HomeMy WebLinkAbout20090766 Ver 1_More Info Letter_20090813affluNA
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freernan
Governor Director Secretary
August 13, 2009
DWQ Project # 2009-0766
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Agape Word Fellowship, Inc
Attn: Mr. Jerry M. Williams
9100 Rhinebeck Court
Raleigh, NC 27613
Subject Property: Agape Fellowship Church, Raleigh, NC
UT to Walnut Creek [030402, 27-34-(4), C, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Williams:
On July 10, 2009, the Division of Water Quality (DWQ) received your application dated July 10, 2009 to
impact 1,695 square feet (ft) of Zone 1 protected riparian buffers and 1,622 square feet (ft) of Zone 2
protected riparian buffers to construct the proposed sanitary sewer at the subject property. The DWQ has
determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact
protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the
additional information requested below, we will place this project on hold as incomplete until we receive
this additional information. If we do not receive the requested information, your project will be formally
returned as incomplete. Please provide the following information so that we may continue to review your
project.
Additional Information Requested:
1. Please provide engineering calculations to show the peak discharge rate from the proposed dry
detention basin during the ten year storm.
2. Please provide engineering calculations to show that the existing stormwater sewer system is
sized adequately to handle the additional stormwater flow from the proposed development.
3. Please provide a photograph of the pipe outlet from the existing storm sewer system so that the
DWQ may observe the condition of the outlet area.
Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this
information to me. If you will not be able to provide the requested information within that timeframe,
please provide written confirmation that you intend to provide the requested information, and include a
specific timetable delineating when the requested materials will be provided. If we do not hear from you
in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider
the project as returned.
401 CiversighUExpress Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: hitp://h2o.enr.state.nc.us/ncwetiands/
North Carolina
Vaturalltf
An Equal Opportunity 1 Affirmative Action Employer
Agape
Page 2 of 2
August 13, 2009
This letter only addresses the application review and does not authorize any impacts to wetlands, waters or
protected buffers. Please be aware that any impacts requested within your application are not authorized (at
this time) by the DWQ. Please call Ms. Amy Chapman or Ms. Cyndi Karoly at 919-733-1786 if you have
any questions regarding or would like to set up a meeting to discuss this matter.
Sincer , U4j,
Qn Cyndi Karoly, Supervisor
?I 401 Oversight/Express Review Permitting Unit
CBK/asc
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
Debbie Edwards, S&EC, 11010 Raven Ridge Rd, Raleigh, NC 27614
File Copy
Filename: 090766AgapeFellowshipChurch( Wake)NBR_On_Hold