HomeMy WebLinkAboutNCC190232_NOI Application_20190509Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 5/9/2019 1:04:08 PM (NCG01 NOI Submission)
Approve by Georgoulias, Bethany 5/9/2019 1:31:02 PM (Review- Construction NOI 10856)
• The task was assigned to Georgoulias, Bethany by round robin distribution 5/9/2019 1:04 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 13, 2019 5:00 PM
5/9/2019 1:04 PM
Submit by Georgoulias, Bethany 5/9/2019 1:31:18 PM (Payment Verification - NCG01-2019-0232)
• The task was assigned to Georgoulias, Bethany. The due date is: May 10, 2019 5:00 PM
5/9/2019 1:31 PM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * Robert Lee Jobe
2. County* Guilford
3. Highway or Street 4148 McConnel Road
Address * Street name only is acceptable if no address nurrber assigned yet
4. City or Township* Greensboro
5. State * NC
1 r-i) iTiT 7i1) M fiIi (-:To a 10141
6. Zip Code* 27406
7. Latitude * Enter the latitude in decirral degrees
36.0534
8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative)
-76.6990
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
05/13/2019
Estimated Construction Project Start Date
10. Date to End*
03/11/2021
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Other
than SFE (1522)
Standard Industrial Gassification for Development
12. Acres to be
2.51
disturbed*
(including off -site borrow and waste areas)
13. Total site area
47.56
(acres)*
14. Post-
0.00
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-GUILF-2019-Robert Lee Jobe
Tracking ID
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Little Alamance Creek
Wate rbody* Wfe of waterbody into which storawater runoff will discharge
15b. Waterbody 16-19-3-(0.5)
Index No.* NC Waterbody Index Nanber
Stormwater rJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC f No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Jimmy R. Lynch & Sons, Inc.
Name *
2. First Name*
Daniel
ff Corporation, enter Registered Agent First l\b e
3. Last Name *
Lynch
ff Corporation, enter Registered Agent Last Barre
4. Permitee E-mail
dlynch@jrlynchandsons.com
Address*
5. Permittee 336-362-9964
Telephone No.*
6. Permittee Mailing Street Address
Address* PO Drawer BB
Address Line 2
City
Pilot Mountain
Fbstal / Zip Code
27041
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
r Yes
Street Address
307 S. Academy Street
Address Line 2
City
Pilot Mountain
Postal / Zip Code
27041
State / Province / Region
NC
Country
USA
State / Province / Region
NC
Country
USA
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Individual
Ownership*
2. Primary Site Robert
Contact - First
Name *
3. Primary Site Jobe
Contact - Last
Name *
4. Title
5. Site Contact E- dlynch@jrlynchandsons.com
mail Address*
6. Site Contact 336-697-2302
Telephone No.*
7. Organization
Name
8. Site Contact Street Address
Mailing Address* 4148 McConnell Road
Address Line 2
aty
Greensboro
Rbstal / Zip Code
27406
State / Province / Region
NC
Country
USA
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 05/06/2019
Approved *
2. E&SC Plan Project 19-02-GCRP-01720
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* Guilford County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan Robert Lee Jobe_ handwritten.pdf 157.05KB
Approval Mist be RCFformat
letter/documentation
6. NOI Certification NCG01 NOI - Jobe Property.pdf 74.15KB
Form Mist be RJFformat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6B (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
Type Name* Daniel Lynch
Date * 05/09/2019
F. Tracking and COC Info
NOI Tracking No. 10856
NC Reference No. NCG01-2019-0232
Uses 'count number variable (incremrented by SP)
Certificate of NCC190232
Coverage (COC) Uses 'count nunber variable (increrrentedbySP)
No. *
Count Number 232
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)