Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20050977 Ver 1_Complete File_20050606
o? W AT ?'rl o Ni?' -c Nlichael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality June 14, 2005 Charles Abernathy, County Manager McDowell County 60 East Court Street Marion, NC 28752 Subject Property: Catawba River EWP (2005-1 & 2) DWQ Project # 05-0977 McDowell County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Abernathy: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 1,000 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on June 3, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose (but not necessarily the design) that you described in your application. This authorization by no way authorizes the reconstruction / construction of any dikes or other measures which prevent the rivers access to it's floodplain. If you change your project beyond the approval here, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733-1786 /FAX 919.733-6893/ Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 500b Recycled/109% Post Consumer Paper McDowell County: Page 2 of 6 June 14, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 1,000 feet Catawba River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. McDowell County: Page 3 of G June 14, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. McDowell County: Page 4 of 6 June 14, 2005 ' 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted McDowell County: Page 5 of 6 June 14, 2005 on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14.If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. McDowell County: Page 6 of 6 June 14, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AWWkhb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Mike Osborne, CH2MHill 4820 Parkway Plaza Blvd. Suite 20 Charlotte, NC 28217 USACE Asheville Regulatory Field Office DWQ Asheville Regional Office DLR Asheville Regional Office File Copy Central Files Filename: 05-0977. EW P.CatawbaRiver.Approval Triage Check List Date: 06/09/05 Project Name: Catawba River EWP 2005-192 DWQ#: 05-0971 County: McDowell Kevin Barnett, Asheville Regional Office To: 30-day Processing Time: 6/6/05 to 7/6/05 From: Cyndi Karoly Telephone : (919) 733-9721 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! 4824 Parkway Plaza Blvd. Suite 200 Charlotte, NC C i C I H I LL 28217-1968 Tel 704..329 329 Tel 70.0072 June 3, 2005 Fax 704.329.0141 US Army Corps of Engineers 151 Patton Avenue Room 208 Asheville, NC 28801-5006 North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Unit, 1650 Mail Service Center Raleigh, North Carolina 27699-1650 North Carolina Wildlife Resource Commission rD c/o Dave McHenry JU> > 20830 Great Smokey Mountain Expressway .1 1005 Waynesville, North Carolina 28786 'rDS=76i, ; r"RE;G .,CH Dear Sir/ Madam: UTy CH2M HILL is submitting the enclosed Pre-Construction Notification (PCN) applications and associated documents on behalf of McDowell County, North Carolina regarding upcoming bank repair/stabilization at multiple sites in the County. CH2M HILL is involved in the project of streambank repair and debris removal due to floods that occurred as the result of tropical depressions Frances and Ivan in September 2004 in McDowell County. This project is funded by the NRCS Emergency Watershed Protection Program. The project objectives are to repair the affected river and streambanks at the identified sites. The first site is located along a section of the Catawba River upstream of the intersection of Highway 70 and Major Conley Road at Mad Mama's Campground, stream class C. The second site is located approximately one (1) mile upstream of Mad Mama's Campground at the intersection of Resistoflex Road and Old Greenlee Road, stream class C. These two (2) streams are not classified Trout Streams. CH2M HILL in conjunction with McDowell County intends to complete this project in two phases. The first phase will involve removal of debris that poses a potential threat to the adjacent and downstream properties, public infrastructure, and utilities. The massive woody and foreign debris on the streambanks and in floodplains could potentially clog the downstream culverts or bridges and direct channel flows into vulnerable banks during future flood events. During the second phase, streambank stabilization designs will be implemented at the sites where streambank erosion had resulted in property damage, loss of land and/or poses a continuing threat to private and public property or utilities. CH2M HILL intends to commence with the first phase of the project, the woody debris removal on or about June 15, 2005. Page 2 June 3, 2005 Should you have questions or comments, please feel free to call our office at 704.329.0073 ext. 250. Sincerely, CH2M HILL k? Liane Morgan PCNletterCOED W Q W RCFinal l-2(6-3-05).doc Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "NSA".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. ir payment in o e Noith aro in` a Weflan s Restoration rogram is propose or mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal v Pcen-t Area of Environmental Concern (see the top of page 2 for further details), checka CI? II. Applicant Information JUN 2005 . DEN''R 1-tit }iFr;( L..L i . Owner/Applicant Information EjWiDSA;rDSiOn"','?r,?jr?t Name: Charles Abernathy /McDowell County Manager Mailing Address: 60 East Court Street Marion, NC 28752 Telephone Number: 828-652-7121 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mike Osborne Company Affiliation: CH2M HILL Mailing Address: 4824 Parkway Plaza Blvd. Suite 20 Charlotte, NC 28217 Telephone Number: 704-329-0073 ext 252 Fax Number: 704-329-0141 E-mail Address: mike.osbome@ch2m.com Page 1 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Catawba River EWP 2005-1, EWP 2005-2 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): SEE TABLE 1 4. Location County: McDowell Nearest Town: Old Fort Subdivision name (include phase/lot number): NA Directions to site (include road numbers, landmarks, etc.): From I-40, go N on US 70 approximately 7 miles. The site is located 1 mile downstream from the intersection of US 70 and Major Conley Rd. See Exhibit 1 for site locations. 5. Site coordinates, if available (UTM or Lat/Long): SEE SITE DESCRIPTIONS (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): SEE TABLE 1 7. Nearest body of water (stream/river/sound/ocean/lake): Catawba River 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The proposed site consists of light residential and agricultural uses (see Exhibit 1). The stream and stream banks were heavily impacted during Tropical Storms Frances and Ivan. Page 2 of 12 Extensive stream bank erosion threatens the stability of existing structures. Extensive deposits of rocky debris have reduced the capacity of the Catawba River. 9. Describe the overall project in detail, including the type of equipment to be used: From I-40, go N on US 70 approximately 7 miles. Turn Right onto Old Greenlee Road. The most downstream site is 1.34 miles from the intersection of US-70 and Greenlee Rd. The sites continue alongside of Greenlee Rd. for approximately 3 miles. The most upstream site is located 1 mile downstream from the intersection of US 70 and Major Conley Rd. See attached map for site locations. High-water flows have severely eroded the banks and left considerable rocky and woody debris in the channel (see Exhibit 2). In this section of river several houses and property are threatened by these conditions. Repairs in this reach of stream will involve the following: -Remove rocky and woody debris from floodplain -Stabilize the channel in its post flood configuration using organic and rock structure. EWP 2005-1 This project area includes approximately 1000 linear feet of the Catawba River near US 70. The project area is located at 35°4141 "N 82°02'46"W. High-water flows have severely eroded the banks. In this section of river the resulting severe streambank erosion and scour have left a 24-in sewer line exposed and threatened the stability of mobile homes located along the river's edge. Repairs in this reach of stream will involve the following: -Stabilize the channel in its post flood configuration using organic and rock structure -Reconstruct the streambank. EWP 2005-2 This project area includes approximately 600 linear feet of the Catawba River near US 70. The project area is located at 35°41'01 "N 82°03'45"W. High-water flows have severely eroded the left bank and left considerable rocky and woody debris in the channel and floodplain. In this section of river structures and property including a sewer line, power utility lines are threatened by the erosion and debris. Repairs in this reach of stream will involve the following: -Remove rocky and woody debris from floodplain -Stabilize the channel in its post flood configuration using organic and rock structure. Page 3 of 12 The techniques that will be utilized for the proposed repairs at the EWP sites listed above are described below. Removal of Organic and Rocky Debris Fallen trees, limbs, and non-native material within the cross section of the existing or original channel up to and including the debris line shall be removed. Any foreign debris (e.g. trash appliances) will also be removed. Trees leaning over the channel whose near term fall is apparent will be removed. These rooted trees will be cut three feet above the ground surface and the root masses will be left in place. Disturbance of channel bottom and banks and equipment access shall be held to the minimum necessary to allow the construction equipment to remove the debris. All areas disturbed due to debris removal and equipment access shall be reshaped and reseeded. Access to the channel will be perpendicular to the channel so that cutting of trees is held to a minimum with precaution taken to protect mast production and stream canopy trees. These trees will be cut off at ground level so re- sprouting may occur after construction. Dead trees and small brush piles that provide den habitat and are determined to pose no hazard to the channel will be protected. Woody debris will be chipped and disposed of in upland areas or hauled offsite. Rocky material within the floodplain will be removed using an excavator. The removal of rocky debris will proceed from the stream channel back toward the stream bank allowing the excavator to work on the debris pile. The reconstructed floodplain will be shaped in a manner intended to restore hydraulic capacity of the stream system. Rocky debris removed from the floodplain will be used to stabilize the streambank or will be hauled offsite. At sites where there is no eroded streambank in the immediate vicinity, the excavated material will be used to strengthen the natural berm of the streambank or will be hauled offsite. In no case shall the deposited material be placed at an elevation higher than the existing streambanks. Rocky material will not be removed below pre-existing elevations such as rock bars within the channel width. Streambank Repair When possible, excavation equipment will access streambank repair areas from the dry and will not track into the stream channel. Where suitable material is available, rock vane and root wads will be installed in the restored bank section to reduce bank stress and provide stability to the unconsolidated fill (typical structure cross-sections and plan views are included in Exhibit 3). An existing cross section is included for each of the impacted channel sections requiring stabilization (Exhibit 3). Drainage areas of project areas are also listed on Exhibit 4. The drainage area is used to determine the design storm (10-year or 25-year for trout streams) peak flow using USGS Rural Regression equations for the Blue Ridge-Piedmont. Design storm velocity and shear stress values were also calculated. This information, in conjunction with the field investigation analysis, DSR notations, and agency guidance and regulations, are used to develop an appropriate streambank stabilization design. Equipment that may be used to accomplish the above listed tasks includes; rubber tired skidders, 15 ton dump truck, hydraulic track mounted excavator with thumb, and chainsaws. Page 4 of 12 10. Explain the purpose of the proposed work: The work addressed in this application is intended to improve post flood hydraulic capacity of the stream reaches discussed and stabilize severely eroded streambanks that are threatening structures or other property. The proposed actions are not intended to enhance existing conditions or restore stream reaches using natural channel design techniques. Such activities would require detailed engineering evaluation and design, which are beyond the intent of the EWP program. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. NO VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be Page 5 of 12 included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Provide a written description of the proposed impacts: Proposed impacts include limited streambed disturbances, debris removal, and streambank stabilization. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved. local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: None Total area of wetland impact proposed: NA 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name Average Width of Stream Before Impact Perennial or Intermittent? (please secif ) Streambank EWP 2005-1 stabilization, 1000 Catawba R 50 ft Perennial Reconstruct streambank/dike Streambank EWP 2005-2 stabilization, 600 Catawba R 30 ft Perennial Debris removal * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.m,ipqucst.com, etc.). Page 6 of 12 Cumulative impacts (linear distance in feet) to all streams on site: 1600 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbod (if applicable) y Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. When at all possible equipment will be kept out of the stream channel, stream crossings will be minimized, and no excavation will be below the existing channel bed. When at all possible stream material will be moved from dry areas to banks, minimizing the movement of wet (or below water line) stream material. Creating wide, shallow channels will be avoided. Temporary and/or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground disturbing activities. Rocky material shall not be used for bank stabilization above the Page 7 of 12 normal high water mark. Large rocky material will be brought in to stabilize the toe of impacted streambanks where necessary. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NA 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the Page 8 of 12 NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wm/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): NA Amount of buffer mitigation requested (square feet): NA Amount of Riparian wetland mitigation requested (acres): NA Amount of Non-riparian wetland mitigation requested (acres): NA Amount of Coastal wetland mitigation requested (acres): NA IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements o the National or North Carolina Environmental Policy Act Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or -0260- X1. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Imperviousness will not change. Erosion and sedimentation prevention and control will be maintained throughout this project primarily through: proper water management, construction sequencing, proper staging and stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution will not be stored in areas that could be flooded during this project. Page 10 of 12 XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Portable facilities shall be provided at the work site. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): it is the applicarn` ly-in advance-of-desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). NA Applicant/Agent's Signa re Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 12 Table 1. DSR Map ID PIN Owner Property Owner's Address City State Zip Streambank Rock Woody Comments Number size stabilization debris debris (acres) removal removal EWP 2005- DSR1 079200523549 James and Inna 1.75 P.O. Box 1657 Mari on NC 28752 1000 LF I McKinney EWP 2005- DSR2 079100297245 Johnson Family 10.68 1885 Hwy 70 Mari n NC 28752 400 LF 200 LF 2 Properties LLC 'Vest Page 12 of 12 0 1,250 2,500 5,000 Feet DSR 1 i , , , i McDowell County, NC fS CF42MHILL Marion West, NC - USGS Quad .41110. EXHIBIT 1a - Mad Mama's Campground 0440 i j _ ! I (469.46A) 21 i0 _ ' --' f -7' ;f! r ? - I , ?__ - f gyp) f-v? \ 2 .F n 2..0? , 1718 ?19 ) h 8504 0' I (.% (17.?6A) rl ,y' V- ?9 HW''u N 1497 J `\ 7 1.5?h I F '' f35\46 597442 \ b: ti S i 13. (22.30n) ? 086 I \ `o --- -. -- . ' ---- - 4958 - - j 'ot 90 15.T9o t .• )- ?? -) ' ',"6565 Qsi ujl Q`iT71 . 3'549 - J 2kr Access Hwy. 70 3 i i 6362; ?, ,;?/Y• b? C 1.61A I ` I ff S ? 1.40A) . (2.43A1 11 $a,A I` 02 687G o , .b ' 1761 .^ I - 1?4 ? 149 '? l ?f \ i. ff :. I • • (2.54A) 142.34A) ':'35 4 ' a Manhole 12.72 I ?' ')57fr ti r w ,.< <-.i• r (1.97A) s 9528 0567. 7 7721 - •en 13g9 5 4? Y/ 7437 3arJ?s i 1P7? ' 4225 i9 _3 C x 810 s -- - 1 7.0 9301 -- - -- -- c) • ?? 3.2.79 0 I ? = e, ey r.12o 7? Bank Repalr ?0 I 1881 .? ` G ? I ? sA 4, j ?i?• ?•, 124.84A1 1 ?, _-,y? J ,^;,n 532, 1472 85i2+? I ?. ,? 1.300 , / ? ?• .. .'3?t.; -, ?'G yr• ,303 4 0139 _. I _ _.. .. .._ - INDEX d 0791 9 ° l y t. 1' 1 DSR 1 - MAD MAMA'S CAMPGROUND EXHIBIT 2a - DEED MAP 1 r' = 527' EXHIBIT 3 - MAD MAMA'S CAMPGROUND McDowell Co. EWP 2005-1 existing cross section 1? 20 15 10 s a? 5 = 0 -5 Width (ft) McDowell Co., Catawba River, DSR 1 Design Parameters Apply to Site Figure Title 1 BANK STABILIZATION TYPICAL SECTION X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION 3 STREAM CHANNEL BENCH TYPICAL SECTION 4 TYPICAL J HOOK DETAIL 5 TYPICAL CROSS VANE DETAIL X 6 SUGGESTED VEGETATION LIST X 7 STABILIZATION PLANTING PLAN 8 BENCH PLANTING PLAN X 9 LIVE STAKE DETAIL X 10 DEAD STOUT STAKE DETAIL X 11 EC FABRIC INSTALLATION DETAIL X 12 EC FABRIC ANCHOR DETAIL X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL X 14 TEMPORARY SILT FENCE DETAIL X 15 TEMPORARY STREAM CROSSING DETAIL X 16 LAND QUALITY STOCK PILE LAYOUT X 17 LAND QUALITY STREAM CROSSING LAYOUT X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT 1. Minimize damage to live trees during installation of bank stabilization Notes and/or Measurements 150 LF of left bank bank; A=7 ft, measured from Left Edge of Water; Use 21-1:1V slope EC fabric = 4.5 Ib/ft2 2. Protect Sanitary Sewer Manhole by contouring an earthen berm with rock toe around it. Construct 1'00 LF of berm with 4ft rock toe, keyed in one rock diameter as per Figure 2 (3H:1 V, A=4, measured from the channel bottom 10 It away from SSMH). Tie berm into existing grade. Do not disturb the pond berm during construction. Locate utilities prior to construction. Planting plan as per Figure 7. 3. Light grading (towards river, 10,'0 max) over 2 acres just upstream of Hwy 70 bridge on left bank. Apply 2-inches of topsoil and seed using native grass mix. 3 2c D Sr J.E.D. 05/10/2005 EXHIBIT 4a - DSR 1 MAD MAMA'S CAMPGROUND CH2M H I LL McDowell County ? 0 1.25 2.5 5 Miles Drainage Area Map i r. - - 'l t r s ?, Photo 1 - Sever erosion at bank. Rock and woody debris deposits. DSR 1 - Mad Mama's Campground Photo 2 - View of former access road. Photo 3 - Debris removal. Photo 4 - Significant bank erosion and debris removal. ACCESS AGREEMENT This Access Agreement is made between McDowell County and: Property Owner: County of McDowell Street Address: Right -of- way for PG Sewer line City/State: Marion, NC 28752 McDowell County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization • Re-vegetation • Channel Relocation to Pre-Flood Location • Debris Removal McDowell County and the Property Owner agree: 1. Property owner grants permission to McDowell County and its contractors and agents to enter upon our land for the purpose of assessing and repairing the flood damage caused by hurricanes-Frances-and-Ivan-Additionallyligmgm Ytent-1tT?lu?es?i a ri o ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. 2. Property owner grants permission to McDowell County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. McDowell County agrees to comply with local, state and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. This Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. McDowell County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases McDowell County and its contractors from liability for any damage incurred as a result of this work. 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this site. 7. Property owner agrees not to remove or modify constructed repairs, including vegetation, for one year from the date of completion. Me o ell Coun pry By: By: Dat( O vn 5 Date: \? I A:1Access Agreement (streams)rev 2.doc 4/26/2005 ------------------------------------------------------------------------------ P BLK LOT (A C D I,R S ,CF) UPDATE ABST (YIN) NBH 92 . 00 - 52 - 3549 ACTtOfl. I N COUNT-0 0 01"0 0 3 0I-tI?tENTS T PROPERTY VALUES: BUILDING: NER: GREENtEE t' OBXF: ViAlzioN TIC 57 OWNER: 000000011588 OD V 10 CO Mr DL : G - CARDS : LE? T/S BOOK /PAGE DE D ATE INST STAMPS 00625 0589 10H 2000 WD 3f UMB DIR STREET NAME US HIGHWAY 70 NsIllp: 06 Y: U/M:1000 UPD:- LAND: 40000 MARKET: 40000 ASSESSED: 4 0701-07- DEFERRED: -& HWY 70 a.ur• a.vi1VV VVLL• ABBREVIATED LEGAL DESCR .00 CHESTNUT RIDGE TYPE SUFFIX STREET MUNT- = TAXBILL ACCESS AGREEMENT This Access Agreement is made between McDowell County and: Property Owner: Brian McKinney Street Address: 1423 Hwy 70 West City/State: Marion, NC 28752 McDowell County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization • Re-vegetation • Channel Relocation to Pre-Flood Location • Debris Removal McDowell County and the Property Owner agree: 1. Property owner grants permission to McDowell County and its contractors and agents to enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances an van. Additionally, -is agreement me des the ngfi o ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. 2. Property owner grants permission to McDowell County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. McDowell County agrees to comply with local, state and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. This Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. McDowell County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases McDowell County and its contractors from liability for any damage incurred as a result of this work. 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this site. 7. Property owner agrees not to remove or modify constructed repairs, including vegetation, for one year from the date of completion. McDowell County or Representative Property Owner By: r By/jt.L''{1 Date: ?f S Date: CAVocuments and Settings\Planning Department\Local Settings\Temporary Internet Files\Content.IE5\BJLJ79CW\Access Agreement (streams)rev 2 (2).doc 3/17/2005 4APBLK LOT (A C D I, )792 . 00 - 40 - 9301 ACTfOfl: )?cC6R T--000i"002-799 E 1 - PROPZM ,S,CF) UPDATE ABST (Y/N) NBH 122100 OBXF: LAND: MARKET: ASSESSED: DEFERRED: PRIOR OWN-h.-t,,: 0 ! 7 rclrr, ur, ?L n••?L•. & HWY 70 MODEL: 10-t urrICS • CARDS: - SALE? T/S BOOK /PAGE DE ATE INST STAMPS ABBREVIATED LEGAL DESCR _ 00592 0188 0624/1999 WD 500.00 NUMB DIR STREET NAME TYPE X Tom` d6- - U/M:1704 UP :-03/10 2005 11.: TAXBILL CTY: - - ACCESS AGREEMENT This Access Agreement is made between McDowell County and: Property Owner: Boyd Contractors & Materials Inc. Street Address: 3879 Harmony Grove Rd. City/State: Nebo, NC 28761 McDowell County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization • Re-vegetation • Channel Relocation to Pre-Flood Location • Debris Removal McDowell County and the Property Owner agree: 1. Property owner grants permission to McDowell County and its contractors and agents to enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances and Ivan. Additionally, this agreement includes the right of ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. 2. Property owner grants permission to McDowell County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. McDowell County agrees to comply with local, state and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. This Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. McDowell County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases McDowell County and its contractors from liability for any damage incurred as a result of this work. 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this site. 7. Property owner agrees not to remove or modify constructed repairs, including vegetation, for one year from the date of completion. McDowell County or Re resentative By: '/'? Dater Property Owner By: Date: --- A:\Access Agreement streams rev 2.doc 5/25/2005 I ------------------------------------ 0792 . 00 - B51 - 050 (A C 07 ACT ACC6UNT-000Ha152 QOM, ENT'SEXTSTINCR OWNER: BOYD NEBO NC 28761-00 PRIOR OWNER: I=WN 0 USE: 10 CO MODEL: CA'. -0-G VACANT SALE? T/S BOOK /PAGE DE D ATE INST STA 00311 0816 015 5982 WD NUMB DIR STREET NAME ?THWY 70 TNP : -b CTY: - - U/M: - - - - --- ------ ---- ----- --- OD-I, R, S, CF) UPDATE ABST (Y/N) NBH ?,.. OBXF: -25500 LAND: 1391-60 MARKET: 164660 ASSESSED: DEFERRED: 00307 P.C. & HWY 70 DS: i- CODE: NEW NOTICE _ 'S ABBREVIATED LEGAL DESCR 133000.00 DB 311-816 HWY 70 45 ACRE 0 27.49 AC- TYPE X i.- iJPH 0303/2005 14:33 MELISS-A TAXBILL —T I Trailer Park 111 / 1, .,_( �L Ai Gdl f. •. R� ` ,• tan BM 1222 en aj�PPnd Gravel r„ � Wh :rt Sulrita� bo �••. N • :: 1 Downstream Project Limits N. 1 9 ) 4 Girl Scout \`'S - I• c CamP. a SM 1279n 1. I Fiii�i«, Radio Towe 9 nt `� .• • .� </ letic( ' (WRBM) r Feld ' DSR -2 I�K C • ` •,. ,.y t -' `' M 153 t� 4 i ,�. Park: •� Upstream Project Limits` ` - Mem C4 i ' $ •,r � 1w 418 -1391 7 I ii i 1 laypit W ti cn Calvary {BINr ti x i Troller ~ } - S/ /pads t• k 0 1,250 2,500 5,000 Feet DSR 2 1 I McDowell County, NC CH2MHILL Marion West, NC - USGS Quad 400► EXHIBIT 1b - Tom Johnson's Campground IIVO XED \?DEXFU ON 0792 ON 0792\ 0792 7810 dwFxCD OP- "iOCxm ON 07e2o't aa2ea 13.44 2',142 Bank Repair 1.880, 6.590 7.85a\ 5870 8751 QTa2 Access Resisto0ex Road I 4617 , \ 0490 1 D C1 13t8 A) (1091A) x A 7300 Debris Removal 7245 ` 4-42!10 0266 W nh?, • ?R +? s?3185 8.00A 1 ?G ? oc oobz -- -- CgTq?9 ATAM3A RIVER ,I 8x25 1260 12010 2236 8218 4420 i i L34A1 `e?51 30 . e?, I I rrg7 S IA4o I _ bsl / D9 1004 1 I re 4 zz ;I z5 ' ' ?y, 9I ? 980 °' U2 •11.40 15.49A1._ 1 1 - --- -- - - - -- - -- -- l.19h1 ' 6 y 8940 r tft3u , y 23 z A 587 e3i3 I a 1 6e7 a, f J, 143 26 T , s 3 „ v s,? 91 'r? I 16 1020 I? 2a `e I % A 59'1 s s f ti uuwl u.>vi 1.25A1 1.12A i- ,10 • ?, 76A3 , • 7r , ?l iJ? '?? % ??•??. 7i 24 •Y1 ., ?T i8 9772 b7iz r s ti. . 13? ?/ ?i 11C? 76J9 Z 203 26 - '860 .191= 9612 2 J +r Z• I ?, / ry 1 Z 4725 11611 r 1.050 0634 n.+ (l.70d1 / Lr e - i 1772 g . _ = i7u l2.EZA 170 7 0\ q7563212 ` / ' ?+ e'r• . qr ,' ?, Ine1+ lte+l ^ o ° f'? _6514- /683 , 1.4EC . ?' i7aS b - O exit 1589'- g3, z ,7o m ! " y ' =2515• m`(Ip l! d? 1 , s 7 428- - w . ri e h s. t° .. A 1' G'i , = 5 c ,i9a, 7 j•.? ' 54'37 r2 9 93 t8 r 2CP f i.l'a b 1?11 97 J S ?• y' Sv 7779 n 4S` Q 5 1111 ue11 1.060 2Q21 1m 2 1494'- I _u7s7 f- I 94A A '= IJ = FII,I?,A)g : •, sx. I no 7. 4 7 "_ 5_'S9 17 6 n .1 d' `„ l'2.02A1 e, 21 .I n 15322 833?ass °2247 na 'p?1s91; ?1?336 5394. y300 / 147. 7?) Q92 -2227= o K..-? ?1 a? Z09? E260 _ f + ,v r3• - 62 G z.o8a 1'?ja 5 r., . - 5146 13 12 =i; q l ya 1 5 .y.. o•, 9157 X1149 ?r!'2.OGA 1 '? - 1 ' 114 • i-n 9 9 I/y?I? o a 150 `` 5097 rKCO>`? `! I .. rlt 8?,?Fn, .n +C91 ,w c bn •? I (17-1 88Jz EXHIBIT 2b - DEED MAP DSR 2 - TOM JOHNSON'S CAMPGROUND 117=430' N W E S EXHIBIT 3 - TOM JOHNSON'S CAMPGROUND McDowell Co. EWP 2005-2 existing cross section 1 20 15 10 5 ? 0 -5 -10 Width (ft) McDowell Co., Catawba River, DSR 2 Design Parameters McDowell Co., Catawba River, DSR 2 Design Parameters Apply to Site Figure Title EXISTING CROSS SECTION WITH MARKUPS 1 BANK STABILIZATION TYPICAL SECTION X 2 BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION 3 STREAM CHANNEL BENCH TYPICAL SECTION 4 TYPICAL J HOOK DETAIL 5 TYPICAL CROSS VANE DETAIL X 6 SUGGESTED VEGETATION LIST 7 STABILIZATION PLANTING PLAN X 8 BENCH PLANTING PLAN X 9 LIVE STAKE DETAIL X 10 DEAD STOUT STAKE DETAIL X 11 EC FABRIC INSTALLATION DETAIL X 12 EC FABRIC ANCHOR DETAIL X 13 STABILIZATION CONSTRUCTION ENTRANCE DETAIL X 14 TEMPORARY SILT FENCE DETAIL X 15 TEMPORARY STREAM CROSSING DETAIL X 16 LAND QUALITY STOCK PILE LAYOUT X 17 LAND QUALITY STREAM CROSSING LAYOUT X 18 LAND QUALITY DEBRIS REMOVAL LAYOUT Notes and/or Measurements 100 LF of right bank and 200 LF of left bank; A=4 ft EC fabric = 4.5 Ib/ftz On left bank cut rock berm per Figure 2 (200 ft, A=4 ft ). Fill the washout depression (150'L x 50'W x 3'D) to existing grade, with 2-in top soil on all new surfaces. Tie bank stabilization into existing grade on right bank. Cut rock berm per figure 2 (100 LF, A=4 ft). Both banks and fill area- Planting Figure 8, with zone 2 extending to washout area (within the Sanitary Sewer and Overhead Utility Easements, use only approved plants as directed by the Engineer, where applicable). J. E. D. 04/28/2005 A 10 CN2MHILL EXHIBIT 4b - TOM JOHNSON'S 1.25 2.5 5 Miles PGROUND Map erosion on bend. EXHIBIT 5b DSR2-TomJohnson's Campground Photo 1 - Cross-channel pipeline. Photo 2 - Rock berm construction (right). Visible bank Photo 3 - Bank erosion along roadside. ACCESS AGREEMENT This Access Agreement is made between McDowell County and; Property Owner: Johnson Family Properties LLC t Street Address: 1885 Hwv 70 West City/State: Marion, NC 28752 McDowell County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: • Streambank Stabilization • Re-vegetation • Channel Relocation to Pre-Flood Location • Debris Removal McDowell County and the Property Owner agree: I . 124operty ewt}er-grants-peri;3issi©tt- ia-McDowell-aunty-atid-its-contractors-and-agents t enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances and Ivan. Additionally, this agreement includes the right of ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. 2. Property owner grants permission to McDowell County and its contractors and agents to conduct stream stabilization treasures, which may include debris removal, stream bank stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation. 3. McDowell County agrees to comply with local, state and federal laws applicable to the work, and further agrees to exercise due care and caution in the performance of all work on the Property. 4. This Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties. 5. Emergency Watershed Protection measures are intended to repair flood damage to the stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. McDowell County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. Tile Property owner releases McDowell County and its contractors from liability for any damage incurred as a result of this work. 6. This agreement does not provide confirmation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this site. 7. Property owner agrees not to remove or modify constructed repairs, including vegetation, for one year from the date of completion. McDowell ounty or Re resentative Proper er By: By: Date: T ?{ Date: CADocuments and Settings\Planning Department\My Documents\Access Agreement (streams)rev 2.doc3/15/2005 --- --- -- - - - - - 31 . 00 -B29 - 72245 (A?TfOflI'I CF) UPNATE ABST (Y/N) NBH 'OUNT-000"003 73 8 6 - - PROPERTY r, : ,,ZnDING: 1ER : 111 T. T rl PIARION NC 28752-000 :OR OWNER: 000004760086 OHNSONTH0 0C & 50 RU - . )EL: ?0' CARDS : .jE? TLS 00062/0566 D12 2003 E D,?ATE INSD JMB 1 T STAMPS DIR STREET NAME HWY 70 !SHIP: CrTYT. EXEMPT: U/M:5000 UPI) 3 65 3 0 4T: 3SED ZRED: 05 GRENLEE RD OFF HWY-" ABBREVIATED LEGAL DESCR 00 HWY. 70 CATAWBA RIVER 0041 1: TAXBILL ATTACHMENT DESIGN DETAILS General Notes The Contractor shall make his own determination of the existing subsurface conditions. In areas where proposed construction may conflict with existing utilities, the Contractor shall take all necessary precautions to avoid damage to the utilities. Notify and locate all impacted utilities at least 48 hours prior to excavation. Any damage sustained to utilities shall be repaired by or under the direction of the utility owner at the Contractor's expense. All existing facilities, including but not limited to sidewalks, roads, lawns, landscape vegetation, etc., inside and outside of construction limits that are disturbed under this contract shall be reestablished and/or reconstructed to the original condition at the Contractor's expense. Construction Sequence 1. Begin work at the upstream end of the project reach. 2. Construct proposed structures according to the plans and specifications. 3. Grade stream banks to proposed grade, and tie into existing banks upstream and downstream. 4. Overbank areas (beyond top of bank) adjacent to the project reach shall be graded for positive drainage toward the stream. 5. Apply temporary stabilization to the disturbed areas at the end of each work day. 6. Repeat steps 1 through 5 for each segment of the project reach, working downstream. 1. Con uct soil test to confirm necessary lime and fertilizer amendments. Appropriate lime and fertilizer shall be applied prior to seeding and incorporated to a depth 3 to 5 inch s below the surface. 2. Tem orary stabilization will be applied to all disturbed area on a daily basis. Areas shall be seeded with rye gras at a rate of 15 lbs./ac. and long straw or hay mulched. Straw shall consist of thoroughly threshed wheat, rye o oat straw, reasonably bright in color, and shall not be m sty, moldy, caked, decayed, or excessively dusty and hall be free of noxious weed seeds. 3. Perm nent soil stabilization shall be completed within 7 calendar days of initial soil disturbance or re-disturbance. Plant ng and seeding shall be incorporated into the subsoil at th rates prescribed on Figures 6, 7, and 8. Contractor shall ollow NCDWQ Guidelines for Riparian Restoration, http:/ h2o.enr.state.nc.us/wrp/pdf/buffers.pdf 4. All erth fill in excess of 1 ft depth should be installed in lifts o maximum 6-inches and mechanically compacted. 5. All ro k used for bank stabilization and in-stream structures shall e 3 ft to 4 ft angular rock. 6. Erosion Control (EC) Fabric shall be woven coir mat, secured with dead stout stakes, and shall meet the folloJng standards: 5I?% open area (maximum) 0.? inch maximum opening size 4.5 lbs. per sq. foot maximum sheer stress 16 fps minimum velocity CLT/GENERAL NOTES_NF.DOC USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET'I S SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS PROPOSAL. 7. Filter fabric shall be Amoco Propex 2002 woven geotextile or equivalent. Cut excess filter fabric so no fabric is visible after installation. 8. Seeded areas not specified for coir fabric, shall be mulched with long straw or hay mulch immediately after seeding areas at a rate of 2 tons/acre (uniform loose depth of 1" to 2"). Straw shall consist of thoroughly threshed wheat, rye or oat straw, reasonably bright in color, and shall not be musty, moldy, caked, decayed, or excessively dusty and shall be free of noxious weed seeds. Mulch shall be secured with biodegradable netting (Robex Super Flow or Equal). 9. The Contractor shall be responsible for maintaining seeded areas until 95% vegetative cover is established. Should any seeded area fail to germinate, or washing of any areas occur requiring re-establishment of seeding, the Contractor shall replace any lost soil material and re-seed and re-mulch such areas at Contractor's expense. Standard Erosion and Sediment Control Notes 1. The Contractor shall protect all points of construction ingress and egress by installing a temporary construction entrance as shown in details to prevent the deposition of materials onto public roads. All materials deposited onto public roads shall be removed immediately. 2. The Contractor shall re-vegetate or restore access roads (including construction entrance) to match pre-construction conditions. 3. The Contractor shall inspect daily and maintain continuously in an effective operating condition all erosion and sediment control measures until such times as they are removed with prior permission from Engineer or agency inspector. 4. The ontractor shall protect trees and landscaping not mark 1d for disposal from damage. Any damage that occur shall be repaired at the Contractor's expense. 5. Fenci Contr 3 shall be maintained for animal containment. The -tor shall provide temporary fencing to allow for on of the work. The Contractor shall keep ction equipment away from livestock and take all lions to prevent injury to animals. CLTIGENERAL NOTES_NF.DOC USE OR DISCLOSURE OF DATA CONTAINED ON THIS SHEET SUBJECT TO THE RESTRICTION ON THE TITLE PAGE OF THIS PRO OSAL. EXISTING TOP OF BANK EXISTING GRADE IH / CUT PROPOSED GRADE 3 MIN. (NOT STEEPER) EC FABRIC BASE FLOW SEE FIGURE 7 EXISTING STREAMBED NOTE: HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION DRAWN: GMH TITLE FIGURE PROJ. MANAGER: JMO DATE: 5/2005 BAN K STABILIZATION CH2MHILL TI? PICAL SECTION 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 NTS /__ EXISTING TOP OF BANK PROPOSED GRADE NOTES: 1. HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION. 2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002 WOVEN GEOTEXTILE OR EQUIVALENT. LAY FILTER FABRIC UNDER TRENCH ROCK AND UP BEHIND ROCKS. CUT EXCESS FILTER FABRIC SO NO FABRIC IS VISIBLE AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE). MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12". DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2M H I LL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 CUT` i 2' MIN. OF EXPOSED 1 ROCK ROCK TOE 3 MIN. (NOT STEEPER) 2' MIN. OF ROCK EMBEDDED IN BANK EC FABRIC SEE FIGURE 7 1 BASE FLOW A 1 FILTER FABRIC EXISTING STREAMBED KEY IN ROCK TOE ONE ROCK DIAMETER 4' MIN. NTS TITLE K STABILIZATION ITH ROCK TOE PICAL SECTION FIGURE 2 EXISTING TOP OF BANK EXISTING GRACE PROPOSED GRADE NOTES: CUT 1 ? Y ? , Ali 3 MIN (NOT STEEPER) , EC FABRIC SEE FIGURE 7 GRADE TO DRAIN (1% MAX.) I FILL STREAM CHANNEL BENCH 1. HEIGHT "A" IS MEASURED FROM DEEPEST POINT IN CHANNEL CROSS-SECTION. 2. FILTER FABRIC SHALL BE AMOCO PROPEX 2002 WOVEN GEOTEXTILE OR EQUIVALENT. LAY FILTER FABRIC UNDER TRENCH ROCK AND UP BEHIND ROCKS. CUT EXCESS FILTER FABRIC SO NO FABRIC IS VISIBLE AFTER INSTALLATION. BACKFILL WITH WELL-DRAINING SOIL (USE NATIVE MATERIAL WHENEVER POSSIBLE). MIN. OVERLAP OF COIR OVER FILTER FABRIC OF 12". DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, INC 28217 EXISTING STREAMBED FILTER FABRIC KEY IN ROCK TOE I ONE ROCK DIAMETER 4' MIN. TITLE 2 STREAM CHANNEL BENCH T PICAL SECTION N TS BASE FLOW A 'x_ I FIGURE 3 BANKFULL ELEVATION Ak BOULDERS BOULDER BANKFULL ELEVATION CHANNEL BED TYP I OOU2 2 M t SCOUR POOL ' PLAN VIEW W FOOTER NOTES: PROFILE VIEW t. BOULDER SIZE IS 4' h'JNIMUM OR AS SPECIFIED ON PLANS. 2. WRAP FILTER FABRIC AROUND FOOTER STONES AND SACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT (ON SITE COBBLE WHEN AVAILABLE). DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 NOT TO SOURCE: APPLIED ECOLOGICAL SERVICES, INC TITLE FIGURE J HOOK DETAIL 4 FLOW DIRECTION Y Y a a m m 5'MIN. ---1 CROSS SECTION VIEW BANKFULL ELEVATION FLOW DIRECTION \?\ BOULDERS CHANNEL BED FOOTER j /\ \ z f FOOTER PROFILE VIEW NOTES: t. BOULDER SIZE IS 4' MINIMUM ORAS SPECIFIED ON PLANS. 2. WRAP FILTER FABRIC AROUND FOOTER STONES AND BACKFILL WITH TYPE 3 RIPRAP OR EQUIVALENT (ON SITE COBBLE WHEN AVAILABLE} DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 20' z BOULDERS W TRENCHED IN 3' MIN. AND COVERED t O SILL MUST BE TIED IN TO BANKFULL ELEVATION POOL PLAN VIEW SOURCE: APPLIED ECOLOGICAL SERVICES, INC TITLE FIGURE TY ICAL CROSS VANE DETAIL 5 NOTTO .Mountain Region Suggested Vegetation List i , ' i TREES S P F SMALL TREES/SHRUBS S P F HERBACEOUS VEGETATION FOR SEED MIX Betula lenta Alnus serrulata Arisaema triphyllum Scirpus validus cherry birch x x tag alder x x x jack-in-the-pulpit soft stem bulrush Betula nigra Amelanchierarborea Asclepias incarnata Sparganium americanum river birch x x serviceberry x x swamp milkweed bur-reed Carya cordilormis Aronia arbutitolia Carex crinata Thelypteris palustris bitternut hickory x x x red chokeberry x x fringed sedge marsh fern Carya ovata Asimina triloba Carex intumescens Uniola latilolia shagbark hickory x x x common pawpaw x x bladder sedge river oats Diospyros virginiana Calycanthus lloridus Carex lupulina Vernonia noveboracensh persimmon x x x sweet-shrub x x hop sedge ironweed Fraxinus pennsylvanica Carpinus caroliniana Carex lurida Leersia oryzoides green ash x x ironwood x x lurid sedge rice cutgrass Halesia caroliniana Cornus alternilolia Carex scoparia Lobelia cardinalis silverbeil x x alternate leaf dogwood x x broom sedge cardinal flower Nyssa sylvatica Cornus amomum Carex stricta Lobelia siphilitica blackgum x x x silky dogwood x x tussock sedge great blue lobelia Platanus occidentalis Corylus americans hazel- Carex vulpinoidea Ludwigia alternilolia sycamore x x nut x x fox sedge bushy seedbox Prunus serotina Hamamelis virginiana Chelone glabra Panicum virgatum black cherry x x x witch-hazel x x lurtlehead switchgrass Salix nigra Ilex verticillata Cyperus strigosus Polygonum sagittatum black willow x x winter berry x x x umbrella sedge tearthumb Tilia heterophylla Leucothoe axillaris Elymus hystrix Scirpus atrovirens white basswood x x doghobble x bottlebrush grass green bulrush I Lindera benzoin Eupatorium listulosum Scirpus cyperinus S = Shade -----r--- spicebush x Joe- PYe-weed - - woolgrass------,- --- --- P = Partial Sun i Lyonia ligustrina x Eupatorium pertoliatum Juncus ellusus I F--=- Full Sun i Lyonia ligustrina boneset soft rush i I Magnolia tripetala x Impatiens capensis L-._- --- -- ----- -----?--._:.-- umbrella tree jewel-weed I I -- Physocarpus opulitolius i ninebark x I x x Rhododendron ( periclym enoides I wild azalea x x ( Rhododendron viscosum I ( swamp azalea x x Rosa palustris - -- swamp rose x x -- I _ i Salix sericea ( I ± _ silky willow x x i? - I ( I Spirea latilolia - j I meadowsweet x -- - i-- j ( f Symplocos tinctoria sweet leaf x x Viburnum cassinoides I W ithe-rod x x x i f ( Xanthorhiza simplicissima _ I yellow root x _- l i i TITLE DRAWN: GMH SUGGESTED VEGETATION LIST PROJ. MANAGER: JMO D ATE: DATE: 5/2005 CH2MH I LL FIGURE 4824 PARKWAY PLAZA BOULEVARD SUITE 200 6 CHARLOTTE, NC 28217 WIDTHKOF CHANNEL EXISTIN LIVE STAKE ZONE 3' TO EDGE OF WATER T PLANTING WIDTH WILL VARY TO 1 LANDOWNER COMPLIANCE AND PROJECT SPECIFICATIONS. ZONE I ZONE 2 SYM130L HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION NATIVE TREE AND SHRUB SPECIES TO BE PLANTED T -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS A DENSITY OF 436 TREES/ACRE, WHICH IS AT 15 LBS/ACRE SEEDING RATE. SUFFICIENT TO PROVIDE 320 TREES/ACRE -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE, PERMANENT GRASS/HERB MIXTURE AT I5-20 LBS/ACRE SEEDING RATE. AT MATURITY. FOLLOW NCDWQ GUIDELINES FOR RIPARIAN BUFFER RESTORATION. -SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO: -HERS/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratu/a, Cephalanthus occidentalis, Agrostis alba Carex app. Dactylis glomerata Cornus stricta, Rhododendron maximum, salix , , , serecia, Sambucus canadens/s, etc. Panicum spp., Pennisetum g/aucum, Seca/e cereal,, ETC -TREE SPECIES INCLUDE BUT ARE NOT LIMITED T0: LIVE STAKES TO INCLUDE Comus spp. and Acersop., Betula spp., Frox/nus spp., Juglands Salix serica Nigra, Liriodendron Tulipitera., Pinus strobus., LIVE STAKES SPACED ON 2' CENTERS Platanus occldentalis., Robinla Pseudoacacla., etc. -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS. -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED W ITH A NATIVE, PERMANENT GRASS/HERB MIXTURE AT I5-20 LBS/ACRE SEEDING RATE. AT LEAST 3 SPECIES OF TREES AND S SPECIES OF SHRUBS SHOULD BE USED. NOTES: 1 I -TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND FORESTRY SUPPLY STATIONS. SUBSTITUTION MUST BE APPROVED BY ENGINEER. SOURCE: ALTAMONT ENVIRONMENTAL, INC. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 TITLE ZONE2 VARIES ZONE 1 3' EXISTING STREAMBED _z; STABILIZATION LANTING PLAN FIGURE 7 I ZONE 2 ZONE I VAR;ES 3• MIN. APPROX. WIDTH Or CHANNEL LIVE STAKE ZONE EXISTING ;SURFACE 3' TO EDGE OF WATER ELEVATIO N PLANTING WIDTH WILL VARY TO NG COMPLIANCE AND LANDOWNER ` PROJECT SPECIFICATIONS. i i G f ZONE I ZONE 2 g F a BASEFLOW / f ,- SYMBOL HERBACEOUS SEEDING DESCRIPTION SYMBOL WOODY VEGETATION DESCRIPTION -TD BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRASS AT 15 LBS/ACRE SEEDING RATE NATIVE TREE AND SHRUB SPECIES TO BE PLANTED AT A DENSITY OF 436 TREES/ACRE, WHICH IS SUFFICIENT TO PROVIDE 320 TREES/ACRE . -FOLLOWING CONSTRUCTION AREA TO BE SEEDED WITH AT MATURITY. FOLLOW NCDWO GUIDELINES , A NATIVE, PERMANENT GRASS/HERB MIXTURE AT ® 15-20 LBS/ACRE SEEDING RATE. FOR RIPARIAN BUFFER RESTORATION. -SHRUB SPECIES INCLUDE BUT ARE NOT LIMITED TO: -HERB/GRASS SPECIES INCLUDE BUT ARE NOT LIMITED TO: Alnus serratu/a, Cephalanthus occidentalls, Agrostls a/ba, Carer spp., DacWls glomerata Cornus stricta, Rhododendron maximum, salix EXISTING STREAMSED , Panicum spp., Pennisetum g/aucum, Secale cerea/e, serec/a, Sambucus canadensis, etc. -TREE SPECIES INCLUDE BUT ARE NOT LIMITED TO: ETC. LIVE STAKES TO INCLUDE Cornus spp. and Acer spp., Betula app., Fraxlnus spp., Juglands Salix serica Nigra, Llriodendron Tulipifera., Pinus strobus., LIVE STAKES SPACED ON 2' CENTERS Platanus occldentalis., Robin/a Pseudoacacia., etc. -TO BE SEEDED IMMEDIATELY WITH TEMPORARY RYE GRAS S. -FOLLOWING CONSTRUCTION, AREA TO BE SEEDED WITH A NATIVE, PERMANENT GRASS/HERB MIXTURE AT 15-20 LBS/ACRE SEEDING RATE. AT LEAST 3 SPECIES OF TREES AND 5 SPECIES OF SHRUBS SHOULD BE USED. 'NOTES: -TREE/SHRUB/GRASS SPECIES LISTED ARE SUBJECT TO CHANGE DUE TO AVAILABILITY FROM LOCAL NURSERIES AND FORESTRY SUPPLY STATIONS. - PLANT ZONE I TO EDGE OF WATER - SUBTITUTION MUST BE APPROVED BY ENGINEER SOURCE: ALTAMONT ENVIRONMENTAL, INC. DRAWN: GMH TITLE FIGURE PROJ. MANAGER: JMO DATE: 5/2005 BENCH CH2MHILL P LANTING PLAN H 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 ?r 30" LIVE CUTTING (DORMANT) - TYP DEAD STOUT STAKE TYP, SEE FIGURE 10 NOTE: INSTALL LIVE STAKE SO 2/3 LENGTH IS (MIN. 20") BELOW GROUND DRAWN: GMH PROJ. NIANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 EC FABRIC ESTABLISHED PLANT SHOWN FOR INFORMATION ONLY GROUND p TITLE LIVE STAKE DETAIL NTS 2' MAX SPACING FIGURE 9 STOUT STAKES SHALL BE FASHIONED FROM :ATED 2" BY 4" (NOMINAL) BOARDS. 18" STANDARD (30" IF USED AT TOE OF SLOPE) 2. EAD STOUT STAKES TO BE USED IN LIEU OF METAL R OTHER STAPLES OR FASTENERS FOR SECURING C FABRIC IN PLACE. 3. HE CONTRACTOR MAY USE "ECO-STAKE" 12" LENGTH R APPROVED EQUAL IN LIEU OF DEAD STOUT STAKES FOR INSTALLATION IN THE CENTER OF THE EC FABRIC 4. INSTALL EC FABRIC PER MANUFACTURER'S DRAWN: GMH PROJ. MANAGER: JMO DATE: 512005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 TITLE I FIGURE DE' UT STAKE NTS SOIL BIOENGINEERING BANK STABILIZATION WIDTH VARIES EC FABRIC EXISTING GROUND, TYP DEAD STOUT STAKE i EC FABRIC TOP TIE TO TYPICAL SECTION V OF BANK ANCHOR, TYP. SEE FIGURE 12 ARIES NOTES: 1. INSTALL ON ALL CUT AND FILL SLOPES OF B EC BABRICTOE ANK ANCHOR, 7YP AND NEAR BANK DISTURBED AREAS. SEE FIGURE 12 2. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 3. EC FABRIC SHALL BE WOVEN COIR MAT WITH 50% OPEN AREA (max.), 0.5 INCH MAX. OPENING SIZE, 4.5 Ibs/sq. ft. MAX. SHEER STRESS, 10 fps MIN. VELOCITY. DRAWN: GMH TITLE FIGURE PROJ. MANAGER: JMO DATE: 5/2005 EC FA BRIC INSTALLATION CH2MHILL DETAIL 11 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 NTS F:\CAD\NRCS\Cad-Details\Figl l.dwg, 05/12/2005 03:52:00 PM, PDF995 (temporary).pc3 TOP OF BANK EC FABRIC BASE FLOW DEAD STOUT STAKE SEE FIGURE 10 BACKFILL MAT WRAPS OVER TOP OF STAKE Q TOE TOP OF BANK ANCHOR DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 ON TES. 1. CLEAN SOIL BACKFILL SHALL BE USED TO SECURE DEAD STOUT FABRIC INTO THE SOIL 2. FOR TOE OF SLOPE APPLICATIONS, FABRIC SHALL BE INSTALLED AS TO OVERLAP TRENCH & DEAD STOUT STAKE TO POSITION THE FABRIC FOR INSTALLATION UP THE BANKS. 3. START INSTALLATION OF EC FABRIC AT TOE OF SLOPE. WRAP F,)BRIC OVER TOE OF BANK ANCHOR AND PROCEED UP THE BANK TO TIE TOP OF BANK ANCHOR. 4. FOR END OF GRADING APPLICATIONS, FABRIC SHALL BE INSTAL D PERPENDICULAR TO BANK AND ANCHORED PER TOP OF BANK DtTAIL, WITH THE EXCEPTION THAT FABRIC DOES NOT EXTEND OUTSID?OF TRENCH 6 FABRIC IS NOT EXPOSED. CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 NTS TOE OF BANK ANCHOR AND TITLE I FIGURE EC FABRIC ANCHOR DETAIL 12 50' MIN. EXISTING GROUND 6 SOIL STABILIZATION FABRIC UNDER 2'-3' WASHED STONE DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 'OR AS SPECIFIED z ON PLAN SHEETS m N STREET L-i W H U U J CD IL NOTES: 1. A STABILIZED ENTRANCE PAD OF 2'- 3' WASHED STONE OR RAILROAD BALLAST SHALL B LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE MAY BE USED AS A BASE FOR THE ('CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING LR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 1 4. ANY SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST E REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE. CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 TITLE I FIGURE STABILIZED CONSTRUCTION ENTRANCE DETAIL 13 N.T.S. A _ 8 STEEL POST I B" MAX. WIRE FENCING WOVEN FILTER FABRIC •_! I 1 A B STEEL POST WIRE FENCING z FILTER FABRIC y5 WASHED STONE GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32' IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 14 DAYS. 3. STEEL POSTS SHALL BE 5'-0' IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST ((10 CAGE WITH A MINIMUM OF 6 LINE WIRES WITH 12' STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 7. WIRE AND WASHED STONE WILL BE REQUIRED WHEN: AT TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) DRAWN: GMH PROJ. MANAGER: JMO DATE: 512005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 STEEL POST WIRE FENCING z FILTER FABRIC r w v I I I rA CHOR SKIRT 6' MINIMUM IN LIEU OF BURYING SKIRT, 6" OF J5 WASHED STONE MAY BE USED OVER TURNDOWN. SEE SECTION B-8. SECTION A-A MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FI ACLALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY ER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIME T DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 4. REMOVE SILT FENCE 1 YEAR PAST CONSTRUCTION! N.T.S. TITLE TEMPORARY SILT FENCE DETAIL _ f ANCHOR SKIRT 6' MINIMUM SECTION 8-B FIGURE 14 5' MAX. BANK HEIGHT STREAM CH NNEL p SURFACE FLOW ire ,/i 6r DIVERSION \1`I')?Y r \' Iry\\C?P?Q??d? ` G ` - ' ? ??a?l Iry/I???I)IN 1?11J 'o 0 VI) i i 4 1. USE #57 WASHED STONE h 2. OMIT #57 WASHED STONE ON \`{?) \\ \pV) CHANNEL BOTTOM IF CROSSING A COBBLED BED STREAM. STONE APPROACH SECTION 5:1 MAX. SLOPE ON ROAD 3. REMOVE STONE AND FILTER STONE OVER FILTER FABRIC (SEE NOTE 2) FABRIC AFTER CONSTRUCTION AND TIE INTO EXISTING GRADE. VEGETATE SITE ACCORDING TO PLANTING PLAN. ORIGINAL STREAMBANK o? STONE OVER ' o.. 1 FILTER FABRIC ?" °' I 6" MIN. DRAWN: GMH PROJ. MANAGER: JMO DATE: 5/2005 CH2MHILL 4824 PARKWAY PLAZA BOULEVARD SUITE 200 CHARLOTTE, NC 28217 %J TEMPORARY ACCESS AS SPECIFIED BY ENGINEER FILTER FABRIC TITLE TEMPORARY STREAM CROSSING DETAIL NTS FIGURE 15 ?SLgEDTiER® No. 937 811 E Engineer's Computation Pad A10 a d , 501 i ? l 1 St4G; /? ?e? Co/ISfrs.G?i v1 h fihnCe- ? 5 ?`o?lo?.Ie G ?Gl t l Co.ts?i?L? &I.A-r l3ar6 a3?ineGC SSa,y fo Wl IOCY- rc, n o r7- ?? 0.•7 10,-/ road, See /JroY,o% 51?c?/iy?,seo/ Access /nc?a? ??troa?l? <i U ? rar G.,c/ ,^C,..r?? ?%?J?V er'oss: ?3 cue f•..'/. . A,51-arc S 7??cp »? ?Gn ?/G` Gr?/akPr- , ? !n/:70 /1 G O ?,??C ?'?'GI? O r' ? O ?+IGI Pr' a ?.??( co ?,1?/e !'e-y?o ?A 1, .2 Sr 13H {?e 57`rea.n SGa?G /vo -/- to Source: NC Land Quality Section Figure 16 4/= rho r ® No. 937 811 E VSCAEDTLER Engineer's Computation Pad //?,, 40/ 50' ?'ons?/NGf?`v> 1 A Kt Ol?u ? ?rGC/ L /eSa/?S in 4 A o F \ GO rl Coo S!i/?S S'?a,1?? G l /L7rp?iQ1ic1 t S7?/'eam $eG?/?rrftrr7L C0-7 a l ?OdSN,rG f?L+ w / RdG i l u? sfr? 1p,?j I` f c? S R SeGu?O? D?f'bn .?1N p-f?-P/ S?Dr•I?PC STA?i i IrrQG? / /hhi eot:e?y. " Source; NC Land Quality Section Figure 17 STAEDTLER® No. 937 811 E Engineer's Computation Pad Xd Q tiI ?v SlaU./XeG? Cv n ?? /? ?><<' 01 ( 1 13,r 1 ? a 1 e-ee( f i 1 I ?Iez. eSSG•7 Fro. A4.1 1",041 see. /`C •S j.f ? 07' ? vl/L? / .C/ j ti j r y . 4 /7 ?t TGi r 9 5. N't:li lir f0 ?i U.?J7ra.. ?/?U^ ?r?T/C-•l?, ?c s foie 6G?eti- y/Jo/r re •"O "r I 1 rt_??, ? • LvJ ?aen /Vcf ?v scale- :Source: NC Land Quality Section Figure 18 4/.Ls/,,s Organic Debris Removal Standard Operation Procedures (SOP) Emergency Watershed Protection (EWP) Stream Repair Projects McDowell County, North Carolina SCOPE OF WORK The work shall consist of the cleanup of designated stream areas by the removal and disposal of trees, logs, stumps, brush, tops, rubbish, and other debris deposited in the stream channel and floodplain by the storms of September 8 and 16, 2004. CLEARING AND DEBRIS REMOVAL Debris removal crews shall remove only that material which has been clearly marked by a representative of McDowell County and/or CH2M HILL, INC (Representative) as indicated by flagging and/or orange/red spray paint. ONLY marked debris is to be removed. Representative cannot authorize additional work. Any work that will result in an increase in costmust ubmitted to CH2NT-IULZ or ap rp oval-pnbr to-starg_su t work. ir? e event- --?W - that the contractor uses on-site clopping, the chipper may follow the clean-up crew along the length of the project reach. The Contractor is responsible to properly dispose of chips. Proper disposal may include spreading on site or removing off-site. On-site disposal requires written approval by the property owner. Unless specifically requested to leave the chips in a pile by a property owner the chipper shall make reasonable efforts to spread the chips as chipping progresses. Chippers and other heavy equipment will be staged and used at least 30-feet from the top of the streambank or on existing paved or graveled areas prepared in accordance with standard details described in Figure 18 (Attachment 1). Repair of any property damage resulting from debris removal is the sole responsibility of the Contractor. All debris removal shall be within the included sites as identified in this solicitation and as directed by the Representative. For bid preparation purposes, the Representative has marked and identified debris to be removed. Removed debris shall be placed only in those areas as directed by the Representative. For Bid purposes, debris staging areas are assumed to be within 300 feet of top of bank. On-site burning is not allowed. Fallen trees, limbs and dislodged brush within the cross section of the existing or original channel up to and including the debris line of the subject storm shall be removed. Any foreign (man-made) debris washed in from upstream, shall be removed. Marked trees severely undercut by stream bank erosion and trees severely leaning over the channel whose near term fall is apparent shall be removed. In general, Contractor clearing will be limited to the cutting of severely damaged trees leaning across the channel, and other trees as needed to gain access for equipment to points of channel blockage. P:\R4cDowcllCountyNortliC\327539\Specs\Dcbris Removal SOP rcv2V3_jcd.doc 1 Disturbance of the channel bottom and banks, and equipment access areas shall be held to the minimum necessary to allow the construction equipment to remove the debris and shall be consistent with all state and federal permits. All areas disturbed due to debris removal or equipment access shall be reshaped and reseeded in accordance with standard details described in Figures 7-18 (Attachment 1). Access to the channel will generally be perpendicular to the channel so cutting of trees is held to a minimum with precaution taken to protect mast producing and stream canopy trees. Un-marked dead trees that provide den habitat and are determined to pose no hazard to the channel shall be protected. As such, the contractor will only remove marked debris. The contractor will exercise care in the areas of existing crops to minimize damages. PROVIDED EQUIPMENT & FACILITIES The Contractor shall provide adequate sanitary facilities for equipment operators and work crews. Portable facilities shall be provided at the worksite and arrangements made for proper servicing. A portable facility will be provided within 1,000 feet of the egvip-n-v- ndI-QL,--Y-ark cm-,ms aUall_ti mes -_ COMMUNICATIONS Each mechanized piece of equipment and each work crew shall be equipped with a two way, battery operated radio. Radios shall be FM, have a minimum range of 5 miles. Radios shall be maintained "on" and in the receive mode at all times while the operator is at the site. Batteries shall be recharged overnight or as needed. An extra set of fully charged batteries shall be maintained on board the equipment at all times. Radios shall be equipped with clip-on hand mikes or headsets. Radios shall be maintained in good operating condition and equipment operators shall be knowledgeable in the use and care of the radios. Each Contractor site supervisor shall also maintain a secondary communication system compatible with the Representative's system. Brush Removal Guidelines • Small diameter brush and limbs (less than four inches in diameter) that will not cause damage if remobilized by high water will be cut into short lengths (five feet long or less) and left in place. • All marked, dislodged or uprooted larger diameter brush will be removed from the channel or streambank and chipped in designated areas greater than 30-feet from the top of the bank. • Saplings and shrubs with an intact root system are not to be removed. P:UNlcDowellCountyNorthC\327539\.Specs\Debris Removal SOP revMjed.doc Tree Removal Guidelines • _ Trees will be chipped in designated areas greater than 30-feet from the top of the streambank. Chippers and/or tub grinders may be staged on-site with written consent from the property owner or at a central location approved by the County. • Larger diameter trees may be pulled to the chipper using a mechanized winch provided the process does not create excess disturbance to the streambank. • Marked trees whose near term fall is apparent should be cut at the marked location, which will be indicated by a painted ring around the trunk at least three- feet above the ground surface. The root system shall not be removed from the streambank. • As approved by the Representative, larger diameter trees that cannot be moved using hand equipment will be cut to manageable lengths and removed. • The sale of chips or firewood is not allowed. Foreign Debris and Trash Removal Guidelines • Foreign (manmade) debris and trash will be bagged in orange trash bags where possible. • Filled trash bags will be removed from the channel and transported directly offsite by the Contractor to the local landfill. • Large debris must be loaded into a dump truck or roll-off container and transported to the local landfill for disposal. • Local landfill is located at McDowell County Landfill. Tipping fees are $ 32/ ton, which shall be paid by the Contractor. Stream bed and Bank Repair Guidelines • All temporary stream crossings shall be installed as described in Figures 15 -18 (Attachment 1). All Stream embankments disturbed by Contractor activities, denuded, or left bare as a result of debris removal shall be regraded, planted, and erosion control fabric installed as described in Figures 6, 7, and 9 -12 (Attachment 1). • Temporary staging, chipping, and work access points shall be regraded and grassed using a native grass/herb mix as outlined in Figures 6, 7, and 16 -18 (Attachment 1). P:\I?IcDowellCountyNorthC\327539\Specs\Debris Removal SOP revMjed.doc Contractor shall install erosion control measures as outlined in Figures 10 -18. SUPERINTENDENCE OF EQUIPMENT AND WORK CREWS Any contractor providing three (3) or more pieces of equipment or five (5) or more work crew or equipment operators shall provide a non-working crew superintendent in addition to the required laborers and operators. The contractor shall designate in writing the names of the crew superintendent and an alternate prior to award of the contract. The crew superintendent shall provide on-site supervision of work crews and equipment operators. The crew superintendent shall be responsible for the safety of work crews and for the location and servicing of portable sanitary facilities. He/she shall be equipped with a portable communication as specified above. The crew superintendent shall communicate with the Representative to assure that work crews and equipment are performing at a satisfactory level. The crew Superintendent shall coordinate with the Representative to schedule equipment and operators for each days work and as far in advance a._" S_possible.The superintendent shall be responsible for - -the daily operating times of all work crews and equiPmerit aria-shall ---- maintain a log of daily equipment and work crew operations. He/she shall coordinate daily with the Representative to concur on actual footage of streambank cleared. WORK DIRECTION Contractors and equipment operators will not perform activities requested or instructed by landowners or others at the worksite, except as confirmed by the assigned Representative. ENVIRONMENTAL CONSIDERATIONS Earth moving equipment will cross and operate in the stream flow only when necessary and only when directed to do so by the Representative. Equipment shall be maintained to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs and lubrication will be performed at safe distances from the stream and only at locations approved by the Representative. Should fuel leaks, oil leakages or hydraulic pipe rupture occur during construction, the operators will immediately remove the equipment to a "safe" area and proceed with repairs. The Representative will direct operators to remove equipment from the stream whenever a leak is observed or suspected. P:\NlcDowellCountyNortliC\327539\Specs\Dcbris Removal SOP rev2V3jcd.doc SAFETY Contractor shall be responsible for the safe execution of this work and conform to all applicable state and federal regulations. Additionally, at work sites, where equipment will be operating on public roads, flagmen shall be stationed to warn oncoming traffic of congestion, construction road signs shall be in place and a means of removing sediment, mud or rocks from roadways shall be established. Residue deposited on roadways may be removed by sweep machine, manual sweeping methods or pressurized water. The contractor will be responsible for the implementation of these measures. Chain saw operators will be expected to perform debris removal operations during periods of extreme weather conditions and in areas of deep and fast moving water. The contractor is responsible for providing the necessary equipment, clothing and other gear to insure that laborers can perform effectively and safely under these conditions. The Contractor shall determine if working conditions are hazardous and/or of sufficient extreme to prevent efficient and effective operation. When such conditions exist, the Contractor shall shut down work crews until conditions improve. EQUIPMENT Equipment selection to complete the work is the Contractor's responsibility. The following list of equipment has been utilized on similar debris removal projects and is provided as a courtesy to the Contractor. This is not a requirement. Item No.1 Hydraulic Track Mounted Excavator with Experienced Operator Min. Weight 48,000 lbs Min. Reach 26 feet Min. Digging depth 22 feet Equipped with thumb Min. Bucket size 1.0 cu yds. Equipped with two-way radio Min Horse Power 140 HP Item No. 2 Skidder with Experienced Operator and Two Helpers Rubber Tired with Winch and Blade Min Horse Power 80HP Min. Winch Cable Wire Rope -150 ft and 5/8 inch diameter Min Chokers: 4 with 2 Chain saws Min. 20-inch bars with daily supply of sharpened chains (min. 3 chains) Equipped with two-way radio Item No. 3 Dump Truck with Experienced Driver Rear dump haul truck tandem axle min. Capacity -15 tons equipped with two-way radio P:\I?1cDowellCountyNortliC\327539\Specs\Dcbris Removal SOP rcv2V3jed.doc Item No. 4 Chipper 14-inch capacity Tub Grinder 8-foot interior tub diameter P:\NlcDowcllCountyNortliC\327539\Spccs\Dcbris Rcmoval SOP rcv2V3Jcd.doc 6 [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] Subject: [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] From: Cyndi Karoly <cyndi.karoly@ncmail.net> Date: Wed, 16 Mar 2005 15:58:57 -0500 To: Laurie J Dennison <Laurie.J.Dennison@ncmail.net> fyi - so please note that fees are waived when you create these files - perhaps a brief handwritten note in the file jacket, or we can add a copy of this message Subject: [Fwd: [Fwd: STream Clearing Activities]] From: Tom Reeder <tom.reeder@ncmail.net> Date: Wed, 16 Mar 2005 15:43:18 -0500 To: Cyndi Karoly <cyndi.karoly@ncmail.net> Cyndi - In answer to your question yesterday it appears that the fees are being waived for the EWP associated 401s. Subject: [Fwd: STream Clearing Activities] From: Alan Klimek <alan.klimek@ncmail.net> Date: Wed, 16 Mar 2005 15:37:40 -0500 To: Tom Reeder <Tom.Reeder@ncmail.net> Yes, the fees are being waived. See attachment. Alan -------- Original Message -------- Subject:STream Clearing Activities Date:Mon, 28 Feb 2005 09:40:08 -0500 From:"Robin W. Smith" <robin.w.smithPncmail.net> Organization:NC DENR To:Alan Klimek <Alan.Klimek(cUncmail.net>, Jim Simons <Jim.Simons(C-(?ncmai].net>, David Vogel <David.Vogel(u ncmai1.net> CC:Johanna Reese <Jollanna.Reese(a),ncmail.net>, Nann Guthrie <Nann.Guthrie a,ncmail.rnet> `A11: Attached is an electronic copy of the letter and information sheet sent to the 19 counties and one town that have contracts with MRCS for stream clearing projects. Those letters went out over the Secretary's signature on Friday. We will hand-deliver a memo containing the same basic information to the mountain area legislators tomorrow. We are also working with the Governor's office on a news release; I am not sure how soon that will go out. Give me a call if you have any questions. Thanks for working toward getting meetings set up. Robin. 1 of 2 3/17/2005 6:46 AM [Fwd: [Fwd: [Fwd: STream Clearing Activities]]] Robin W. Smith <robin.w.sinith(a?ncmail.net> Assistant Secretary of Planning & Policy Office of the Secretary NC DENR Content-Type: message/rfc822 [Fwd: [Fwd: STream Clearing Activities]] Content-Encoding: 7bit Content-Type: message/rfc822 [Fwd: STream Clearing Activities] Content-Encoding: 7bit 2 of 2 3/17/2005 6:46 AM February 25, 2005 Page 1 of 2 February 25, 2005 RE: Emergency Watershed Protection Stream-Clearing Projects Dear I know that County experienced stream damage as a result of the fall hurricanes. Our department would like to work closely with your county to insure that stream restoration projects receiving state and federal funds under the Emergency Watershed Protection (EWP) program move as smoothly as possible through the environmental review and permitting process. I have enclosed for your information a brief summary of the types of permits and approvals that may be required for these projects. For projects that involve work directly affecting the streambed, the United States Army Corps of Engineers will be the primary environmental permitting agency. For those projects, our staff in the Division of Water Quality and the Division of Land Resources play a supporting role and issue related state approvals. I have asked our staff to meet with all of the western counties, either individually or in small groups, to talk about each county's proposed stream restoration projects and answer your questions about permit requirements. Our staff will ask the Corps of Engineers and Soil and Water Conservation staff to join in those meetings in an effort to put together a plan of action for reviewing and approving stream restoration projects as quickly as possible. You should receive a telephone call from DENR staff soon to talk about a date and time that would be convenient to meet and talk about your projects. I have also directed our staff to waive fees for state water quality certifications (under Section 401 of the Clean Water Act) and for approval of erosion and sedimentation February 25, 2005 Page 2 of 2 control plans for stream-clearing projects funded under EWP. Fees will be waived for all EWP permit s requested by September 1, 2005. I hope these efforts will ease the burden on county governments already challenged by the demands of reconstruction and recovery. If we can help you in any other way, please do not hesitate to call. I have asked Assistant Secretary Robin Smith to be a-primary contact on these projects for DENR; you can reach Ms. Smith at (919) 715-4141. The enclosed information sheet also provides contact information for DENR staff in both the Asheville and Winston-Salem Regional Offices and for the Corps of Engineers office in Asheville. Sincerely, William G. Ross, Jr.