Loading...
HomeMy WebLinkAboutNCC190261_NOI Signed Certification_20190510 NCGO1 Notice of Intent (NOI) Certification Form Print this form,complete,scan and upload to the electronic NOI. Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program S12 N.Salisbury Street,6 1h Floor 1612 Mail Service Center Raleigh, NC 27699-1612 Per NC General Statute143-215.6B(i), any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report,plan, mother documentfiled or required to be maintained under this Article ororule implementing this Article. . . shall be guilty ufo Class J misdemeanor which may include o//nenot to exceed ten thousand dollars($20'00(). Under penalty of law, I certify that(check all four boxes to indicate your agreement): KI I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. OD The information submitted in this NOI is,to the best of my knowledge and belief,true,accurate,and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. OD | will abide by all conditions ofthe NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. DO If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan)ofthe NCGO10000 General Permit, | will nonetheless ensure that all conditions of Part|| of the permit are met on the project at all times. 91 | hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner asan individual permit. Legally Responsible Organizational Entity: 1oo4 Catherine Lake Solar, LLC * Legally Responsible Person: Jonathan Burke Bgnature� Qate� 05'10'201* ~ IMPORT4N7NOTE. This form must be signed by a responsible corporate officer that owns or operates the construction activity,such osopresident,secretary, treasurer, or vice president, o/o manager that is authorized in accordance with Part IV,Section B, Item(6)o/the NCGQ20000permit. For more information on signatory requirements,see Part IV,Section B' Item(6)of the N(G028000permit.