Loading...
HomeMy WebLinkAboutNCC190315_ESC Approval Submitted_20190516From: Greg Tobias To: Tom Foster Subject: Holly Springs PreCon Date: Thursday, May 02, 2019 2:16:01 PM Items discussed on 5/1/19: • All city specifications are online. • Engineered As-Builts are required prior to a CO being issued. • New Plat required for a CO to be issued. • The city does not issued TCO's. Only CO's will be issued. • No special conditions discussed. • Ethan Faulkerner, Development Inspector, requires 24hr notice prior to inspections. • Traffic Control is a big issue for the town. They don't want any vehicles or debris in the streets. • An onsite pre -con is required prior to Utility work beginning. • Jeff Peters is the erosion control inspector. • You must go online to get the storm water permit NCGO1 (information included in the packet). • The fire lane must have a city inspected proof roll prior to finishing. • A particular water meter vault is required — allow enough lead time to get it. • Violations will be issued if there is a potential of site, storm water pollution. An incident is necessary, only the potential of an incident. Greg Tobias GANAWAY Prpiect Manager CONTRACTING 7'70 SSO.7722 Cel! 67B371,43+40 380 N Main St. Alpharetta, GA 30M9 r"4g Wbiaspganawama m GA1VAWAY,COM ,•, IWE T tq 4 V kw 0 P•' V rn