Loading...
HomeMy WebLinkAbout420024_PERMIT FILE_20171231q - 5 ` q Type of Visit: fQ C fiance Inspection U Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: 0 Routine O Complaint Q Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: - /�( rr Arrival Time: Departure Time: ® County: Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: 7&--rf Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: �_� 1 � iW1�. • ��Z:,.gnts �, �: 1w ^�leHf 1 i'` k� �. �� i �. �,'r ,.� �1 �� ? P �.lYt��, .�.. f!:%A�XI }li' • r `I �f; i�! : � 1 a ir�r '.. .. ,'fr ' � � L�� WC P r � .. 1 . 1 MEN! %1 �rrf �f`,// rMl�: f -�� q» GI 1 ' IM s� 1 r rr flf+ ■ • �� f� 1 y'. ■ 1 1 -0 IV r�,f �y,�, �tta.',r�� , f1�F1W1� q�f�il t r nr��urla; 1 w } V �' ■ � 1 -- f � f ■ . 1 1 ' -- r 1 r`„ I .., : 1 !f1 E I - f � ■ �4 » a.. + •r f == A i, {{,r ,o N" ,le..✓, �1 f 1 h71 ail '1� i ,� 1 1Xt ?� 7 .1 r�+� , .Iff r Y'fP 1, cc��„„ 1�11 i1{fl`?�''a X� 1 �l , ,/ef� X��f� �l�'rfrl 11 rff r[h;wil Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (byes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili umber: - 2 1 1 G Date of Inspection: '1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. if yes, is waste level into the structural freeboard? ❑ Yes o ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): !( Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments hreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes N ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ FrozcnGround ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): _ �3p t r� c� 1�P5`C�-2, s1i� g iA 1 a 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [ ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable 0 Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfe ❑ Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No. ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Z-- 2 111ate of Inspection: '1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes VNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes o A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o ❑ NA NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the 0 Yes [:]No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE I S"I k �5 e SILrv-R-\I f(/�o f .3C) 17 i) = S.q I— r � S'- L(� ov"I'(L''0" tom- //22/ N +rec)V.P I4V ' Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 4 s 6"P'f. Phone: 7q [ - k/2UD Date: ?--el "-1 1 214120I S Divission of Water Resources Facility Number - �iL Division obSoPand Water fonservation no Other Agency f ype of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: %L Farm Name: 'Jtry (ice Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: �T Title: Onsite Representative: L41 e_i-K y Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Certification Number: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Pouitty Capacity Pop. �, ,,,ate Cattle Capacity Pop. Wean to Finish La er Non -La er Dairy Cow Dairy Calf Dairy Heifer Wean to Feeder Feeder to Finish Farrow to Wean Design Current qry Cow Farrow to Feeder Dr PLoultr,Ca aei P■o P. Non -Dairy Farrow to Finish La ers Beef Stocker Gilts -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other; 11-1 a. Was the conveyance man-made'? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesrNoo NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesNA ❑ NE of the State other than from a discharge? Page 1 of 3 21412013 Continued Facilit ''Number: Z - 2­ Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: - Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z ? 2 'op' 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes VNoD❑NA ❑NE NA ❑ NE Structure 5 Structure 6 ❑ Yes;No No NA ❑ NE ❑ Yes ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes N ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or t0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Wn^indow ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 130 t A,'4044 re 5 ee. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? _Required Records _& Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes NA ❑ NE ❑ Yes NA rNo ❑ NE ❑ Yes NA ❑ NE ❑ Yes o ❑ NA j ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes a ❑ NA ❑ NE ❑ YesgNo ❑ NA ❑ NE []Other: ❑ Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ; ' Weather Code ❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall InspectirNo Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 0 Yes❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: Z -Z Date of Ins ection 24. Did the facility fail to calibrate waste application equipment as required by the permit? Yes �_J N NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes No NA NE the appropriate box(es) below. Failure to complete annual sludge survey Failure to develop a POA for sludge levels Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? Yes o NA [] NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Yes No NA NE Other issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [] Yes [] No NA NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [] Yes No NA NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the Ej Yes No [] NA NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. Yes No NA ❑ NE Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? Yes No NA NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? Yes No NA NE 34. Does the facility require a follow-up visit by the same agency? Yes No NA C] NE Comments (refer to question #)`: Explain any.YManswers and/or -any -additional. recommendatians_oraany other comments. ` Use drawings of facility to better explain situations (use'additi6nal-pages asinecessary)." a 51102 2 n�uG'6i'1 `- ,6-54,r-r�e� , <U CGr 4-i. � c.t � r1 c�G�� i t btoC'44t'1-t. 010. C4 Yee Reviewer/Inspector Name: Phone Reviewer/Inspector Signature Page 3 of 3 Date _ if-4 ? 21412014 OiTigion of Water Resources Facility Number Z� - ZC� Division of Soihand Water Conservation 0 Other Agency Type of Visit: O Compliance inspection 0 Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: O Routine 0 Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: 1 �p D _ Departure Time: EZ-7607 County: Region: Farm Name: S' G�/'� C' Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: a,/ 4 Integrator: Pbone: Certified Operator: Certification Number: Back-up Operator: Location of Farm: Certification Number: Latitude: Longitude: Current Design Current Design Current K.Design Swine Capacity Pop. WTetPoWultCapacity Pop. Cattle Capacity Pop. Wean to Finish DairyCow Wean to Feeder La er DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder aoultr, Ca licit P,o Non -Dairy Farrow to Finish s jNn-PLayers Beef Stocker Gilts Beef FeederBoars s Beef Brood Cow s Other Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation'? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? 0 Yes VN�o NA ❑ NE b. Did the discharge reach waters of the State? (if yes, notify DWR) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes VNoO ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NE of the State other than from a discharge'? Page 1 of 3 21412015 Continued Facility Number: L Z - Z Date of Inspection: —/ 2 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No 0 NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ZNo ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): /r 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 9 No A ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application'? If yes, check the appropriate box below. ❑ Yes No [] NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 15ty n.-►t, ey, S n. Qt r ¢ t /7 5r 4 F PSc-P 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes p o NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes rNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 2N NA [] NE 18. Is there a lack of properly operating waste application equipment? ❑Yes ���ozoEl NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? El Yes ❑ NA jNo ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑Lease Agreements ❑Other; 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes eNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 2jAo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued l Facilit Number: Z - Z. 0-jDate of Inspection: - 2 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes a ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to property dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use�drawings of facility to better explain situations (use additional pages as necessary). C a ! ebr.5 h'VV\ a- 2. z — (Y s-1 I v •- (6 -l.i S^ ✓l t- 5 i nj (-kj - 2p p S! rc N�t 1=o v2 C 6 �r9-�►*- n V J{ y[ ►+�G ' a P d tl i t tG�K i ►�dC . Reviewer/Inspector Name: Reviewer/Inspector Signature: J In S kz_ /C_ Phone: Date: q ` / 2 Page 3 of 3 21412015 (6 - I s Type of Visit: V Co ance Inspection (� Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: (., 1? Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Le r L Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Swine Capacity Fop. Wean to Finish Design Current Wet Poultry Capacity Pap. Cattle Layer,- Dairy Cow Design Capacity Current Pop. Wean to Feeder 11 INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Farrow to Feeder Design Current Dry Cow Dr P,onit . Ca aci P,o . Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Other Other JELILther Turkeys Turkey Poults Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Yes ❑ No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field Other: a. Was the conveyance man-made? ❑ Yes rNo NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? 5 d. Does the discharge bypass the waste management system? (If yes, notify DWR) Yes ❑ No NA ❑ NE 2. is there evidence of a past discharge from any part of the operation? ❑ Yes o _IA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412014 Continued Facili Number: Cl- Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in) 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? 2No ❑ NA ❑ NE o ❑ NA ❑ NE Structure 6 ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental t reat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes' ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes rNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 4 No ❑ NA ❑ NE maintenance or improvement? Waste Application KNo 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes a ❑ NA ❑ NE maintenance or improvement? ZNo[:] 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): ��i2i i►�Jlti �►TrL _. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? W❑ ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes NVNo ❑ NA ❑ NE I8. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [] Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412014 Continued Facili Number: IDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA [] NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Vo❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes VNo ❑ NA ❑ NE Other issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34, Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No [] NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE ❑ Yes [] No ❑ NA ❑ NE Comments (refer to question #): Explain:any: YES answers and/or any additional re'commerida"tion`s or'any other, comments. Use drawin g s'of facility to better explain situations use additional pages as,necessa n S ► 2 (--� ti-. CrP i �,c,e c� %� SM �/ 5'joi ! ( O 7 3 o A , r--. Gk14 il in fi /uC S.' r f'r e -. #2_0 4 n J k,�- S L[;u,+ 9 I ,r2 G J, ,syk 45jz 5&_lrtie y�3r,kr�0S sYsP �e� ("c� SuY 5h©wS q �, os �pc/t! 7L ?10 Reviewer/Inspector Name: Reviewer/Inspector Signature: L7 (.t���L�1 Page 3 of 3 Phone:, j 7 S 1 y Z v Date: 6) -- 21412014 .il (Type of Visit: Compli a inspection O Operation Review Q Structure Evaluation Q Technical Assistance I Reason for Visit: outme Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access Date of Visit: Arrival Time: Departure Time: ��D County: Region: Farm Name: 6 �2n Z_ Owner Email: Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: ���Liy �. Integrator: Certified Operator: Phone: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pap. Wet Poultry C►apecity Pop. Cattle Capacity Pap. Wean to Finish La er DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder 1) > P,oult�. Ca aci P■o Non -Dairy Farrow to Finish La ers Beef Stocker Gilts Non -Layers Pullets Beef Feeder Boars Beef Brood Cow Turke s Other Turke Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o No ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) [] Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the.operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ NA ❑ NE ❑ YesgNo o ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE Page 1 of 3 21412011 Continued 2 Facility Number: L jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes�No No NA a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ NA Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in); 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes:No No NA ❑ Yes ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental reat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �No❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12, Crop Type(s): r �aA , /yj aj r A •] r f'� S 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] YesV❑ NA 0NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? 0 YesfN ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o gNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 2 L Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑Monthly and 1" Rainfall Inspections dge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑YesVN ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? []Yes ❑ NA ❑ NE Page 2 of 3 21412011 Continued • 2- Facili Number: Date of Inspection: L- 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? if yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? []Yes ❑ No ❑ NA ❑ NE Coinments,(refer to question #): Explain any YES answers and/or any -additional recommendado.ris or any other comments: Use'draw''- ngs`of facility to'better explain situations (use additional pages as necessary). ce—ry�-�y r Reviewerhnspector Name: Reviewer/Inspector Signature: 3(.i S d �•�/� Page 3 of 3 Phone: -! /9 79 1 2-CO Date: / 2 ( ^/ 21412011 Type of Visit: P Com nce Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: / j Arrival Time: Departure Time: { D County: Region: Farm Name: S() (a ry- a±: &� Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: " Certified Operator: Sack -up Operator: Location of Farm: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design C+urrent Design Current Swine Capacity Pap. Net Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er DairyCow Wean to Feeder Non -La er DairyCalf Feeder to Finish DairyHeifer Farrow to Wean Design Current D Cow Farrow to Feeder Dr, F,oultr. Ca acit l;o Non -Dairy Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood On — Turkeys U_ther Turkey Poults Other Other Discharses and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) [:]Yes No ❑ NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes Zfj ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Facility Numb-tr: V,/ - ZV- I IDate of Inspection: g9/ / Waste Collection & Treatment 4. Is storage capacity {structural plus storm storage plus heavy rainfall} less than adequate? ❑Yes ZNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard {in}: 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No [DNA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWQ 7. Do any of the structures need maintenance or improvement? [] Yes ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? 0 Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ZrNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): / &7n w 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �TNo NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? [:]Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �(No ❑ NA ❑ NE the appropriate box. ❑WUP [I Checklists [-]Design [-]Maps []Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application El Weekly Freeboard ❑Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 ° Rainfall inspection Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facili, Number: - Z jDate of Inspection: Q 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No [:]Yes [—]No ❑ NA ❑ NE DNA ❑NE ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additlonal=recommendations`nr,anyptheir comments.,< , -; lUse drawings of facility to better explain, situations.(use additional pages as necessary). "- �(k � Sk ✓yfL L� to-/t'r63 FAA '"'�} ✓' 2. t � S ,�-� i� � �i�-r r�-�-�' �cT � d � � C� ��--� �Oc�,h ate. Reviewer/Inspector Name: Phone: 79/— `/Zd 0 Reviewer/Inspector Signature: �� L ��G•,/� � � Page 3 of 3 Date: 21412011 & 2 Facility Number: - ZC Date of Inspection-, /. / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes e�o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): s;-L 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes EYNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes eff No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EJ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes JZ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): l�e'7 s... 13. Soil Type(s): 14, Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No . ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 1,7. Does the facility lack adequate acreage for land application? ❑ Yes ❑ o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �jrNo ❑ NA ❑ NE Required Records & Documents l9. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes rNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [3 Design []Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Z No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [3Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [] No ❑ NA ❑ NE Page 2 of 3 21412011 Continued &1Z Facility Number: Date of Inspection. 2r 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes�No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes eNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes [2rNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34, Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [—]Yes ❑ No [:]Yes [:]No [:]Yes [:]No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question`#): Explain any YES answers and/or any additional.. recommendations or any other comments Use drawingsoffacility to Better explain sitiiitions (use additional pages as necessary)..-=� Reviewer/Inspector Name: Phone: /91` K2 ---� Reviewer/Inspector Signature: 6� "54eyr 7FG,/ e, e / Page 3 of 3 Date: // / 13 2r 21412011 Type of visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of visit: I 46Wr Arrival Time: Departure Time: 1�7� 1 County: Farm Name: 5 R 6 Eklazz_�/ Z Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: ILQ �+Z`►�� Title: Onsite Representative: Phone: Integrator: Phone: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Region: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dai Cow Wean to Feeder Non -Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder aci I;o P. Nan-Dai arrow to Finish La ers Beef Stocker Gilts Non -La ers Beef Feeder Boars Pullets Beef Brood Cow Turke s Other Turke Poults Other Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes 7 ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued Eacilit Number: tj Z Date of Inspection: Z Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA �NEl ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes NA NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental hreat, notify DWQ 7. Do any of the structures need maintenance or improvement? [—]Yes N ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? El Yes � No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2J'No ❑ NA ❑ NE maintenance or improvement? Waste Application No 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA V ❑ NE maintenance or improvement? /No[] 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload [] Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s):f�s-- 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Z� ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes / ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [] Yes �4)❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis []Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: JDate of inspection: / 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ffNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon / List structure(s) and date of first survey indicating non-compliance: I%/ i 4-4✓ I7 d S C 26. Did the facility fail provide documentation of an actively certified operator in charge'? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes la �01:1 NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NI, If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34, Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ff): !Explainany` YES answe�s'and/or any additional recomnnendations or'any other eotrimentsijh Use drawings of facility to better explain situations (use additional pages as�necessary). i�- (P.63 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: T- 2/4/2011 AFT r W -( 20 '1 t t o __ -_.- Type of Visit Ocom nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: 2 v Departure Time: County: Farm Name: S & r—A-P_ ,, 6 Z_ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Le ✓✓ i Certified Operator: Back-up Operator: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Location of Farm: Latitude: ❑ o = , = Longitude: = ° = 1 0 11 Design Current .Design •urr.ent Design Current opulation Cattle C*apacityPopulation Swine C*apaare�r�ty Population Wet Poultry Capacity111, ❑ Wean to Finish IQ Layer I ❑ Dairy Cow ❑ Wean to Feeder JEJ Non -La er I I ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean ry Poultry❑ D Cow ❑ Farrow to Feeder a ers❑ ❑Non-Dai❑ Farrow to Finish on -La ersullets ro Beef Stocker ❑ Beef Feeder ❑ Gilts ❑ Boars ❑ Beef Brood Cow ❑ Turke s Other ❑ Turkey Poults ❑ Other ❑Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes XNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Fieid ❑ Other a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the State'? (If yes, notify DWQ) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) ❑ Yes ElNA [INE 2. Is there evidence of a past discharge from any part of the operation? ElrNo [I NA [I NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State El Yes❑ NA ❑ NE other than from a discharge? Page I of 3 12/2"4 Continued (a -Z_. Facility Number.Z. — Z Date of Inspection Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure l Structure 2 Structure 3 Structure 4 ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes �El NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No NA El NE (ie/ urge trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed El o ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentZNo otify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes NA ❑ NE S. Do any of the stuctures lack adequate markers as required by the permit? ❑YesNA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑Yes NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA El 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Fo ❑ NA ❑ NE Comments (r�fer{�o�questtonp#) Explain,�any�YE�answ,ers�and/or�,�'any�e �o�mmend ions: or any other,commeis#s. �Tr �IJ'se drawmgsfaf facilityrto better explaln�situations:�(use�addittonalpages as�nec.essary,): T Reviewer/Inspector Name ,� Phone: Z 0� Reviewer/Inspector Signature: it a_ 70 tje r / Date: 1! ( I Page 2 of 3 12128104 Continued 6 Z__ Facility Number: Z —2 Date of Inspection I 0 Re aired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes V�r`No NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ElNE the approprrate box. ❑ WUP ❑ Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain InspectionZNo,,,E eather Code 22. Did the facility fail to install and maintain a rain gauge? El YesNA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? ElYes 12 NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ YesFNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE F "lffiY S Y* �.. !s_., 3Y r k ,- Additional CnmEitentsansl/arSDrarvings,j:f��l;A,44',>?., i +� _ 4, • l"S ,d ,dl$ �? 4a;,u:�.� i Page 3 of 3 12128104 Type of Visit 16 Co ance Inspection O Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit Routine O Complaint Q Follow up Q Referral Q Emergency Q Other ❑ Denied Access Date of Visit: 11Z 1I01 Arrival Time: lib Departure Time: County: Farm Name: A_ & L S 1061 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: ,r // Title: L Onsite Representative: /e- Certified Operator: Back-up Operator: Location of Farm: �o Latitude: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Longitude: = o =' = Design Current Design Current Design Current Swine Capty Population Wet Poultry C*apacity Population C►attle Capacity Population ❑ Wean to Finish 10 Laver 1 110 ❑ Dairy Cow El Wean Wean to Feeder Non -Layer I ❑ Dairy Calf ❑ Feeder to Finish ❑ Dairy Heifer ❑ Farrow to Wean Dry Poultry ❑ D Cow ❑ Farrow to Feeder ❑ Non -Dairy La ers ❑ Farrow to Finish ❑ Beef Stocker FE] ❑ Gilts Non -La ersPullets El Beef Feeder ❑ Boars ❑ Beef Brood Cow ❑ Turkeys (}ther ❑Turkey Poults ❑ Other ❑ Other Number of Structures: Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) e. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes J2<�OONA 1"1F_1 NA ❑ NE ❑ Yes ❑ NE ❑ Yes ONo [--]-NA ❑ NE ❑ Yes N ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number: Z — Z. L Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes "NoNA [I NE a. If yes, is waste level into the structural freeboard? ❑ Yes��No[]] NA ❑ NE Structure l Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity ol'any of the structures observed? ❑ Yes No ❑ NA [IN E (iel large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa notify DWQ 7. Do any of the structures need maintenance or improvement? El yes I o ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ N E maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes VNo ❑ NA [INE maintenance/ i m provement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. [:]Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or i 0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) �3�r .n S g or 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes O No [INA ElNE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [3N El NA El NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[]Yes No El NA El NE 17. Does the facility lack adequate acreage for land application? El N NA El 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE of facility{tti.better explain Reviewer/inspector Name Phone: 291 2 t70 Reviewer/Inspector Signature: S - Date: Z ] Q Page 2 of 3 12128104 Continued Facility Number:( —Lf Date of Inspection Z b Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ZNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ W P ❑ h kl' ❑ ❑ ❑ h ec es U C fists Dign Maps Ot er 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZrNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes NA "NVE03 ❑ NE 24. Did the facilityfail to calibrate waste application equipment as re required b the permit? ppq Y ❑ Yes NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes 7N9,' ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,E] NA C:Ko�No ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document [] Yes ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes []No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Rev iewerllnspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Page 3 of 3 12128104 ion of Water Quality Facility Number Z 0 Division of Soil and Water. Conservation r Other Agency Type of Visit Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit j04o'utine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: ® Departure Time: County: Farm Name: 5 P6 Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars 'Other' 10 Other Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = o = Longitude: = ° = 1 = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ElTurkex Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifei ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system'? (If yes, notify DWQ) 2. is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes O 1V ❑ NA El NE El Yes No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 12128104 Continued 1 i I i Facility Number: Date of Inspection Zl Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes ` No 'n1A ElNE ElYes o ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway`?: Designed Freeboard (in): Observed Freeboard (in): 3 `` 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Zf'No A ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed [:]Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental thre t, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes I No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? El Yes�No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Flo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required -buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 1.7 e SGGg . 6-mi 5 �� 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes 17. Does the facility lack adequate acreage for land application? ❑ Yes 18. Is there a lack of properly operating waste application equipment? ❑ Yes EErIN�No NA No ❑ NA No NA No NA o ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/lnspector Name Phone: Reviewer/Inspector Signature: 4_ Date: 1212ZV2 12128104 Continued Facility Number: Z —L Date of Inspection Re uired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ;21�'NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the approprratc box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ffNo I NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ElNA ElNE 25. Did the facility fail to conduct a sludge survey as required by the permit? ElYes I o NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? El Yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE (Additional Comments and/or Drawings: 1 12128104 i H Facility Number ! Z� 1ivision of Water Quality O Division of Soil and Water Conservation 0 Other Agency Type of Visit e_) Co nce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine O Complaint O Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: 07 ArrivalTimed O S Departure Time: County: Region: Farm Name: > ''^ [p �� _ s P _ Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: I Phone No: Onsite Representative: Integrator: Certified Operator: Operator Certification Number: Back-up Operator: Back-up Certification Number: Location of Farm: Latitude: = e = t ❑ 4{ Longitude: ❑ o Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Fa to Feeder arrow to Finish Gilts Boars Other ❑ Other Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er ❑ Non -La et Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turke s ❑ Turkc Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity" Population`: ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow b. Did the discharge reach waters of the State'? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: = d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 2"No ❑ NA ❑ NE ❑ Yes LNA El NE El Yes o ❑ NA El NE ❑ Yes dNq ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 12128104 Continued Facility Number:( Z —Z_ Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 ❑ Yes "No'NA ❑ NE [EllYes o ❑ NA ❑ NE Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 OK 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (ic/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes No ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa -notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes E No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2<0 ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need El �❑ NA El NE maintenance/improvement? � 11. Is there evidence of incorrect application? If yes, check the appropriate box below. El,� Yes I,�No L7 NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) crAy e�. __-' 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ENo NA ❑ NE ,❑ 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 2rN. ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yeso El NA El NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA [INE 18. Is there a lack of properly operating waste application equipment? ElYesFNo❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): w Reviewer/Inspector Name Phone: + r zoo Reviewer/Inspector Signature: ��jL� S w~(�� (( Date: ZGIb 7 12128104 Continued 4 ,l Facility Number: L Z —2 Date of Inspection 2 0 Required Records & Documents i 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes 0<0 NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes, check ❑ Yes I No ❑ NA ❑ NE the appropirate box. ❑ WUP []Checklists ❑ Design ❑Maps ❑Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes o NA ❑ NE ;Annual ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Certification PP Y Y Y ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rain Inspections ❑ eather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ YesfN- o .` NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yeso/❑ NA ❑ NE 24. Did the facility fai i to calibrate waste application equipment as required by the permit? ❑ Yes R Tl� O ' NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑Yes No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes ��NNA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments and/or Drawings: 12128104 Type of Visit Q"�Voutine ante Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason far Visit O Complaint O Follow up O Referral O Emergency O Other ❑ Denied Access Date of Visit: GG Arrival Time: / Departure Time: County: Farm Name: �� 1Z �'" G* Z Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Fai -to Feeder Gilts Boars Other ❑ Other Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: [= O = ` � " Longitude: = ° ❑ ` ❑ " Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ La er I10 Non-Layet Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets i ❑ Turkeys ❑ Turkey Poults ❑ Other Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifej ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: E:J Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? El Yes o NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWQ) ElYes o P0NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (if yes, notify DWQ) ❑ Yes ElNA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA El NE 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State ElYes No ❑ NA ❑ NE other than from a discharge? 12128104 Continued Facility Number: Z Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure I Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ZrNo 'NA ❑ NE ❑ Yes o ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threa notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ;No/(:]'NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the pen -nit? ❑Yes No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �❑NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need El Yes No ❑ NA ❑ NE maintenance/improvement? ,_ , 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ElLYes fNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [:]PAN ❑ PAN > 10% or t0 Ibs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area r 12. Crop type(s)— p 5— 43 it rye i 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �, o�❑ NA [I NE 15. Does the receiving crop and/or land application site need improvement? El Yes [d' NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination%❑ Yes 25o NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes o NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes o ❑ NA ❑ NE �'4:s �' P.44S�R' � lyn•4 '9e`�1` :�. & �+N4�C e�a1.y`g f*ram �.a' , .. ,, "` .. Comments referto questions#}Explain)any YES answers andlor3any recommendations ar any other, comments. i�lC'"516 Use dr�wpgi�ny�gs ofpfacil1ityrto bettertex laintsituatibos: (use additional pages as necessary): :T1ire41Ri•-&"'._'v..F ''. Reviewer/inspector Name Phone: Reviewer/Inspector Signature: 4.- Date: a 12128104 ' Continued ,. Facility Number: 4.17-o- 2,Z;;Pf Date of Inspection '� G Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes No NA El NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement'? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ We er Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o -NA ElNE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o A ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit'? ❑ Yes ��ONA �No ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report the mortality rates that were higher than normal'? 30. At the time of the inspection did the facility pose an odor or air quality concern'? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ❑ No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did R evi ewer/[ nspector fail to discuss review/inspection with an on -site representative'? ❑ Yes ❑ No ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency'? ❑ Yes ❑ No ❑ NA ❑ NE Additional Comments and/or.Urawitigs 12128104 Date of Visit: .1��� Arrival Time: Departure Time: County: Region: J Farm Name: z— - Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other JO-Other- Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: 0 0 =' = Longitude: = o = Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer I 1� ❑ Non -La er_ .. _ .. Dry Poultry 0 Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy_Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Co Number of Structures: =. b. Did the discharge reach waters of the State'? (if yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes [ Io ❑ NA ❑ NE No N o ❑N ❑ Yes A ❑ NE ❑ Yes A ❑ NE ❑ Yes o NA ❑ NE ❑ Yes o ❑ NE El Yes o ❑ NA ❑ NE 12128104 Continued I Facility Number: 2 — Z Date of Inspection I 3 tl as- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): f 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed rl through a waste management or closure plan? ❑ Yes No NA ❑ NE ❑ Yes L LJ NA ❑ NE Structure 5 Structure 6 ❑ Yes 2r.No ❑ NA ❑ NE ❑ Yes Q<o LJ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat .,notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes �No -NA ElNE 8. Do any of the stuctures lack adequate markers as required by the permit? [I Yes:No [Ell NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) ,_� 9. Does any part of the waste management system other than the waste structures require El Yes 2<0 0 NA ❑ NE maintenance or improvement? Waste Application � 10. Are there any required buffers, setbacks, or compliance altematives that need ❑ Yes ,._,�No LJ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN [--IPAN > 10% or ] 0 ]bs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drifl ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) /-,I r , T FA 14. Do the receiving crops differ from th+Sse designated in the CAWMP? El Yes -IVA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ;O� o`NAElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination,[]YesNA ElNE 17. Does the facility lack adequate acreage for land application? El Yes�NNI%k ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes QNo ❑ NA ❑ NE Reviewer/Inspector Name ulii`' : �`,� Phone: Reviewer/Inspector Signature: Date: 3 0 -2 12128104 Continued Facility Number: Z -- Z Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropirate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes f�`oEll No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes NA ❑ NE 25. Did the facili fail to conduct a slud a surve as re uired b the ermit? ❑ Yes NA ❑ NE h' g Y q Y p 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No L A ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes N❑ NA El NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document El Yes�No❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No o NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes tEl A El NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes NoA ❑ NE . 33. Does facility require a follow-up visit by same agency? El Yes oA ❑ NE Rdilittonal Comments "and/or Drawings Y ✓i . CEEi� CL "d"U c✓h e- ry of ! 7 r�J N l� 'IL 5- �`Q rr II l 0- 5 , -} a. fj c T C r4- ,n e f-, y � a 4- t,,g-+ '"'4 6 el rM lira P � may. 12128104 Type of Visit C Complian a Inspection O Operation Review O Lagoon Evaluation Reason for Visit O utine O Complaint O Follow up O Emergency Notification O Other © Denied Access Fac' 'ty Number Date of Visit: Time: Not Operational Q Below Threshold ;7ermitted [3 Certtfied [3Conditionally Certified [3 Registered Date Last Operated or Above Threshold: ......................... FarmName: .... r....�...Ce6..........((........................... County: .... .....`f............................................ OwnerName: ► I.t....�f ..h. .l... Phone No: ............... ........................................................................ MailingAddress:.......................................................................................................................................................................................................... Facility Contact: ...., Title: Onsite Representative: ........................................................................................................ Certified Operator: .......................................... Q. Location Location of Farm: Phone No: Integrator: ...................................................................................... Operator Certification Number: .......................................... ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 4 " Longitude ' & « Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) e. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway StrucH}re 1 Strum r Structure 3 Structure 4 Structure 5 Identifier: Y ..... Fecboard (inches): 12112103 ❑ Yes • No ❑ Yes p l40 ❑ Yes ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes o Structure 6 Continued Facility :Number: Z12 — 2. t/ I Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes [Plo seepage, etc.) 6.. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes 2<0 closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑Yes o 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes No elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? If yes, check the appropriate box below. El Yes o ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type J;�111^ U j 1Aq r - T , h p _Y GA.P /. 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 18. Are there any dead animals not disposed of properly within 24 hours? 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes ❑ Yes ]; ❑ Yes ❑ Yes ❑ Yes ❑ Yes FNo ❑ Yes o ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 12112103 Continued adlityWNurnber: -z c Date of Inspection / o Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 25. Did the facility fail to have a actively certified operator in charge? 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 28. Does facility require a follow-up visit by same agency? 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 32. Did the facility fail to install and maintain a rain gauge? 33. Did the facility fail to conduct an annual sludge survey? 34. Did the facility fail to calibrate waste application equipment? 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below ❑ Stocking Form ❑ Crop Yield Form ❑ Rainfall [:]Inspection After V Rain ❑ 120 Minute Inspections ❑ Annual Certification Form ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No es ❑ No ❑ Yes ❑ Yes Imo ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes L.1'�0 12112103 Type of Visit Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit .0--Routine 0 Complaint 0 Follow up 0 Emergency Notification 0 Other ❑ Denied Access Facility Number Date of Visit: rd Permitted ertitiedd 3Conditionally Certified 3 Registered �1-'� u ` Farm Name: ,85d*otly alrt Q90 4&2 Owner Name: Mailing Address: 30S Facility Contact: Onsite Representative: Certified Operator: po".. Location of Farm: Title: 03 Time: sa rO Not O erational Below Threshold Date Last Operateo or Above Threshold: County: mz�e Phone No: Phone No: Integrator: Operator Certification Number: ZZ Y" Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �� _� Du Longitude Design Current Design Current Design . Current Swine Capacity. Po ulation Poultry Capacity Pa ulation '-Cattle act " `Po ulation ❑ Wean to Feeder I ❑ Layer ❑Dai ❑ Feeder to Finish ❑ Non -Layer Non -Dairy ❑ Farrow to Wean -El❑ ❑ F ow to Feeder ❑ Other Farrow to Finish 0 Total Design Capacity ❑ Gilts ❑ Boars Total sSL-W "F Number of Lagoons g.. ❑ Subsurface Drains Present ❑ Lagoon Area ............... ...._ _..... ❑ S ra Field Area HoldmgaPonds 1=Solid Traps ❑ No Liquid Waste Management S stem . . Discharees 8. f Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Colligiction & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate'? PfSpiilway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: / G Freeboard (inches): 2_t " LAI 05103101 ❑ Yes )Z'No ❑ Yes�No El Yes �No ❑ Yes No ❑ Yes ;E No ❑ Yes ,lo ❑ Yes [�Mo Structure 6 Continued Facility Number: t{ Z — Z Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes ;dNo seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an ❑ Yes gNo immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes XNO 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ZINo Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes.No 11. Is there evidence of over application? ❑ Excessive Ponding ElPAN ElHydraulic Overload ElYes No 12. Crop type Slat Coe + 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes Jam-<0 14. a) Does the facility lack adequate acreage for land application? ❑ Yes [:]No b) Does the facility need a wettable acre determination? ❑ Yes [—]No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes P 9116. Is there a lack of adequate waste application equipment? ❑ Yes N0 Re wired Records Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 18, Does the facility fail to have all components of the Certified Animal WAn nagement Plan readily available? (ie/ WUP, checklists, design, maps, etc. ❑ Yes ff No $ f I ysis 19. Does record keeping need improvement? (iel irrigation,freeboard, t na & sJ11s3m/pre reports) El Yes 12<0 703 20. Is facility not in compliance with any applicable setback criteria in clothe time of design? III ElYes 0"No 21, Did the facility fail to have a actively certified operator in charge? Z u10 3 ❑ Yes ",ONO 22. Pail to notify regional DWQ of emergency situations as required by neral Permit? (ie/ discharge, freeboard problems, over application) lr (>✓0 2 — • 3e ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes Flo 24, Does facility require a follow-up visit by same agency? ❑ Yes 'No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Z No 113 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments(refer to.queshon #) Explatn any YES answ�s:apoloany recommendations,or ariy'nther comments. Use drawingsof facility to6etter explEain situations. (use,additional pages as necessary) Y teld Copy El Final Notes' A 1 44w.�°, W6Lr _� co Z.�o! nj � f CA1to4 wMAA j W;(UALl Reviewer/Inspector Name; Reviewer/Inspector Signature: Date: 9 f 03 05103101 Continued M Facility Number: Date of Inspection Odar Issues 26, Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28, Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the Flush tanks lack a submerged fill pipe or a p'crmanentitemporary cover? 05103101 r ❑ Yes �o ❑ Yes ;ErNo ❑ Yes ' lvo ❑ Yes [;'Na ❑ Yes 2<02 ❑ Yes r ❑ Yes No I Type of Visit O Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit O Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number ,� hate of Visit: Ia D� Time: b-' 0 5 Not O erational 0 Below Threshold P41ermitted C rtified Cj Conditionally Certified [3Registered Date Last Operat d or ove Threshold: Farm Name: __ Nl %2 County: Owner Name: i Phone No: MailingAddress: f71?_�I Ugh_ J D �C.+C4 2a•s !"� Facility Contact: Onsite Representative: Certified Operator: Location of Farm: Title: Phone No: Integrator: - Operator Certification Number: %BSI eErswine []Poultry ❑ Cattle ❑ Horse Latitude 0' 06 Du Longitude Da 4 �K Design Swine Ca aci Current P,o ulation WM8111gn Current Design Current ci P,a ulation Cattle Ca aci P,o ulation ❑ Wean to Feeder 1 10 Dairy ❑Non -La er I 1U] Non -Dairy ❑ Other " Total Design Capacity Total SSLW FFeeder to Finish E3Farrow to Wean, ❑ F.gM to Feeder Farrow to Finish ❑ Gilts JD c:�" ❑ Boars Number of Lagoons Holding Ponds / Salid ',raps ❑Subsurface Drains Present ❑ Lagoon Area ❑ Spray Field Area ❑ No Li uid Waste Mana ement S stem Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? AP-Lte- Cellection -& Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Identifier: Freeboard (inches):�„�� 05103101 Structure 5 ❑ Yes El Yes EJ-K/o El.� Yes 'Na ❑ Yesfo ❑ Yes FeKNo ❑ Yes �o ❑ Yes [>o Structure 6 Continued ' Facility Number: Z — Z Date of Inspection 0 4 D 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes Xj"No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? El Yes 'PNo (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) �� 7. Do any of the structures need maintenance/improvement? ICJ Yes El No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes ON, 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes ON, Waste Auolication 10. Are there any buffers that need maintenance/improvement? ❑ Yes ,1'No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Yes No 12. Crop type 'K L S. 13. Do the receiving crops differ wrth those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes allo 14, a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes �o 16. Is there a lack of adequate waste application equipment? ❑ Yes jTNo Reauired Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certified Animal ast Management Plan readily available? (ic/ WUP, checklists, design, maps, etc.) i ,jl �,�� j 3 i !P ❑ Yes ;?No 8 tqf -.V4 1/6,lot 19. Does record keeping need improvement? (ie/ irrigation, freeboard, w sty ana��sis & soil sample reports) ❑ Yes 20. is facilitynot in compliance with an applicable setback criteria in fe(cat me of of)desi n? p y pp g ❑Yes ,E:rNo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes ;3<0 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes �fo 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes '12<0 24. Does facility require a follow-up visit by same agency? ❑ Yes 0 0NNo 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Z No 0 No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Comments refer "to uestioir # . Ex lain i6 YES ans '` '4 were and/or an recommi ndahons or ( q ) p y y anyothercomments � .. Use drawings of facility to better explain situations (use additional pages as necessary) % field Copy ❑Final Notes fiUuLc� /� M q t'7 � r 3 ci j,j k, g� /�.c.��1 'I ' i,va� .ems- -b 'Q _ { . Reviewer/Inspector Name '51-- 1— LINO Reviewer/Inspector Signature: Date: 05103101 Continued Facility Number: Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? TP- C'�dt. 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ZNo ❑ Yes *No' [ o ❑ Yes ❑ Yes FeMoo El Yes <F ElYes El Yes Additional Comments and/or Drawings: i 05103101 i' ' -- -.J, € a 1 s' DIVISIOn of,"Water€Qaahty € a. E € € € 1 r €� E,, € ;tf ,Ia < € a.•'€€ E€ .¢E e €•i n €� f €€i N l € € i '�t (L) 1 I> 3 k _ E Ir E 1t.A' € 3 ! ; E r E r C OiAsiotl of Soil -and Water Conserva C a �° ,` [ iit� OOther,A'}gFnCiy Type of Visit Q Complia Inspection Q Operation Review O Lagoon Evaluation Reason for Visit out Q Complaint Q Follow up Q Emergency Notification Q Other ❑ Denied Access Facil' Number �(1 Bate of Visit: '7 1 U Time: Printed on. 10/26/2000 Q Not Operational Q Below Threshold 94ee'rmitted © Certified [3Conditionally Certified © Registered Date Last Operated or Above Threshold: ......................... Farm Name: ......� �. .....~ 1.. ..s . 2-..... County:...... ICT I.r`. x............................................... ...... ........... ......... OwnerName:........................................................................................................................... Phone No:...................................................................................... FacilityContact:..............................................................................Tille:................................................................ Phone No:..............................................:.... MailingAddress: ..................................................................................................................... ..................................................................................... .......................... Onsite Representative: ............................ Integrator ...... lJ,,.P, Certified Operator: l4 ". L �iL Operator Certification Number: .......................................... Location of Farm: I ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ��0 ' 16 Longitude • ° it Design Current Design Current Design Current Swine Capacity -Population Poultry Capacity Population Cattle Capacity Population ❑ Wean to Feeder 10 Layer JEI Dairy ❑ Feeder to Finish ❑Non -Layer ❑Non -Dairy ❑ Farrow to Wean ❑ Farr to Feeder ❑ Other arrow to Finish Total Design Capacity ❑ Gilts ❑ Boars E�l Total SSLW Number of Lagoons Holding Ponds / Solid Traps ❑ Subsurface Drains Present l❑ Lagoon Area ❑ No Liquid Waste Management System Discharges & Stream Impact's 1. Is any discharge observed from any part of the operation? Discharge originated w ❑ Lagoon ❑ Spray Field ElOther a. If' discharge is observed, was the conveyance man-made? b. If discharge is ohserved. did it reach Water or the State? (If yes, noliry DWQ) c. II'discharge is observed. what is the estimated flow in g.11/min? d. Does discharge bypass a lagoon system? (ll'yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? Spray Field Area 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway St' t Ire I Sn•uuture, 2 Structure 3 Structure 4 Structure 5 {(.. ..ro ❑ Yes �No ❑ Yes No ❑ Yes o ❑ Yes Vo. Yes Yes ❑ Yes No Structu -c 6 Freeboard (inches): 5100 Continued on back Facility Number: L./Z—ZG/ I Dateof.Inspection T/1 D printed on: 10/26/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes o seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Ve,o ❑ Yes No []Yes :/No El Yes ❑ Yes No ❑ Yes ❑ No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application'? b) Does the facility need a wettable acre determination'? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement'? 16. Is there a lack of adequate waste application equipment'? Required Records & Documenyi 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design'? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewerllnsp� fail to discuss reviewlinspection with on -site representative? 24. Does facilityXquire a follow-up visit by same agency? 25. WereWry additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 0`5io ❑ Yes ;��o ❑ Yes ❑ Yes ❑ Yes VNo ❑ Yes ❑ Yes No ❑ Yes N ❑ YesjN ❑ YesElYes ❑ Yes N ❑ Yes N ❑ Yes No ❑ Yes No OJI�o-yi. dgficiend $ vr+ re n tea. dt -ring this:visit;. 'Y:otj *iil.teeoive o furtht'r corre'soric]teiice: about: thus visit: Comments (refer'to question #}; Explain any .YES answers and/or any'recommendations or any other comments � , Y 1= 1 Use drawin 5.. a , : g of facility to t'ette`r`ezplatn sttuatlons. (use addtttoTyal pages as necessary) =6 ., Reviewer/Inspector Name G s �k2L Reviewer/Inspector Signature: E - Date: �_ s/o0 Facility umber: Z — Z Date of Inspection /� o printed on: 10/26/2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32, Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Aantttonat comments-anaior urawm P ❑ Yes o ❑ Yes ❑ Yes o ❑ Yes ❑ Yes :Zo� 'Yes ❑ Yes 5100 Routine Q Complaint Q Follow-up of DWQ inspection Q Follow-up of DSWC review 0 Other Fac' ' Number Date or Inspection Time of Inspection L f gj2ffVj 24 hr. (hh:mm) Permitted © Certified [3 Conditionally Certified E3 Registered 113 Not Operational] Date Last Operated: Farm Name: c1`tt.✓.A.a..!`�........... county:............ .........?`.......................................... 6..z.............................................. � /l Owner Name: Facility Contact: .... .goW' v' t a h 7 Title: ......................................................... Mailing Address: Phone No: ....... Phone No:..,., OnsiteRepresentative:........................................................................................................... Integrator:............................................................ .......................... Certified Operator: ,,,1 „�,,,,,,r�k �^,`1,,,,,,,................................„ Operator Certification Number .......................................... I............. Location of Farm: ` • .. .. .......... .. .T Latitude �' �' " Longitude ' �' �" Swine , Y � ❑ Wean to Feeder e ❑ Feeder to Finish ❑ Farrow to Wean ❑ F w to Feeder arrow to Finish ❑ Gilts `i rl Boars ;Current,i Desygn Current ` y^Po�iulation Poultry Capacity € Population: Ci , EI Non -Layer I I L. ❑ Other I �a `;' Total Desrgn� C ��� �'�•,�� i�{.,1ota�' i "� Numberjof LagootisE �° + ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Feld Area ! ; Holden g Ponds'/ Solid Tra ps,o ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (Il' yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ...............0 ............................................ 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Structure 6 ❑ Yes ❑ No Continued on track 3123/99 Facility Number: Z — Z Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes o (If any of questions 4.6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes Oleo 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes o Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes o 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Yes p 12. Crop type rtl � e { .je,91-5' 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes Ta 14. a) Does the facility lack adequate acreage for land application? ❑ Yes b) Does the facility need a wettable acre determination? ❑ Yes 2NO �O c) This facility is pended for a wettable acre determination? ❑ Yes 15. Does the receiving crop need improvement? ❑ Yes Ol O Yes 16. Is there'a lack of adequate waste application equipment? ❑ Required Records & Documents IT. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes 214o 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes {O 20-- Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ONO- 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes 0'90 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ❑ No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes 0 24. Does facilit uire a follow-upvisit b same agency? Y ❑ Yes 25. W K any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes o i+*iOlhW js'or dgficj6ncies •w•*rb, pQte 00'ri ft �hjsAsjt: • Yoh Will-tO'iye ijo #'uj•t�gr' cor'resaotidence: about; this visit: ................................... . Y Facility Number: Z -- 7—V Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below Yes ❑ No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes —Io roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ YesJ �O 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes El Yes o es ❑ No A61 - a , .IE Di• , � , , p♦ot Sion of Soil and Water Conservation Operation Review it;p�'' Sian-oPSiiil and Water Conservateon ,Compliance Ii4ectrotta i } f, sion of Water Quality ! Comphance Inspection { x : S er Agency operattor ieVieW ' } € %r C "�{ t t;' 10 Routine Q Complaint Q Follow-up of DWQ inspection Q Follow -tip of DSWC review O Other Faci ' y Number bate of Inspection j~ 2 Time of Inspection L! o 0 J 24 hr. (hh:mm) Permitted 13 Certified 0 Conditionally Certified 0 Registered JQ Not O erational Date Lest Operated: Farm Name: ` i'rJf�s..... ''!}�.!''` �' .... ...... County: ...l. f.'....................................................... Z� Owner Name: ,• /f %� /d C '-'L a /f r r Phone No. o ....................af................!�...,............................................................. •............. .....................................�.............................. Facility Contact:V.................................... Title•................................................................ hone No: .................. iVIailingAddress:D.........Z.'.o.....:L.�................................Z,��...C...b..........,.....,................. ...........,.............. Onsite Representative: .'.:!&4f1<.. e h... r................................................................. Integrator: ` n.-t.- �.�`....`-s............................................ Certified Operator:,.pYV*/� VI C e- T Operator Certification Nutt�ber:..................;................ .I.......... �.........'............................................................ .ocation of Farm: _ �/ 2-- A ........................................................... .............I.—.. "T Latitude �� �� Longitude Design Current Desi' n g Current Design' .Current .Swine Z Capacity Population Poultry. Ca acit Population Cattle Capacity Population ❑ Wean to Feeder ; ❑Layer ❑ Feeder to Finish �1❑ Non -Layer ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other 4 Total Msi 13 ETParrow to Finish o ❑ Gilts, u ❑ Boars I ❑ Dairy ❑ Non -Dairy i iS i,-t gn Capacity TotaI:SSLw Number of Lagoons 10 Subsurface Drains Present ❑ Laguon Area ❑ Spray held Arca f � nds'o❑ No LiqudWaste Management SystemHolhng Po/SlidTraps Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at; ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. if discharge is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? W C Il ' &T Yes No ❑ ❑ Yes No ❑ Yes o ❑ Yes ❑ Yes o ❑ Yes N rite o ection reatniettt 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes No Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: y ct Freeboard(inches): .......7i.�!!.......................................................................................................................... ........................... 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 3/23/99 Structure b ❑ Yes ZNo Continued on back Facility Number,'W_ -- Date of Inspection 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? 3 Waste Application 10. Are there any buffers that need maintenance/improvement? 11, Is there evidence of over application? ❑ Excessive Ponding ❑ PAN 12. Crop type 13. Do the receiving crops diffJr witdthose designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records &_Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? : 10 yiQlaiiotis'or• dl ficie'ncies were p¢tec3 do' ing 4his'visit:...... receive iti fu>�t�tgr ; corres• oiidence'. about thss visit: of facWty tw t!tter.ezalain'situations ,fuse'"additional nap -es. z5► ❑ Yes o ❑ Yes o ❑ Yes o ❑ Yes No ❑ Yes 6 <No ElYes o ❑ Yes ��No < El Yes � eNo Yes ❑ No ❑ Yes p ❑ Yes 01<0 ❑ Yes ZrNo ❑ Yes No ❑ Yes No ❑ Yes No �s o ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes 0 No I A-y- Kee �s S �,trU s jpLlG+r c1ti. c4-p �,x Th tier/,r*#7. W' "'! G►�-�l s 1•-"v�— re.,� {. J�nP �J�' �--�! a►-- ��-b `- %4� r- ion � �w ii/!�(/, i I�[.�`!a �j U„ro�, l �� be~k� F.'� h Y ��t q��,.�! 101 1�- a� r, .I `�%• +41s is l=+ac, l �7 r'r toenj; W`-!!""/�('� � �t YaC.,4 � Lk r M re- �'t"- aS � ��tl fO � �9.•� Z`�� Disc.! Z�r Reviewer/Inspector Name Reviewer/Inspector Signature: Date: T/ Z 3/23/99 f Y. Zy no i A Facility NumbZ Date of Inspection d er Time of Inspectionj�ztd 24 hr. (hh:mm) 13 Registered Certified © Appliedpftfor Permit 1/Permitted 0 Not O erational Date Last Operated: Farm Narne:��., 'rrij.1J.'S Gi`'� � Zrr............. Cotrnty:.... 7�"r !..,...............................,......,,.,. OwnerName: ,... .... ..� f'....... .('..........vt...............L...,............................ Phone No:. ... ................/........,...............,... Facility Contact: i ,l% I `'t t` n �-- ............................. .. Title: ... Phone No: ................................................... ....................... Mailing Address:.. ........................... ti �/rgQ,,Pi.. `(.�...................................................... .......................... �•D , 4 b X 12o 114 2-3 ............................................................................ .... .................. Onsite Representative: ... ....1........ T�.. ......................................................... InteKrator:...!/5........................................... Certified Operator;......... ............... ..1�' G,`� . Operator Certification Number;. [ ... // ............................ .................... Location of Fann: < E— l(/ 2--- r...............................................1--,-,,,....:..:.:...................................................11.11.11.1111.11..,1","I",-,,-,,",'l-,'...:_......................,.............................................................................1 Latitude • =' � Longitude 0 =1 11 4Design Current! �. '`. `S,Design tCurrent;' Destgm CCurrent Swore " FCapacity: PopulationPoultry Capac�tyPapulation CattlewkCcttyPopulationr� x . El Wean to Feeder x ❑Layer FE3Nairy ElFeeder to Finish ❑ Non Layer on Dairy El Farrow to Wean ;� t t ❑ Farr w to Feeder ❑Other �` BT arrow to IJinish Total Design Capacity ,. ❑ Gilts y kTotal 's °; ❑Boars x 'SSLW s i h @.i'C9 Number f Lag / Holding Ponds ❑ Subsurface Drains Present ❑Lagoon Area ❑ Spray Field Area '�`,xNO No Liquid Waste Management System m General 1. Are there any buffers that need maintenance/improvement? ❑ Yes ZNo 2. Is any discharge observed from any part of the operation? ❑ Yes o Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? ❑ Yes No b. If discharge is observed, dill it reach Surface Watcr'? (If yes, notify DWQ) ❑ Yes o c. If discharge is observed, what is the estimated flow in gal/min? .d. Does discharge bypass a lagoon system'? (If yes, notify DWQ) ❑ Yes ONo 3. Is there evidence of past discharge from any part of the operation? ❑ Yes o 4. Were there any adverse impacts to the waters of the State other than from a discharge? ❑ Yes . 5. Does any part of the waste management system (other than lagoons/holding ponds) require ❑ Yes No maintenance/improvement? 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes N 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes, No 7/25I97 Continued on back !1 Gw r ro I IS 11_ - - racility l4umber: 9L -- 2 y 8. Are there lagoons or storage ponds on site which need to be properly closed'? ❑ Yes \a l 1 Structures (Lagoons,Holding Ponds, Flush fits, etc.) Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ) ' Fr�ch�ard (ft); ...........1? . ,......,... ...............................................................................................:........................................ 10. Is seepage observed from any of the structures'? ❑ Yes No 11. Is erosion, or any other threats to the integrity of any of the structures observed'? ❑ Yes 'o 12, Do any of the structures need maintenance/iml-)rovenient'? ❑ Yes `o (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes No Waste Application 14. Is there physical evidence of over application'? ❑ Yes o (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type l�Qr"!''".L,:�1..I... 1...t �}.I.'tj........I............................. - 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes No _ 18. Does the receiving crop need improvement? ❑ Yes .2 o 0Is there a lack of available waste application equipment? ❑ Yes o . Does facility require a follow-up visit by same agency? ❑ Yes 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes o' 22. Does record keeping need improvement? es ❑ No For Certified or Permitted Facilities Only 23. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? Cl Yes ETNo 24. Were any additional problems noted which cause noncompliance of the Certified AW,MP? ❑ Yes 2<0_ 25. Were any additional problems noted which cause noncompliance of the Permit'? ❑ Yes i o 0 No.violations or d'icieneie's.were-noted-during this visit.- Nou.will receive no further correspondence about this:visit.• omments`(referto ;.question #): Explain Any YEs answers and/or any recommendations or se. drawings of facility`to:bettcr explain situations."(use additional pages as necctisary 1`� L' Q� rape O'e,-v7� L G� ft_j -I ee-.1 7/25/97 Reviewer/Inspector Name 00, Reviewer/inspector Signature: nnxv / ,�[/"' Date: Y '` F f' ❑ DSWC Animal Feedlot Operation Review ' C] DWQ Animal Feedlot Operation Site Inspection Routine 0 Cona )faint 0 Follow- u) of MV) ins e(-.tion 0 Foliow-upof I)y1VC review 0 Other Date of Inspection Facility Number —� 'rime ni' Inspectinn 24 hr. (hh:mm) Irotal Time (in fraction ut'hours Farm Status: ® Registered ❑ Applied for Permit lex.1?5 for I hr 15 min)) Spent on Review ❑ Certified [] Permitted. or Inspection r,includes tr.ivel .Ind processing) [] Not O peratiortal Dale Last Operated: ................................................................................................................................................ Farm Name: ...... C�t.f. ...}.�s....FC>S.?.d.S.... .... ...................................... Count. ......... I............ Owner Name: ....... dal'...1P..1.'. .....F C!JS.............................................................. Phone\o:.....,r...:-� ��......c .1............................ I ............ ,,.... Facility Contact: (J r ' ..................... .......!-.V.�.�..'<.a..1Cf��!?.M..f{.0.................. i"itEe:......�ta�si.^...G.....t�..11...............,.,.....,. I'hEfnc• \a:....:�:.I'..tl.`.?..�.,.. Mailing Address: I �................................... .......................... r Onstte Representative :........... .. .. .... .(.,.i~t.Lr'.hM..Y................................................ Integrator:.............. ............... Certified Operator ......... ................... Operator Certification Number:.........�.G: t..`.�..,.,....... Location of harm: ......C....... A ..... / 1:1.:..15.`.4.... %t... �.%`.� C! S <C"� ' �� .�1.... �.�:?....� !ti...i.1 �..r�...�..�.^..�........ .�. �,. �...................... Latitude F7�70 { ®:' Longitude • 1 -;, 41 11 /` :' Type of Operation Swine ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder arrow to Finish I=EU ❑ Other Design Current Design Current Capacity Population ° Poultry Capacity Population ❑ Layer ❑ Non -Layer Design Current Cattle Capacity Population ❑ Dairy . ❑ Non -Dairy Total Design Capacity .. M -Total SSL W Number of Lagoons / Holding PondsEL_�❑ Subsurface Drains Present I © Lagoon Area ❑ Spra}' Field Area General 1. Are there any buffers that need mainten ancelint proventent? 2. Is any discharge observed from any part of the operation? Discharge oritinatcd ar ❑ Lagoon ❑ Spray Field ❑ Other a. li"dischar e is observed, was the conveyance tnan-niade:' h. 1fdischarge is observed, did it reach Surface Water? (If yes, notify DWQ) c, lf'disOiarge is observed, what is the estimated flow in gal/ntin" d. Dees discharge bypass a lagoon system? (It ves, notify DNVQ) 3. Is there evidence of past discharge from any pan of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 47 5. Does any part of the: waste management system (other than lagoons/holding ponds) require nla I n to p:ut ec/i m p ro�r nt� n t'? 4/30/97 ❑ Yes N0 ❑ Yes CI'o n�({ ❑ Yes [XNo ❑ Yes ❑ No [:]Yes ❑ No ❑ Yes 0 No. ❑ Yes 0 0'o ❑ Yes 2<11 Continued on hack w Facility Number: — 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ffNo 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes 2'N0 8. Are there lagoons or storage ponds on site which need to be properly closed'? ❑ Yes QlNo Structures (Lagoons ansllor I -folding fonds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes C No Freeboard (ft): Structure i Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 ........................... ............ ..... ...................... I.......... ...................................... .......... ........................... ,...... ... .............................. ....................................... 10. Is seepage observed from any of the structures? ❑ Yes ❑-,No 11. Is erosion, or any other threats to the integrity of any of the structures observed? ❑ Yes L &o 12. Do any of the structures need maintenance/improvement? ❑ Yes Q`No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify D"'Q) f�. 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes G l\o Waste Application 14. Is there physical evidence of over application'' ❑ Yes 0 No (If in excess of WIMP, or runoff entering waters of the State, notify DWQ) 15. Crop type............................................................................................................................................................................................................................................ 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ElYes El];o 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes Q No 18. Does the receiving crop need improvement? ❑ Yes 0 No 19. Is there a lack of available waste application equipment? ❑ Yes ONo 20. Does facility require a follow-up visit by same agency? ❑ Yes [ No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes ❑ No For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes ❑ No 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes ❑ No 24. Does record keeping need improvement? ❑ Yes ❑ No Reviewer/inspector Name Reviewer/Inspector Signature: 7 , r �. Date. - cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 State of North Carolina Department of Environment, Health and Natural Resources " Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A'� DEHNR DIVISION OF WATER QUALITY May 19, 1997 Mr. Rudy Grammer Smithfield Carroll's P.O. Box 1240 Waverely, Virginia 23890 Subject: Compliance Evaluation Inspection Facility # 42-24 Carroll's Farm # 62 Halifax County Dear Mr. Grammer: On May 6, 1997, Mr. Buster Towell from the Raleigh Regional office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that the Swine operation was not discharging wastewater into waters of the State and that the waste lagoon had the required amount of freeboard. As a result of the inspection the facility was found to be in compliance with the State's animal nondischarge regulations. Effective wastewater treatment and facility maintenance are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal. -waste -management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571.4718 Raleigh, North Carolina 27609N%q4F C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 50% recycled/10% post -consumer paper `v Mr. Rudy Grammer Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an "Operator in Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Q�� 4kTtt-' Judy Garrett Water Quality Section Supervisor cc: Mr. Jeff Dillard, Halifax County Health Department Mr. Wayne Short, Fishing Creek Soil and Water Conservation District ( Halifax County) Ms. Margaret O'Keefe, DSWC --- RRO DWQ Compliance Group RRO Files 42-24 ❑ DSWC Animal Feedlot Operation Review -�-�� Animal Feedlot Operation Site Inspection," Routine 13 Complaint 0 State employee call 0 Follow-up of DWQ inspection 0 Follow-up of DSWC review Date of Inspection - 6 Facility Number 2- Time of Inspection Use 24 hr. time Farm Status: Total Time (in hours) Spent onReNiew Z or Inspection" (In cludes travel and processing) Farm Name: (26ffr-Q-t Is IDS - County: Owner Name: �y''i; `f It f- �/� i'/J� s Phone No: go 0 p Mailing Address: 90- 0 V 0 y-' 1 Zy 0 fit/( }-,/ t7✓ i— 4"'-fq- 2 31 Onsite representative: ' ! �1 L""t Integrator: Certified Operator Name: Location of Farm: Latitude Longitude Longitude• 0 Not O eratiortal Date Last Operated: Type of Operation and Design Capacity Swine. -`Number Pauitry Number Cattle Number ❑ Wean to Feeder ❑ Feeder to Finish Farrow to Wean w to Feeder Farrow to Finish 1310 g Ponds 0 Subsurface Drains Present Number o Lagao ! Holdia r EjLa oon Area 0 Sarav Field Area General 1. Are there any buffers that need maintenance/improvement? ❑ Yes .SNo 2. Is any discharge observed from any part of the operation? ❑ Yes d a. If discharge is observed, was the conveyance man-made'? ❑ yes NO b. If discharge is observed, did it reach Surface Water? Of yes, notify DWQ) ❑ Yes 8 No c. If discharge is observed, what is the estimated flow in gaVmin? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ;-No3. Is there evidence of past discharge from any part of the operation? ElYes 4. Was there any adverse impacts to the waters of the State other than fram a discharge? ❑ YesS. Does any part of cite waste management system(other than lagoons/holding ponds) require ❑ Yes maintenance/improvement? Continued on back 7; Gid t'tie facility fail to have a certified operator in responsible charge (if inspection after 1/ 1/97)? 8. A:e there lagoons or storage ponds on site which need to be properly closed? Structures (Lagoons and/or_ Jjoldin? Pond 9. Is structural freeboard less than adequate? Freeboard (ft): Lagoon � Lasoo�2 t Lagoon 3 zIS' E -3 10. Is seepage observed from any of the structures? 11. Is erosion, or anv other threats to the integrity of any of the structures observed? 12. Do any of the structures need maintenance/improvement? (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adquate markers to identify start and stop pumping levels? Waste Application 14. Is there physical evidence of over application? (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type �.�... %1. -k-.. .... ._ ..... _... �..._ ..... _�. _� ......_ ... 16. Do'the active crops differ with those designated in the Animal Waste Management Plan? 17. Does the facility have a lack of adequate acreage for land application? 13. Does the cover crop need improverent? 19. Is there a lack of available irrigation equipment? For Certified Facilities Onlv 20. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? 21. Does the facility fail to comply with the Animal Waste Management Plan in any way? 22. Does record keeping need improvement? 23. Does facility require a follow-up visit by same agency? 24. Did Reviewer/Inspector fail to discuss review/inspection with owner or operator in charge? ❑ Yes �' o• ❑ Yes ❑ Yes 9'No Lagoon 4 ❑ Yes 0-90 ❑ Yes 21 No ❑ Yes 1 'o ❑ Yes ffNo ❑ Yes Z No ❑ Yes No ❑ Yes a / ❑ Yes E) N ❑ Yes No ❑ Yes [I No ❑ Yes ❑ Ne ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Commen#s (refer to questtoti #} :Explain any YES answers an /oranv`reco nmendahons or,aayrarhexcarimments lice drawings of facility t better exp]Ain sttuatzons . fuse addtitonal pages as necessaryjN 4 �r Re�,lewenlnspecror Same G ReviNvenlnspector Signature: Date: , c: Division uf' !after Qualin•, Water Ouulirn Section, Facilin• .-assessment Unit 1 i, [ 4%95 State of North Carolina Department of Environment, Health and Natural Resources Raleigh Regional Office James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary DEHNR DIVISION OF WATER QUALITY August 26, 1996 Mr. Rudy Grammer Smithfield-Carrolls P.O. Box 1240 Waverely, Virginia 23890 Subject: Compliance Evaluation Inspection Carrolls Farm # 62 Facility # 42-24 SR 1112 Halifax County Dear Mr. Grammer: On August 7, 1996, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is part of the Division's efforts to determine compliance with the State's animal waste nondischarge rules. The inspection determined that this swine facility was not discharging wastewater into waters of the State and that the waste lagoon had more than the required amount of freeboard. There was a Waste Utilization Plan onsite and it was determined that records were being kept to show waste application events. As a result of this inspection the facility was found to be in compliance with the State's animal nondischarge rules. Effective wastewater treatment and facility stewardship are an important responsibility of all animal waste producers. The Division of Water Quality has the responsibility to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges of wastewater to surface waters of the State are subject to the assessment of civil penalties and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take this opportunity to remind you that you are required to have an approved animal waste management plan by December 31, 1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District office. 3800 Barrett Drive, Suite 101, FAX 919-571-4718 Raleigh, North Carolina 27609 N4 4F C An Equal Opportunity Affirmative Action Employer Voice 919-571-4700 500/6 recycled/10% post -consumer paper Carrolls # 62 Page 2 The General Assembly recently passed Senate Bill 1217 which will require all animal waste management systems to designate an " Operator in Responsible Charge". It shall be the responsibility of this individual to oversee the operation and maintenance of the animal waste management system and to have control over waste application activities. Currently classes are being held for operators of swine facilities and training- is being developed specifically to address dairy and liquid poultry operations. For more information please call either your local Soil and Water Conservation District or Cooperative Extension Service Office. The Raleigh Regional Office appreciates your cooperation in this matter. If you have any questions regarding this inspection please call Mr. Buster Towell at (919) 571-4700. Sincerely, Judy E. Garrett Water Quality Supervisor cc: Halifax County Health Department Fishing Creek Soil and Water Conservation District (Halifax) Steve Bennett --Regional Coordinator, DSWC RRO File Copy SMITH FIELD-CARRQLUS FARMS P.O. Box 1240 WAVERLY, VIRGINIA 23890 August 31, 1995 Mr. Kenneth Schuster DEHNR; Raleigh Regional Office 3800 Barrett Drive; Suite 101 Raleigh, NC 27609 RE: Management Deficiency Notification, Smithfield-Carroll's Farms #62; Halifax, County SR It 12 Dear Mr. Schuster: M s r•, C�7 i T I n�� I am in receipt of your letter of August 23, 1995, regarding the recent compliance inspection by your office. The deficiency reported by the inspection consisted of leaking clean -outs behind the confinement buildings. I am able to report to you that the pipe fitting's at this location have been inspected by the maintenance staff, and the damaged fitting has already been repaired. I trust this information is sufficient for the required written response. However, should you require additional information, I may be reached at (804) 834-2109. Sincerely, Ru y Grammer Manager of Farming & Environmental Affairs cc: Adolph Miller, Carroll's Foods of Va., Inc. John Carter, Carroll's Foods of Va., Inc. 1 State of North Carolina Department of Environment, Health and Natural Resources + LT. Raleigh Regional Office Ova James B. Hunt, ,Secreta[D E H N Jonathan B. Howes, Secretary Boyce A. Hudson, Regional Manager Division of Environmental Management August 23, 1995 Mr. Rudy Grammer Smithfield-Carrolls P.O. Box 1240 Waverly, Virginia 23890 Subject: Management Deficiency Notification Smithfield-Carrolls Farm # 62 Halifax County SR 1112 Dear Mr. Grammer: On July 25, 1995, Mr. Buster Towell from the Raleigh Regional Office conducted a compliance inspection of the subject animal facility. This inspection is a part of the Division's effort to determine potential problems associated with animal waste disposal systems. Mr. Toweli's site visit determined that wastewater from your facility was not discharging to the surface waters of the state, nor were any manmade pipes, ditches, or other prohibited conveyances (for the purpose of willfully discharging wastewater) observed. However, as a result of the inspection, the following deficiencies were observed: Evidence of small amounts of waste from leaking clean -outs located behind the containment buildings were noted in the road side ditch. During rainfall events this waste could enter adjacent lowland areas. In addition to continued facility waste management, these deficiencies must be immediately addressed to help prevent the possibility of an illegal discharge. The Raleigh Regional Office will require a written response to the aforementioned issues within 30 days of receipt of this letter. You should specifically address how you plan to correct this problem and submit a schedule (with dates) stating when these management deficiencies will be corrected. 3800 Barrett Drive, Suite 101, Raleigh, North Carolina 27609 Telephone 919-571-4700 FAX 919-571-4718 An Equal Opportunity Affirmative Action Employer 6M recycled/ 10% post -consumer paper Carrolls # 52 Hog Farm Page 2 Effective wastewater treatment and facility stewardship are a responsibility of all animal facilities. The Division of Environmental Management is required to enforce water quality regulations in order to protect the natural resources of the State. Accordingly, illegal discharges to surface waters of the State are subject to civil penalties of up to $10,000 per day, and may also result in the loss of deemed permitted status, requiring immediate submission of a waste management plan. This office would also like to take the opportunity to remind you that you are requirec!l to have an approved animal _waste management plan by December,1997. This plan must be Certified by a designated technical specialist or a professional engineer. For a listing of certified technical specialists or assistance with your waste management plan you should contact your local Soil and Water Conservation District. The Raleigh Regional Office appreciates your cooperation in this matter. if you have any questions regarding your inspection please call Buster Towell at (919) 571-4700. Sincerely, Kenneth Schuster, P.E. Regional Supervisor cc: Halifax County Health Department Fishing Creek Conservation District {Halifax County} Steve Bennett --Regional Coordinator, DSWC Facility Number: Division of Environmental Management Animal Feedlot Operations Site Visitation Record Date:-.,'- I r -�e Time: 12 `/ General Information: Farm Name: C14rrt2 //_S Z -- _ -- County: ►' /- y Owner Name: C r-/lS l 1,W • Phole 1 o:_aj L/a 7_, On Site Representative: Z,44A lZ� Y _ Integrator: GYq rry //S Mailing Address: • o B o x/ 2- y A_ �.vaU�z3�g U Physical Address/Location:_ _S-/ /// Latitude:/ I Lon itude: 1 I Operation Description: (based on design characteristics) Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals ow 1p 0A) ❑ Layer ❑ Dairy ❑ Nursery ❑ Non -Layer ❑ Beef a6;der $`D 00 OrherType of Livestock: Number of Animals: Number of Lagoons:include in the Drawings and Observations the freeboard of each lagoon) L Facility_ Inspection: Lagoon Is lagoon(s) freeboard less than I foot + 25 year 24 hour storm storage?: Yes ❑ No Is seepage observed from the Iagoon?: Yes ❑ No C < Is erosion observed?: Yes ❑ No CCa' Is any discharge observed? Yes ❑ No 0 Man-made ❑ Not Man-made Cover Crop Does the facility need more acreage for spraying?: Yes ❑ No ❑ Does the cover crop need improvement?: Yes ❑ No ❑ { list the crops which need improvement) Crop type:__ Acreage: 3 S Setback Criteria f Is a dwelling located within 200 feet of waste application? Yes ❑ No �J Is a well located within 100 feet of waste application? Yes ❑ No Is animaI waste stockpiled within 100 feet of USGS Blue Line Stream? Yes ❑ No i� Is animal waste land applied or spray irrigated within 25 feet of Blue Line Stream? Yes ❑ No AOI -- January 17,1996 Maintenance / Does the facility maintenance need improvement? Yes ❑ — No � Is there evidence -of past discharge from any part of the operation? Yes ❑ No Does record keeping need improvement? Yes ❑ No Cd' Did the facility fail to have a copy of the Animal Waste Management Plan on site? Yes or --No ❑ Explain any Yes answers:. (, hS- e a-1: ! Zg 4 . v► 0 4fh h y I�SW C h d � try 5s • � a . T, Signature: C Date: e ? - 94� cc. Facility Assessment Unit Use Attachments if Needed Drawings or Qbservations: AOI -- January 17,1996 _7;_^a�a.'�JUL—i4--1955 15:2b FROM DEM WATER QUALITY SECTION TO .,-� . RRO P.02iO2 " Site Requires Immediate _A�ttendon- / Facility No. 412- 7-5' DIVISION OF ENVIRONNffiNTAL MANAGEMENT ANIMAL, FEEDLOT OPERATIONS SITE. VISITATION RECORD DATE: _7 ` Z 5 — , 1995 Time: / f7 ° D Farm Name/awn( Mailing.Address: County: i /f Integrator. Phone: On Site Representative: 14?1-r t] /, Phone: 01-5 ` 3 ` 9 3 Physical Address/Location: ?9�// � Type of Operation: Swine Poultry Cattle Design Capacity: (" a a S 41,, 4 _ Number of Animals on Site: DEM Certification Number: ACE DEM Certification- Number: ACNEW Latitude: -3 6 ' C_ 6 _' Longitude: _? - 33 4 ' Z�" Elevation: Feet Circle Yes or No Does the Animal Waste Lagoon ha;70r fficienr. freeboard- of 1 Foot + 25 year 24 hour storm event (approxirnately 1 Foot -+- 7 inches) No Actual Freeboard: -, Z__Ft. Inches Was any seepage observed from the lagoon(s)? 7 Eo s or(p Was any erosion observed? Yes o Is adequate laud available for spray? Yes or No ) Is the cover crop adequate? Yes or No Crop(s) being utilized: Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwellings? Gar No 100 Feet from Wells? Nor No _�e arimal waste- stockpiled within 100 Feet of USGS Blue. Li ne S trcam? Yes <3N x mal waste land applied.or spray irrigated within 25 Feet of a USGS Map Blue Line? Yes oCD a Ts animal waste discharged into waters of the state by inan-(Wade ditch, flushing. system, or tither 6mi;ar man-matde devices? Yes oK91- if Yes. Please- Explain. ►+.�c5 the facility ittaiatain adequate waste mattageruent records (volumes of ruanure; land applied. spray irrigated on specific acreage with cover crop)?0�5s.br No Additional comments: L<- CtiAe, '-F a A.// _ d�j w�_e2_!'�.F S i� Q- � o <S' �S'-1.� // ���-•ow�..� Jd�- ature cc: Facility Assessment Unit Use Attachments if Needed. TOTAL P,O2 ,TUL-1 �-199� 15 � 2b FROM DEP1 WATER QUALITY SECTION TO � RRO P. 02i02 4 / Site Requires Immediate xtterinor., Facility No. '-/ DIVISION OF ENVIRONMENTAL MANAGEMENT" ANIMAL FEEDLOT OPERATIONS SITE VISITATION RECORD DATE: 7 - Z S , 1995 Time: / C7 ° D Farm Name/Owner_ / f r ram►'-- ZZI,� -2-- Mailing Address: 7;_ D !? �/y.!`�y // County- i Integrator. Phone: On Site Representative: 41eJ �V A� Phone: 1161 Physical Address/Location: Type of Operation: Swine Poultry Cattle Design Capacity: C, Saw s' Number of Animals on Site; z L DEM Certification Number: ACE DEM_ Cerdfiication Number-. ACNEW Ladrud.e: -3 6 ' r 6 Longitude: ? 3 4 Elevation: _____--_Feet Circle Yea or No Does the Animal Waste Lagoon haU0,XT cient freeboard of L Foot + 25 year 24 hour storm event (approximately 1 Foot + 7 inches) No Actual Freeboard: _,•�Ft. Inches Was. any seepage observed from the iagoon(s)? Yes or o Was any erosion observed? Yes or No Is adequate land available for spray? Yes or No Is the cover crop adequate? Yes or No Crop(s) being utilized: Co - - c-,-j 4 U%,- Does the facility meet SCS minimum setback criteria'? 200 Feet from Dwellings? 'e or No 100 Feet from Wells? L e or No :ne arimal waste stockpiled within 100 Feet of USGS Blue Line Stream? Yes o f '; animal waste land applied or spray irrigated within 25 Feer of a USGS Map Blue Line'? Yes orb '; animal waste discharged into waters of the state by man-made ditch, flushing system, or other .;ir^ilar rnan-made devices? Yes or If Yes, Please Explain. .Aa CS MC Fatality maintain adequate waste tuauagerncar records (volumes of manure, land applied. spray irrigated on specific acreage with cover crop)'? No Additional Comments: 17 b e t�47,f k/- _Vv\\5 rung �- �� � =,��,�-�v,Ls r e, rd.,, r Si ature - - cc: Facility Assessmtmt Unit Use Attachments if Needed. TOTAL P.02 `.0 W A TF9P �O G • O 'C Smithfield Carroll's Farms Farm 62 385 Highway 158 Roanoke Rapids NC 27870 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E., Director Division of Water Quality May 1, 2003 Subject: Certificate of Coverage No. AWS420024 Farm 62 Swine Waste Collection, Treatment, Storage and Application System Halifax County Dear Smithfield Carroll's Farms: On April 28, 2003, .the North Carolina General Assembly ratified Senate Bill 733 which directs the Division of Water Quality (Division) to extend the expiration date -of the Swine Waste Operation General Permit AWG100000. Therefore, the General Permit has been re -issued by the Division to extend the expiration date to October 1, 2004. During the period of this extension the Division will be working with all interested parties on the development of a new version of the Non -Discharge General Permit. In accordance with your application received on February 13, 2003 and in accordance with the directive • of Senate Bill 733, we are hereby forwarding to you this Certificate of Coverage (COC) issued to Smithfield Carroll's Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. The issuance of this COC supercedes and terminates your previous COC Number AWS420024 which expired on April 30, 2003. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 62, located in Halifax County, with an animal capacity of no greater than an annual average of 500 Farrow to Finish swine and the application to land as specified in the facility's Certified Animal Waste Management Plan (CAWMP). If this is a Farrow to Wean or Farrow to Feeder operation, there may also be one boar for each 15 sows. Where boars are unneccessary, they may be replaced by an equivalent number of sows. Any of the sows may be replaced by gilts at a rate of 4 gilts for every 3 sows The COC shall be effective from the date of issuance until October 1, 2004'. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions and limitations as specified in the General Permit, the facility's CAWMP, and this COC. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this facility. Any increase in waste production greater than the certified design capacity or increase in number of animals authorized by this COC (as provided above) will require a modification to the CAWMP and this COC and must be completed prior to actual increase in either wastewater flow or number of animals. If your Waste Utilization Plan has been developed based on site specific information, careful evaluation of future samples is necessary.. Should your records show that the current Waste Utilization Plan is inaccurate you will need to have a new Waste Utilization Plan developed. . The issuance of this COC does not excuse the Permittee from the obligation to comply with all applicable laws, rules, standards, and ordinances (local, state, and federal), nor does issuance of a COC to to under this hermit convey,ajjv property rights in either real or personal property. IN Non -Discharge Permitting Unit Internet http:Nh2o.enr.state.nc.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919)715-6048 Customer Service Center Telephone 1-B77-623-6748 An Equal Opportunity Action Employer 50% recycled/10% post -consumer paper Upon abandonment or depopulation for a period of four years or more, the Permittee must submit . documentation to the Division demonstrating that all current NRCS standards are met prior to restocking of the facility. Per NRCS standards a 100 foot separation shall be maintained between water supply wells and any lagoon or any wetted area of a spray field. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143- 215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. If you wish to continue the activity permitted under the General Permit after the expiration date of the General Permit, an application for renewal must be filed at least 180 days prior to expiration. This COC is not automatically transferable. A name/ownership change application must be submitted to the Division prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual permit by contacting the staff member listed below for information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. This facility is located in a county covered by our Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Michelle Barnett at (919) 733-5083 ext. 544. Sincerely, for Alan W. Klimek, P.E. Enclosures (General Permit AWG100000) cc: (Certificate of Coverage only for all cc's) Raleigh Regional Office, Water Quality Section Halifax County Health Department Halifax County Soil and Water Conservation District Permit File AWS420024 NDPU Files is Murphy -Brown, LLC 4/17102 0 NUTRIENT UTILIZATION PLAN Grower(s): NPD (USA) Farm Name: NPD (USA) Farm 62 County: Halifax Farm Ca acit Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation 2622 Hwy 24 West P.O. Box 856 Warsaw, NC 26398 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required, for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. • Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. • 1 of 8 • This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. L I The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility, In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Capacity Type Waste Produced per Animal Total Farrow to Wean 3212 gal/yr gal/yr Farrow to Feeder 4015 gaVyr gal/yr 500 Farrow to Finish 10585 gal/yr 5,292.500 gal/yr Wean to Feeder 223 gal/yr galtyr Feeder to Finish 986 gal/yr gal/yr Total 5,292,500 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibstyr Ibstyr Farrow to Feeder 6.5 Ibslyr Ibstyr 500 Farrow to Finish 26 Ibs/yr 13,000 Ibstyr Wean to Feeder 0.48 ibs/yr Ibstyr Feeder to Finish 2.3 Ibslyr lbs/yr Total 13,000 lbslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 23.89 Total N Required 1st Year: 7764.25 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 7,764.25 Total Nitrogen Produced by Farm: 5,465.00 ` Nitrogen Balance for Crops: (2,299.25) " See Additional Comments, Page The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 NEEMM 3(a) of 8 • • r1 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue - Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized / unit yield 1.6 lbs N / bushel 50 lbs N / ton 50 lbs N / ton 1.25 lbs N 1 bushel 12 lbs N / ton 0.12 lbs N 1 lbs lint 50 lbs N / ton 50 lbs N / ton 1.3 ibs N 1 bushel 2.4 lbs N / bushel 50 lbs N 1 acre 50 lbs N 1 acre 2.5 lbs N / cwt 2.4 lbs N 1 bushel 4.0 lbs N 1 bushel 40 lbs N 1 acre I yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 . SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT r/animal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. • APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. • Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide • The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr " inches 1291 1A Gritney C 0.5 1 1291 16 Gritney C 0.5 1 1291 2A Gritney C 0.5 1 1291 2B Gritney C 0.5 1 1291 3 Gritney C 0.5 1 1291 4A Gritney C 0.5 1 1291 4B Gritney C 0.5 1 n LJ 6 of 8 • Additional Comments: The Amounts of Waste and Plant Available Nitrogen Produced per year as shown in the tables on page 2 are the typical amounts that are used in the absence of actual "On -Farm" records. However, site specific historical data from 1998-2000 was used to determine the average amounts of Waste and Plant Available Nitrogen produced at this facility. The Average Volume of Wastewater Applied: 6,071,500 gal/year. The Average Plant Available Nitrogen Produced: 5,465 Ibslyear. See the attached documentation for the calculations of the above numbers. The owner may choose not to plant the small grain cover crop on any or all of the wetted acreage if desired. This option should be used only if there is sufficient storage available in the lagoons to store the amount of waste and • rainfall that will be added from Oct -Feb. • 7 of 8 0 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: NPD (USA) Farm 62 Owner: NPD (USA) Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land - according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. • Name of Facility Owner: NPD (USA) Signature: Date Name of Manager (if different from owner): Signature: Date Name of Technical Specialist: M. Kevin Weston Affiliation: Murphy -Brown, LLC. _ Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: • 8of8 Nr QIF- RIMV e-�' 5 6� � Murphy -Brown, LLC 4/22/2005 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Murphy -Brown, LLC Farm Name: SPG Farm 62 County: Halifax "'r Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder 500 Feeder to Finish / Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation ` The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 1 SA NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, A tons, etc.): Capacity -Type Waste Produced per Animal Total Farrow to Wean 3212 gallyr gallyr Farrow to Feeder 4015 gallyr gallyr 500 Farrow to Finish 10585 gallyr 5,292,500 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 all rgal/yr Total 5,292,500 gall r AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): *based on site specific data Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibs/yr Ibslyr Farrow to Feeder 6.5 Ibslyr Ibslyr 500 Farrow to Finish 10.93 Ibslyr 5,465 Ibslyr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibsl r Ibsl r Total 5,465 Ibs! r Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 58.99 Total N Required 1st Year: 14551.75 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 14,551.75 Total Nitrogen Produced by Farm: 5,465.00 Nitrogen Balance for Crops: (9,086,76) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 Tract Reid Inigated _, !3 3(o) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE. LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue- Grazed H Fescue- Hay I Oats J Rye K Small Grain - Grazed L Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized 1 unit yield 1.6 lbs N 1 bushel 50 lbs N 1 ton 50 lbs N 1 ton 1.25 lbs N 1 bushel 12 lbs N 1 ton 0.12 lbs N / lbs lint 50 lbs N 1 ton 50 lbs N / ton 1.3 lbs N 1 bushel 2.4 lbs N 1 bushel 50 lbs N 1 acre 50 lbs N 1 acre 2.5 lbs N 1 cwt 2.4 lbs N 1 bushel 4.0 lbs N 1 bushel 40 lbs N 1 acre 1 yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT danimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. "This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in . determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inthr " inches 1291 1A Gritney C T 0.5 1 1 B Gritney C 0.5 1 2A Gritney C 0.5 1 28 Gritney C 0.5 1 3 Gritney C 0.5 1 4A Gritney C 0.5 1 4B Gdtney C 0.5 1 Reid Lease 5A Gritney H 0.5 1 5B Gritney H 0.5 1 6A Gritney H 0.5 1 6B Gritney H 0.5 1 7 Gritney H 0.5 1 8A Grftney H 0.5 1 813 Gritney H 0.5 1 9A Gritney H 0.5 1 9B Gritney H 0.5 1 10 Gdtney H 0.5 1 1291 Sub1 Gritney C 0.5 1 Reid Lease sub2 Gritney H 0.5 1 6 of 8 Additional Comments: The acreage listed on this plan as subfields is the balance of the total field acreage minus the wet acres at this site. This acreage will be claimed when making application with an aerway machine. This acreage is optional for this plan. 7of8 04127-2005 10:51 SPG 2524452695 PAGE2 NUTRIENT UTILIZATION PLAIN CERTIFICATION Name of Farm: SPC Farm tip Owner. Murphy -Brown, LLC Mana>sger. Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. 1/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. t/we understand that I must own or have access to equipment, primarily inigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will oe applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be tiled on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner. Mur h -Brown LLC Signature: Name of Manager (if different from owner): Signature: Name of Technical Specialist: Dawn Williamson Affiliation• Murphy -Brown, LLC. Address: ...2825 Hwy 24 West, PO Drawer 856 Warsaw,, NC 28398 Telephone:. _. (910) 293-3434 .... Signatures: .- 2, G�—O NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recievinq crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such'that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 F a rm 7 � Scale: 1 "=3( offset Wells w Lagoon F ,aK_n\ Cz NORTH CAROLINA FARM LEASE AGREEMENT HALIFAX COUNTY THIS FARM LEASE AGREEMENT made and entered into this the loth day of December 2003, by and between ALICE PARTIN REID (hereinafter referred to as "Owner"), 218 King George Road, Greenville, NC 27858; and MURPHY-BROWN, LLC (hereinafter referred to as "Tenant"), 2822 Hwy. 24/50 West, Warsaw, NC 28398. WHERAS, Owner is the owner of certain lands, Premises and improvements designated on the attached aerial photograph identified as Exhibit A — Tax Parcel 04-02102; containing 94 acres more or less. AND WHEREAS, Tenant desires to farm the approximately 35 acres of cleared land and install an eight inch PVC pipeline across Owner's property and to bury the same approximately four feet underground to transfer waste waste and effluent from the adjoining swine facility to designated spray fields. Tenant also desires to lease the remaining wooded land to maintain exclusive hunting rights during the leased period. ( AND WHEREAS, Owner and Tenant have negotiated such terms, conditions and stipulations and now desire to memorialize the same as established by the terms, conditions and stipulations as hereinafter set forth. NOW, THEREFORE, for and in consideration of the Premises, the sum of Ten Dollars ($10.00) in hand paid to each party by the other, the receipt and sufficiency of which hereby is acknowledged and by the mutual promises, covenants and conditions contained herein, the parties hereby do hereby covenant, stipulate and agree as follows: 1. TERM OF THE LEASE: The initial term of this Lease shall be for a period of ten (10) years commencing the 1.Oth day of December, 2003 (the "Inception Date"), and ending the 31 st day of December, 2013. 2. INITIAL TERM RENT FOR CROPLAND: Tenant shall pay to Owner rent for the initial term of ten years, $16,800.00, due and payable as follows: a. The Sum of $1,680 due and payable on or before December 1, 2004. b. The Sum of $1,680 due and payable on or before December 1, 2005. c. The Sum of $1,680 due and payable on or before December 1, 2006. d. The Sum of $1,680 due and payable on or before December 1, 2007. e. The Sum of $1,680 due and payable on or before December 1, 2008 f. The Sum of $1,680 due and payable on or before December 1, 2009 g. The Sum of $1,680 due and payable on or before December 1, 2010 h. The Sum of $1,680 due and payable on or before December 1, 2011 i. The Sum of $1,680 due and payable on or before December 1, 2012 j. The Sum of $1,680 due and payable on or before December 1, 2013 3. INITIAL TERM RENT FOR HUNTING RIGHTS: Tenant shall pay to Owner rent for the initial term of five years, $6000.00, for the exclusive rights for ingress and regress to all land and the hunting rights for all non cropland, for the first five years of this lease, such payment will be due and payable as follows: a. The Sum of $1,200.00 due and payable on or before December 1, 2004. b. The Sum of $1,200.00 due and payable on or before December 1, 2005. c. The Sum of $1,200.00 due and payable on or before December 1, 2006. d. The Sum of $1,200.00 due and payable on or before December 1, 2007. e. The Sum of $1,200.00 due and payable on or before December 1, 2008. 4. RIGHT TO RENEGIOTIATE THE HUNTING RIGHTS: Owner reserves the right to renegotiate the annual hunting rights at the end of the first five-year term. At the end of the first five-year term both parties will have the right to renegotiate the payment and terms of any additional or further hunting rights for the non -cropland. Tenant shall retain all hunting right for the cleared land during the ten-year farm lease agreement. 5. ENVIRONMENTAL: Tenant shall not permit, allow, or cause any act to be performed or Any practice to be adapted or followed in and about the Premises which shall cause or be likely to cause injury or damage to any person or to said Premises or to other property or any persons. In no case shall Tenant cause or allow waste water effluent to be discharged or released onto Premises. In addition to Owner's other remedies, Tenant agrees to indemnify and hold Owner harmless from against any and all loss, liabilities, damages, injuries, interest, deficiencies, fines, penalties, costs, expenses attorney(s)' fees and costs of investigation and clean up including, without limitation, to claims, suits and proceeding by Federal, State, County and local governmental authorities with respect to, or as a direct or indirect result of the presence on or under, or the escape, seepage, leakage, spillage, discharge, emission, discharging or releasing from, the property any wastewater effluent, if such occurs, during the term of this Lease or during any extended period. - 6. STRUCTURAL CHANGES: Tenant shall not construct any additional improvements Upon the Premises except the underground pipeline. At the expiration of the tern of this Lease, upon demand by Owner, Tenant, at Tennant's sole cost and expense, shall remove all underground equipment placed upon the Premises by Tenant, including, but not limited to underground pipes. At the option of Owner, at the expiration of the term of this Lease or earlier termination, Owner may retain all underground pipelines on the Premises, in which event all underground piping shall become the property of Owner. 7. PROPERTY TAXES: Owner will be responsible for all county and state property taxes due on the property. 8. ASSIGNMENT AND SELLING OF PREMISES: Tenant shall have the right to assign This lease or the sublet the Lease. Owner shall have full authority to assign this lease, to mortgage, lease or sell his property. Tenant agrees to subordinate this Lease to such mortgage, lease or sale. 9. MEMORANDUM OF LEASE: Owner agrees to sign, for recording at the Halifax County Courthouse, a Memorandum of Lease. 10. BINDING EFFECT: This Agreement shall be binding upon the parties, their heirs, assigns, personal representatives and successors in interest. This Agreement may be executed in one or more counterparts each of which shall be deemed to be an original. AGREED to this the 10`h day of December, 2003. dC.lzz' (SEAL} Alice Partin Reid, Owner/ Murphy-Btowft LLC, Tenant NORTH CAROLINA PITT COUNTY I, a Notary Public of Pitt County, North Carolina, do hereby certify that ALICE PARTIN REID, personally appeared before me this day and acknowledged the due execution of the foregoing LEASE for the purpose therein expressed. Witness my hand and notaries seal this _L day of December 2003, My commission expires: � 13 r-)�G07 (Notary Seal) tary P is NORTH CAROLINA fflo&iA COUNTY h,Yoi� W�slerbeel� I, a Notary Public of Duplin County, North Carolina, do hereby certify that MAW, a manager of MURPHY-BROWN, LLC personally appeared before me this day and acknowledged the due execution of the foregoing LEASE for the purpose therein expressed. Witness my hand and notaries seal this AIN _day of December 2003. My commission expires: QC4 + (S, -Xa . ! (Notary Seal) . Notary Public State of North Carolina Department of Environment, Health and Natural Resources James B. Hunt, Jr., Governor Jonathan B: Howes, Secretary Smithfield Carroll's Farms Farm 62 PO Box 1240 Waverly Va 23890 e�� [:)EHNR November 12, 1996 SUBJECT: Operator in Charge Designation Facility: Farm 62 Facility ID#: 42-24 Halifax County Dear Farm Owner: Senate Bill 1217, An Act to Implement Recommendations of the BIue Ribbon Study Commission on Agricultural Waste, enacted by the 1996 North Carolina General Assembly, requires a certified operator for each animal waste management system that serves 250 or more swine by January 1, 1997. The owner of each animal waste management system must submit a designation form to the Technical Assistance and Certification Group which designates an Operator in Charge and is countersigned by the certified operator. The enclosed form must be submitted by January 1, 1997 for all facilities in operation as of that date, Failure to designate a certified operator for your animal waste management system is a violation of 15A NCAC 2H .0224 and may result in the assessment of a civil penalty. If you have questions concerning operator training or examinations for certification, please contact your local North Carolina Cooperative Extension Service agent or our office. Examinations have been offered on an on -going basis in many counties throughout the state for the past several months and will continue to be offered through December 31, 1996. Thank you for your cooperation. If you have any questions concerning this requirement please call Beth Buffington or Barry Huneycutt of our staff at 919/733-0026. Sincerely,/ j A. Preston Howard, Jr., P. ., Director Division of Water Quality Enclosure cc: Raleigh Regional Office Water Quality Files �W P.O. Box 27687, FAX 919-715-3060 Raleigh, North Carolina 2761 1-7687 Nvf An Equal Opportunity/Affirmative Action Employer Voice 919-715-4100 50% recycled/ 10% post -consumer paper Revised April 20, 1999 JUSTIFICATION & DOCUMENTATION FOR MANDATORY WA DETERMINATION Facility Number q L - Farm Name: l-v 1:5 6 7 On -Site Representative: 96vik, &9-, --- Inspector/Reviewer's Name: 7,gw e. i/ Date of site visit: S:fz2- /Illy Date of most recent WUP 2 - `j G Annual farm PAN deficit: 3 213pounds Operation is flagged for a wettable acre determination due to failure of Part 11 eligibility item(s) Fl F2 F3 F4 Operation not required to secure WA determination at this time based on exemption E1 E2 E3 E4 Operation pended for wettable acre determination based on P9 P2 P3 Irrigation System(s) - circle #: 1. hard -hose traveler; 2. center -pivot system; 3. linear -move system; 4. stationary sprinkler system w/permanent pipe; 5. stationary sprinkler system wlportable pipe; 6. stationary gun system wlpermanent pipe; 7. stationary gun system wlportable pipe PART I. WA Determination Exemptions (Eligibility failure, Part 11, overrides Part I exemption.) Ell Adequate irrigation design, including map depicting wettable acres, is complete and signed by an I or PE. E2 Adequate D, and D21D3 irrigation operating parameter sheets, including map depicting wettable acres, is complete and signed by an I or PE. E3 Adequate D, irrigation operating parameter sheet, including map depicting wettable acres, is complete and signed by a WUP. E4 75% rule, exemption as verified in Part Ill. (NOTE: 75 % exemption cannot be applied to farms that fail the eligibility checklist in Part II. Complete eligibility checklist, Part 11 - F1 F2 F3, before completing computational table in Part 111). PART 11. 75% Rule Eligibility Checklist and Documentation of WA Determination Requirements. WA Determination required because operation fails one of the eligibility requirements listed below: F1 Lack of acreage which resulted in overapplication of wastewater (PAN) on spray field(s) according to farm's last two years of irrigation records. F2 Unclear, illegible, or lack of information/map. F3 Obvious field limitations (numerous ditches; failure to.deduct required . buffer/setback acreage; or 25% of total acreage identified in CAWMP includes small, irregularly shaped fields - fields less than 5 acres fortravelers-orless than 2 acres for stationary sprinklers). F4 WA determination required because CAWMP credits field(s)'s acreage in excess of 75% of the respective field's total acreage as noted in table in Part III. Revised April 20, 1999 acility Number � Z. - G- Part III. Field by Field Determination of 75% Exemption Rule for WA Determination TRACT NUMBER FIELD NUMBER'.2 TYPE OF IRRIGATION SYSTEM TOTAL ACRES CAWMP ACRES FIELD % COMMENTS3 ce,p fob -7 i FIELD NUMBER' - hydrant, pull, zone, or point numbers may be used in place of field numbers depending on CAWMP and type of irrigation system. If pulls, etc. cross more than one field, inspector/reviewer will have to combine fields to calculate 75% field by field determination for exemption; otherwise operation will be subject to WA determination. FIELD NUMBER' - must be clearly delineated on map. COMMENTS' - back-up fields with CAWMP acreage exceeding 75% of its total acres and having received less than 50% of its annual PAN as documented in the farm's previous two years' (1997 & 1998) of irrigation records, cannot serve as the sole basis for requiring a WA Determination. Back-up fields must be noted in the comment section and must be accessible by irrigation system. Part IV. Pendin Determinations ,A,ds ` ae x5. Pi Plan. lacks fallowing information: 4me �,� wy� w J l� P2 Plan revision may satisfy 75% rule based on adequate overall PAN deficit and by adjusting all field acreage to below 75% use rate P3 Other (ie/in process of installing new irrigation system): State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director CERTIFIED MAIL RETURN RECEIPT REQUESTED Smithfield arro 's arms Farm 62 PO Box 1240 Waverly Va 23890 Farm Number. 42 - 24 Dear Smithfield Carroll's Farms: April 17, 1998 \goy You are hereby notified that Farm 62, in accordance with G.S. 143-215.1 OC,,must apply for coverage under an Animal Waste Operation General Permit. Upon receipt of this Ietter, your farm has sixty (60) days to submit the attached application and all supporting documentation. In accordance with Chapter 626 of 1995 Session Laws (Regular Session 1996), Section 19(c)(2), any owner or operator who fails to submit an application by the date specified by the Department SHALL NOT OPERATE the animal waste system after the specified date. Your application must be returned within sixty (60) days of receipt of this letter. Failure to submit the application as required may also subject your facility to a civil penalty and other enforcement actions for each day the facility is operated following the due date of the application. The attached application has been partially completed using information listed in your Animal Waste Management Plan Certification Form. If any of the general or operation information listed is incorrect please make corrections as noted on the application before returning the application package. The signed original application, one copy of the signed application, two copies of a general location map, and two copies of the Certified Animal Waste Management Plan must be returned to complete the application package. The completed package should be sent to the following address: North Carolina Division of Water Quality Water Quality Section Non -Discharge Permitting Unit Post Office Box 29535 Raleigh, NC 27626-0535 If you have any questions concerning this letter, please call Mike Lewandowski at (919)733-5083 extension 362 or Charles Alvarez with the Raleigh Regional Office at (919) 571-4700, Sincerely, ,,f:,,,A. Preston Howard, Jr., P.E. cc: Permit File (w/o encl.) Raleigh Regional Office (w/o encl.) P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer- 50% recycled/ 10% post -consumer paper Murphy -Brown, LLC 4/17/02 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): NPD (USA) Farm Name: NPD (USA) Farm 62 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 I Wean to Feeder Feeder to Finish 1 Storage Structure: Anaerobic Lagoon Storage Period: >180 days ' 4 Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used r to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 34 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 This plan is based on the waste application method shown above, If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Ca aci Type Waste Produced per Animal Total Farrow to Wean 3212 galtyr galtyr Farrow to Feeder 4015 galtyr galtyr 500 Farrow to Finish 10585 galtyr 5,292,500 gaityr Wean to Feeder 223 galtyr galtyr Feeder to Finish 986 galtyr galtyr Total 5,292,500 galtyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (lbs): Capacity Type Nitro en Produced per Animal Total Farrow to Wean 5.4 Ibstyr Ibstyr Farrow to Feeder 6.5 Ibstyr Ibstyr 500 Farrow to Finish 26 Ibstyr 13,000 Ibstyr Wean to Feeder 0.48 Ibstyr Ibstyr Feeder to Finish 2.3 ibs/yr Ibstyr Total 13,000 Ibstyr Applying the above amount of waste is a big job. You should plan time and have approprlate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 23.89 Total N Required 1 st Year: 7764.25 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 7,764.25 Total Nitrogen Produced by Farm: 5,465.00 " Nitrogen Balance for Crops: (2,299.25) " See Additional Comments, Page The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 8 Reception Area Specifications 3(a) of 8 3(a) of 8 This plan does not include commercial fertilizer, The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches, Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall, The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A Barley B Hybrid Bermudagrass - Grazed C Hybrid Bermudagrass - Hay D Corn - Grain E Corn - Silage F Cotton G Fescue - Grazed H Fescue - Hay I Oats J Rye K Small Grain - Grazed L -Small Grain - Hay M Grain Sorghum N Wheat O Soybean P Pine Trees Lbs N utilized / unit yield 1.6 Ibs N / bushel 50 Ibs N / ton 50 Ibs N / ton 1.25 Ibs N 1 bushel 12 Ibs N / ton 0.12 Ibs N / Ibs lint 50 Ibs N I ton 50 Ibs N / ton 1.3 Ibs N / bushel 2.4 Ibs N / bushel 50 Ibs N I acre 50 Ibs N 1 acre 2.5 Ibs N / cwt 2.4 Ibs N / bushel 4.0 Ibs N / bushel 40 Ibs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste, 4of8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Spec ifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years,°you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract _ Hydrant Type Crop inlhr " inches 1291 1A Gritney C 0.5 1 1291 1 B Gritney C 0.5 1 1291 2A Gritney C 0.5 1 1291 2B Gritney C 0.5 1 1291 3 Gritney C 0.5 1 1291 4A Gritney C 0.5 1 1291 4B Gritney C 0.5 1 6of8 Additional Comments: The Amounts of Waste and Plant Available Nitrogen Produced per year as shown in the tables on page 2 are the typical amounts that are used in the absence of actual "On -Farm" records. However, site specific historical data from 1998-2000 was used to determine the average amounts of Waste and Plant Available Nitrogen Rroduced at this facility. The Average Volume of Wastewater Applied: 6,071,600 gal/year. The Average Plant Available Nitrogen Produced: 5,465 Ibsl ear. see the attached documentation for the calculations of the above numbers. The owner may choose not to plant the small grain cover crop on any or all of the wetted acreage if desired. This option should be used only if there is sufficient storage available in the lagoons to store the amount of waste and rainfall that will be added from Oct -Feb. 7of8 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: NPD (USA) Farm 62 Owner: NPD (USA) Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in.this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: NPD (USA) Signature: Date Name of Manager (if different from owner): Signature: Name of Technical Specialist: M. Kevin Weston Affiliation: Murphy -Brown, LLC. Address: — 2822 Hwy 24 West O Drawer — - ------ _ , Pawer 856 Warsaw, NC 28398 Telephone--_______ (910)_ 293-3434 Signature: Date r 8 of 8 Smithfield-Carroll's Farms (dba NPD-USA) Lagoon Analyses for Farm 62 Secondary Lagoon Actual lagoon analyses, 1998-2000. Data from NCDA, Agronomic Division Lab MonthNear Lagoon 62S PAN/1000 gal Feb-98 1.50 Apr-98 1.50 Jun-98 0 6 M.Q Aug-98 6 Oct-98 l ii4. Feb-99 �1y2 Apr-99 ,; Q 86, Jun-99 A 0:93; Aug-99 - 0'1. �. Oct-99 sQk K Dec-99 Q�9' Feb-00'1. Apr-00 -1a! Jun-00 049AI 3 " Aug-00 0 64, Oct-00 0.23 Lagoon Averagel 0.94 Farm Average 1 0.94 Std. Deviation = .48 x avg. PAN Std. Deviation = .48 x .94 #11000 gal Std. Deviation = .45 #/1000 gal Range = .94 + .45 #11000 gal Range = .49 to 1.39 #11000 gal (Shaded) Revised avg.= .90 # PAN11000 gal fro M11f:7ai• = ►hill►►►M- FM - A 17tw_v Year Year 1000 gal Total PA = :1�+r4j&iiIiLM X 6I+>AI7OM Year Year 000 ._ o�p = 5,465 lbs. Year SPAN/1000 gal. #PAN/1000 gal. Annual Wastewater Applicat'ionrSummary Total Wastewater ADPlied Per Year Year Total Gallons 1996 7,633,875 1997 5,691,750 1998 9,871,200 1999* 4,272,000 2000* 4,071,300 Avg.1996-2000 6,308,025 Avg.1998-2000 6,071,500 *Water Reduction Strategies in Place *Water Reduction Strategies in Place NCCES Publication AG-439-42 Requires 3 years data to modify CAWMP site specific Smithfield-Carroll's Farms Lagoon Analyses for Halifax County Farms Farm 62 Data from North Carolina DeparhentofAgricultureAgronamic0ivision Date Lagoon Laboratory Results TKN P K m m m Ibs.11000 Nutrients Available for First Crop N P205 K20 al. Ibs.11000 al. lbs.11000 at. Nitrogen Reduction % Apr-93 62P 500 100 400 2.00 1.43 3,00 62S 300 0 100 1.20 0.00 0.75 40.00 Apr-94 62P 700 100 600 2.80 1.43 4.50 62S 300 100 400 1.20 1.43 3.00 57.14 Apr-95 62P 800 100 700 3.20 1.43 5.25 62S 400 100 500 1.60 1.43 3.75 50.00 Sep-95 62P 427 100 610 1.60 1.30 4.90 62S 126 95.7 630 0.47 1.30 5.10 70.63 Apr-96 62P 602 ' 92.9 497 2.30 1.20 4,00 62S 399 173 447 1.50 2.30 3.60 34.78 Sep-96 62P 826 446 675 3.10 6.00 5.40 62S 217 113 642 0.81 1.50 5.10 73.87 Apr-97 62P 756 56.2 608 2.80 0.75 4.90 62S 476 43.8 551 1.80 0.59 4.40 35.71 Jun-97 62P 777 79.2 613 2.90 1.10 4.90 62S 336 73.3 587 1.30 0.98 4.70 55.17 Sep-97 62P 497 105 688 1.90 1,40 5.50 62S 42 69.4 676 0.16 0.93 5.40 91 M Feb-08 62P 665 93.3 605 2.50 1.30 4.80 625 392 67 614 1.50 0.90 4.90 40.00 Apr-98 62P 595 114 606 2,50 1.50 4.90 62S 357 61.2 550 1.50 0.82 4.40 40,00 Jun-98 62P 553 76.2 592 2.30 1.00 4.70 62S 147 57.3 589 0.61 077 4.70 73.48 Aug-98 62P 477 88.2 640 2.00 1.20 5.10 62S 157 72.0 644 0.65 r 0.96 5.20 67.50 Oct-98 62P 523 85.7 625 2.20 1,20 5.00 62S 237 74.4 642 0.99 0.99 5.10 55.00 Feb-99 62P 644 82.1 620 2.70 1.10 5.00 62S 280 56.5 543 1.20 0.76 4.40 55.56 Apr-99 62P 576 84.7 574 2.40 1.10 4.60 62S 205 43.1 554 0.86 0.58 4,40 64.17 Jun-99 62P 628 83.3 676 2.60 1.10 7.00 62S 224 63.1 737 0.93 0.84 5.90 64.23 Aug-99 62P 532 93.1 730 2.20 1.20 5.80 62S 187 77.1 748 0.78 1,00 6.00 64.55 Oct-99 62P 289 61.5 423 1.2 0.82 3.40 62S 141 48.6 467 0.59 0.65 3.70 50.83 Dec-99 62P 458 86.7 670 1.90 1.20 5.40 62S 233 59.9 543 0.97 0.80 4.40 48.95 Feb-00 62P 498 80.9 667 2.10 1.10 5.30 62S 316 57.4 526 1.30 0,77 4.20 38,10 Apr-00 62P 547 107 746 2.30 1.40 6,00 62S 304 77.3 657 1.30 1.00 5.30 43.48 Jun-00 62P 766 2.41 42.5 3.30 0.03 0,34 62S 223 84.8 652 0.93 1,10 5.20 71.82 Aug-00 62P 630 85.2 792 2.60 1.10 6.30 628 155 56.5 620 0.64 0.75 5.00 75.38 Oct-00 62P 350 114 918 1.50 1.50 7.40 62S 55.7 65.7 663 0.23 0.88 5.30 84.67 Avg. 57.85 Sheetl IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: NPD(USA) Farm 62 Address: 385 Hwy 158 Roanoke Rapids, NC 27870 Telephone: (252) 537-9710 Administrative Office (252) 445-3773 Farm Table 1 - Field Specifications i Approximate Maximum Useable Size Field of Field County: Halifax Date: 4/17102 Maximum Maximum Application Application per Irrigation Rate Cycle :• ��Bermuda Sheet2 TABLE 2 - Travelling Irrigation Gun Settings Make, Model and Type of Equipment: traveler w12.5"x850' hose and Nelson 100 Field No. Travel Application TRAVEL LANE Wetted Nozzle Operating Operating and Speed Rate Effective Effective Diameter Diameter Pressure Pressure Arc Hydrant No. (ft/min) (in/hr.) Width(ft.) Lenath(ft) (feet) (Inches) at Gun(psi) at reel(psi) Pattern Comments - Acres Der pull ®� ! . 1 ! . ! ® 1 • • �� 11 .r 1 s ----�-��_ Rollie Sheet3 TABLE 3 - Solid Set Irrigation Gun Settings Make, Model and Type of Equipment Operating Parameters Field No Wetted Hydrant Spacing(ft) Application Nozzle Operating Operating and Number of Diameter Along Between Rate Diameter Pressure Time -------- 1 1 1 -------- 1 1 1 ----_-�- MENU,1 ! MENVULUM ---��----■1 1 1 1 Sheet4 TABLE 4 - Irrigation System Specifications Traveling Solid Set Irrigation Gun Irrigation Flow Rate of Sprinkler (gpm) 167 0 Operating Pressure at Pump (psi) 96.6 #DIVI01 Design Precipitation Rate (inlhr) 0.42 #DIVI01 Hose Length (feet) 850 xxxxxx UC Type of Speed Compensation Mechanical xxxxxx UC Pump Type (PTO, Engine, Electric) Engine Pump Power Requirement (hp) 20.9 #DIVI01 TABLE 5 - Thrust Block Specifications THRUST BLOCK LOCATION AREA (sq. ft.) 90 degree bend 8.77 Dead End 6.22 Tee 4.35 Gate Valve 6.22 45 degree bend 4.72 Page 1 Sheets V I N IRRIGATION SYSTEM DESIGNER C1� �/ `' � Name: Micah Kevin Weston, CID �="`/;� � Company: Murphy -Brown, LLC * w Address: 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 ve Phone: i 910293-3434 Q 41 . Required Documentation RiNK��� The following details of design and materials must accompany all irrigation designs: 1. A scale drawing of the proposed irrigation system which includes hydrant locations, pipelines, thrust block locations and buffer areas where applicable. 2. Assumptions and computations for determining total dynamic head and horsepower requirements. 3. Computations used to determine all mainline and lateral pipe sizes_ 4. Sources and/or calculations used fok determining application rates. 5. Computations used to determine the size of thrust blocks and illustrations of all thrust block configurations required in the system 6. Manufacturer's specifications for the irrigation pump, traveler and sprinkler(s). 7. Manufacturer's specifications for the irrigation pipe and/or USDA-NRCS standard for IRRIGATION WATER CONVEYANCE. 8. The information required by this form are the minimum requirements. It is the responsibility of the designer to consider all relevant factors at a particular site and address them as appropriate. 9. Irrigation pipes should not be installed in lagoon or storage pond embankments without the approval of the designer. NOTE: A buffer strip of 25' or wider must be maintained between the limits of the irrigation system and all , perennial streams and surface waters per NC Statutes. Sheet6 Narrative of Irrigation System Operation This is a "wetted acre" determination for a traveler system for an existing facility. This farm has hydrants that are spaced for using a center pivot. Two of these hydrants will be moved to allow the traveler system to have hydrants spaced at 77% of the wetted diameter. The acres were calculated based on the equipment specified on sheet 2 and the tables developed by NCSU for calculating area allowances for existing hard hose traveler systems_ These tables show allowances from 75% to 80% lane spacings. The actual lane spacings are 77%, therefore the figures were interpolated to reflect such. Moving the two hydrants will require additional pipe to be installed. This additional pipe shall be 6" Class 160 PVC and buried at a minimum of 30" deep. Schedule 80 fittings shall be used for all connections. Thrust blocks and air vents shall be installed as shown on the drawing. Sheet7 Sp[,lnkier Speecifiggtions Sprinkler Type: Nelson 100 Nozzle Size: 0.965 inches Sprinkler Pressure: 50 psi Flowrate(GPM): 167 gpm Wetted Diameter. 234 feet CALCULATIONS Reflects 10% reduction from manufacturers chart Lane S acn inas Desired Spacing (%): 70 % Design Spacing(feet): 163.8 'PVC irrigation pipe normally comes in 20' pieces, so round to the nearest multiple of 20. Actual Spacing (feet): 180 feet Actual Spacing (%): 77 % Application Rate Application Rate =(96.3xFlowrate)1(3.1415x(.9xradius)squared) Design App. Rate = 0.42 in/hr 300 degree arc = 0.50 in/hr 220 degree arc = 0.68 In/hr 180 degree arc = 0.83 in/hr Travel speed = 1.605 x Flowrate 1 Desired application amount x Lane Spacing Desired app. (in.) = 0.35 inches 300 degree are = 4.25 ft/min 220 degree arc = 5.11 ftlmin 180 degree arc = 8.51 ftlmin Mainline Velocity Velocity = .408 x Flowrate /.pipe diameter. squared feet/sec."* "For buried pipelines, velocity should be below 5 feet per second Pipe size: 6 inches Velocity= 1.89 ft/sec. Page 1 Sheet? Maximum Mainline -Friction- Loss Most distant hydrant: 4 Total distance: 3080 feet Friction Loss is figured using HazenlWilliam's Equation Friction Loss= 0.21 feet/100 feet Max. Mainline Loss = 6.4 feet or 2.8 psi atal Dynamic Head Sprinkler Pressure: 50 psi Loss through traveller: 35 psi Elevation head: 2.1 psi Mainline loss: 2.8 psi Suction head and lift: 2.1 psi 5% fitting loss: 4.6 psi TOTAL(TDH) = 96.6 psi or 223.0 feet Horsepower Required Horsepower = Flowrate x TDH(feet)13960 / Pump effeciency Pump Description: Pump Efficiency: 45 % orsepower Required: 20.9 Hp Ibrust Blocking Thrust Block Area = Thrust / Soil Bearing Strength Thrust: 7460 feet Soil Bearing Strength: 1200 feet End Cap: 6.2 ft2 90 degree elbow: 8.8 ft2 Tee: 4.4 ft2 45 degree elbow: 4.7 ft2 Pipe PrPr,egsurg , ftting Check Pressure Rating of Pipe to be Used: 160 psi Max. Pressure on system when running: 96.6 psi 70% of Pressure Rating: 112 psi If Max. Pressure on system is less than 70% of Pressure Rating, OK Page 2 - State_of North Carolina Department of Environment and Natural Resources Division of Water Quality Jaynes B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Smithfield Carroll's Farms Farm 62 PO Box 1240 Waverly VA 23890 Dear Smithfield Carroll's Farms: 1 • • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND,NATURAL RESOURCE$ December 30, 1999 I' L�--- IR R�,(ff�N Subject: Fertilizer Application Recordkeeping Animal Waste Management System Facility Number "42=24:? Halifaz_Coanty.::? This letter is being sent to clarify the recordkeeping requirement for Plant Available Nitrogen (PAN) application on fields that are part of your Certified Animal Waste Management Plan. In order to show that the agronomic loading rates for the crops being grown are not being exceeded, you must keep records of all sources of nitrogen that are being added to these sites. This would include nitrogen from all types of animal waste as well as municipal and industrial sludges/residuals, and commercial fertilizers. Beginning January 1, 2000, all nitrogen sources applied to land receiving animal waste are required to be kept on the appropriate recordkeeping forms (i.e. IRR1, IRR2, DRYI,.DRY2, DRY3, SLURI, SLUR2, SLDI, and SLD2) and maintained in the facility records for review. The Division of Water Quality (DWQ) compliance inspectors and Division of Soil and Water operation reviewers will review all recordkeeping during routine inspections. Facilities not documenting all sources of nitrogen application will be subject to an appropriate enforcement action. Please be advised that nothing in this letter should be taken as removing from you the responsibility or liability for failure to comply with any State Rule, State Statute, Local County Ordinance, or permitting requirement. If you have any questions regarding this letter, please do not hesitate to contact Ms. Sonya Avant of the DWQ staff at (919) 733-5083 ext. 571. Sincerely, Kerr T. Stevens, Director Division of Water Quality cc: Raleigh Regional Office Halifax County Soil and Water Conservation District Facility File 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919.733-5083 Fax 919-715.6048 An Equal Opportunity Affirmative Action Employer 50% recycied/10% post -consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director May 26, 1998 Adolph Miller Farm 62 PO Box 1240 Waverly VA 23890 C IL NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Certificate of Coverage No. AWS420024 Farm 62 Swine Waste Collection, Treatment, Storage and Application System Halifax County Dear Adolph Miller: In accordance with your application received on April 27, 1998, we are forwarding this Certificate of Coverage (COC) issued to Smithfield Carroll's Farms, authorizing the operation of the subject animal waste collection, treatment, storage and land application system in accordance with General Permit AWG100000. This approval shall consist of the operation of this system including, but not limited to, the management of animal waste from the Farm 62, located in Halifax County, with an animal capacity of no greater than 500 Farrow to Finish and -the application to land as specified in the Certified Animal Waste Management Plan (CAWMP). The COC shall be effective from the date of issuance until April 30, 2003. Pursuant to this COC, you are authorized and required to operate the system in conformity with the conditions .and limitations as specified in the General Permit, the facility's CAWMP, and this COC, with no discharge of wastes to surface waters. An adequate system for collecting and maintaining the required monitoring data and operational information must be established for this farm. Any increase in waste production greater than the certified design capacity or increase in number of stocked animals above the number authorized by this COC will require a modification to the CAWMP and this COC and shall be completed prior to actual increase in either wastewater flow or number of animals. Please be advised that any violation of the terms and conditions specified in this COC, the General Permit or the CAWMP may result in the revocation of this COC, or penalties in accordance with NCGS 143-215.6A through 143-215.6C including civil penalties, criminal penalties, and injunctive relief. Upon notification by the Division of this COC's expiration, you shall apply for its renewal. This request shall be made within 30 days of notification by the Division. This COC is not automatically transferable. A name/ownership change application must be submitted to the DWQ prior to a name change or change in ownership. If any parts, requirements, or limitations contained in this COC are unacceptable, you have the right to apply for an individual non -discharge permit by contacting the engineer listed below for P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Certificate of Coverage AWS420024 Farm 62 Page 2 information on this process. Unless such a request is made within 30 days, this COC shall be final and binding. The subject farm is located in the Raleigh Regional Office. The Regional Office Water Quality Staff may be reached at (919) 571-4700. If you need additional information concerning this COC or the General Permit, please contact Sue Homewood at (919) 733-5083 ext. 502. Sincerely, -• A. Preston Howard, Jr., P.E. • p � (� �_� . C�1 f� cc: (Certificate of Coverage only for all cc's) Halifax County Health Department tRalei h-Re ional-Office-Water uality-Section �' � 4199$ g g._._ � Q� Y L.. Halifax County Soil and Water Conservation District Permit File DEHNR RALEIGH REGIONAL OFFICE) State of North Carolina Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) General Permit - Existing Liquid Animal Waste Operations The following questions have been completed utilizing information on file with the Division. Please review the information for completeness and make any corrections which are appropriate. If a question has not been completed by the Division, please complete as best as possible. Do not leave any question unanswered. GENERAL INFORMATION: 1.1 Facility Name: Farm 62 1.2 Print Land Owner's name: Smithfield Carroll's Farms 1.3 Mailing address: PO Box 1240 City, State: Waverly Va _ Zip: 23890 Telephone Number (include area code): 834-2109 1.4 County where facility is located: Halifax 1.5 Facility Location (Directions from nearest major highway. Please include SR numbers for state roads. Please include a copy of a county road map with the location of the farm identified): SR 1 112 1/2 mile N.N.W. of intersection of SR H 12 and SR 1113. 1.6 Print Farm Manager's name (if different from Land Owner): Rebept '. Manly- jkjal„}, M i yJr r _ 1.7 Lessee's / Integrator's name (if applicable; please circle which type is listed): Carroll's Foods, Inc Smithfield Carroll's 1.8 Date Facility Originally Began Operation: 01/01/92 1.9 Date(s) of Facility Expansion(s) (if applicable): N/A 2. OPERATION INFORMATION: 2.1 FacilityNo.: 42 (county number); 24 (facility number). 2.2 Operation Descrip i noti not Swine operation ow to Finish 500- Certified Design Capacity Is the above information correct? [::]Yes; F7no. If no, correct below using the design capacity of the facility The "No. of Animals" should be the maximum num er or which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals Wean to Feeder Layer Dairy Feeder to Finish Non -Layer Beef Farrow to Wean (# sow) Turkey Farrow to Feeder (# sow) Farrow to Finish (# sow) Other Type of Livestock on the farm: No. of Animals: FORM: AWO-G-E 1/28/98 Page I of 4 42 - 24 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 34.21 ; Required Acreage (as listed in the AWMP): 34.21 2.4 Are subsurface drains present within 100' of any of the application fields? YES or (please circle one) 2.5 Are subsurface drains present in the vicinity or under the lagoon(s)? YES or (please circle one) 2.6 Does this facility meet all applicable siting requirements? (Swine Farm Siting Act, NRCS Standards, etc.) (Swine Only) (YE3 or NO (please circle one) What was the date that this facility's swine houses and lagoon were sited? i n What was the date that this facility's land application areas were sited? I m / /q I 3. REQUIRED ITEMS CHECKLIST Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicants Initials 3.1 One completed and signed original and one copy of the application for General Permit - Animal Waste Operations; _ > 3.2 Two copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied; 3.3 Two copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a general permit application for animal waste operations. C'P The CAWMP must include the following components: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility. 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application. 3.3.4 The soil series present on every land application field. 3.3.5 The crops grown on every land application field. 3.3.4 The Realistic Yield Expectation (RYE) for every crop shown in the WUP. 3.3.7 The PAN applied to every land application field. 3.3.8 The waste application windows for every crop utilized in the WUP. 3.3.9 The required NRCS Standard specifications. 3.3.10 A site schematic. 3.3.1 1 Emergency Action Plan. 3.3.12 Insect Control Checklist with chosen best management practices noted. 3.3.13 Odor Control Checklist with chosen best management practices noted. 3.3.14 Mortality Control Checklist with the selected method noted. 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.) If your CAWMP includes components not shown on this list, such as an irrigation design, or site evaluation, please include the additional components with your submittal. FORM: AWO-G-E 1/28/98 Page 2 of 4 42 - 24 Facility Number: 42 - 24 Facility Name: Farm 62 4. APPLICANT'S CERTIFICATION: I, AbcLPIA t4IL a, F7?9- SM iTKFiG7Lp- 4'Agg} LL' S (Land Owner's name listed in question 1.2), attest that this application for S N i7h-Pt [ s1 - CAP42C L' S PAA-,45 tl L, Z.. (Facility name listed in question I.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to incomplete �y Signature ,lrTy � 1A Date 5. MANAGER'S CERTIFICATION: (complete only ifdifferent from the Land Owner) 1, &DOij" MILL Pk. Mt` P, (Manager's name listed in question 1.6), attest that this application for V4I TN-Fje—LZ — C-A-RW'cLL' S F;OA I S b L (Facility name listed in question 1.I) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as i plete Signature _ ,. iz &A e,2 Date y^ L THE APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FAX NUMBER: (919) 733-0719 FORM: AWO-G-E 1/28/98 Page 3 of 4 42 - 24 DI`-ISION OF NVATER QUALITY REGIONAL OFFICES (I/98) Asheville Regional WQ Supervisor 59 Wood`in Place Asheville, NC 28801 (70"')251-6208 Fax (704) 251-6452 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk Cat• Rutherford Graham Swain Ha%-,A•ood Transvlvania Henderson Yancey Jackson Fayetteville Regional WQ Supervisor Wachovia Building. Suite 714 Favetteville. NC 2E301 (910)486-15"'1 Fax (910) 486-0707 Anson Moore Bizden Richmond Cumberland Robeson Ham, e , Sampson Hoke Scotland Monteornery Winston-Salem Regional VVQ Supervisor 585 Wauehto-wn Street Winston-Salem. NC 27107 (910) 771-4600 Fax (910) 771-4631 A]amance Roci:irgohafn Allechany Randolph Ash Stokes Caswell Sum• Davidson V�'atausa Davie NVilkes Forsyth Yadkin Guilford Washington Regional WQ Supervisor 943 Washington Square Mall Washington, NC 27889 (919)946-6481 Fax (919) 975-3716 Beaufort Jones Bertie Lenoir Camden Martin Chowan Pamlico Craven Pasquotank Currituck Perquimans Dare Pitt Gates Tvrell Greene Washington Hertford Wayne Hyde Mooresville Regional WQ Supervisor 919 North Main Street Mooresville, NC 28115 (704)663-1699 Fax (704) 663.6040 Alexander Lincoln Cabamts Mecklenburg Catawba Rowan Cleveland Stanly Gaston Union Iredell FORM: A«'O-G-E 1/28/98 Page 4 of 4 Raleigh Regional WQ Supervisor 3800 Barrett Dr. Raleigh, NC 27611 (919)571-4700 Fax (919) 733-7072 Chatham Nash Durham Northampton Edeecombe Orange Franklin Person Granville Vance Halifax Wake Johnston Warren Lee Wilson Wilmington Region. WQ Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910)395-3900 Fax (910) 350-2004 Brunswick New Hanover Carteret Onslow Columbus Pender Duplin •ws '.r�� -F r jr �, v'��.�. � ,-r,� •jY. � r '] .'. - . •.r ..'S/ `1 ,-,• �'� ' tea.71 ,�• �1�•% C � — ... .. `. !f 'rye •�•rr� .1 tt !+ � ` . �.� x ♦ R, r '� �!!' .� � •,+:. 'i�'.' . . „� J ' "fir' rr � y► •a. ,S.T•�i ••�•� �'`�� f+++ccF+++.� ., . .f . '!�. ,` J�� •...I. a� iY +t..�'� � �� •�- h'. '1 � � _ �•y ". :Y• �•'. � �� •�\ tit'., .w,•' ' •� ' ` •- ' ,rJ -'��� 'y;l�g,. •. �(. .{� is J +��: ov .14 -IF IFT 77 If 41 It �74 _ ^�.. r�S' fir• �. 1t� JC •t !�qJ �'+.f,"'+AF.y;. y 'r 5' ~ ` 'J��. r t� , ,•p' r'. .s' s� d •�'r '1 .. y !/I�r..IP�V. �`;. L `rt'�+1 _�wti �r 1r' ..'Y r a t•...� r �., RIO Jf+.yyl- � [..:. ?'4ra', '. �• F *' r •r . -' .J. i, ,•• S,5 '� fRir •f . ,a r e:� . 1.`-• r � `'0{`. .' 5w f't' � � "1 .�i e� � .✓', ! .'' .r `. .�' .ter^. .� •!,i�1r:~�,�yr�.'y'r AV- \-• • •ii'• �' .�:^ rr -ti.., A Pam•'• + \ `�<y: l° � ^r , f '•1 �Vir, C.y:. y i:.� la ''1�. •Ktf.4,>t w'1. • .,��...• � � � J � ^ �• ::s��,.• j�, •�• � ,y'''''Tj•�•�'.a. [C ' `'�,'.•' ':err' 'yM• •�t: �����! .�e Z.;. + ���'�a��f �.' ,'�".'h� -. ... ���'�.. �, :i�f �. � ri, •,•'�__� •y °!}' a'y' y i•.'1ttii�.��{y, 1.•, .-: WASTE UTILIZATION PLAN Producer. Carroll's Foods of Virginia, Inc. Location: East of Enfield off of Rte. 1112 Telephone: (804) 834-2109 Type Operation: Farrow to Finish Number of Animals: 500 sows (Design Capacity) The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potential, cation exchange capabilities, and available water holding capabilities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from Your waste management facility. Attached, you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if tamed out; meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. WASTE UTILIZATION PLAN Amount of Waste Produced Per Yearfoallons. W. tons, etc.) 500 animals x 10,585 gal (amt.) waste/animal/year = 5,292,500 al (amt.) waste/year. Amount of Plant Available Nitrogen (PAM_Produced Per Year 500 animals x 26 lbs. PAN/animal/year = 13,000 lbs. PAN/year. (PAN from N. C. Tech Guide Std. 633) Amount of Plant Available_ Nitrogen (PAN) From Secondary Lagoon 13,000 lbs. PAN/year x 80% = 10,400 lbs. PAN/year. Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown and surface application: Table 1: ACRES OWNED BY PRODUCER Tract # Field Soil Type Crop Lbs. N per Ac. Acres Lbs. N Utilized Month of Application 1291 1 Emporia Bermudagrass Hay 350 2.60 910 Apr -Oct 2 Gritney lBermudagrass Hay 350 31.61 11,064 Apr -Oct 1 Emporia ISmall Grain 50 2.60 130 Feb -Apr &Nov 2 Gritney Small Grain 50 31.61 1,581 Feb -Apr &Nov Total 1 34.21 1 13,684' * This N is from animal waste only. If nutrients from other sources such as commercial fertilizers are applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. WASTE UTILIZATION PLAN Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowner must be attached) (Required only if operator does not own adequate land [See Required Specification 21) Tract Field Soil Crop Lbs. N Acres Lbs. N Month of • See footnote for Table 1. Table 1 Table 2 Total 11tilized .. Totals from above Tables Acres Lbs. N Utilized 34.21 13,884 0 0 34.21 13,684 Amount.of N Produced Surplus or Deficit 10,400 3,284 NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. WASTE UTILIZATION PLAN See attached map showing the fields to be used for the utilization of waste water. Application of Waste by Irrigation Field No. Soil Type Crop Application Rate In/Hr Application Amount in. 1 Emporia Bermuda/Small Grain 0.35 5.9 2 Gritney Bermuda/Small Grain 0.35 5.9 THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL BE NEEDED FOR DRY LITTER OR SLURRY. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 MONTHS. In no instance should the volume of waste being stored in your structure exceed Elevation 86.4 ft. . Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil and Water Conservation District office after you receive the waste analysis report for assistance in determining the amount per acre to apply and the proper application rate prior to applying the waste. Narrative of Operation: This operation is located off of Rte. 1112 east of Enfield in Halifax County. The operation is located on CFSA tract 1291. The swine operation is farrow to finish with a design capacity of 500 active sows. It is estimated that 5,292,500 allons of animal waste will be produced annually for land application. There are 34 acres of cropland available for land application. The waste from the swine houses is stored in a primary and secondary anaerobic treatment lagoon system. The secondary laaoon is used to further reduce the nitrogen content of the waste before_ it island applied. Frequent sampiln4of our secondary lagoons of similar capacity and geographic location, indicates that nitrogen levels are reduced an additional 40%. The latest lagoon sample analyses for this farm shows that the nitrogen content of the secondary lagoon was 54% less than the nitrogen content of the primary lagoon (see attached analysis). A reduction of 20% was used to determine nitrogen production for this plan. The waste is land applied to bermudagrass haviand using irrigation. A small grain cover crop will be planted in the fall for fall and early spring applications. The small grain cover crop will be removed as hay. Before sludge is applied, samples will be taken to determine its nutrient content. Application rates for the sludge will be based on the nutrient content of the sludge so that it is applied at agronomic rates. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to the assessment of civil penalties of $10,000 per day by the Division of Environmental Management for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land on which to properly apply the waste. if the producer does not own adequate land to property dispose of waste, he shall provide NRCS with a copy of a written agreement (sample enclosed) with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not to exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Altemative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by the DEM. [See FOTG Standard 393 - Filter Strips and Standard 390 (Interim) - Riparian Forest Buffers.] 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when the wind is blowing. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See 'Weather and Climate 'in North Carolina" in the Technical Reference - Environment file for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and provide uniformity of application. 8. Animal waste shall not .be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that no more than 20 to 25 percent of the leaf area is covered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop on bare soil. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 11. Animal waste shall not be applied closer than 50 feet to surface water. This distance may be reduced for waters that are not perennial provided adequate vegetative filter strips are present. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters, drainageways or wetlands by a discharge or by overspraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses. Animal waste may be applied at agronomic rates to grassed waterways that do not discharge directly into water courses provided the application causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. Lagoons and other uncovered waste containment structures must maintain a maximum operating level to provide adequate storage for a 25-year, 24-hour storm event in addition to the one (1) foot mandatory freeboard. 18. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 19. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 20. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 21. Wastewater should be analyzed at least twice annually to determine nutrient content. 2-2. Fields receiving wastewater should be soil sampled each year to monitor micronutrients, phosphorous, potash, and time levels. 23. The crops, on which wastewater is applied, should be removed from the farm. WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 24. Crop yields should be recorded and meet yield targets shown in the waste utilization plan. 25. Records should be kept to document when, where, and how much waste water is applied. 26. Waste analyses and soil sample reports should be kept for at least three years. 27. Daily rainfall amounts should be recorded. WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Smithfield-Carroll's Farm 62 Owner/Manager Agreement I (we) understand and will follow and implement the specification and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner. Smithfield-Carroll's Farms try_ Adolph iller�Geneml Manager (Please print) Signature: «�LCG Date: Name of alter (If different from owner): Signature: Date: Name of Technical Specialist: (Please print) i P, O Affiliation: L) ' Address (Agency): 1, ,c. ► � ?S'3 Signature: a Date: ,La Vie. �E t h 14 Zk � r' •�, r -• y�y'� �, ' pl : tea R •�'' It �, rJ ti 1'tir-.:+'Iap L,• , 1f. f ..r 1-S •.\ .•�lsi.�' f ?' ,`ii;� ' ,y L+n,.My, `11��, •�• �r • r�'wF, � � � :It It ",1 •% • y''� J4 �, 'J• 7,•; !1�•I tip'td' '�li.. rrlw •�,'s•';,ir d._ /• .:7.�b• rR'-•',� a 1 r •+Tr r:{ a� i,} ` My"rA' .�* ati S �1' •� •, _ r->. 1. •r4�.'.�ff 'f• 1YA 'in•��' .T i IA' 'T' S., -' f -r'�• Ste' :i \ t f.or'� •'� 01/ �`aii,:,i•.'�1'r' .7-,�-•� f 'r.ii��iC,i. '�I�+ \��,� �!..1 =\\ ,` r nl. - •:r:+ t, ' "rr'�L•��.i,1'�' � ' ,�'� ,�'�� f n • .�` rP�1~ , r F; !' ' 1 vI \ : '. ,,,� , •1y-%1•l r Y:::r:.: .: r ..- �� `�_' .C.r� l ,.;;'��" ter_ ,,.fir"•., f._ i a • �3�A — r 3c5n . 5�6 s .� � 3i65A Sa 1 — � v�. •_ � r 37c� ti�7p'•. 1 '+ - q11 S ne - J a S�41j+ r� i y ` -ains Sheec G-.3 7!h k►7 411 V. it !•,r 71pt1 ug 454 455E i 3L5A t� 44�F 365+ti r s... 110 all y�1 411 •.� ,. - .j, N,,5 . 3658•'�. A • �u5p :i }4SN • � is : � �u+� � F, f • J i i 4 -4 a ENFI ELO TO 1 r+E r NALI KAX CO., N( S C A LE II - i o6 C SURVEY BY S.V. j� W E T 7 7. 1 I r :. r +�O _ r..� /4\ asSoclarEs c.L.! a rs.s r. s t• • :�ao,_.'.^ �`� TOTAL AR EA a 35. \7 • ■ 72.0 • 1 ;rl r Jo 7 r a.f 7 [ O . a sitr rr.4n.f 1...1•, ■ 1.1 . \ a3' ♦4.a 1 .1 111 11.L saa 1.77.• r� aus 4o.a at.i ua . ..• as.� �f.l a ■ ��■.+ ■+ 1 u.o a1.o1 ■1 7r. rss 7s� 7.7 r• r as 1 87.1 a-4.7 as.r s4.7 84-% • a a. 7 ■a.�(v.+ 7, Ot.l� ■1. !0. 1 � .7 T. 1 7610 ra'. T.-■ 74.• r. ■ ;I OPENS ` a7. } 0() t�` -- wt r n.a 41.a 4f.a •s.7 •.7 as n.! a.a •a. ■•s �•:w� I $4.4 47.6E a ;•a■ ta.r 7, I 7s.r 7s 1 1, 1 1 05.1 41.a a4.a as. as.1 s.7 sa.a as a �`• 4 ••• 041.4 .a 4,4 01 a rr , ,.0 r+• 7+■ if 4-10 ■ . .• a+.• so a7,1 a;a Tl a7"+ 9a4 30.4 +■. 1,t v� T ea 04.7 C� Tu.0 7s.• 79.2 :y,a 7. O PE +. • \ f �� 0 0 S ye r �� M E T a� a $1, J a 7 a4.1 ,1 .1 0.1 a. sa.4 ,. .! 03 a 'tom at Pa.a J.a raj 16.7 72.7 74.3 7■.9 l l •o, a r ,.7: 60,1 alp 00 •! *%.1. +.a sl.2 aL. 8.4 Mo as s sa.s 18.6 91 f7: sa,1 a1.a so r7.9ras 761 70.5 r7.: T,, ► I I 1 � 1 O1',� •f ., l 7l.f aL. f■.1 aa.6 7.1 0 ■s.s ` f.a s.a . s 041 )• .1 ■ � �f .r 04.s as a rs• rr ` Tr.a 77 G ,I 1 1 a s J as. 7 0, a ..7 a•-8/9 f s1T fJ.7 sa.6 ,4f,s .s.7 •r.! aa0 'tra • faa ! _ l.S •T.I ■a.)f •af Ja.a f•7A 71 1 .. /aa.a �.•'�'� f w0005 F r wE / CEM£7ERY 1..■:+ 44.1 74-9 as,J •ao fr,a 97.9 u.a aa.o azs ■r,aataaas fa• ■..+ 1 91.1 ars a■.) ■r.7 7+.• 7a., 76.7 1 / CE METERY I _ OPEN S f K' a: //. ,7,, I �0 GRAVES I CL Ata6 y 91,0 +. • 07.1 .L♦ 97.7 M-1 a■,D /f.0 f a.a 74. 1 sT.I fa.T' .. .5.1 ar.t 41 a ■+ a . ■.• al 1 764 77.0 lla CE ME TE hY I . r _ r I � a Smithfield-Carroll's Farms Lagoon Analyses for Halifax County Farms Farm 62 Data from North Carolina Department of Agriculture Agronomic Division Date Lagoon Laboratory Results TKN P K ( m) mj mj N IbsJ1000 Nutrients Available for First Crop P2O5 K2O al. lbsJ1000 al.j lbsJ1000 gal. Nitrogen Reduction % Apr-93 62P 500 100 400 2.00 1.43 3.00 62S 300 0 100 1.20 0.00 0.75 40.00 Apr-94 62P 700 100 600 2.80 1.43 4.50 62S 300 100 400 1.20 1.43 3.00 57.14 Apr-95 62P 800 100 700 3.20 1.43 5.25 62S 400 100 500 1.60 1.43 3.75 50.00 Sep-95 62P 427 100 610 1.60 1.30 4.90 62S 126 95.7 630 0.47 1.30 5.10 70.63 Apr-96 62P 602 92.9 497 2.30 1.20 4.00 62S 399 173 447 1.50 2.30 3.60 34.78 Sep-96 62P 826 446 675 3.10 6.00 5.40 62S 217 113 642 0.81 1.50 5.10 73.87 Apr-97 62P 756 56.2 608 2.80 0.75 4.90 62S 476 43.8 551 1.80 0.59 4.40 35.71 Jun-97 62P 777 79.2 613 2.90 1.10 4.90 62S 336 73.3 587 1.30 0.98 4.70 55.17 Sep-97 62P 497 105 688 1.90 1.40 5.50 62S 42 69.4 676 0.16 0.93 5.40 91.58 Feb-98 62P 665 93.3 605 2.50 1.30 4.80 62S 392 67 614 1.50 0.90 4.90 40.00 Avg. 54.59 AT-ZAC'-:XZVT B = - I of Agri -Waste Mang gement Bialogicaland AgriCulturat Errgineerirng North Carolina Sta!e University L:4ESTOCK LiAS= SA.'! =NC, A3i EISIS XX0 CALCULA.:ON OF LAND AP?LZCA::ON RATIS Ja:es C. Barked I. SW U COL EC 1CN A. Semi -Solid Laz Manure i. Scraped di ec__y from lot into spreader a. From Loaded spreader, collect about 2 Ibs of manure f_on different locations using nor=ecallic collectors. U. Froa storage a. CoLlec_ about 2 Us of manure fro= under the surface crust avoiding bedding materials and using non=ecallic collectors. B. Liquid Manure Slurry i. [Ender-sloewd-Boor pic a. Extend a I/2" nonmetallic Conduit open on both ends into manure.ca Fit floor. b. Seal upper end of conduit (e.g., by placing i QuK over end of canduiz) trapping manure that has entered Lover end, remove and ecpty slurry inco'plastic bucker or nonmetallic container. c. Take subsar_ples from 5 or tore locations or at least I quart. d. Mix and add about 3/4 pint ca norm ecal_ic sample container. i_. Uzarior Karate basin or rank a. `rake sure manure has been well mixed vi:h a liquid manure chotre_•agitatoz pump or p: pe:l-er ag_:a:.,r. b. sake swis.:r_.es from.. ahou: ] P-: locations, f_-m ay__srgr pu-- or Umm manu,_ spreader and dace in a plasrjc bucke_. * Professor and _x:ans-an Spec-al_s:. Voiogical and Agri _l: w! 2^g_~err-ng DepaW=e^ , Nor:.. QrslLna Scace Un_yerzi:-!. Raleigh. ';C. 20f3 • e. Mix and add 3/4 pint to a non:ecallic sa=ple container. C. Lagoon Liquid 1. Collect about 3/'4 pint of recfcled lagoon liquid fro-n in:1o•. pipe to flush canics in a nor^necallic sacple container. ii. From lagoon a. Place a s=all boc=le b. Extand boct'_a 10-15' c. Brush away f'_oacing d. 5ubmer6+ boc_le w:t't e. Enac-1 inc7 a lagoon, nix. and add 0. 3roiler or Turkey Lit-te. I. House litter (1/2 pine or less) on end of 10-15' pole, away fro= bank edge. sc--= or debris. :n 1' of liquid surfaca. buc'ke: , repeat abcu_ 5 times jround 3/4 plat to nor_^c"_,C.-_c sarple eonca:ner a. visual r inspect 1, ._a_ fc_ areas of va^t_ag qua! -Cy. e g areas a:o_Zd fzede.= and vazerer , and est'__ace percane a - - floor surface in each area. b. Take about 5 !::tar subsaraples at locations prapor_:onace to Lten a. E.g., if 341 of l___er of similar visual qualic-r is around fe_rars and wacarars, cake 1 subsaraple there and the ocher 4, subs.: -;Las "rora re=aindar of floor surface. C. At each collect li_=ar f_on a 5' by b" area dog.. cc earth floor and place in a plastic bucket. d. After 5 ,uesa^plus have been added to the bucket. m-;x, and add about-Z-3 lbs l:t_ar to it nor%=ecallic sample container such as a 1-gallan Freezer bag and seal. U . From stockpile a. Take ;u�-.'^;les °_=ra abcut 5 locations at leasc 13" into ;:le. b. Xix, ac:- _ 2 its t. nor_-eta:'_:c sar7la container and sea:.. ATTACHMENT B 3 of 3 II. SAHTL° PRE?ARATION A.`is7 :?-A.NSF7-R A. Place sarple into an expandable container Chat can be sealed. Rinse residues from cnr._a:net w.th dean water but do noc use disinfectants, soaps, or C;eae in any ocher way. B. Pack sarpie 1-i Lca. ref:'gerace, freeze, or transfer to lab quickly. C. Fland-del.rer-f is most -__;able way of sample transfer. D. If mailed, pracec_ sc:^p_e container with packing material such as nevspape:, box or rat::age with wrapping paper, and tape. E. Commercial saa;tle c_n:ainers and mailers are also available. Contacts: L. A&L East_^ Ag__c__t__al lab, Inc. iii. Polf=oaa Packers Corp. 7621 Vhiz_oine "lead 2320 S. Foster Avenue Ric:`=crd, VA 2== Vheelirg. IL 60090 Ph: (304)743-34-'% Ph: (312)398-0110 it. Fisher Sctenci=;c Co. iv. NASCO 3315 --mcon Road 901 Janesville Avenue Raleigh, NC 27504 Fort Atkinson, uI 53538 Ph: (919)376-2251 Ph: (414)563-2446 F. Private arialyCical labs are available, buc sample analyses are costly. G. The NCOA provides this service for Korth Carolina residents. i. Address: North Carolina Departent of Agr:c_Itsra AS onozic Division P1ant/:Tascc/So Lucian Advisory Section Blue Ridge Road Canter P.O. Box 27647 Raleigh, NC 27611 ?h: (919)733-2655 At==:: Dr. Ray Campbel.? ii. For arl 14 al :i_h the sam;-1e. fit. Include the following identification information with sample: a. _ivo=tocSc sFeciss (da:_�, swine, cu=kev, ect ) b. L:vest__k asa_e (sJne-nurser;r, fins ing. cu_key-breeders, Sr;oderFcusa. grc_e„ nu:.ae_ f'_ocks grove on 1ic_er, etc.) c. '.asz_ type ;d: _ ?at sc,-ged :r.ar.ure, liquld slur-y; slsirie-pit sl•-;rry, laa...n sLudgs: bra-ler-house l,trer, stockpile "loutine analyses perfot^ed on all sarnles: N. P. K. Ca, *!g, Na, S. Fe, !In, Zn, Cu. 8 v. Additional ana: ses perr�_.ed upon request. OM, Mo. Cd. Ni, Pb rOrr, 00441a- 9NITED_STATES_________ Soil_ --------- P. 0. Box 10s_2QI_St. Andrews ` DEPARTMENT_OE_w ______ ConservationTarboro,_North Ca:2iina 27886 AGRICULTURE -------------- ServiceTeEephone_(919)_S4Tr7g00 Subject: ENG — Carroll's Foods Lagoon Designs Date: May 27, 1992 . To: Wayne Short, District Conservationist Halifax, North Carolina I have reviewed the swine waste management plans for Farm No. 62 (Partin Farm) and Farm NO. 63 (Harris Farm) in Halifax County. Both plans appear to meet Soil Conservation Service specifications. Joy P. Sherrod Civii Engineer cc: S. Cox --.cam .' _r•:-•-� - -J..., + •.-�:.:'. G Z', > c� ..1 � i G �• SCF No.: 62 Operator:Carroll's Foods VA County: Halifax Distance to nearest residence (other -than owner): I. STEADY STATE LIVE WEIGHT Date 01/10/92 2500.0 feet 500 sows (farrow to finish) x 1417 lbs. = 708500 lbs 0 sows (farrow to feeder) x 522 lbs. - 0 lbs 0 head (finishing only) x 135 lbs. - 0 lbs 0 sows (farrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. - 0 lbs V708500 TOTAL STEADY STATE LIVE WEIGHT (SSLW) _ lb's 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 708500 lbs. SSLW x Treatment Volume(CF)/lb. SSLW Treatment Volume(Cr)/lb. SSLW= 1 CF/lb. SSLW Volume = 70850�cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet: Owner requests no sludge storage. . Sludge will be removed as needed. 4. TOTAL DESIGN VOLUME for PRIMARY LAGOON Inside top length ,610.0 feet ; Inside top width 150.0 feet Top of dike at elevation 88.0 feet u,1, io, Freeboard 1.0 feet ; Side slopes 2.0 : 1 (Inside lagoon) a,rre Total design lagoon liquid level at elevation 87.0 feet Bottom of lagoon elevation 75.0 feet Seasonal high water table elevation -at_.$-feet,/ Total design volume using prismoidai formula 1-no SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.0 2.0 2.0 2.5 606.0 145.5 12.0 AREA OF TOP LENGTH * WIDTH 606.0 145.5 88173.0 (AREA OF TOP) AREA OF BOTTOM LENGTH * WIDTH = 558.0 91.5 51057.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH * WIDTH * 4 582.0 118.5 275868.0 (AREA OF MIDSECTION * 4) CU. FT. = (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM) 88173.0 275868.0 51057.0 DEPTH/6 2.1 DESIGN VOLUME FOR PRIMARY LAGOON = 830A96 CU. FT. 4. TOTAL DESIGN VOLUME for SECONDARY LAGOON Inside top length 310.0 feet Inside top width 150.0 feet Top of dike at elevation 88.0 feet' Freeboard 1.0 feet ; Side slopes 2.0 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 87.0 feet Bottom of lagoon elevation 75.0 feet Seasonal high water table elevation 48ii. feet � /oie 7a . 3 �rrr7, c,vrr �,Pr` Total design volume using prismoidal formula nQ s�as�nq/} a e � SS/END1 SS/END2 SS/SIDE]. SS/SIDE2 LENGTH WIDTH DEPTH 2.0 2.0 2.0 2.5 306.0 145.5 12.0 AREA OF TOP LENGTH * WIDTH 306.0 145.5 AREA OF BOTTOM LENGTH * WIDTH = 258.0 91.5 44523.0 (AREA OF TOP) 23607.0 (AREA OF BOTTOM) AREA OF MIDSECTION LENGTH WIDTH * 4 282.0 118.5 133668.0 (AREA OF MIDSECTION * 4) CU. FT. [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] 44523.0 133668.0 23607.0 DESIGN VOLUME for SECONDARY LAGOON = 40�596CU. FT. DEPTH/6 2.0 5. TEMPORARY STORAGE REQUIRED PRIMARY LAGOON DRAINAGE AREA: Lagoon (top of dike) Length * Width = square feet 610.0 150.0 91500.0 SECONDARY LAGOON DRAINAGE AREA: Lagoon (top of dike) Length * Width = square feet 310.0 150.0 46500.0 Drainage for dike between Primary & Secondary Lagoons Length * Width square feet Length * Width = square feet 550.0 5.0 2750.0 550.0 5.0 2750.0 TOTAL DA 94250.0 TOTAL DA 49250.0 Design temporary storage period to be 180-days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = 708500 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 173020 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day Volume = 0.0 cubic feet 180 days storage/7.48 gallons per CF 5C. Volume of rainfall in excess of evaporation Location of weather station used : Enfield Rainfall exceeds evaporation 6 months used: Oct -Mar 180 days excess rainfall 12.0 inches Volume = 12.0 in * DA / 12.�inches per foot Primary Lagoon Secondary Lagoon Volume = 94,407.1 cubic feet 49332.1 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = 6.7 inches / 12 inches per foot * DA PRIMARY LAGOON SECONDARY LAGOON Volume = 52.622.94cubic feet 27497.9 cubic feet TOTAL REQUIRED TEMPORARY STORAGE Primary Secondary 5A waste produced. 173020 cubic feet 5B wash water. 0 cubic feet 5C rainfall. 94407 49332 cubic feet 5D 25yr-24hr. 52623 27498 cubic feet TOTAL 396880 cubic feet 6. SUMMARY r Total required volume `1105,380 cubic feet Total design volume avail. A233W 92 cubic feet 408500 Min. req. treatment volume plus sludge accumulation cubic ft Total design volume less 25yr-24hr storm is 1153,671 cubic feet A 5•0� feet secondary fend numninQ}. �rJ- . � �'?5 yt- �.4hr- �"�r.v�, �«r�C�Q'� �G�S'CG• At elev. W-zer.feet ; (start numnina} Seasonal high water table elevation 7. DESIGNED BY:"APPROVED BY: DATE: % L�`r T/ / DATE: OPERATION AND MAINTENANCE PLAN ------------------------------ This lagoon is designed for waste treatment with minimum odor control. The time required for the planned fluid level to be reached may vary due to soil conditions,flushing operations, and the amount of fresh water added to the system. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent runoff from the field or damage - to crops. The following items are to be carried out: 1. The primary lagoon will be pre -charged to 1/2 its capacity to Prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see Attachment H) before land application. 3. Begin pump -out of the lagoon when f uid,,level reaches eleva- tion a5•ISW in the secondary lagoon a marked by'permanent markers. Stop pump -out when the fluid level reaches elevation 75CM in the secondary lagoon 4. The recommended maximum amount to apply per irrigation+is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. SITE EVALUATION REPORT Producer: [`arrO//,s ry,ge, and Size Opera ti on: ,50D -4C1r-r-ow -in -Ani.SA SCS Job Class: County: Da te: 1011 %�/ Di stance to the Nearest Residence Other. Than Owner or Public faci i i t : par+`, r Facrn +neac parr: 15 rarer Pnd J I a.Do . Di stance to wells and other water sources: 5; 4-e ). - 7 1 AD a 4+ ffaza_rd Cl ass fi cati oir: oaf h i,+, k,: i/ b e ci � " f+uzarC� . Th¢ wa 5 -& o.? ,s; i? *'I ffousi Pp faci l i tr: 9u #er- vo/aS h ncf o ve,,A p o p y; rr,Prc✓F-nP,rls. -7�ia".p . rr/a .*-ee'yCle &U05h w47�Pt -A,," 3eeorl zv�e !aJ GTh --avy ,P/v,Aj ,'r7-/c ll�/aa.n Lagoon Specifics: ,ba46 6.- es c v, f% 6L �`►�e [tl O1r7,�I1�rr�rt7/ �''{ C4vG .�° (ske pe54 �/a / ✓cr-l��Q/ .sh��r/d 6P �a�f� o�ti-.r/l <n�E���kr7)P� s,� s/ape C ins,de � ��fs, �; 5.a� 5/0�5' C'o►�76i�±� O� .� ��`Z. fo / � ✓Pr�. pump nq Crcl e: /yD 61mS SITE EVALUATION REPORT page 2 Land Application of Mastc (ac_res available, crops): SD - &o ac res Q�oL��nf�e Gc�P/iC4�T dr arr aPrrl�a pri/r►Gr,��j/ l 33 a �pr+a6 ; nubtron d� Per.rada Corn Jrrp�/ bP c(3Pd Waste Irrigation Equipment: g`AYN ,ett Perri is Requi red: P4 +F< j) rr.�, r10 Loos-:-, perm,45 w. (/ be -,-,e r f�,r /moan C'Ons�i�D n • ,� Summar Y of Soi l s Investi ga ti on: /1 Si L 3�:-htfJ/e jsor / rr.2��ri a� Tor -emba4fw;nf e Ycr r✓P4/Pd sa-r►¢ pou/y yra (skro's , �h cf, c,� f: 11 ve a / prt r � / �,, bob fo►►, Poem f, al or Pa e - °�° i n 9L%12 �P of seb� -i15 a di6ia/, �� 5 irtn¢er. a� i s PX one o should 6� uradorou� � : nrl�s etcaval(ed bol*tm ar irLs;& S/90P, •5�ar 4nd 6act�'�%/rd a f �Gh� d� L� L .r�aKer cr/, i2 rrpr'rr� ry �p- mms4 be iVl- aZ-'O'e y S•' a 1/try -3 �:,c,Qb /e ,50 / rr 4lTlicr % ar PmAonLr0V. AID rf? Cri'Gl i �ruo�rr A- Tern arQ r .sparos e mecs� Misc. I tc 6e KQp7l ObbVe z5c2Soral h)Y, wash fdt.,/eAo Sui tabi l i ty of si tc-(/s.) or sari nc operation: .S�es Lire° .5 a;xa le - i�ePor� t^epo'C88 by., ' U. S. DEPARTMENT OF AGRICULTURE , SCS•538 SOIL CONSERVATION SERVICE 10.56 SOIL INVESTIGATION TO DETERMINE SUITABILITY OF PROPOSED POND SITE FARMER'S NAME m ISTRICT d A. a •DATE D G COUNTY S. C. S. PHOTO SHEET NO. WORK UNIT - - - WATERSHED AREA MEASUREMENT'S CROPLAND ACRES PASTURE ACRES k/aynf = h4>r-- WOODLAND ACRES TOTAL _�___�� ACRES �6iiH CLASS WORK UNIT CONSERVATIONIST SKETCH OF PROPOSED PON N WING WHERE BORINGS WERE MADE (Approx. scale I"= feet) to reference point on center line of dam and Identify on sketch. naf .j-0 ti,t.Q/C ■rrrr��rrrrrrrrrrrrrrrrrrr ■r���rrrrrrrrrrrrrrrrrrrrrr, ME.rrrrrrrrrrrr�►�rrrrrrrrrr �.�rrrrrrrrrrrrrr�i�rrrrrrrrr■ rrrrrrrrrrrrrrrrrr���rrrrrerrtr rrrrrrrrrtrrrrrrrrrra�rrrrrr rrr .rrrrrrrrrrrr MCrrrrr■ ■�ii�''I <��,�rrrrrrrrrr�r��r���rrrr ■«�rrr��.�rrrrrrr►rrrr��r�r��rrr MINN ■r} ■rrrr c��urrrr�i.:�rrrri�rrrrrr� ��rrrrrrr ���rrr�lrrrrrr�rr�rrrr■ ��rr��rrr��r��r�ca����r��rrrrr��rr�rrrrr r�1r..' ���IR��Irrr���i�• - �rfr�Jli�rrrrrr ■rrrrr��>��,�r��►�rrrrrrr�rrrrrrrrr rrrrrrrri,�rrrrrr���rr�l��rrr rrrrrrrr��r��r�l��rrrrrrrrr 0 BORING NUNIBERPROFILE Make and list dam-ille and spillwav bormas first - then pondeor arm and borrow pit borings. separate With vertical red line. (Continued on back where necasfar;1) show water table elevallons an dam -ilia 6orings. [4]ICI©101©f�1�i11l7.MImf®1011®#ml®I MIE�lmlm�Q71®1�I MI NA'Jlrlr!1"In! r:rfrirti.�l�lrl�lrlrlrfrfrlrfrlr 1�r�C�lrlrf�"!'!■snt"••;rlrlr##EQl�irl�" � I�trfrlL�l�I�t�IONIMlgllr!©1NE!! =lrl!Q=1A1 '"" N1M1r ®f�r�riP.lx��f rfrfrlrt�}��rl�tr�r���rlr�r MEMO. SIM UPONMUMMIES �rl�rlr#rlrlrfr;rlr ■ '' ��l—l—lrfr!rirtrlrCrlr MMININNIN W rlrlr r Mall©!rl�lrlrlrlrlrlrlrlr sr!rIr!rlrlr!r� Irlrlr�rEr!r�rlrlrl ■ � r!�rlr�rl■ �r!r!r!rIr!rirl !rl�r!rtr�r!r!�rlriririr�r!r�r�r �rlrlrlrlrirlrrlr#rlrlrlrfrlrlrlrlrlrlrlrlrlrl rrr�rrr�rirrErr�r�r�r�r!r�r�Irr�r�r� ! � LBORINGS MADE BY - e /a rC_ �d Ir SIGNATURE & TITLE n� 1 r �bo�rrgg .,wc� 4vl4l, 6arkApe ) j g . gravel vcos - very coarse sand coarse sand a - sand fa - fine sand We - very fine sand lcos - loamy coarse sand Is - loamy sand Ifs - loamy fine sand al - sandy loam fal - fine sandy loam vfal - very fine sandy loam TYPES L-jp, gal - gravelly sandy loam I - Ioam gI - gravelly loam stl - stony loam a= - silt all - ailt loam cl - clay loam sicl - silty clay loam Hc1 - sandy, clay lown atcl - stony clay loam sic - silty clay c - clay 1. Suitable material for embankment is available [DYea 0 No (lndfrale whirr located on the rketch on rewTse ride) REMAW- Prr�hc+n �rnFr �7 4pza- 71%P/�; �.5 54i7D��t'e F� r`t riA or .� f ,`l-� ��y�P� /��aQ.� Qrea � �L rr)a�er•a� s�,o�k� .62 cr.scd .� �� C��.c�e��'-r�r-e��e�i 7��•�3-� �he-r1 CjL� SG' i S/7'7 �%rD4f�= f c�r?'Jee-r7knrrr�. i Explait hazards requiring special attention h ;leg"4-a (Seepece-wring..nwk eec.1 Second S'�oJIF— Valuirle n7/e-!l rae. . � al'z" . —/A{ c?SDI'rE� S-'yh vct Cr bee. So;(s !r✓Paled r0a". e S 7l `"eY , 77ie bolo,>, W Ae NERAL REMARKS: ,V 1� -SP ma-lerio l ; S e,cpo.5Pc .-h 7Ih E.t'ra vQJ7�Q`f a7/yarr/ a 4i'-A , SAAce A/ be eoro flat f Fd la�e-- zV CZ- Operations and Maintenance Plan INSPECTION/ DOCUMENTATION SPECIFICATIONS Each CAWMP has included an Emergency Action Plan. In the event that effluent is discharged from the waste management system, farm personnel should refer to the Emergency Action Plan for remediation procedures. All components of the waste management system are to be inspected weekly by the certified operator in charge. Each week the certified operator will visually inspect each component of the waste management system and document his/her findings on a weekly inspection checklist. This checklist will be kept on file by the operator in charge for presentation to Division of Water Quality personnel upon request. Inspections should. include the following: Lagoon: Pool Area- inspect the lagoon pool area for undesirable vegetative growth and excessive foreign material or debris. Foreign material should be removed on an as needed basis and vegetation on the inside of lagoon banks controlled by mowing, chopping, or chemicals. Embankment: The operator will walk each lagoon and inspect lagoon embankment for integrity. Vegetation on the lagoon embankment must be properly maintained in order to accurately access its integrity. Routine mowing of embankments is suggested as a means to best manage these areas. Specific items to note include, but are not limited to, extreme settlement or low points along the lagoon berm, side slope stability, seepage, or wet areas on back slope, erosion, and rodent damage. Inspection findings will be documented on the weekly inspection report. Should repairs be required to the lagoon, the operator in charge should contact a qualified technical specialist before commencing any activities that affect the lagoon structures. Pipes: All pipes should be inspected weekly for cracks, separation, or any potential restrictions of flow. Where pipes enter the Iagoon, they should be extended such that erosion of the liner cannot occur. These pipe extensions should have proper supports to prevent sagging. Pipes leading to irrigators, including connections, should be inspected to assure proper waste transport, and to prevent leakage that may result in uneven application of effluent. Pumps: All pumps will be inspected weekly. The certified operator shall indicate if each pump was operating in a normal or abnormal condition. The inspection should also indicate if any leaks from loose fittings or seals were detected and indicate repair action. Irrigators: Each irrigation unit will be visually inspected for loose fittings, poor seals, or other methods of waste leakage to ensure proper application of swine effluent. Operations and Maintenance Plan INSPECTION/DOCUMENTATION SPECIFICATIONS (continued) All repairs and maintenance to the waste collection, treatment, storage, and transmission structures shall be documented in a maintenance and repair manual. The operator shall keep an informal record, in chronological order, of all repairs made to the waste management system or equipment. The certified operator should consult a technical specialist in the event changes are made to equipment that will alter the operating capacity of the waste management system. This maintenance manual shall be made available to the Division of Water Quality at its request. EMERGENCY ACTION PLAN PHONE NUMBERS DWQ 919 946-6481 EMERGENCY MANAGEMENT SYSTEM (919) 536-6545 SWCD (919) 583-3481 N RCS K919, 583-3481 This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at this facility. The following are some action items you should take. Stop the release of wastes. Depending on the situation, this may or may not be possible, Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. a. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rules for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -possible action. a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. Contact company person: Senior Production Mgr. - M. Miles H - (804) 658-3205, W - (919) 537-9710 Complex Mgr. - Kelvin Terry H - (919) 589-2481, W - (919) 445-2695 Farming Mgr. -Alvin Lane H - (919) 587-4881, W - (919) 587-2109 b. During normal business hours, call your DWQ (Division of Water Quality) regional office. Phone 919-946-6481. After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. c. If spill leaves property or enters surface waters, call local EMS Phone Number 919-536-6545. d. Instruct EMS to contact local Health Department. e. Contact local SWCD office phone number 919-583-3481, and local NRCS office for advice/technical assistance phone number 919-583-3481. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask that person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair of problem to minimize off - site damage. a. Contractor's Name: Johnny Sykes b. Contractor's Address: Conway. INC c. Contractor's Phone: 919 585-1565 6. Contact the technical specialist who certified the lagoon and/or Waste Utilization Plan. (NRCS, Consulting Engineer, etc.) a. Name: Rudy Gra__rnmer b. Phone: (804) 834-2109 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. Swine Farm Wasle Management Odor Conlrol Checklist Storer (':Ill+c 13M1•10 to Alinimiie ndtrs Site Sµecill(' Pracli.es 1a1u1;1.aJ ----�. ��._-�++inC I1r(xluclitll I 1 Vegckuliv(: (1[ 1u>talCd huliCls; _ � _----------- t I Recommended hest managenient practices; I I 11(xxl indetnull :uul C011n11(111 senie . mmal lxklc sol lures • Ilirlp manure -covered animals Iloors PI(I(II ills lace'. . WCt Ilia IILlrC-C(11'e[ecI annuals . lotled 11tIo s; uAillefers located over slotted 11mrs, l 1 Feeders at high end of solid Iltiors; f I SCNIJ)e manure boildilp fr1101 Iloors; Whide lour ventilation li}r iryiog IaMIIIIC C I I CCIIIII I Intl v • I Itine. U�rC(IIl(alt Illa[1111C ICHI Y1':II hj' I111S11, Jill r(:Cflatge, • I allial microbial composition or s •rape- hl' Cltl(xN %volilalion ,�CIIIkI�ItµNl e\I1:(Il�l tllll� • Volatile glues; la- "MI Illa111 CWHICC, I)ust it-II'llk iCI11 am Ill(1\Yllle311 I11.1001 ill[ I:ICe5 1 )ust nimalS; 'ashdonn bet1Ce(ai g mps ofanimals', I I Feed additives; l I Feeler covers; LL-ke'd delivery doansixnu cmenders to feeler - - - covers - - — - — Hu,h bulks -- • Agitation of regcled lagwil I I Flush hulk covers; h(Ioid chile tanks Lire tilling tl Emend lilt lines near hntlool oflailks loth anti-si phan vents 1 111%h :Ills) s AgItilion .lul lag 11,a%Ac,,%110 1 1I(1e11hHII hush with onset ll(xlr VC11i l,lliDil coliyeyallye P.it 1ec11mpc polill� • Agtiallon Ill recycled tagoon I I Fmcad recharge pule] to ilea[ bottom of pits 111111 anti -siphon 1'CINS h(lui(I nhile Liss ore lillin ( I.III .11 ll11111\ AglWPM (IMi11g S111111) lilllk .Illllpl lailk Covell --fillip, and drawn llll ( Illlil(111 th.lin C011CC11(Itl • Agllatl(In duting wastewtiter ! 3 llo,� covers tr IuuLIitn 1k1\CS conveyance Source Callse MIN ill Minimize [hhirs SItC Sill'CllfC 1'1'UCOVV1 I-nd ol'tllaillpilwN m Agil -ill iun dtIt i I I A %%asle%%illel 1 i I'\telid Ji.eh:u!<e Iwilll of piixa (irtdcl nealll l:Aronn cunl'(a-auce lagoon litluid leVCI a l .upoolI ;IN llarc; • Volatile gas cli►issious; tYl'ropet lagoon litplid capacilV: • lliological nlising: It CollCul lagoon su,Itup procedures: Agitation "illillillltl ill:ilallnll W11C11 pt1111I11nb'', I I Millillilllll SIIII'aCC area-Itl-rolkit [it! ralin; I Mechanical aeralion; I I Novell Inolo ical addllives Il l ig:lliull S1111111,1e1 • 1 ligh pressure ilgilalioiv. -k) rriplle (N) illy %%':lys %%itll lilile Ilr ntl %kind; nuiil+ s • Wiud drill I I kiiltimum recommended operating pressure. jyf'uugt ilnake near lagnoll litplid Sill laCC. hapix11i ^� Soolalx 1,111)` of hasill • Parlud microbial decollllxlSkllnll; I I IIullUni or nudlewl loads 1gi surlare • h1l\irig %viiil(: Iilliug; I I 'fan covcls; • Agitation %%lieu empl}ing I I Basin surl'itce luals of solids. I I I'rtll'CI1 Ilinlnl+lCal atlthllCCs ()r ()\Id'JIllS S011111! basil ;ul l;wc P;Irlial nlicrohiill decunllxlsilion; i i FMend drainpipe nutlet; mile leach htluid • Mixing %%Ilile lilling; Icvcl; • Agitation v lien euipll'iq I 1 Rellln%-C settled solids IgLI1;ilIt N1,111lue, ;lull% or ,lu(lltc . Agilalino %%lien slireadinE; ^ I I Soil injeclinn ul'slilm-Isiudges; — — splcadel oullels 0 Volatile gaps Clolssions I I Wash icsidual manure lionl spreatler ali::i use. I i I'roven hinlogicill udtlillveS or omilanls I lucovelcd ula$mle. Volatile gil-, enlissinns %%line I : soil irliectioll ol',lul I)/sludl;es s)nirl OF S11111;e tin field timing 11 Soil ilkC01JU1lillinll %%ilhill •18 hrs; sal lltccs I ! 1%pteall in thin Imililull IaNCIs Ilir rapid dl.% ille. I I I'rM-01 %Bola gical a(ldiliWS or oxidanls I )ead allilmil% • Carcass decomixlsltlon 'rONl' diSixlSilinli 01.C:IrCaiieS I )ciul ;lmlllal; cass decomposilion I I Complete Coverilig ni ralcasses in burial pit;, pts — — _ _ _ II I'rnlx:r Itl(at11111/C(1115l1"uCIk011 UI dlSpnsll Illy tut illclakolS • Inc(Inl111CIC cnluhuslion 115econdal). slack huiners Insect Control Clleciclist for Animal Operations Source CULISC RAM, W Miaimiec t7durs Sile Specific Praclices Liquid Sys[ nis I In.Ai I illllcis • Acclailliktiun ul'sulids uSIJ sySlelrlS is il,;Sigr►ed anti ulk:rated Ituurine IISC of inSecrici&IC sulliciently to W111Ore acculnlilaled solids liuni during spriuglsunmler glitters as desigue,l. months IlIrlannve bridging of aCgln►Ilhted Solids al Ituutilib lise of (odelllicidt: ihschllrae }ear rulu►d. I.alnioui mid i'u, • ('rusted tiuhdS I"aililaill lagoulla, scilling Ilasills and piss %%liege pest breeding is apparent In inininiize Ole crusting of solids to a deplh of nu inure than 6- 8 inches over more than 311;u ofsurlilce 1'.\,',iti�i1'e ��,a','I:d11e • Ijig vegetalt011 "ill'illaill vegetal►ve control al,iag ballksoh it Ui1111 iUg0olh alld 011ler ilillhlllndniellls lli pft:%Vol acelltill ILL lioil ofticcaying vegelalive uuillcr along water's edge oil ilnpnln►dnleul's Ik:rimeler. _ inn_• Sy'Icnls hced,a; • I'ee,l spillage 1'' esign, upeli le and inailllalll Iced sysleots (e.g,, _ hunkers and Ironglis) its minimize the acculuLila Iioil ul'decayil►g %�astage. iydean up spillage oil a rouline basis (c g., 7-III day interval .luring slimmer, 15-30 day nllel till during; llinlerl. I ccd tilol iil:e • Acculmdaliuns of feed resi,laes I Itedlic,: IlloISMIL: aerunullaluul wilhiu and alOill►d ilnitie,liille Ik:rinleler of teed Aorlge tlreaS by itsurillg drainage assay Isom sit.: :nut/ur prot•i 11% adCCILMLe C0111alllllielt (e g , covered bin for hfewer's brain and siu►ilal Ilibh luoislure grain prlklucis) l I IIISlk:el lilt and remove or break up accumuh sled solid, in tiller sllips arlwnd li:rd stodge as Ileulul. Smirce'. Cut"t : IM11,11 I bAdIlig AIC;IN • Accuamlaliuns ui animal withi ;s anal Ice d waslage: )IN Al:ult Ic 111111,1111114 • AcCLIllllllitli011S of alulual yeasts 11A11'I, it) Miuinliec 01111n, _ I I F.lilninale: Jim alias Ihal Irap aloiSMIC ahsug lends alit) 001Cl 10ca11013S ►1ht7rL Wash! accMiltllates hail &SIIIl NLIILC by- a111111aIS is lilt taint. I +Ai,int.rin tune rows and lillcr strips arnuud animal luOIelijig taus us Illiniali7e; accumulations of ►►as es (I c., inspect for and reaurVe: OF Isreak up aecutlullalcd solids as 1Ic:�'tl4d )- I I Remove spillage un a rnnlinc Isasis (c g , 7-11I dad' irllural during snlunitrf, 15-i0 tltly mlcl Val during ►►inter) w1jerc Immure is loaded list laud itlspli.alirns or disixssal. I I P1116th: for adequale tlrainagL� around maame: stmIllilcs. I'I Irslxxl Iin arltl nluorc OF hrcak up accluuulatcd Wades III Idler '.frills :Irouutt slockpiles and manure htmtllirlt, areas '.IS Theeded. Silt Specific I'ruclires Source Cause BMPs to Minimize Odor Site Specific Practices Standing water around • Improper drainage; Grade and landscape such that water drains facilities • Microbial decomposition of away from facilities organic matter Manure tracked onto Poorly maintained access roads Pr Farm access road maintenance public roads from farm access Additional Information: Available From Swine Manure Management ; 0200 Rule/BMP Packet NCSU, County Extension Center Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet NCSU - BAE Swine Produclion Facility Manure Management: Pit Reellarge - Lagoon Treatment ; EBAE 128-88 NCSU - BAE Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment; EBAE 129-88 NCSU - BAE Lagoon Design and Management for Livestock Manure Treatment and Storage ; EBAE 103-83 NCSU-BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU - Swine Extension Environmental Assurance Program ; NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings Florida Cooperative Extension I I AMOC - November 11, 1996, Page 5 E Mortality Management Methods (check which mcthod(s) arc being implemented) Burial three feet beneath the surface of the ground %sithin 24 hours after knowledge of the death. The burial must be at least 300 feet from any Flowing stream of public body of water. Rendering at a rendering plant licensed under G.S. 106-168.7. CItomplete incineration. G In the case of dead poultry only, placing in a disposal pit of a size and design appro%-cd by the Department of Agriculture. G Any method which is in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of the State Veterinarian must be attached). .+ System Calibration Information presented in manufacturer's charts are based on average operating conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. with continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces -the coverage diameter and application uniformity. For the above reasons, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once ever thr 's recommended. Calibration involves�'o�feccttang and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection container 25 feet a art long the transect on both sides of the gun cart. You s ould compute the average application rate for all collection containers. You should also look for evidence of nonuniformity of the application. On a windless day, variation between containers of more. than 30 percent is cause for concern. You should contagt your irrigation dealer or technical specialist for assistance. T.AapQue`st:. Maps: print http://www.mapquest.conlL/maps/print.adp?mapdata=5SWr5yNjh48... C04 A Send To Printer Back to Map Roanoke Rapids NC 27870 US Notes: .......................................................... 11FW.� Book a Hotel: Save up to 70% on Orbitx Savers Nationaridel Book Nowt All rights reserved. Use Subject to License/Copyright NAv� CCMs This map is informational only. No representation is made or warranty given as to Its Content. User assumes all risk of use. MapQuest and its suppliers assume no responsibility for any loss or delay resulting from such use. Privacy Policy & Legal Notices cp 2003 MapQuest.com, Inc. All rights reserved. 1 of 1 9/4/2003 11:26 AM MapQuN: Maps: print http:Hwww.mapquest.com/maps/print.adp?mapdata=5SWr5yNjh48... Pr %, V, E- qs Tr, - Send To Printer Back to Map i / Roanoke Rapids NC 27870 US Notes: Back a Hotel: Save up to 70% on ©rbitz Savers Nationwidel Book Nowl. All rights reserved. Use Subject to License/Copyright [iiwTE cr it This map is informational only. No representation is made or warranty given as to its content. User assumes all risk of use. MapQuest and Its suppliers assume no responsibility for any loss or delay resulting from such use. Privacy Policy & Legal Notices © 2003 MapQuest.com, Inc. All rights reserved. I of 1 9/4/2003 11:26 AM R1 DATE/TIME :JUN. -?0' 03(FRI) 11:1.8 jUN-20-2003-FRI 1`i;35 PM NPD USA 252- 537 9798 FAX No. 252 537 9798 P. 001 P. 001 SMITHFIELD Premium Genetics 385 Hwy 158 Roanoke ,Rapids, NC 27870 Fax: (252) 537-9798 DATE: a TO; Sr FROM* RZEFERENCE: fj�'� G19i2� N'-CTMBER OF PAGES: (including Cover Sheet) If you do not receive WJ pages of this fax eall: (252) 537-9710 ext Rl ►J.n`PEI'1 ME JUN. -20` 03(PFi1) �, : 28 �? �1 979S P. 002 iiiN-20-2003-FR I 1 2: 3; PM NPD USA FAX No. 252 537 9798 P 002 i Smithfield Premiurti enetic s (S- ) 3855figh-way 158,1{oanokg Rapids,1(C, USA .27870 TeCep: (252)537-9710 �: (252) 5379798 CEftu&T: (757)377-9190 E-mait: don,ros*@spdetitics.com FROM Don 9�osie 11 i To: ,.rD. fester C.C. 7,-raig Westerbeef, Yohn, Carter, R,o6ert -Moana Date: 6120103 Topic: -WEEBOA!kD Dear Mr, Hester our current freeboard readings a•.-e: Farm 50 — 49" Farm 61 — 3" " Farm 62 -- 24" Farm 63 30" Reduced water consumption arid good fortune allowed our farms to miss some of the scattered showers, which have helped our levels. I look forward to the drier weather next week and maybe for the rest of summer. Waste Management Plan Changes Facility 44 -z' Z Farm . ._._ This farms Waste Management Plan has made the following changes: Crop changes ❑ Wetted Acres ❑ Increased Acreage ❑ Decreased Acreage ❑ Changed Irrigation Design ❑ Change in Farm type ❑ PIan based on 3 Years On Farm Records �ther Comments: 13--'� -a3 Date nf, ti�^R a- i Murphy -Brown, LLC 08/09/2003 P.O. Box 856 4 z-Z+ Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Farm Name: Murphy -Brown, LLC SPG Farm 62 Amendment county: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent poll of surface water and/or groundwater. The plant nutrients in the animal waste should be u, to reduce the amount of commercial fertilizer required for the crops in the fields where the is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyze before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 8 Reception Area Specifications I Field Irrigated Soil Ist Crop Time to IstCrop IstCrop LbsN/Ac Lbs N Total lbs N Acreage T ype Code Apply Yield lbs N/Unit Residual lAc Utilized Rolm �Tract 3(a) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized I unit yield A Barley 1.6 Ibs N 1 bushel B Hybrid Bermudagrass - Grazed 50 Ibs N 1 ton C Hybrid Bermudagrass - Hay 50 Ibs N 1 ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N / ton F Cotton 0.12 Ibs N 1 Ibs lint G Fescue- Grazed 50 Ibs N 1 ton H Fescue- Hay 50 Ibs N I ton I Oats 1.3 Ibs N 1 bushel J Rye 2.4 Ibs N 1 bushel K Small Grain - Grazed 50 Ibs N 1 acre L Small Grain - Hay 50 Ibs N 1 acre M Grain Sorghum 2.5 Ibs N 1 cwt N Wheat 2.4 Ibs N / bushel O Soybean 4.0 Ibs N 1 bushel P Pine Trees 40 Ibs N 1 acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of8 Additional Comments: The acreage listed on this amendment is the balance of the total field acreage minus the wetted acres at this site. The areas not covered by the conventional Irrigation system are being entered into the pumping records as sub fields so that the acres can be claimed when making application with an Aerway machine. 7of8 AM-20-2003—WED 05-06 PM NPD USA FAX No.252 537 9796 P.0Q3 E Aug 20 03 0415rp MURPHY-BROWN 91D2933138 • P. 8 I NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: SPO Farm 62 Amendment Owner. Murphy -Brown, LLC Owner/Manager Agreement: I/we understand and will follow and implement the specfftcabons and the operation and maintenance procedures established In the approved animal waste nutrient managemeni plan for the farm named above. Uwe know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new Facilities,, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. Uwe understand that I must own or have ocems to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be avalable at the appropriate pumping time such that no discharge occurs from the lagoon in -the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan wdl be filed on site at the form office and at the office of the local Sod and Water Conservation District and will be available for review by NCDWQ upon request. Name of I Signature Name of Manager (iif different from owner): Signature: Date Name of rachnical Specialist: Dawn Williamson AtIitiation: Murphy-Brown�LLC _ Address: ^� 2822 _ft 24 West, PO Drawer 856 Warsaw HC 28M Telephone: 910 Z93-3434 Signature. '& 9-03 6990W91 i 00e w Murphy -Brown, LLC Grower(s): Farm Name: 4/22/2005 NUTRIENT UTILIZATION PLAN Murphy -Brown, LLC SPG Farm 62 County: Halifax Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish 500 Wean to Feeder Feeder to Finish Storage Structure: Storage Period. Application Method: 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28396 44a -a 7 The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. Anaerobic Lagoon >'180 days Irrigation This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3, Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. RECEIVED / DENR / DWQ 1 of 8 Aquifer ProtPrtion Sertiofl MAY 14 2009 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, f} tons, etc.): CaRacity Type Waste Produced per Animal Total Farrow to Wean 3212 gal/yr gallyr Farrow to Feeder 4015 gallyr gallyr 500 Farrow to Finish 10585 gallyr 5,292,500 gallyr Wean to Feeder 223 gallyr gallyr Feeder to Finish 986 gallyr gallyr Total 5,292,500 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): "based on site specific data .Capacity Type Nitrogen Produced per Animal Total Farrow to Wean 5.4 Ibs/yr Ibs/yr Farrow to Feeder 6.5 Ibslyr Ibslyr 500 Farrow to Finish 10.93 Ibs/yr 5,465 Ibs/yr Wean to Feeder 0.48 Ibslyr Ibslyr Feeder to Finish 2.3 Ibs/ r Ibs/yr Total 5,465 Ibs/yr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 58.99 Total N Required 1st Year: 14551.75 Total N Required 2nd Year: 0 Average Annual Nitrogen Requirement of Crops: 14,551.75 Total Nitrogen Produced by Farm: 5,465.00 Nitrogen Balance for Crops: (9,086.75) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2of8 -Reception AcMage__Typq_ Code— Apply Yleld lbs N-/Untt Residual fAc Utilized �� N■■■� ■■■■� �� �� �� �� �� r�■�� err � ��� �� � � �� �� �� � s(s) of 8 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to Interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized 1 unit yield A Barley 1.6 lbs N 1 bushel B Hybrid Bermudagrass - Grazed 50 lbs N I ton C Hybrid Bermudagrass - Hay 50 lbs N 1 ton D Corn - Grain 1.26 lbs N 1 bushel E Corn - Silage 12 lbs N 1 ton F Cotton 0.12 lbs N 1 lbs lint G Fescue - Grazed 50 lbs N 1 ton H Fescue - Hay 50 lbs N 1 ton I Oats 1.3 lbs N 1 bushel J Rye 2.4 lbs N 1 bushel K Small Grain - Grazed 50 lbs N 1 acre L Small Grain - Hay 50 lbs N 1 acre M Grain Sorghum 2.5 lbs N 1 cwt N Wheat 2.4 lbs N 1 bushel O Soybean 4.0 lbs N I bushel P Pine Trees 40 lbs N 1 acre 1 yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 8 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PANT rlanimal Farm Totall r Farrow to Wean 0.84 Farrow to Feeder 1 500 Farrow to Finish 4.1 2050 Wean to Feeder 0.072 Feeder to Finish 0.36 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 2050 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 10250 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 34 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 82 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. `This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of -the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of8 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract H!rdrant Type crop in/hr " inches _ 1291 1 A Gritney C 0.5 1 1 B Gritney C 0.5 1 2A Gritney C 0.5 1 2B Gritney C 0.5 1 3 Gritney C 0.5 1 4A Gritney C 0.5 1 4B Gritney C 0.5 1 Reid Lease 5A Gritney H 0.5 1 5B Gritney H 0.5 1 6A Gritney H 0.5 1 6B Gritney H 0.5 1 7 Gritney H 0.5 1 8A Gritney H 0.5 1 8B Gritney H 0.5 1 9A Gritney H 0.5 1 9B Gritney H 0.5 1 10 Gritney H 0.5 1 1291 sub1 Gr tney C 0.5 1 Reid Lease sub2 Gritney H 0.5 1 6of8 Additional Comments: The acreage listed on this plan as subfields is the balance of the total field acreage minus the wet acres at this site. This acreage will be claimed when making application with an aerway machine. This acreage is optional for this plan. 0, 7of8 04-27-2005 10:51 5PG 2524152695 PAGE2 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: SPCA Farm 62 Owner Murphy -Brown, LLC Manager: OwnerlManager Agreement: Ilwe understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above_ Ilwe know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. llwe understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 26 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Murphy Brown., Li_C Signature: '�� Date Name of Manager (if different from owner): Signature: Name of Technical Specialist: Dawn Williamson Affiliation: Mur h -8rown LLC. Address: 28822 Hwy 24 Wes14 PO Drawer 856 Warsaw NC ,28396 Telephone: 910 253-3434 Signature: Borg. Date —z7--'o Date NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 1 of 3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainadeways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist'. Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 2of3 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 3of3 Farm 7.'-. Scale: 1 "=3( ), offset Wells w Lagoon F ,aF-M LZ NORTH CAROLINA FARM LEASE AGREEMENT HALIFAX COUNTY THIS FARM LEASE AGREEMENT made and entered into this the 10`h day of December 2003, by and between ALICE PARTIN REID (hereinafter referred to as "Owner"), 218 King George Road, Greenville, NC 27858; and MURPHY-BROWN, LLC (hereinafter referred to as "Tenant"), 2822 Hwy. 24/50 West, Warsaw, NC 28398. WHERAS, Owner is the owner of certain lands, Premises and improvements designated on the attached aerial photograph identified as Exhibit A — Tax Parcel 04-021.02; containing 94 acres more or less. AND WHEREAS, Tenant desires to farm the approximately 35 acres of cleared land and install an eight inch PVC pipeline across Owner's property and to bury the same approximately four feet underground to transfer waste waste and effluent from the adjoining swine facility to designated spray fields. Tenant also desires to lease the remaining wooded land to maintain exclusive hunting rights during the leased period. ( AND WHEREAS, Owner and Tenant have negotiated such terms, conditions and stipulations and now desire to memorialize the same as established by the terms, conditions and stipulations as hereinafter set forth. NOW, THEREFORE, for and in consideration of the Premises, the suzn of Ten Dollars ($10.00) in hand paid to each party by the other, the receipt and sufficiency of which hereby is acknowledged and by the mutual promises, covenants and conditions contained herein, the parties hereby do hereby covenant, stipulate and agree as follows: TERM OF THE LEASE: The initial term of this Lease shall be for a period of ten (10) years commencing the 1.Oth day of December, 2003 (the "Inception Date"), and ending the 31 st day of December, 2013. 2, INITIAL TERM RENT FOR CROPLAND: Tenant shall pay to Owner rent for the initial term of ten years, $16,800.00, due and payable as follows: a. The Sum of $1,680 due and payable on or before December 1, 2004. b. The Sum of $1,680 due and payable on or before December 1, 2005. c. The Sum of $1,680 due and payable on or before December 1, 2006. d. The Sum of $1,680 due and payable on or before December 1, 2007. ( e. The Sum of $1,680 due and payable on or before December 1, 2008 f. The Sum of $1,680 due and payable on or before December 1, 2009 g. The Sum of $1,680 due and payable on or before December 1, 2010 h. The Sum of $1,680 due and payable on or before December 1, 2011 i. The Sum of $1,680 due and payable on or before December 1, 2012 j. The Sum of $1,680 due and payable on or before December 1, 2013 3. INITIAL TERM RENT FOR HUNTING RIGHTS: Tenant shall -pay to Owner rent for the initial term of five years, $6000.00, for the exclusive rights for ingress and regress to all land and the hunting rights for all non cropland, for the first five years of this lease, such payment will be due and payable as follows: a. The Sum of $1,200.00 due and payable on or before December 1, 2004. b. The Sum of $1,200.00 due and payable on or before December 1, 2005. c. The Sum of $1,200.00 due and payable on or before December 1, 2006. d. The Sum of $1,200.00 due and payable on or before December 1, 2007. e. The Sum of $1,200,00 due and payable on or before December 1, 2008. 4. RIGHT TO RENEGIOTIATE THE HUNTING RIGHTS: Owner reserves the right to renegotiate the annual hunting rights at the end of the first five-year term. At the end of the first five-year term both parties will have the right to renegotiate the payment and terms of any additional or fitrther hunting rights for the non -cropland. Tenant shall retain all hunting right for the cleared land during the ten-year farm lease agreement. 5. ENVIRONMENTAL: Tenant shall not permit, allow, or cause any act to be performed or Any practice to be adapted or followed in and about the Premises which shall cause or be likely to cause injury or damage to any person or to said Premises or to other property or any persons. In no case shall Tenant cause or allow waste water effluent to be discharged or released onto Premises. In addition to Owner's other remedies, Tenant agrees to indemnify and hold Owner harmless from against any and all loss, liabilities, damages, injuries, interest, deficiencies, fines, penalties, costs, expenses attorney(s)' fees and costs of investigation and clean up including, without limitation, to claims, suits and proceeding by Federal, State, County and local governmental authorities with respect to, or as a direct or indirect result of the presence on or under, or the escape, seepage, leakage, spillage, discharge, emission, discharging or releasing from, the property any wastewater effluent, if such occurs, during the term of this Lease or during any extended period. 6. STRUCTURAL CHANGES: Tenant shall not construct any additional improvements Upon the Premises except the underground pipeline. At the expiration of the tem of this Lease, upon demand by Owner, Tenant, at Tennant's sole cost and expense, shall remove all underground equipment placed upon the Premises by Tenant, including, but not limited to underground pipes. At the option of Owner, at the expiration of the term of this Lease or earlier termination, Owner may retain all underground pipelines on the Premises, in which event all underground piping shall become the property of Owner. 7. PROPERTY TAXES: Owner will be responsible for all county and state property taxes due on the property. 8. ASSIGNMENT AND SELLING OF PREMISES: Tenant shall have the right to assign This lease or the sublet the Lease. Owner shall have full authority to assign this lease, to mortgage, lease or sell his property. Tenant agrees to subordinate this Lease to such mortgage, lease or sale. 9. MEMORANDUM OF LEASE: Owner agrees to sign, for recording at the Halifax County Courthouse, a Memorandum of Lease. 10. BINDING EFFECT: This Agreement shall be binding upon the parties, their heirs, assigns, personal representatives and successors in interest, This Agreement may be executed in one or more counterparts each of which shall be deemed to be an original. AGREED to this the 10`h day of December, 2003. IX�LC.Li c (SEAL) Alice Partin Reid. Owner/ Murp4y-B#owA LLC, Tenant NORTH CAROLINA PITT COUNTY 1, a Notary Public of Pitt County, North Carolina, do hereby certify that ALICE PARTIN REID, personally appeared before me this day and acknowledged the due execution of the foregoing LEASE for the purpose therein expressed. Witness my hand and notaries seal this day of December 2003. My commission expires: k�b 17 (Notary Seal) �Itary P is NORTH CAROLINA FAnyr COUNTY IkYV4 Wes�er(ote.K I, a Notary Public of Duplin County, North Carolina, do hereby certify that EQN ROS , a manager of MURPHY-BROWN, LLC personally appeared before me this day and acknowledged the due execution of the foregoing LEASE for the purpose therein expressed. Witness my hand and notaries seal this Af� day of December 2003. My commission expires: OcA - IS, -a (Notary Seal) Notary Public A ol' Pi" "L rt ,6L .... .. i� t TI h 1�111:,if N f, in'll"t, 41 ti� m v qo,,W,r� Wz 4-4 ao� Irrj ra.z Mlw vjt�