HomeMy WebLinkAbout20090867 Ver 1_401 Application_200908094 a r
North Carolina State University is a land-grant NCSU Water Quality Group
university and a constituent institution of the Department of Biological and Agricultural Engineering
University of North Carolina College of Agricultural and Life Sciences
Campus Box 7637
Raleigh, North Carolina 27695-7637
Date: August 10, 2009 0 0- 0 6 6 7
To: Eric Kulz, NC Division of Water Quality
From: Karen Hall
919.515.3723 (phone)
919.515.7448 (fax)
Subject: Nationwide 27 PCN
AtH EA In
Eric,
Please find attached a copy of the PCN for the Keesee Property Tributary Restoration in Chatham
County NC. This project will not impact wetlands and is not for compensatory mitigation. If you
have questions, please contact me at 919-515-8242. Thank you.
Regards,
f
R R= [EDWIN
AUG 1 1 2009
DENR • WATER QUAUTY
WETLANDS AND STORMWATER BRANCH
Karen Hall
Extension Associate
NCSU Water Quality Group
Employment and program opportunities are offered to all people regardless of race, color, national origin, gender, age or disability.
North Carolina State University, North Carolina A&T State University, U.S. Department of Agriculture, and local governments cooperating.
Q?6F W A TE qqG
o ?
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit El Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Keesee Stream Restoration
2b. County: Chatham
2c. Nearest municipality / town: Chapel Hill
2d. Subdivision name: n/a
2e. NCDOT only, T.I.P. or state
project no: n/a
3. Owner Information
3a. Name(s) on Recorded Deed: David H Keesee and Susan W Keesee
3b. Deed Book and Page No. Deed book 774 page 0285
3c. Responsible Party (for LLC if
applicable):
3d. Street address: 360 Luna Lane
3e. City, state, zip: Chapel Hill, NC 27517
3f. Telephone no.: 919-933-4879
3g. Fax no.:
3h. Email address: keesee@email.unc.edu; dave.keesee@quintiles.com
Page I of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify: NC State University-technical assistance
4b. Name: Karen Hall
4c. Business name
(if applicable): North Carolina State University
4d. Street address: Campus Box 7637
4e. City, state, zip: Raleigh, NC 27695
4f. Telephone no.: 919-515-8242
4g. Fax no.: 919-515-7448
4h. Email address: karen-hall@ncsu.edu
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 0018725
1b. Site coordinates (in decimal degrees): Latitude: 35.85762 Longitude: - 79.07527
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 6.998 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Wilson Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: WS-IV;NSW
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Site is formerly farmland, now a homesite. Previous owner attempted to redirect the stream channel by filling with
construction and road debris and other waste materials. The property now is reverting to woodland but is hampered by
invasive exotic vegetation and debris. The remainder of the watershed is very low density residential properties and rural
agricultural land.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
450 feet of which 130 feet are perennial Wilson Creek and the remainder is an unamed intermittent tributary of Wilson
Creek.
3d. Explain the purpose of the proposed project:
Previous owners modified the unamed tributary stream channel by filling with debris. The channel is now incised with a
major headcut working upstream. The current owners want to restore this stream to improve the water quality and habitat.
This project will remove the debris and restore the stream to natural profile, dimensions and pattern.
3e. Describe the overall project in detail, including the type of equipment to be used:
The unnamed tributary will be restored to a more natural stream using natural channel design. One piece of tracked
heavy equipment will be used to remove all filled debris. Debris will be hauled off site. Wood and stone in-stream
structures will be utilized to assure channel stability.Sediment and erosion control measures will be installed. Native
vegetation, including trees, stakes, cover grasses and perennial grasses will be planted following construction.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ? Yes ® No ? Unknown
project (including all prior phases) in the past.
Comments:
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ® No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
relocation and
S1 ®P ? T reforming a UT of Wilson ? PER ® Corps 7 320
channel and flood Creek ® INT ® DWQ
plain
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? 1 NT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 320
3i. Comments: All invasive and exotic plant materials will be eradicated and replanted with native plants
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
K Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary (T) impact required?
B1 ?P?T ?Yes
? No
B2 ? P ? T ? Yes
? No
B3 ? P ? T ? Yes
? No
6h. Total buffer impacts
6i. Comments:
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
No stream crossings. Access by adjacent driveway.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
No stream crossings. Access by adjacent driveway.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b . If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a . What is the overall percent imperviousness of this project? 0%
2b . Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No impact to the imperviousness of the
property is anticipated. Requesting NW 27 permit.
2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Chatham County
? Phase II
3b . Which of the following locally-implemented stormwater management programs ® NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a . Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b . Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ® No
5. DWQ 401 Unit Stormwater Review
5a . Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No
5b . Have all of the 401 Unit submittal requirements been met? ® Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation o f the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
none
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
E] Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Natural Heritage Program Personnel and Databases
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Natural Heritage Program Personnel and Databases
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO peronnel and maps
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Chatham County GIS database of FEMA mapping
David Keesee; Susan Keesee July 28, 2009
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
f!F t A4 k1 .I ti ?4 rea+.?+r n ' 1 r,., rq a lirkt .I €'r
.: ?` ?I,a". yerr ?I F1?'? ? '1?4?. 1"? e ? ?';' l•? a?w??f ?y? ?i? „ ? ?.- ???
? ?'?`? r ? r? , . w:,a . ? •, '? .? `? ?!? ? ? 2. c=.,. r f ?°r ,r?? a?'-" '' `' • 1* T E ?'? ?, ?i.
aI. A •i-•;, 'L dd .. / A? ih ' ¢ ?'..•, ', R#. i ,i Y I -ry.M1 y
#A4'4
t ,J, I ? ° b •... r, I kti-°' 'i? 4 ?+r? ?yw to • ?, ? ? .? .' r d'? I :,?' •dt @_ r+? .. #
PA
" h- I? •?#° , fir.
;W i I. F,•
: ?Y r?t. fo ?s' i 2 U.U#
I 1'." x.. a- e:.ll?r{ ...k,.?'1:`. ...+w•se G t'ei 1*+,'4' ry '?? o
ye??y ? ar ++y,
a * }
q':
?..4 -P'1 4}+?, _ Y#
:a a ..? #. ak ee M',lr, xx '. `F^ 1a' 'u #aF {Jy a i<? elt'.
• e
G
Y F ? R L V k+
?.
?.°ir -.b,?.lF'?I°s, y?n??., r_9?e+ t •f- 'r'' :. ?Y
5, I 45?. (I yt 7
SL.. 1 a ;'.,: I '° •; Ly' ICI ?F'F y' }{y /y y_ JL} 5, 'p _ IC'?' 2Ii?3,
nor °
; ?c ?''a 4 a* e
f !! , ,9 8.443 ?'.. ?= h g• ,? ,? h *F
LEA`. °.7 a i le _ I #
JCt'.
.' ? ? ? • ? - •?se+?,"? +r' " ?i ? Sew y
?' -'?? ,?. ' ?>?.. `'`e' J?"d{• ? ?..:, ? .. q' ? 1? `;,,f ? a r•e I?' r= x,?'' ? ? 5' ,? ? `?4 ?# ?•i.?a.r ^???: r#!
r .. , r q y
°-sSIA"' sfr,..?• 9 l; s 'M"1R +'I°_g ',F' 7..;,ll?.i
,}. Mla?'.i 'd?' ??rl "t :'l ..,51?' 1 I ~_?,y12+/I, -'14- ?'t,,'-+i0'??•F,l F#I ?" ? ? ?I ..?° 1?: lay°" I
y? ?I • ill '-A&, ^, ? ;r??' '?l i! ' •' +,a?? d..•? 9'?:i ' I,? Y., 'I ? A ? r S IS 1' ,. Wh ? ? S a?
.T
,
r. f.. .. . ¢. r+ r
+0k
IL
lJA 4W '044 4 A Ar 24 ?I ''?- ,??Y?.?t?'' k*:S*PAR
46.
20 0 ' 4 ^=
9 4 1 L+Ly? Ld ?L 9. ?t?+ .7?rr]AidL. 45
1 200 S 115 r
341 TR-2 3P, B-BCHATHAM COUNTY NC Parcel Number: 18725 Deed Book: 774
Owner Name: KEESEE DAVID W & SUSAN H Plat Book:: 98 '4
Map Number: 9776-77-7040.000 Deed Page: 0285
?y4..A yr` Owner Address: 360 LUNA LN Plat Page: 0443
r Property Map Owner City: CHAPEL HILL Deed Acres: 6.998
Owner Address: KEESEE SUSAN H Physical Address: 360 LUNA LN
N
The
Disclaimer: p Owner State: NC Improvement Value: 265078
The data a provided on this map are prepared for the inventory of real property found within
'
Chatham County, NC and are compiled from recorded plats, deeds, and other public records Owner Zip: 27517 Land Value: 121475
?'RHCAR? and data. This data is for informational purposes only and should not be substituted Description: N l-44 Fire District: 107
for a true title search, property appraisal, survey, or for zoning verification. Township Code: 13 One Inch = 589 Feet
0
r
N
Ln
N
N
0
T
X m a a NO. NOTES: DRN CHK DATE
z
z z 9 Conceptual Design EKeeseeib Restoration ,
p a m z
N 9o p
BIOLOGICAL & AGRICULTURAL ENGINEERING
WEAVER LABS CAMPUS BOX 7MS
p NORTH CAROUNASTATE UNNERSRY
Chattam County, NC PLAN VIEW RALEIGNNC27695
3
3
m z
70 ? m
Q)
Q)
r
FLOW
O?
m?
TI m'?'
p 10
m mZ
7o T I
O O° <
?o
n z
v
m
?o MI
N
0
O Z
z
w -
T rn
Im ' I
M 22
70 T i r-
O m O
n M Z
T
D vo
I -
M
r ? ?..r i rc L4E 5'?
vO .
? y P3
?or
C r li, t dr x:
D A xt ?? 7
A Z r L '?.
TI m f
-H C)
mx m a a No. NOTES: DRN CHK DATE
z a z Conceptual Design Keesee Trib Restoration
N p m z
9
BIOLOGICAL & AGRICULTURAL ENGINEERING
WEAVER l/1BS CAMPUS BOX 76?S
p NORiIi CAROUNASTATE UNIVERSRY
"ALEI
m pQ Chattam County, NC ROCK CONSTRUCTED RIFFLE `,?'"cz?es
? ao
z
m z
?La v
?La
n m
? o
o
m?
A ?
0
Z
O
TL mZ
O0 WO
m 7La m
? A Z
O
O
17, IL 17,
0 0
[') ['? =I
O O
III- I
C C II
T
rn rn y D
7v 7v m
? 17,
rn rn
4 T rn
t I-I I i?
I-1 I I-1 I i
m 1-1I1-1I1-
rn 0 Z
D tr
D ?
o pD-
O
r
D5A ON v:Fk. Nw N Cam'
m 7: m- r
Dp 0 p °Z p
Om ?O 3r ?S
n-pr m O r N >0 O A `
O mv0 C? m 3?
?G ?G)
N
?° o?
N r v =T
r n r0 N ? y m m D ? O d ??
Z O x
r >z r r Z'f a
D
f?v rgrr O N C=? mm
< a `s.
m O D r^ P°n z C
r v m C,
m H oo p c'1 f {?' F;rs
,,, L O z m?
m z 70` n CN
TL p x N m m ,
N O
m M O ? O R IM F { ,,
-n '
v m m Lp N N r x
N m m
c 9
Z 0D oZ m O
m cn m >
m m ?n Z mp ??.
m v
p a fk
?x m a a No. NOTES: DRN CHK DATE
z a z
Conceptual Design Keesee Trib Restoration ,
? 9m o
w
BIOLOGICAL & AGRICULTURAL ENGINEERING
WEAVER LABS CAMPUS BOX 7MS
p NOffM CAROUNA STATE UNIVERSRY
?' pQ Chattam County, NC CONSTRUCTED LOG RIFFLE RALEIGH NCZM95
2 O
0 0
Z D
Z p 0
O Zm
v0 Z!
=0
fTl z? " o
c/) (nI J U C0
(A N
G)Z Drpr
D D Z O m 0
< r O O p
? mm M -CA Pl? U)
m m m
M;U>(1 N
O D ;U D Z: m
D
co r- r- r-
0 r r
zppm m
ZZ 0 x
r 0 z
O 1 f?1
Z p xl D
T _n 1 Z
O 0
Q m
Z7
0 r
D `0 J C
m Z
O C O A
O N O p
Z
O Zl K
W m
M O M
c) ;1
p°o
F_
Z
G
fTI C
W o
0
c
z
z
O
U)
mvmrmmmmm
m D Z Z O D Z .n Z
0 c
-
m
x u
D
ZmFOr0D 00
°c X00 m?
X m Z
x ?
cn m x 0
c -1
m o O mN
=
D 0 O -
DK 0 Vl FD
pN 0 n OF
Z
o D 2
m CO
z r
p r om
?m 00 m =mar
m
zm D z ?m
mr r- mo
O z z ry
O --I
rn
N c 0 ?? N A?
K T DITxI
Z
c?
\
\ r
0
p
2 m O on \ \ ?z
N 0Z ° r
m R
m ,
\
0 \
,
\ z
m
\ ,
\ m
D
CD
W
X L Om IM
mmzRE?m,
ZZOZm
m mm?D co
Dm0-1
r mn
o3?
z v)
OM xc-1 N
D mom2:
0 x C D
Omom?r
mm?pcW
?m0r-mm
m?0MOm
O D
m
I Z 0-0
CD2_0fArl°
i O-n m S4 z z
m=0-3
D j --I `L M
D
r A X -U
a co m 0 W O ?
m O Om 3
m U)
V1
° O D O
F m
A
z
(n
m C
n
O
n °O \ O
I N \. \
n ° \\\ \
v
8
m
m \\
0 \
0
N \\
c
0 \ \
m
m
0
R
X
c?
0
0
r
O
>
C
0
N
00
m D
0
0 0 zo
0
0
mF
V)g
0
z
M0
c
(n
m
n
O
Z
ID
I
IU
rn
m?
0 m
A °
Fn
m
O j?
i
O =
O y
o
? m
?0? 0 X
0 N_
0
0
0
m
c
0
m
D
z
x
C
m
0
z
CA a
?x m a a NO. NOTES: DRN CHK DATE
z
z z 9 El Conceptual Design EKeeseeib Restoration
z 9 m p
BIOLOGICAL & AGRICULTURAL ENGINEERING
WEAVER LABS CAMPUS BOX 7MS
p NORiIi CAROUNASTATE UNIVERSLiY
pQ Chattam County, NC LOG DROP STRUCTURE "ALEI`,H"cz7e95
\\ zD
N
\ \ m
\ o
W m
Fn
D r
22,
0