HomeMy WebLinkAboutNCC190283_ESC Approval Submitted_20190514ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
May 6, 2019
LETTER OF APPROVAL
WITH MODIFICATIONS
The University of North Carolina at Chapel Hill
ATTN: Jonathan Pruitt, Vice Chancellor for Finance and Operations
Campus Box 1000
Chapel Hill, NC 27599-1000
RE: Project Name: UNC Kenan Stadium and Off -Site Stormwater Site
Project ID: ORANG-2019-013
Approved Acres: 2.6
County: ORANGE, City: Chapel Hill Street: Stadium Drive
River Basin: Cape Fear, Stream Classification: Jordan Reservoir Watershed
Submitted By: The John R McAdams Company
Date Received by LQS: April 17, 2019
Plan Type: New
Dear Mr. Pruitt:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval with Modifications. The
enclosed Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions abouit the NOI form to Annette Lucas at
Annette.lucasOncdenr.gov or Paul Clark at Paul.clarkOncdenr.gov. After you submit a complete and
correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCG01 permit. However, on or after June 1, 2019, a $100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
` Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
NORTH CAROLIN.4
L 919.791.4200
Letter of Approval with Modifications
The University of North Carolina at Chapel Hill
May 6, 2019
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspection made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project. Please
notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES Permit
cc: Daryl Riggins, PE (riggins@mcadamsco.com) - Electronic Copy
DEMLR - Raleigh Regional Office File
Letter of Approval with Modifications
The University of North Carolina at Chapel Hill
May 6, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: UNC Kenan Stadium and Off -Site Stormwater Site
Project ID: ORANG-2019-013
County: ORANGE
1. This approval is limited to the land -disturbing activity associated with Kenan
Stadium. The land -disturbing activity associated with Finley Golf Club House is not
approved. A revised plan submittal is required for this additional 0.13 acres of
disturbance. GS 113A-57(3)
2. Provide a construction entrance for the Kenan Stadium site. Provide a plan detail,
construction specifications, and maintenance requirements for the construction
entrance. Identify the location of the construction entrance on the plan sheet using s
symbol identified in the legend. (GS 113A-57(3), 15A NCAC 04B .0113)
3. Provide two copies of the plan set (one full-size and one half-size), showing the
modifications required for approval prior to initiating land disturbing activity.
Provide a cover letter referencing the project name, project ID, and purpose for
submittal. (G.S. 113A-57(4))