dry detention basin during the ten year storm. 2. Please provide engineering calculations to show that the existing stormwater sewer system is sized adequately to handle the additional stormwater flow from the proposed development. 3. Please provide a photograph of the pipe outlet from the existing storm sewer system so that the DWQ may observe the condition of the outlet area. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to me. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. 401 CiversighUExpress Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: hitp://h2o.enr.state.nc.us/ncwetiands/ North Carolina Vaturalltf An Equal Opportunity 1 Affirmative Action Employer Agape Page 2 of 2 August 13, 2009 This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Amy Chapman or Ms. Cyndi Karoly at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincer , U4j, Qn Cyndi Karoly, Supervisor ?I 401 Oversight/Express Review Permitting Unit CBK/asc cc: Lauren Witherspoon, DWQ Raleigh Regional Office Debbie Edwards, S&EC, 11010 Raven Ridge Rd, Raleigh, NC 27614 File Copy Filename: 090766AgapeFellowshipChurch( Wake)NBR_On_Hold