Loading...
HomeMy WebLinkAbout20070291 Ver 4_USACE Permit_20090811ID 1 - D Uk I v i U.S. ARMY CORPS OF ENGINEERS- o? WILMINGTON DISTRICT Action ID. SAW-2006-41503 County: Bladen USGS Quad: Kelly GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner: Mr. Don Betz p 12(@ L5 6 V Lower Cape Fear Sewer and Water Authority t/ i? Address: 1107 New Pointe Boulevard, Suite 17 AUG 1 1 2009 Leland, NC 28451 DENR - WATER QUALITY Telephone No.: 910-383-1919 WETLMDS AND STORMWATER BRMM Size and location of property (water body, road name/number, town, etc.): The project area is adjacent to and within the Cape Fear River and is located at the end of Lock Number 1 Road, upstream of Lock and Dam Number 1, east of N.C. Highway 87, near East Arcadia, Bladen County, North Carolina. Description of projects area and activity: Kings Bluff Pump Station Expansion. This permit authorizes the temporary discharge of fill material into 0.222 acres of the Cape Fear River and 0.721 acres of adjacent wetlands for the installation of approximately 1100 feet of 60 inch water intake pipe and intake screens. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ® Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 12 SEE ATTACHED GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Ronnie Smith at 910-251-4829. Corps Regulatory Official: Ronnie Smith \ i Date: August 10, 2009 Expiration Date of Verification: August 10, 2011 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http://www.saw.usace.army.mil/WETLANDS/index.htnil to complete the survey online. Page 1 of 2 Determination of Jurisdiction: ? Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). There 'are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ? There are.waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued on October 22, 2007. Action ID 2006-41503 Basis of Jurisdictional Determination: Corps Regulatory Official: Date: Autiust 10, 2009 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: Ms. Kim Williams Ms. Cyndi Karoly Land Management Group NCDENR-DWQ Post Office Box 2522 1650 Mail Service Center Wilmington, NC 28402 Raleigh, NC 27699 Department of Commerce, Nautical Data Branch 1315 East-West Highway, N/CS261 Station 7331 Silver Springs, MD 20910 Ms. Emily McArthur McKim and Creed 243 North Front Street Wilmington, North Carolina 28401 Page 2 of 2