Loading...
HomeMy WebLinkAboutNCC190259_NOI Application_20190513Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/13/2019 12:49:52 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 5/13/2019 1:26:19 PM (Review- Construction NOI 10942) • The task was assigned to Georgoulias, Bethany by round robin distribution 5/13/2019 12:50 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 15, 2019 5:00 PM. The priority is: High 5/13/2019 12:50 PM Submit by Georgoulias, Bethany 5/13/2019 1:26:38 PM (Payment Verification - NCG01-2019-0259) • The task was assigned to Georgoulias, Bethany. The due date is: May 14, 2019 5:00 PM. The priority is: High 5/13/2019 1:26 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * ATF Infrastructure 2. County* Hoke 3. Highway or Street King Road & Hwy 211 Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township * Fort Bragg 5. State * NC 1r-i)iTII1T7i)MfiTif_TiIa10141 6. Zip Code* 28307 7. Latitude * Enter the latitude in decirral degrees 35.1156 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.3630 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin * 05/31 /2019 Estimated Construction Project Start Date 10. Date to End* 01 /31 /2020 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Development 12. Acres to be 8.80 disturbed* (including off -site borrow and waste areas) 13. Total site area 8.80 (acres)* 14. Post- 1.00 construction (Estimated) impervious area (acres) * NCC Project NCC-HOKE-2019-ATF Infrastructure Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Wolf Pit Creek Waterbody * Narre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 18-13-3 Index No. * NCWaterbody Index Nunber Stormwater r No discharges will flow rj Yes to additional wate rs * 15c. Additional Quewhiffle Creek Receiving Waterbody narre Waterbody 15d. Waterbody 14-2-14 Index No. NCWaterbody Index Ninber 15e. Additional Waterbody narre Receiving Waterbody 15f. Waterbody NCWaterbody Index Nunter Index No. 16a. Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization American States Utility Services Name * 2. First Name* Jim ff Corporation, enter Registered Agent First l\b e 3. Last Name * Cotton V Corporation, enter Registered Agent Last Barre 3b. Title Senior Vice President and Procurement Officer 4. Permitee E-mail Jim.Cotton@asusinc.com Address* 5. Permittee 540.645.7070 Telephone No.* 6. Permittee Mailing Street Address Address* 904 Princess Anne Street, Suite 204 Address Line 2 Suite 204 City State / Province / Region Fredericksburg Virginia Fbstal / Zip Code Country 22407 United States Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address * 904 Princess Anne Street, Suite 204 Address Line 2 Suite 204 City State / Province / Region Fredericksburg Virginia Postal / Zip Code Country 22408 United States C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Government - Federal Ownership* 2. Primary Site Shay Contact - First Name * 3. Primary Site Coombs Contact - Last Name * 4. Title Project Manager 5. Site Contact E- shay.coombs@asusinc.com mail Address* 6. Site Contact (910) 303-7348 Telephone No.* 7. Organization American States Utility Services Name 8. Site Contact Street Address Mailing Address* 903 Armistead Street Address Line 2 city Fort Bragg Rbstal / Zip Code 28307 State / Province / Region NC Country USA D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 04/05/2019 Approved * 2. E&SC Plan Project MOORE-2019-034 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan PN80037_Erosion Control Approval Letter and Approval 729.17KB Documents_Revision.pdf letter/documentation Mist be RJF forrrat 6. NOI Certification NCG01-eNOI-Certification-Form-20190507-DEMLR- Form 399.68KB SW_JC_Signed.pdf Mast be RCF format This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature #W t 60A, IV Type Name * Jim Cotton Title Senior Vice President Organization American States Utility Services Date * 05/13/2019 F. Tracking and COC Info NOI Tracking No. 10942 NC Reference No. NCG01-2019-0259 Uses 'count number variable (incremrented by SP) Certificate of NCC190259 Coverage (COC) Uses 'count nunber variable (increrrentedbySP) No. * Count Number 259 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)