HomeMy WebLinkAboutNCC190259_NOI Application_20190513Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 5/13/2019 12:49:52 PM (NCG01 NOI Submission)
Approve by Georgoulias, Bethany 5/13/2019 1:26:19 PM (Review- Construction NOI 10942)
• The task was assigned to Georgoulias, Bethany by round robin distribution 5/13/2019 12:50 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 15, 2019 5:00 PM.
The priority is: High 5/13/2019 12:50 PM
Submit by Georgoulias, Bethany 5/13/2019 1:26:38 PM (Payment Verification - NCG01-2019-0259)
• The task was assigned to Georgoulias, Bethany. The due date is: May 14, 2019 5:00 PM. The priority
is: High 5/13/2019 1:26 PM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * ATF Infrastructure
2. County* Hoke
3. Highway or Street King Road & Hwy 211
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township * Fort Bragg
5. State * NC
1r-i)iTII1T7i)MfiTif_TiIa10141
6. Zip Code* 28307
7. Latitude * Enter the latitude in decirral degrees
35.1156
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-79.3630
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin * 05/31 /2019
Estimated Construction Project Start Date
10. Date to End* 01 /31 /2020
Estimated Construction Project End Date
11. SIC (Primary)* Industrial (1541)
Standard Industrial aassification for Development
12. Acres to be 8.80
disturbed* (including off -site borrow and waste areas)
13. Total site area
8.80
(acres)*
14. Post-
1.00
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-HOKE-2019-ATF Infrastructure
Tracking ID
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Wolf Pit Creek
Waterbody * Narre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 18-13-3
Index No. * NCWaterbody Index Nunber
Stormwater r No
discharges will flow rj Yes
to additional
wate rs *
15c. Additional Quewhiffle Creek
Receiving Waterbody narre
Waterbody
15d. Waterbody 14-2-14
Index No. NCWaterbody Index Ninber
15e. Additional Waterbody narre
Receiving
Waterbody
15f. Waterbody NCWaterbody Index Nunter
Index No.
16a. Is this project r Yes
subject to the NC f No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization American States Utility Services
Name *
2. First Name* Jim
ff Corporation, enter Registered Agent First l\b e
3. Last Name * Cotton
V Corporation, enter Registered Agent Last Barre
3b. Title Senior Vice President and Procurement
Officer
4. Permitee E-mail Jim.Cotton@asusinc.com
Address*
5. Permittee 540.645.7070
Telephone No.*
6. Permittee Mailing Street Address
Address* 904 Princess Anne Street, Suite 204
Address Line 2
Suite 204
City State / Province / Region
Fredericksburg Virginia
Fbstal / Zip Code Country
22407 United States
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address * 904 Princess Anne Street, Suite 204
Address Line 2
Suite 204
City
State / Province / Region
Fredericksburg
Virginia
Postal / Zip Code
Country
22408
United States
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Government - Federal
Ownership*
2. Primary Site Shay
Contact - First
Name *
3. Primary Site Coombs
Contact - Last
Name *
4. Title Project Manager
5. Site Contact E- shay.coombs@asusinc.com
mail Address*
6. Site Contact (910) 303-7348
Telephone No.*
7. Organization
American States Utility Services
Name
8. Site Contact
Street Address
Mailing Address*
903 Armistead Street
Address Line 2
city
Fort Bragg
Rbstal / Zip Code
28307
State / Province / Region
NC
Country
USA
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 04/05/2019
Approved *
2. E&SC Plan Project MOORE-2019-034
Number/ID* Assigned by agency or local program
3. E&SC Plan f• State DEQ Office
Approved by r Local Program
4. State DEQ Office * Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan PN80037_Erosion Control Approval Letter and
Approval 729.17KB
Documents_Revision.pdf
letter/documentation
Mist be RJF forrrat
6. NOI Certification NCG01-eNOI-Certification-Form-20190507-DEMLR-
Form 399.68KB
SW_JC_Signed.pdf
Mast be RCF format
This is an Express f No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
#W t 60A, IV
Type Name * Jim Cotton
Title Senior Vice President
Organization American States Utility Services
Date * 05/13/2019
F. Tracking and COC Info
NOI Tracking No. 10942
NC Reference No. NCG01-2019-0259
Uses 'count number variable (incremrented by SP)
Certificate of NCC190259
Coverage (COC) Uses 'count nunber variable (increrrentedbySP)
No. *
Count Number 259
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)