HomeMy WebLinkAbout20050187 Ver 1_Complete File_20050131F Vq AT FR Michael F. Easley, Governor
O OG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Q ` Division of Water Quality
August 23, 2005
DWQ # 20050187
Guilford County
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
Town of Summerfield
Attn: Michael Brandt, Town Administrator
4117 Oak Ridge Road
Summerfield, NC 27358
Subject Property: Summerfield Town Hall, Rhodan Road and Summerfield Road
UT Mears Fork
NOTICE OF WITHDRAWL
Dear Mr. Brandt:
On January 31, 2005, you requested a 401 Water Quality Certification from the Division of Water.
Quality (DWQ) for your project. We wrote to you on February 7, 2005 discussing concerns that we
have regarding the design of the project and stating that it would be placed on hold for three weeks
giving you time to address DWQ's concerns. As of today, DWQ has not received a response to this
request. Therefore, your file is hereby considered withdrawn and will not be reviewed until DWQ's
earlier concerns are addressed. Once you have collected sufficient information to have a complete
application (please see our February 7, 2005 letter for the missing information), you will need to
reapply for DWQ approval. This includes submitting a complete application package with the
appropriate fee.
Please be aware that you have no authorization under Section 401 of the Clear Water Act for this
activity and any work done within waters of the state would be a violation of North Carolina General
Statutes and Administrative Code. Please call Mr. Ian McMillan at 919-715-4631 if you have any
questions or concerns.
Unit
cc:
Daryl Lamb, Winston-Salem DWQ RegiMal Office
Raleigh Corps of Engineers
Central Files
File Copy
Jay Guffey, DMP, 6415 Old Plank Road, High Point, NC 27265
Filename: S:\2005 Conespondence\05-0187 Summerfield Town Hall (Guilford) Withdrawal.doc
1, `I Carolina
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htW://h2o.enr,statc.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
OF W A Michael F. Easley, Governor
? Willi
R
J
S
G
am
oss
r.,
ecretary
.
7
CIO North Carolina Department of Environment and Natural Resources
-1 Alan W. Klimek, P.E. Director
W Division of Water Quality
February 7. 2005
DWQ Project # 05-0187
Guilford County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Town of Summerfield
Attn: Michael Brandt, Town Administrator
4117 Oak Ridge Road
Summerfield, NC 27358
Subject Property: Rhodan Road and Summerfield Road, UT Mears Fork
REQUEST FOR MORE INFORMATION'
Dear Mr. Brandt:
On January 31, 2005, the Division of Water Quality (DWQ) received your application dated
January 5, 2005 to impact 215 feet of streams to construct the proposed government municipal
building. The DWQ has determined that your application was incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in
order to process your application to impact protected wetlands and/or streams on the subject
property. Therefore, unless we receive the additional information requested below, we will have
to move toward denial of your application as required by 15A NCAC 2H.0506 and will place
this project on hold as incomplete until we receive this additional information. Please provide
the following information so that we may continue to review your project.
Additional Information Requested:
1. Plan Details
a. Please show all stream impacts including all fill slopes, dissipaters and bank
stabilization on the site plan. It is unclear from the map and design plans provided
where the stream is located and where the impacts to the stream will occur. Both
permanent and temporary impacts should be shown on the design plans.
b. Please provide the location of any proposed stormwater management practices as
required by the appropriate General Certification.
c. Please provide detail for the stormwater management practices as required for project
that will create more than 30% impervious cover.
2. Application Details
a. Please indicate which 404 Permit the USACE would use to authorize this project.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetiands
Nose Carolina
Naturally
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Town of Summerfield
Page 2 of 2
February 8, 2005
b. For Section IV, question 1 on the PNC, please provide a "written description of the
proposed impacts" to the stream.
3. Mitigation
a. If the stream is perennial, then 215 feet of compensatory stream mitigation is required
for this project. Please provide a compensatory mitigation plan or provided field-based
evidence that the stream is not perennial.
Please respond within three weeks of the date of this letter by sending this information to me in
writing and Daryl Lamb of the DWQ Winston-Salem Regional Office. If we do not hear from
you within three weeks, we will assume that you no longer want to pursue this project and we
will consider the project as withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands,
waters or protected buffers. Please be aware that any impacts requested within your application
are not authorized (at this time) by the DWQ. Please call Brian Wrenn or Ms. Cyndi Karoly at
919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss
this matter.
Sincerely,
s?
Cyndi Karoly, Supervisor
401 Oversight Unit
CBKlbs
cc: Daryl Lamb, DWQ Winston-Salem Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Jay Guffey, DMP, 6415 Old Plank Road, High Point, NC 27265
Filename: 05--0187 - Town of Summerfield (Guilford) On Hold
DAVIS-MARTIN-POWELL & ASSOCIATES, INC.
dMP ENGINEERING • LAND PLANNING * SURVEYING
6415 Old Plank Road, High Point, NC 27265
(336) 886-4821 • Fax (336) 886-4458 • www.dmp-inc.com 050187
TRANSMITTAL
Date: January 27, 2005
To: Division of Water Quality Re: Town of Summerfield Town Hall
401 Wetlands Unit Job No. E-3656
1650 Mail Service Center
Raleigh, NC 27699-1650
We are sending you attached the following items:
? Shop Drawings
? Prints
? Plans
? Samples
? Specifications
? Disk
? Copy of Letter
? Other
# Copies Drawing # Description Disposition
7 Completed PCN with supporting documents For approval
1 Check for $475.00
PAYMENT
RECEIVED
Remarks:
Q?,c??ger
JAN .1 11 7005
DENR - WATER QWa-lTY
Y&TLANDS AND STOR ATER BRl
By:_
J Kffey, El
c: File
DENR - WATER QUALITY
VERkaDft STRMWATER BRANCH
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. 050187
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Michael Brandt Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministrator(ddtriad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5 of 12 r.
,1
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg, Sheriff's Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 360 11'59"N 79'54'1 0"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at hq://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield. Typical construction equipment will be used, pans, excavators, etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at liM2://www.feTna.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please sec' )
1 Piping 215 UT Mears Fork V Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapgguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on ma
Type of Impact* Area of
Impact
(acres) Name of Waterbod
(if applicable) y Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed. pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire length of the channel is to be Dined because of safetv concerns during high flows.
This building will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed. '
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/newetlands/stnngide.htrnl.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payment will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/unp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XH. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the City of Greensboro. This stream has been
straightened in the past.
G.S
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
N
W+E
S
Q?EASANTp RD
VICINITY MAP
N. T.S.
rlplll? &1M 'b
architect, p.a.
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawing indicates the general scope of tl
project in terms of the architectural design ct
cept, building dimensions and an outline of ma
architectural elements of construction. As a s
document. this drawing does not necessarily i
or describe all work required for the project';
performance and completion. Contractors, Sut
Contractors and Suppliers shall be responsibh
providing and installing all items indicated, imp
required by local codes, without adjustment b
Contract Price.
Consultants'
Mechanical, Plumbing, Electrical Engineering=
PACE COOABORATI
+604 GREEN VALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.asp?z=17&n=4006682&e=598677&s=24&size=l&u=6&datum='...
Trailhead Tak4i4is map._.
ize it!
ozonel and_custorn
Q Base Camp 'ST
tMol
.r , , Sf' qfi _\ ,r?d5? 31' GO sy
,
Map/Photo Info
Topo Download
Photo Download
USGS Topo Maps i
' 1:24K/25K Series
t? 1:100K Series
U 1:250K Series
Map Size
Small
Medium
Large
View Scale
1 24,000
Update Map R
Coordinate Format
D/M/S
Coordinate Datum
WGS84/NAD83 , T _ S
RShow target i
Email this map
Bookmark this map
Print this map
360 12'00"N, 790 54'09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
rv;
G
lofl 8:50 AM
tTH CAROLINA - SHEET NUMBER 8
_ j
Ch C B 1 140 (90) FEE I
+r-k ? McCY r ?y w CcB
LrMcQti 1 r,. 220
a ° ? . ? GcB eC2J\ ?? ( ? S ?. • ? Ce62 II ? Cc6
CCB 4 t't a
'CeC2
i S trs s }'?M;aE 1. „[- QG '' t N F 2- Ig,?? 7v
7v
t
!{ McE211 Ce62 fl 1 S } CcB CCg k d t `'.
ti 5
I rtceq? „ ; occ,
In t ._y h`?t1 - ' , `• ", ) -
Ce82
.McC2
14, ?C } t McC2 fm4
i ?? l'e y a. F rs L rss Ma? ?(?? ,.7 ? McC2' e' 1 ?,oy M
?i i, t•. + ?? ? g t .c,,.. A ? ? '?cU? Ce6? ? r ?? ?.,? ,.aka
-cB I ]so L? Gar o o
I' _ a t,• ` t i .? ?Y y\. t Sp 1 `.•.? Y C r ,. r"' G`(?' ?` n
I' r ?!? ?° ?t}t' ?'?e6?4 ?. ?. ? ? ?•,, ? McC2 ? ? ?'
ti , f° y r O Ccq lac zg
Cce fa ac° r ?r r
kk ./ CeB2
A?b
x v ?! - ? ? ! MaC ? .
Jell, r S eF, } ' ?aO ? a 9a
Y y 5 '? 'b +t?. } Ca ter t ?'? dB/? Va6 CeB2 ; .t ?+? ?f •z'
IR Cc6 : ff ° t " 150
I m ayU,kC is r 4/ {• +,
geB2 S'
erf?eld , \-
umm
€
ce zT?.'? F dl r ` r ;1ff r ? CEti t^ VaC ? 1 AA
Cc !
1
B_
{ fl?)-F. i h xti± r/o` '?.n f {. t fsh?"! - Cc6 VaD Ap '.
F ??. t r ?. `:? yaF, ,
s
VaC
? I yS... ,'4'd ?v/? ?? .?a ? HhB ? • fvi o
y ? ? h1 S it` ? ?4 6 ! ?- ? MaC ` O VaD ?
?f 1 DCcI ? ? ?>` APC ? rc62 ?? ?X c62 ? :`ti• `?c ? VaC ? y, o
s x
,2q
C? ,(` s MaC`) 'i?y.+? r ' ,MaC ..- ' I ? M1 ? 1? ? : MeB,;?. ?? ? f 14 CeB2 Ma
t YY
CcB Ch .? 3? i,: r - r?r. MaB ( 'v1aD ar:
l E.? ' MaI7 r ru
?a? MaD ? MaC. ? t ! t, r ? YaD -??
C 08 y' Co? Cc8 McC2 f rr i ?'. \ r Ch `? :CeC2 Cc6!
WkC r ?s ' `,.'`r
MaD ?:•f Fr .,.MclY2 i ?: `.?...r ,.,F pVaC i
1? ?' APB ? d ' ! f- y r? .?. 4r ? ? ,k APEF' n ° Ce r 1i? ? McC2
l? +.., ! ? C.cC m ? }t ??.., ??LJ ?'. ?4ry z` s•, ? re: , / ? B2.. { s ,..? ? ?i
? 1 r t ro `• 1 ?
:k f CeB2 Ct
f'r ?'" ADC r ?if •; ! ?? ?? cC2 ? ?
C262 •
[?fc f_Q, ,? 1 ?? ". CeC2
'MaE t ?bC Er,D 5? . ,,a. OP Pte, Chf CeB2 t; .
'MaB
aC C Wh ;McC2, Ch
f 2 r ` C?tf MaE 'a? ' L cp Ch f? i Co tMd
?i -. 1 s F G Ap.B MaE ~ I McC2 McE2 1
_ ° c? ?Jfc 2 - a ?Q ; u T CeC2 x3 ' ARC?? Brandt
Lake
Ma6 McC2 McB2 CeB2
I 1_
J K
- JAN ? ?3 1 2005
W WATER BRAN'
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. 0 5 0 1 8 7
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: Michael Brandt, Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministrator(&,triad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Page 5 of 12
Fax Number:
p
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than, sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg, Sheriffs Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 36011'59"N 79054' 10"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield. Typical construction equipment will be used, pans, excavators, etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.jz
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Piping 215 UT Mears Fork 2' Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.us(_*s.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mal2 uest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on map
Type of Impact* Area of
Impact
(acres)
Name Wate) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire leneth of the channel is to be Dined because of safetv concerns during high flows.
This building will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USAGE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
littp://h2o.enr.state.nc.us/ncwetlands/strrngide.htrnl.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payment will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
». M
X.
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify V
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers. Required
Zone* Impact
(square feet Multiplier Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
r .• r
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in. advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the City of Greensboro. This stream has been
straightened in the past.
G .i
Applicant/Agent's Signature `Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
N
W+E
S
PLEASANT R1D?E RD
RHONDAN RD
G
-n
r
a
VICINITY MAP
N. T.S.
G
=?z
N
0
rw
09
architect, p.a.
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawing indicates the general scope of tl
project in terms of the architectural design cc
cept, building dimensions and an outline of ma
architectural elements of construction. As a s
document. this drawing does not necessarily i
or describe all work required for the project';
performance and completion. Contractors, Sut
Contractors and Suppliers shall be responsibh
providing and installing all items indicated, imp
required by local codes, without adjustment b
Contract Price.
Consultants,
Mechanical, Plumbing, Electrical Engineering=
PACE COOABORATI
604 GREEN /ALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.asp?z=17&n=4006682&e=598677&s=24&size=l&u=6&dawm=...
Tra?fhead . TAke'this map
, ...
N%I
and-customize'it!
10 base Camp 'ST frs _ .
0 ozone',
450F2.31'. GO a?.
Map/Photo Info '.
Topo Download
Photo Download
USGS Topo Maps
U 1:24K/25K Series
1:100K Series
1:250K Series
Map Size
I_) Small
Medium
Large
View Scale
1 :24,000
Update Map
Coordinate Format
D/M/S
Coordinate Datum
WGS84/NAD83
RShow target'
Email this map
Bookmark this map
Print this map
1 of 1 „'c 4 , F 1V 8:50 AM
360 12' 00"N, 790 54'09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
__i
ifVTH CAROLINA - SHEET NUMBER 8
1
Ch C B r iaourx[r[[i
Mc 2 220 WcC2 } Cc6.'
Cl-
W
1? L CcB CeC2 1 ?? i (.? rye`. CeB2 CCB
I ? ? r } ?,.. `NMI ? c?2?.. r i i •r+. - + ? °? , ?.
eC2
r
McE2 r CeB2 CcB CCB
t, h. i1 " r ..M C{?f Ce62
1 i MaQ
r
?Ct.? i}¢ ? ti , L r j McC2 ' tea, r, ? r t t .? ;
YI, S Iii {., Ma? Mcc
k ? ', v '. r \ r ' r Mc?2 CeB2 r {«i° ? ;,t?` 'f
w
I50 ?;A t y
'cB 1 ?.Stsd. v,J. Pte. ,
d ? o ? Ce6?r \ ? M,_ , McC2
?? r L CCB 'J, i r nest ' ! ', CcC i- Nl Er
?o CeB2 3 r U
qB r? 1r?? ??p
Ma'C 'a
lei : CcB r?- u C y.'? VaC`,
1 ? R Ys ? VY f7 t t e??' t V ?1 { 4 ?? Y- C , F
1 ,I
Y" Y
Ctr82 Summerfield? - ?.
' r ,{ , -v ? ? CeC1?.??} ?a •'? r ° tNJaci e62 ? 4 ? 5 i?`e } ? ? „??' ?#
tid h v?? "k. f x
r ? r f , ?? WFf «m c ? {" ? + qP
.f t F r ? r ?. ?..
t t 'V aDf , q
CC 8 rt r6`?? r1•v - ?' ? ?
B? ?r, Ch . Va'C !?... rat ?,b, a - i'r ljCeC2 ? ??? 7?', ? ? .. ? tT - ? m?? a ? '?' ? h tYIA ??•
r .VC4f? °"„« • [`'(b`cC .? i '0, 0 r? P.?s. «?iF }_ ? r ?. c ;? Va?C ? ? ? w
t?tD2!"` C82 z HhB c
MaC VaD
( b 1• t^ q Mc62 McB2 Y a t O
Iefl .i :,?rcB??f?f ?SB? r •. ,( 4 CeB2
(?i*MaC,z` ;, . yf, } ? t,- ?MaC. ? t ? ? ? ? f 1 •
r CeB2 ?Ma
CcB ?r r r_ McBi?
MaB
I' -? Ma?D mot. }? r
VaD ? ?, ?
C g Co/` CcB McC`2, ?,.' x Ch GieC2
tt. fxn MaD / Wk ? _ ..Mc?. ;s '??rr ?VaC ?:. •4 a
? = F 1
U?
?h? Ma: ? j I
t? ?'?1aD ? ? o- ti r ??? W ,?AP McC2 ?M?E2 ??eC2 ??,•«.. c,?,. y ??? ? '- ,?.Ne.?:
u ?. ` Bu
ri AP{' f ?w ? !' ? t `? ?? .??': } , y, •Uti ? i? • a r ? CeB2`>, ? i Mc C2 .
5 s 1 CeB2 CeC r } % ?? •:,.McC2
AbC r !:? ! - Dry i N
APC? T u• ?? ar„ ? ?c Le62• ? . C, Mr;C
1vtF?Pt .?.? r ?? i ."? CeC2 r, q ? EnD ??t?k6 ?O? ,e .'h??? .. Ch4•y? ;n"/ .,';:-• e _r;"
APB
f MaE b cPc2 , ';f CeB2
'I - f _ • ? ? `h?? -.-.? ? S / € ? ?-^. ? M c(. 220 -
31 k
MOB ! MaC
eC / Wt? / McC2 Ch
E Mc •C2 Mc??. ? Mtl'
i 2 r 4?r ?« t i m MaE '.APB,'?G? Gti:%?a t , # ,.
??? \ y MaE G G Ma
- '` ' NPcc2 •.i s . r e° cecz x A P Lake Brandt
MaB McC2 PAcB2 Ce62,
w v
? r 0.' ? ? 7(it?5
WENUNDS"3 c70ROATERWNGH
Office Use Only: Form Version May 2002
05fJ187
USAGE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Michael Brandt Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministrator(i?triad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5 of 12 ;:. -
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg, Sheriff's Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 36011'59"N 79054' 10"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield. Typical construction equipment will be used, pans, excavators, etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at httn://www.fema.Qov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please secify
1 Piping 215 UT Mears Fork 2' Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uss.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire length of the channel is to be Dined because of safetv concerns during high flows.
This building, will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/newetlands/strmp-ide.litrnl.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payment will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.ne.us/wro/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
X.
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify V
Yes E] No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* s uImpct are feet Multiplier Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
s t t F
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XH. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in. advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the City of Greensboro. This stream has been
straightened in the past.
GS
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
N
W+E
S
P?EASANI R1DDE RD
RHONDAN RD
G
T
r
O
0
VICINITY MAP
N. T.S.
G
Ln
y?
N
O
Gil vi I1 «v i., N.ctw
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawing indicates the general scope of tl
project in terms of the architectural design cc
cept, building dimensions and an outline of ma
architectural elements of construction. As a s
document, this drawing does not necessarily i
or describe all work required for the project'%
performance and completion. Contractors, Sut
Contractors and Suppliers shall be responsibh
providing and installing all items indicated, imp
required by local codes, without adjustment tt
Contract Price.
Consultants
Mechanical, Plumbing, Electrical Engineering-
PACE COOABORATI
604 GREEN VALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
"fTH QAROLINA - SHEET NUMBER 8
'i Ch McCP C B t 140000FEEI
Mc62 c zza r CcB
??^ Cc6 CeC2 ?`, drJ.+ S? S' > i"?. Ya .1 CeB2 n Cc8
?T• ' ? ? M ? ? r . X ? CcB??
CeC2
b1.E2? Ce62. ?u a ?? {? CcB CcB?
. z •.z.t w ti f z r a a,', `• CeB2
McC2
` MGC2 4
McC2- 1 M ^44,
y MaE d y..?
? - ? ? L - Mcpz CeBj y ?
:c8
e ? ', ? i , t (G o
.. .,.,. A B
t ?. p? l ? McDZ Qnr,S
t .'Y oT 4,^L?t .Oc . / F CcD MG C2 - -
1 „a s, x
3 z u x E r
MaE
Iln f CeB1 ? 1St e . t: \t C? ?}
E ?? ( n ?}, _ ??} V
'. v >t `'? •__ {F ?ch ?? ? r / ? ?, dB,±? . VaB CeB2ti }f F P •:js-?,'???
iR v ?C3 tv; '; ?:.• CcB Y• / t"... l50
17 ge,B2 Summerfield
i r ' ? - ? ADC
Sh t4 ?3 ro Ce `?,? ?: t , r e?C Vac e• ?.+ .- ?,
*.-
tC
rY r of: CCB {r
APB
DP?, .Ch Sit 1 4 *' S x m? tat
1 +? n^f?e ` .t,r r t w MaC
'CcC
MaC {`E a 4 tr } P?? Mc62 HhB a?
r ,,? l: 1•t? x4 ^9 fv ,D2' 4"r VVK?? ..
^?r- 2? ;" 1 a e ?4? < ''+T f " Y •MaC. ? ? VaD• c
B ?b o
APC f_ ° • ?i ,xMe 211 i2? ?ti: ?S`? VaC
r.?
} Ma(z;, ' 'MaC s E'?.. ?., • F4. - r ,P t'?
C MeB`•- a CeB2 Ma
,.G cB F' 1 r s. r .
I t%1 MaD, ?• ? ?N1a?C1?VaD ?'?
CCBGag Co Cc8 e 2 cC2? .%' Ch ] C2
%
•r tvia / Nk f• 5 ELY2' ..?" ??.? iVaC ?. ? ,x
[?? MaD? ?P??' ? M?4s - E? w '? McC2 - McE2 CeC2 .???. .? .,.??-ApG, ? ? F s't ?? ?,, ? ?`?AD? ' ?` " ? CeB2 ? McC2.
? et r -
( ? ? - : CcG `w ?? mot. ., ?? ?• _ ? ?? c ? x ? '? .?
CeB2 6e .X c
y ?i C C ,• ? ui ? McC2 ? •?
A C t
I+S ^? p r /,. Wk ApCtAA CeB2
iJ Ch, CeB2 t
-?
!17 ac Wt _nrcc2 Ch y '
2?
'' ?i \ . G ApE v MaE McC2 tJ
r> L« M a? P
Ad? Brandt
Lake
ME
MaB McC2 Me,B2 CeB2
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.asp?z=17&n=4006682&e=598677&s=24&size=l&u=6&dawm=...
Tr head;
Take,1 his map .
nd to tz 'it!
Base ca,
t0 k
FF .. ,a.. P a cu me
'31 ,
Map/Photo Info :.
Topo Download
Photo Downloads
USGS Topo Maps I
J 1:24K/25K Series
1:100K Series
t% 1:250K Series
Map Size
._? Small
Medium
?- Large a
View Scale
1 : 24,000
Update Map Coordinate Format
D/M/S
Coordinate Datum
WGS84/NAD83 e
RShow target)
Email this map
Bookmark this map j
Print this map I
I of l A 'C A,n 4' r I- IV 8:50 AM
360 12' 00"N, 790 54' 09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
J4N.1 1 ? r?
nENR . _.:.,.,W.ueTLTFfiksFtAN?
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. 05U1 io Q •'
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Michael Brandt Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministratoratriad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5 of 12?! `? r 1 T
RECEIVED
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg, Sheriff's Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 360 11'59"N 79054'l O"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at hqp://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield. Typical construction equipment will be used, pans, excavators, etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at ligp://www.fema.go
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma
Type of Impact* Length of
Impact
(linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please seci )
1 Piping 215 UT Mears Fork 2' Intermittent
*
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usc.zs.eov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.tolozone.com,
www.mal2 uest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Name of Waterbo
d
y
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire length of the channel is to be Dined because of safetv concerns during high flows.
This building will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmizide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payment will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
X.
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify. V
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square uarre feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
n `
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B.0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existina Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the Citv of Greensboro. This stream has been
straightened in the past.
G.s
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
N
W+E
S
P`EASAN.? RIDDE RD
RHONDAN RD
G
T
r
D
0
VICINITY MAP
N. T. S.
G
Z?z
N
0
i
architect, p.a.
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawmg indicates the general scope of tl
project in terms of the architectural design cc
cept, building dimensions and an outline of ma
architectural elements of construction. As a s
document, this drawing does not necessarily i
or describe all work required for the project';
performance and completion. Contractors, Sul:
Contractors and Suppliers shall be responsibh
providing and installing all items indicated, imp
required by local codes, without adjustment b
Contract Price.
Consultants
Mechanical, Plumbing, Electrical Engineering-
PACE COOABORATI
604 GREEN VALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.a:p?z=17&n=4006682&e=598677&s=24&size=l&u=6&datum=...
r Tra?ineaa: 'TAke- thl5 map. :
mo C3ZC I'1 as CP base Cam and customize iltl
,'15022.31' -11 D° t6.&4' ; GO
Map/Photo Info_
Topo Download
Photo Download
USGS Topo Maps
1:24K/25K Series f
1:100K Series
V 1:250K Series,
_ Map Size i
U Small
J Medium
Large
View Scale
1:24,000
Update Map
Format
Coordinate,
D/M/S
Coordinate Datum
WGS84/NAD83 #
OShow target'
Email this map r
Bookmark this map
Print this map
lofl C „„ 4 , F,,M IV 8:50 AM
360 12'00"N, 790 54'09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
JTH CAROLINA - SHEET NUMBER 8
' i r
Ch C B nurxxir[t i
1 ?McC2 T : CcB
.? Mc?a?r 3 224 j,^ ? ;.; r 5 4?? ,. ?< ?? ? - G 7 ? r 1^ :" (? r•? r "?i -'t
m CB CeC2 ???? ad S }? "?` r`? t t. CeB2 ?? Ce8
4' I I+ nti
CeC2 1 ?, ; ? ?r s
r 4 ?l ? t 1 l
---p: i•' ?+ y ?., -GeB2 ?? ? ?i' • e t? N?, \ vat ` _ ,
NN 1 t k } .lJraE??'• ,'?• r q. r CeG ,+ Q ? .. ( MaC <ta
McE2,1 r CeB2 ?L o r• S 4',? r ' ?t s.
1' h5' C G: CCB CcB S r
t+(:CeC2 t14 a ?•:
?4
'E? `:rxl r ?[. t=? b. ?. "r _ "F :'?+;• CeB2- . '
Y[ S e, <sC a I 00CC2
oil N
?. t r+ { ?? MaET MCC2'
cB u t rso a- l ?C ?i y ?. t bS? ?.? 8
+? k. u ? APB r? ? ? - ?` a m
} n, t 4 ' 1 t? McQ? (Qar'
??• m' ?? i. ` r C ?? Cce ccq ace
??+ },I+r 4 C -P'L 1 J j \;<6?? ?• `A?F,r. r` f? ? r j:?CcC L. 2 ? ? . o Gv ? MeE :? ? ' ?, ?`?'Ei.
Jn ti e62 dr •f ,? ,? r
C ? N [ C•, r Cls 1? ? ? r
? -? h-, rp b? Y r f 1? G
del u° k 3 a r.? ?V VaC; )1F j t ,r
1 Y y r k f Vi Ti I f. R r :1 k 1
V
{ .'. f• o°- ?Ch. '?[ . f •.A Va6 'Ce82y
IR Sri'' CcB t r, r 7 E 50
µ7 - 4
wa t e
ti
Summerfield
s T,
?eC??Fy
9h 7 °I Jt?? b r? Ce P- . ? ?, r ,?, • ,r4 oC,2 VaC
t F v t 2 i '? qtr t r
1SNft?GZ. ? ^,41iL y?l, ? ? , r 4 Cc? ?• i > ?_: -' i ,.
k " r r ?:: ,?,? •'"? .?' ,4 r...t`?i l'! - r.t % i}i?a... -'VaD AP
P.r4-),, { Sir r CCB \ f:
l ?:. , t t• }^ ? r. V APB '
VaC
ak < i /'CeC2 ?• ?{? 1?:. ? ? ???? ? ? ? ??? f?. ??? ..4,
ID Ch 1 4 G : a +
r ? r '? ?? VaC <a a
0) V C?? '+?: G++ C cif re
i?72g 11 w-m it MC62 I HhB - 1a _ c
t k McB r I DL
"D ?" i APC c c6 2` 2 x^?
A ? .
Ce62 •?r. -
M CeB2 Ma V
?' ??G a Ch I a? i r A. .)? aB
uaD • F ... . arc
n !?a MaD • MaC 7 t t r ` CCB'
C 2? t?' ? ? Co ?` CcB ? ? r ? Mc?C2? ; r F/' ? • i rS? Ch t:? CeCT
M MaD ? WkC } W92
owt
cyla+r ` ? N1a ' iEn l a 1? A vc; 3 N..
r , t ?h ? ` ? '` ? '? :?? Ap MCC2 M E2 \CeC2 t /
?? APG a a/ ^;? { fi 4 ti ; • d }r r CeB2• ' McC2
CcC q t ?? < ° 1 I
11 r
/ ` ,Z + •,?` a CeB2
l r 1'.1? k?_ APC r.. cr is ,, CeB2 r J
r'F,C?P , F,a?, r CeC2. r t . W rr ? E ?? ?e G ? ,:5+/ . .,•t.
1. xqb EnD Wk ?, C [? Chf•ya ra
14 q MCG
MCC
C Ci. Vrh / 'MCC, C
-mc
[ t?
2 c \ a??? L : a Maf ' [e0 L h .,! ?? . ?a } e?2 ?0 1 HMV
MaE • McC2 -M \
T N.,
"' ?D S MaE t ° P i - CeC2 y ApC ' Lake Brandt
MaB McC2 McB2 CeB2
P\:9=U ?
JAN 3 1 2005
DENR - WRIER QUALITY
WETLANDS AND STOMWAI LK orwvwn
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. _ f 15 6 1 8L
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
PAYMENT
1. Owner/Applicant Information RECEIVED
Name: Michael Brandt Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministrator(@,triad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg„ Sheriff's Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 36011'59"N 79054'1 0"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield. Typical construction equipment will be used, pans, excavators, etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE'Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online ath!W://www.fema.jz .
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1 Piping 215 UT Mears Fork 2' Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usas.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres)
Name Wate) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire length of the channel is to be Dined because of safetv concerns during high flows.
This building will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
littp://h2o.enr.state.nc.us/ncwetlands/strrngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payrnent will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.ne.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
Does the project involve an expenditure of public (federal/state)' funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify, )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XU. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the City of Greensboro. This stream has been
straightened in the past.
//li
G -1,
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
VICINITY
n�[ gm 0m,I ci
architect, p.a.
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawing indicates the general scope of ti
project in terms of the architectural design cc
cept, building dimensions and an outline of ma
architectural elements of construction. As a s
document. this drawing does not necessarily i
or describe all work required for the project';
performance and completion. Contractors, Sut
Contractors and Suppliers shall be responsibh
providing and installing all items indicated, imp
required by local codes, without adjustment b
Contract Price.
Consultants,
Mechanical, Plumbing, Electrical Engineering -
PACE COOABORATI
604 GREEN VALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
Civil Engineering-
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.asp?z=17&n=4006682&e=598677&s=24&size=l&u=6&dawm=.,.
Traiihead. Take-this -map...1
to OZOn Base Camp S'. T afld_CUStOmIZE It l
-1180 16.66 ?GO_>r.
Map/Photo Info
_Topo Download
Photo Download
USGS Topo Maps
Q!' 1:24K/25K Series
1: 100K Series
1:250K Series
Map Size
Small
J Medium
Large
View Scale
1 : 24,000
Update Map
Coordinate Format
D/M/S
Coordinate Datum
WGS84/NAD83
OShow target
Email this map
Bookmark this map
Print this map
360 12' 00"N, 790 54' 09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
M*
I of 1G 8:50 AM
A A 7 A C A A , 7 4 r, Lw.
-ITH ,CAROLINA - SHEET NUMBER 8
'.? Ch C B I/40000PECI
McC4 ; C r ,; CcB
p Mcp24 w 220 h fr c ?? ? ?' r
x CCB CeC2 a t ` ?? IaC CeB2 Ce8
_ d ;yr.,?? tt. ?? 11 ,.?MP? +,n. - i 1 Z ?'• r .?t CCB?.
?.? •.i ? r 'CeC2 4"? r1\\° k ? R -r-" '?• ? ?-- ? .+
tS 1 y 9.R2
McE2? h Ce62 C CcB
? !Y (peC2 ? ? ? ? ?? t ? rt r r 4Cc?.:T ? ? ? 4 yt?',i
1 , 1l f ?1. ' f u •?
l ? ? ?• ? ?, l ' h ?t, - ? i ,. - r? A CeB2 7
?.I y ,:;?1 t ` e f, I t .MCC2.
i + 1 t{ + '4? Ma? ?'j MCC2• r6 . - 1 ?.? McJj
JIT
cB T IBC 4'{ ,rr? ?i t ('. Y it ?', I, a ''t \ APB ,.. - tr r, ? • • /.(. ? . fi r; w
o r ?'FAE3f a0 i F CcD yj ;; McC2
s v a_ ?, r ti? • t , x '. ?
tp;':000 1 k ?? +MaEy?
{ ' 1. 4,. t r i S
s 1 ?
Cc8 U cS` i ? t + ???' ?t!a
5 ?? r' T_ ,.?• '9 r`r iI ?.1 r` ta! I 't t ?r?r?? r `C?
ap !s
Cd ${ l' '?? Oh y 4 d? aB CeB2+ '+ r wae;,,r
CcR
g : r .m t.?g •? , g. r" r ? a. n
t° t,..•!1 r CeB2 ?: ?._ ',_?-•; \t,
Summerfield
-3 •
?h ? ? ? 'j'x???? 71 ?? CegF; ( .r' f' t1 X'`- b•? +i? f ? •?Yr ?G,ti ? VIaC' -• 4'i?- ? AP
s' ' kY r m'. A l
{ stt? ? ;rti ° r v k ? f ? Cc8 t f
AIB 6 -
? t: J VaC ? ? ?,??T kL < ?" y//t??CeC2 ? ?P r? ? t! Y r ?, \ aF? * ? ? :I ? 3
I I Ch aK t X ?+ MaGa.
p ;V f ` o r, ifc4 ? ? VaC
HhB J?a? r
?'r ?n ;i Yd I t, ma( VaD• _ o
+ v APC MCQ2
h C0
cBC??f L 1? 1`eQ2 e .y.
t - l 4 i: `' I + F `- r
h ??Ma?,4 ? ,.MaC:. ,? ?j. ? ?" t•• Ma
?'.? '?, r McB:t a r I CeB2
rG
p ./ ?aG r.- CcB MaB aD
?a .E, MaD MaC_. ' r s 1 r? % 1 ` Cc8
C a0 ,r• ? Co.? CcB r ? ? Mc?C2f + r r/' c'' Ch a,i CeC2
MaD / WkC * Mctt2 rl S
f -? ? ? ?? er VaC .
Jf i ` d F? e +
1^1h e rVpp?, McC2 MtlE2 CeC2
1 ?. App' ? f k !? ? ? ? , I . ti +? ? a Ce82`, ' r MCC2
Ce82 Ce i c r ?? 4,
MCC2 t :« i ~
C --?A p C r ?L e k M
McE2, 1 r `` t -I i,/WK?; APC} ?` ?a., ti Ce132
?+ .,t ? c a CeC2 r L , c? ?;' .'tic 4 ? ::?- '
r? ;), j q Epp • a r+.K ?. G? Ch- 'S\ , s r
d NME- ~ b? ,ARg• a c?? t` CeB2
lu?
3 r SM NJa6 m 'C
cC2 aC McB2 ?.? llJh / McCT Ch
1 : 2 .; i t MaE 'c0 s Eti Co ` Mtl'
G G APB ?? ?a t; MaE McC2 M°
i cec2 '' ApC Lahe Brandt
MeB MCC2 McB2 CeB2
i
't
Office Use Only: G Form Version May 2002
USACE Action ID No. DWQ No. Q 5 U l 87
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Michael Brandt Town Administrator
Mailing Address: Town of Summerfield
4117 Oak Ridge Road
Summerfield NC 27358
Telephone Number: 336-643-8655 Fax Number: 336-643-8654
E-mail Address: townadministrator@triad.rr.com
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5 of 12 f A l ?i E T
RECEIVED
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Town of Summerfield Municipal Govt Bldg, Sheriff's Substation
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): ACL 37-A-906-42
4. Location
County: Guilford Nearest Town: Summerfield
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Turn East off of Hwy 220 on
Rhondan Road (Gravel). Site is located northeast of intersection of Rhondan Road and
Summerfield Road
5. Site coordinates, if available (UTM or Lat/Long): 36011'59"N 79054'1 0"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 1.22 Ac
7. Nearest body of water (stream/river/sound/ocean/lake): Mears Fork
8. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site - Partly wooded, Partly cleared, single residence
Off site - single family residence
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
A new municipal government building sheriff's substation for the Town of
Summerfield Typical construction equipment will be used pans excavators etc...
11. Explain the purpose of the proposed work: To construct a new government building for the
Town of Summerfield
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Site visited by the Corps of Engineers
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permits will be required
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: None
Page 7 of 12
2. Individually list wetland impacts below: No wetland impacts proposed
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at hqp://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(leases eci )
1 Piping 215 UT Mears Fork 2' Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses. og_v. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 215
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: No open water impacts proposed
Page 8 of 12
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The entire length of the channel is to be piped because of safety concerns during high flows.
This building will have a large number of private citizen visitors.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/newetlands/stnngide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
If required by the Corps of Engineers, payment will be made into the Wetlands Restoration
Program/Ecosystem Enhancement Program in lieu of mitigation.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Page 10 of 12
Does the project involve an expenditure of public (federal/state),funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify V
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Page 11 of 12
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Existing Impervious 1551.84 SF =.036 AC = 2.95%
Proposed Impervious 32930.58 SF =.756 AC = 61.9%
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Septic tank
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This stream was classified as intermittent by the City of Greensboro. This stream has been
straightened in the past.
UI?
?2 S-
Applicant/Agent's Signature "Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
VICINITY
N. TS.
R
architect, p.a.
post office box 39355
greensboro, north carolina 27
tel 336-282-7171
fax 336-282-7672
SCOPE DOCUMENT
This drawing indicates the general scope of ti
project in terms of the architectural design cc
sept, building dimensions and an outline of ma.
architectural elements of construction. As a a
document, this drawing does not necessarily i
or describe all work required for the project':
performance and completion. Contractors, Sut
Contractors and Suppliers shall be responsibb
providing and installing all items indicated, imp
required by local codes, without adjustment tt
Contract Price.
Consultants
Mechanical, Plumbing, Electrical Engineering -
PACE COOABORATI
604 GREEN VALLEY ROAC
SUITE 200
GREENSBORO, NC 27408
PHONE 336-855-3822
FAX 336-855-9929
Civil Engineering-
TopoZone - The Web's Topographic Map, and more! http://topozone.com/map.asp?z=17&n=4006682&e=598677&s=24&size=l&u=6&datum,...
? Tra?ineaa `? -?Taice thts map. ` ' ' ,
to ozonL* and customize 'it! Base ca
E
45322.31' -1t0°,t$ 96
Map/Photo Info
?Topo Download
Photo Download
USGS Topo Maps
L-' 1:24K/25K Series
?_% 1:100K Series
L> 1:250K Series
Map Size
U Small
C 'Medium
Large
View Scale
1 : 24,000
Update Map
Coordinate Format
DIM/S
Coordinate Datum
WGS84/NAD83 „a
OShow target
Email this map
Bookmark this map
Print this map
360 12'00"N, 790 54'09"W (WGS84/NAD83)
USGS Summerfield Quad
View TopoZone Pro aerial photos, shaded relief, street maps, interactive coordinate display, and elevation data
Iof I ,
A C
A A A '?
4 F I-
8:50 AM
,11TH CAROLINA - SHEET NUMBER 8
t• Ch c B
I ,nurxmfl I
?, ryT 14MCC2 CcB
Mc?)? 7y 220 tr l s ly r a f d (? ! I r t x
Cc8 CeC2 r - Fii O tr Sr Ce82 ;'re m Cc?
l
1 la ,.a.? ' ° a ur $ !? f CeC2 ?• •'' aai - i '??"'"-?i 'z- -f t
t ? t' n`'F' ? ?` •t i tT, t l??,,yy 1 ' ? ,y/1 Y- ;i ??eC ??f oN ? y' ?3 r ? 4a M?a h
WE), ? ? yCeB2' ?lt?V?,t ? ?? G ? t Ctrl Cc8
v r4 ?? V 7?1 I ?? V t
?' t ?r ? i ? c?}? k. ,?2u ? t a I, fY4 {f CeB2 na. r4 a
?i l ? ' ywr t {{tYR r, a `!,i11'•N? t . . s ? ? t` 1S' ? h'1cC2 ?'.,?.? ? , x P ,. r1 4 a j
!``.?? tt tt'?' } \ l .n t l?t?t• ! r,p "MAL 11, MCC2 ..'. c?. ?• .M ?;
`' t ? McU CeB f , 7 r? y 1p `?3
.., I j. {y ti !. 150 rt,.?: c .? r c ? ?` rr t _ ; Y :• 1? f , ?Cr:? ??, r x es
'c13' v
T5 P
1 Y 4 c': Grr n?
` i I ., ?j .. ? Ap¢ .t ) t 1• ?)? 4 t fy ?,,! b ! ?f .G?%N ? r''? r t'Sa"'.A, . c
t L N 1/
} .ti l r + 1 f Meter qaT ? ? .
4
I `fit \ p`?.• trvl it?. ?e?45`Ar } O.? / CcD r!aL, ,t, McCif'• a?f u
1. ° 4 ti tr 4 CcB 1 I ?? L 1{ `!
r 11?• l d S t !? lar ? s CcC ? 'd V M ` ?°
°l v / ? n ?r, t ?? ? .. ??' a ? 1 % ? ?,? • f A?B ? ?? ? 1 ? ? I,', a ? ?' ? .,r ? , r t k ?? -:
r ,
u rl
'VaC
del : cts ro a1, ?i? ..y 4 ?' Cc spa 1 : Y °? cs
$0
f?>1
IE r?V l ??,n . C. k? d r d air
' ? ? e• 4„fp ,?
?VaB CeBZ
sl Y
l 1 50
:CcB °" 'r:?j---•-r l q r,r :n ??? ?r.e- .i
.91
I ti s , ?Ya2 5urumerfield ?-
}f
vac +? _- ??FS t? r r
4 ??, #'+y .F r f f - ? ?1 E `p CcB `? t'r° 5 ,_
AP
S t & r. Cc8 ti
s,.
L i trfx c y t i t; f r d Ap6
r • f Y3L' ,t".?? ht,r< : ?:?4 4f CeC2 } l rp ?, f ? ,.
D
I i r„? f t`i r f e f 1 M C ,_ n r
01 r:?,r'/ Vag ? ?
f rt aB ? +5 '
1- '•? -a"" ? F1 e ) 1 FihB lDla
I r ? ?
MaC +-' VaDr '?
t r! b \ N? 1 ApC p` c6 "y? r Mc62 5? ??' }? n: ??? VaC l ,.
a i Coy" Hi7 ?„ t > >.? 5. u. Y
71.
t?CeB2
t.? Ma? +•1" °qJ?)y E: •r% + tFr l e ' o. i ?? r tt c
i ?? ? . , • ,, '? rr ? Me6 ? I CeB2
t / ?G Y 5^?. CcB Ch lIYFS ti'r?r rtl! t1 t r }i e;P? M`a Ma6 t ?aD a -t,
.i aC. ':? MaD / ? MaC; 1 .+1r _? ^ 'S aj r M aD 4 , •.. +-
??
,f Crag ` Co / Cc6 F ? McC2? a, ri '. ? t' 4 ?_ ? ?h , ? b rf, F'
k vvk to m --x Ar n s ? i;i:
) MaD I t McfU2. i t x. VaC
?7St r'INIab-? # ??h 1 ? ^ f a ? •? t61a`F? I " a ?f.E>^ ? •ry 0 MaE 1;eC2 ? ? V? ? ? `y yet f?}? r
'?•• •?r? r , McC
t? ? Ap('` ?? , W ?.l'` ?i r ??,? ?F? rs ?F, 1 ???, ! 1? l F -• ar: r Ce82:
? ? `,r CcC 1 1 ? o-? t0 vyYr+ r' ?4 ? a r?' {4'• ? r + ?-: ?'i`_
I; sv' CeB2 y
i I ;3 (t t c C4C !? ! 13 // lug r McC2
r -? ApC_?
? (Jr,G E2 .c 1 v t i '; r - I CeC2 a a r ?. : ?KE v . O 'r ?? Y r :ra/ : . M..?4; .
i? , Iy ? S b D'' , ? t ' •°. c n, Cht .i? Ce82 ?n
' s MaE q E? - r
T `• ? , • t `r?""-'? ?, ?;: f,, ?'_" ,? McC2 `2zC y/r - :?v
r f Lk ' M8B aC C MaC /ht }/ ` McCZ . Ch ...
C ,
?q r MCB2
r. _
ll? , 2 - ' 6p r a MaE +t , N O 1 ? Md"
AAaE } McC2
.- D, i MBE P s .CeC2 Brandt
pac Lake
MaB 14CU fA,B2 CeB2
DWQ# (?T' I
Plan Detail Incomplete
Date Who Reviewed: Wrf.tny-
? Please provide a location map for the project.
Please show ?11 stream impacts including fik1 slopes, dissipaters, an bank stabilization on the site plan.
a? cL'sr plans p???,??? ?,? ,?,? 5?,?. ;5 ?6(:a?-tc? c?n? Ul??U?--?
? Please show all wetland impacts including fill slopds.oti the sit plan.
'A Ca Uy-
? Please indicate all buffer impacts on the site plan.
F1 Please indicate proposed lot layout as overlays on the site plan. 5VW?\ ?s? yr P (C v? s .
? Please indicate the location of the protected buffers as overlays on the site plan.
? Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan.
- ? Please provide cross section details showing the provisions for aquatic life passage. - - -- - - - - -- ---
? Please locate any planned sewer lines on the site plan. qt?,Y ^
Please provide the location of any proposed stormwater.management practices as required by e X'?
C? p ro G /3 }? --S ?
lease provide detail for the stormwater management practices as requred
P
wi eA< 73v l0 +?`'t??Vta ?S
? Please specify the percent of project imperviousness area based on the estimated built-out conditions. N
? Please indicate all stormwater outfalls on the site plan.
? Please indicate the diffuse flow provision measures on the site plan.
? Please indicate whether or not the proposed impacts already been conducted.` _
Avoidance and/or Minimization Not Provided 1. '
? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional
information as to why it is necessary for this project.
? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the
Please revise the plans to avoid the impacts.
? This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the
Please revise the plans to minimize the impacts.
? The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because
Please revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If it
is not possible to achieve diffuse flow through the entire buffer then it may be necessary to provide stormwater management
practices that remove nutrients before the stormwater can be discharged through the buffer.
Other
? The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please
provide $ . This additional fee must be received before your application can be reviewed.
? Please complete Section(s) on the application.
? Please provide a signed copy of the application.
? Please provide copies of the application, copies of the site plans and other supporting information.
'ti atio ^?' 4 2/ S
?f compensator fJ-- mitigation is required for this project. -Please provide a compensatory mitigation plan. The
plan must confo to the require?mis in 15 A NCAC 211.0500 and must be a riate to the type of impacts proposed
i? P C Npprrop`tam
Please indicate whi 04 Permit the US CE would use to authorize this project. M
T}PT r
kfi o& 1-1
025120
401 Water Quality Certification Review Fee
Sums-nerfield Town Fall
E-3656
"526
X475.00
??SS mac.
//3 / /c, 5-
I I i
I I
i i
L ND~RSTLI L ND~R~TORY .a.
Tx' IREc. a r s e c c 8
+
~r a' SI~RL~B SHRUB
I,
1 ~ ttli?' ost office box 39355 P
I I I I ~ I ~ TYPE D PL~'lI~`TiN~ YlaRD reensboro north Carolina 27438 a
I l
I ~ \ ~ x S' mirrimum width, It}' maximum width - - 1 tel 336 282 717
I I \ " Plartin~ : 2 Understgry trees per IOq' p~ P fax 336-282-7672 Q
,~ti \ ~ fi3 Shrub4 per ip0' I ~ \ ,~ti,
i I/ \ ~
I I I p`~' SCOPE DOCUMENT p
~ \ I 300 L.F. TYPE D BUFFERr YARD ~ I I Il ~ ~ 0 ~ Thb drawing indicates the general st~pe of the
~%z' I I REQUIREMENTS , N0: E IREO I ~ ~ ~P project in terms of the ~chitectural design c~n- Q cwpt° budding drneesior~s and an outrine of major
d ~ i I 2 UNDERSTOR EE 6 I arci~tectural elenronts of construction. As a scope
I ~ ~ _ , doctNnent, this drawifq does not nereaaar~Y ~dicate ~ , - a descr~e er work regaled for the project's ful
~ - 68'---- P F. 54 I 8 ~ ' - performerux and completion. Contractors, SI~- ~ .
~ Contraoton3 aid $uppiiers.shall be responsible for
SUMMERRELO FIRE DISTRICT, INC. DB 5281, PG 104 providirg and inata~ng sii items ~dicated, a GRAPHIC SCALE i \ ~ 4d regaled by local odes, without adjustment to
I TAi( REF. 1-037-906-069 20 10 0 20 ~ ~ Contract Price.
- ZONED RS-30 / ~
USE: MUNICIPAL PROPERTY REGRADE DITCH IN 244,372.Ot SF ~ ~ 1" = 20 FEET Coneunantw ~,~,,,~,-Y-.~,~,~',,~-Y,~rvwti-~^n-ti ~ ~ sxl~.u~
' THIS AREA AS NEEDED I ~ 5.61 t AC
~ T1NG TREE t.INE ~ EIIS FE LINE ~ / ~ ~ _ _ tR~ - 1~~~~RSTC;RY Nlechanicel, Plwnbing, Electrioel Engrneariooga
I / r 5J 1 + 'I'R~~ ~ ~'-y-~'1 ~ ~ c'
I T TYPED P \ 1 ~ ~ t / SEPTiC TANK 3[i'
~ / BUFF I - ~ / 862.5 / BUFFER YARD ~ t + ~ ~ F~ -r ~ 862.5 ~ ~ ` ~4~/,,, '~"ItF~£
_ 'S7"E \ EIP
.7 296.04' \ ~ M ~ Q-a- ° ° ° ~ - - - - - 0 GEE VALLEY I 6
i M M G~r'1 ' i - SUITE 200 b a ~ T~-~~;: ~ . ~,~x~T~~ ~~~r~
I w 3 I ~ - - - - s GREENSB®R® NC 27408 25' minimum, SC' ma~imun> ~vic3•ih e I~ - ~ ~ ~ ~ \ ' l'l;an?ira~: 3 Crmtrpy trccs per'!0(3' nn :;cr*er -47~i~2
I i o• 1 ; , PHA E 336 X55 ej ~ 5 Undorstc>rt~ :revs ~r 10(1 c.n;:enic;
,Q a tip I ~ I , ~ srr=~~3, der ~,v, L~nr~r FAX 336-855°9929
o iNV irv ° o I I` Q o ~ I ~ I ~
867.9D ~ I ~ \ ~4, ~ ~ '
~ CP / ~ \ \ ~ Z 852.6 862.1 Civil Eilg ° I ~ i NOTE, DO NOT GRADE OR ALLOW Ht~AW
\ / . ; v I 1 ~ I TR1Flt ~ 1101V ~QU/PMENT IN SEWER Nl
PARKING T 7 SPp4 ES ~ ~ a~i.a N I I ~ a~i.a I I I ~ ~ AREA. ~
NTS N0. REQ IRED ~•~NV ~r• ~ ~ ~ $~3. ~ ~ - - _ _ ; ` REQUIREME _ a I ~I
1 CANOPY Tf~E 1 Z I . PER 12 SPACES ~ e ~ C~ ~ Nc.~ ~.1' ~ ~ ~ ~ I ' 1~ I ~I ~ / ~
J RAMP 2 S ~ i N LOIN 1 I I G ~ ~ 5,2 8 S.F. ~ _ ~ I I I~ - _
J I BOTtP01r1 1 I ~ rC ss2,6 DAUlS-MARTIN-POWELL & ASSOCIATES, INC
Q ~ FLOOR 863.0 rc 862,6 ~ a I ~ I ~ FLOOR 875.0 I I 61 ~ 6415 OLD PLANK ROAD
I o I / I I ~ Q, ~ ~ ~a 1 I NIGH POINT, NC 27265 Z ~ (336) 886-4821
I I P~+~' Fax X336) 886-4458 ~ ~ . _ DSCAPE 1~0~' , > ~ ~
{ ~ a ~ ~ ~ I I I N ~I / 1 ~ w \ JAMIE MOLER www. P-iNC,con SEA ~N DB 5499, Pc lzsa _ PAR OR YYf-IITE PINE
~-~------_3a' , , ~ ~ U I ~ ~ I TOWN OF SULI P,FI LD. I \ CANOPY TREES BRADFORD E ~ , c A, p, p, I '-N9TRIFlCA OPi ~ TAX REF. 1-037-906-043 - es +4 L +e,,
R 3' ~ z I ~ DB 6090, ° i ~ R W I 4 5 r. 1- 7-~ A- &,04 T F. 03 _ _ . . Fl A~ _ ~ ZONED R5-30 UNDERSTORY TREES CREPE MYRTLE LDq. ~ usE: sFR
~ a' ) ~ E -zo so' RON V~° i _ { ~ ~ 30 i U ~ \ r- + SHRUBS- COMMON BOXWOOD U TBA K ~ ls,,zs.o_ sF w
7Y ~ EOP EOP ~t3L . \ ~ ~ E. S R.• = T 6: ° Iw'ir'tXI+9I!I`ii _ HRt;B ~ ® ~ ~-----__,_:s LQ~~ ~,4 2 T 6. I ~ o ~+ar Q. O J6_ ss~.~ 1 ( SAL
~ 20' \ 76 I 40
8' { CANOPY / > ~ v ® 9221.:_ A4INiML~i`~i - TREE ~ ~ \ B FFER \ I I ARD ~ ~ ~ ~ ~~R
1.3 -t- - - 1 140 L.F. TYPE B BUFFER YARD ~cleav, ~a`~~*° i
- - I ~ °r ~ Q~ e®'® - - - ~ ~ ~ N0. RE UIREU `,,sES E, ,b+' I EQUIREMENTS Q
/ I ~ - _ _ _ 2~ ~~taa'~seas 1 ~ I 3 O~4NOPY TREES
~ I - - ~ ~ W RE o o a ~ 5 ~ ~ I ~ I PER OD L.F.
' iil•'rr`dpB Wh~C~1 ~ , I p o Z 97 . ~ > .Ill I R I] ~ ~ \ ~ 5 UNDERSTORY TREE ~ I ~ P ~ ~s2~ I
.1antln~s... cau~py trees der 1€ltl ~ 1~ shrubs per IDC}' ~ I ~ ' \ .1 862.1 I i ~ ~ , 25 SHRUBS 35 0 862.1 2 ~ PER 100 L.F.
a , ' I I 862.6 FI~SU'RE G-~ ~ I 1 I I II t
STREET PLANTING Y.~'tD I, ~ I I sso-~ 1 1 I 1 I JAN31
~ I 1 4 ~ I 1 1 ~ ~ 760.5 \ ~
~ I ~ i J ~ uP GPIC" LOT 41 SPACES usNrz-warER ® ~ PARK ( au~,l
coNSTRU noN I ~ ~ a~sr ~ ~
pr~,gN ~ \ 20' DRAINAGE I ~ I EASEM NT ~ ~ ,REQUIREMENTS N . REQUIRE9~ R 1 ~ ,
l• 1 I I 862.4 I ~s . 1 CANOPY TREE ~ 4 ~ o ~ ' r EIP PER 12 SPACES 1 ~ ~ ~
~ , . ass:^s ° ~ \ ~ ~ . a~a , ~iNV iN \
~ ~ I 24" W4L ~ ~ ~ ~ ~2 ~ ~ ~.i' / / ~ 860.05 1 ~
192 L.F. S EET YAR I I \ - 1 ~ ` . r ' ~
I ~ ~ REQUIREMENTS N0. REQUI ED . I 4.t 3.a ~ , ° , `~~i I ~ / i ~ i i ~ i i a, o "
2 CANOPY TREES ~ ~ UP .w
1 4 1 ~ D ~ . ~ 1 ~ ° ~ ~ . ~ o ~ 17 SHRUBS 34 ~ . , d ° . \
a~ ~ , ` / ® ~ _ \ , _ -/f GENEAAL NOTES
PROP. WELL \ 1, ENSTALL GRAVEL AND ~ - s
~l ~ ~ LOCATION \ t1LTER ~ SAWN- / 1 IRON PIPES AT ALL CORNERS UNLESS OTHERWISE NOTED. ~ N UN'nL P / " ) MAINTAI ,IPE
° ~8 '1 5 \ INSTALLATION ~S / i '
2125 2~2 ~Oirt_ptEfE r/ i~~~ our 2) CURRENT ZONING: SFR ~PV` / 855
r IP ~ , s4 ~8 h- - _ - ~p~ a~yDP U Lac DER , W , - ~ ~ 3 LAND USE: MUNICIPAL OFFICE BLDG. AND SHERIFF SUBSTATION ,NEIGHBORHOOD IC R ~ RS, , )
~ ~6 - ~ RH p P ~ 0 \ 4 ®w • g'07"W ® L EIP - - I ~ -i 3 - p~NE ~ ~~Y 4 TAX MAP REFERENCES: ACL 1-037-096A-042 & 043
~ 5 TOTAL NUMBER OF LOTS: 1
UP - - _ o ' ° _ ~ I f I EIP ~ ExCELSTOR ~ , ' )
~ our MATTING i, - J- 869. I ~ 6) TOTAL AREA = 1.22f ACRES
PROJECT BENCHMARK \ I~ PROJECT BENCHMARK R®° IELD ERF M M U 7300 sPIKE IN urluTY Po~E D.13. 3486 PG. 1420
PIKE 1N UTILITY POLE END OF ~8., -CGTT ~ , 'ELEVATION 873.95 ASPHALT III PIPE ~ , - i N s .46' 7) DEED REFERENCES: D-B. 6090, PG. 176 , ELEVAT 0 9 5 5~ 73 N 2 ELD FI R IWE
/ -7 ~1 U PLAT BOOK 72, PAGE 321 r
- ~ ~ 8) EXISTING IMPERVIOUS - 1551.84 S.F. = 0.036 AC.
II 313 L.F. STREET YARD - ~ / 9) BOUNDARY & TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY
II REQUIREMENTS N0. REQUIRED \ I F BY LAND SOLUTIONS, P.C.
~ ENV Sri 3 CANOPY TREES 6 / 869.81 PER 100 L.F. RFACE Y SU R i ERhI6LE B IC RI NOT D SC A WHERE 4117
/ » sHRUes 53 10) UNDERGROUND UTILITIES, APPURTENANCES (MANHOLES, CATCH BASINS, VALVES, ETC.), ARE
N PLA S I SHOWN PER INFORMATION OBTAINED FROM ENGINEERING
UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULp BE CONSIDERED APPROXIMATE.
PAVEMENT LEGEND
U~ILI~TTY LEGG~'N~D
EROSION CDNTRDL AND UTILITY I~GHT DUTY PVMT.
PROP. WATER LINE -W 3 -w w w- °
HEAV°r DUTY PvMT. • • • • • • • • • • • PROP. SAN. SEWER MANHOLE 33 .643° s FAX 0
-
CONCRETE & REQ'D PROP. 5ANIIAKY StVVtK LINt J J
THICKNESS PROP. STORM DRAIN LINE ANNE= Issue Date Description
PROP. CATCH BASIN GENERAL EROSION CONTROL GRADING NOTES:
PROP. YARD INLET p
PROP. INLET PROTECTION (WIRE do STONEL) do STO 12.02.04 ISSUE FOR SIDS NEL) 1. ALL SLOPES SHALL BE SEEDED IMMEDIA TEL Y AFTER REACHING
FINAL GRADE. 12.02.04 ISSUE FOR PERMITS
PROP. INLET PROTECTION (BLOCK & GRAVEL ,K & GRAVEL 2. EROSION CONTROL MEASURES INDICATED ARE SHOWN IN APPROXIMATE LOCATIONS. FIELD ADJUSTMENTS SHOULD BE TOWN OF SUMMERFIELD GOMMI=NTS
EXPECTED TO INSURE SEDIMENT BASINS, BERMS, AND OTHER 12.13.04
TEMPORARY CONSTRUCTION ENTRANCE TRANCE EROSION CONTROL FEA TURFS FUNCTION TO MAXIMUM
EFFICIENCIES
E EXCELSIOR MATTING MEMO= J. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON
THIS PLAN MAY BE REQUIRED TO INSURE NO SEDIMENT
GRAEL AND FILTER BERM LEAVES THE SITE. THE CONTRACTOR IS EXPECTED TO NO TIFY THE ARCHI TECT OR ENGINEER IMMEDIA TEL Y IF
THEY FEEL ADDITIONAL MEASURES ARE NEEDED.
8 4. THE CONTRACTOR MUST COMPLY WITH ALL PROVISIONS
M OF THE NORTH CAROLINA GENERAL STORMWA TER PERMIT
O O FOR LAND DISTURBING CONSTRUCTION ACTIVITIES. Date, DEC. 21 2004
5. ANY SOIL BORROW OR WASTE AREAS LOCATED OFF-
z a 51 1E MUST HAVE AN APPROVED EROSION CONTROL Project No 040204
J SEQUENCE OF CONSTRUCTION PLAN. Drawn By, DAC
0 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA
W 1. OBTAIN GRADING PERMIT. UNTIL APPROVAL HAS BEEN GRANTED BY THE APPROPR/A TE Checked Sy, EM
0 2. INSTALL SILT FENCE. a AGENCIES Drawing
3 PROVIDE INLET PROTECTION. 7. TEMPORARY SLOPE DRAINS ARE TO BE PROVIDED FOR ALL SLOPES CARD Drawing
4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE(S). U GREA TER THAN EIGHT (8) FEET HIGH.
5. PERFORM EXPLORA TOR Y EXCA VA TION/POTHOLING TO VERIFY UTILI FY LOCA TONS 8. EXISTING CONTOURS - 2' INTERVALS
3 6. INSTALL TEMPORARY CONSTRUCTION FENCE, PER APPROPR/A TF PHASE OF CONSTRUCTION. FINISHED CONTOURS - 2' INTERVALS
9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER
w 7 INSTALL TREE PROTECTION. CONTRACTOR TO ENSURE TREE PREPARATION (BY OTHERS) m HAS BEEN PERFORMED PRIOR TO DEMOL177ON OR ANY TYPE OF CONSTRUCTION EXCA VA77ON a WITHIN 15 DAYS OF DISRUPTION WHERE FURTHER CONSTRUCTION GRADIN(03" AND ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD CONDITIONS EXIST
8. PERFORM D£MOLI T70N. m UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER,
"w 9. EXCAVA7F SUFFICIENT TO REROUTE AND INSTALL UTILITIES AND DEEPENED F0071NGS MULCH AND TACK APPLICATION AS SPECIFIED BELOW WILL BE REQUIRED. EROSION CONTROL
3 10. FINISH SITE WORK. 10. DEPENDING ON SEASONAL LIMITATIONS AND WHENEVER POSSIBLE, DISTURBED AREAS
I 11. AFTER ALL AREAS HAVE BEEN STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL / SHALL BE PERMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA 77ON METHODS AND MULCH PLAN AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED /N THE PROJECT
to DEVICES MANUAL. IN THE ABSENCE OF SUCH SPEC/FICA TONS, USE THE PERMANENT
w / SEEDING SPECIF/CA77ONS NOTED IN THIS PLAN SET. ON THIS SHEET FOR TEMPORARY EROSION
z w CONTROL.
.I
W
z
0 z Sheet of
a
O I
I
~1
I
I
I
L~NI3ERST~ U?~tI3ERSTJRY
TREE .a. ar ~ eC c TREE 1
+
I
SHRUB SHRViJ
I j \ ost office box 39355
I I ~ 1 P r north Carolina 27438 greensbo o,
I l I ~ TYPE D PL~IvTiNG Yr1RD
I I I ti~ 336-282-7171 tel
I ~ \ ~ ~ ~ S' minimum width,l0' maximum widib P fax 336-282-7672
I / \ ~ " Plartin~s : 2 Understory trees per 100' \ ~ 18 Shrubs per 100' e ,~ti,
~ I I ^ \
I ~ V I I I SCOPE DOCUMENT o°
I ~ \ ~ 300 L.F. TYPE D BUFFERS YARD ~ I I ~ Thie drawing Inmates the penerei scope of the
I ~ I , NO:~ E UIREO ,z. I I REQUIREMENTS P project ~ terms of the arddteclural desi~ con- Q~' cept, twil~t~ ~ and an outrilro of maior
I ~ I ~ I 2liN0ER,STOR 6 architectural elenronts of construction. As a scope
I dooianent, this drswirp does not necesaar~y ind~ete ~ ~ ~ _ for the o s ful
I ~ 54 I I ---868'-- 1 LF. y _ _ or describe eN work required kot' y - _ performance and completion. Contractors,
~ ~ er shall be r nsible for Contractors a~ S s ~
} SUMMERFIELD FIRE DISTRICT, INC. / \ , GRAPHIC SCALE pravidig and gat all its ~dicated, "ndmd a
DB 3281, PG 104 / \ 0 40 required by bcai rides, witfiout adjustment to 20 10 0 2 Contract price, / \
I TAX REF. 1-037-906-069 ZONED RS-30
- USE: MUNICIPAL PROPERTY / ~ n Cenauftanta~ ~ ~ 1 = 20 FEET ~ sT-DRUB
REGRADE DITCH iN 244,372.01 SF
THIS AREA AS NEEDEp I ~,M'~ 5.61 f AC Ui~~E , ~ "`~,-y, _ - - - ~ 4?~'r~~~s~c;~r l~techaniCa4 Piwnbing, EIeC#rical Engineer
~'~'~'W~`'Y TtNG TREE UI~1E ~ I EXIS ;TtNG TREE / _ _ - - 1 / 5' ~ ~ ~~.,E~
I ~ % 1 TYPED PR \ 1 w ! 3C1' l.~ G~,INflPY
I ~ BUFI I f / ~ BUFFER YARD SEPTIC TANK ~ ~ ~ ~
° _ '57"E / 862.5 - / 862.5 \ ~ ; EIP ~ -
86.7 296.04' J ~ ~ \ _ 604 C VALLEY
M ----R;- v-cr o ~ M M ~ ~m r \ i oo>. I SUITE 200 '
~ i ~ ~ ~ r , ~ ° - - a s - REES ~R NC 27408 - ' ~5' minimum SG' matimum width ~ ' _ _
~ o ° ` .'lantir.~~s_ 3 C:arc~Y trees per 1{Hl' c~n.:~nter P~ 336®855-3822
I - o. ~ . °~o C~ ~ tin~tezstory t;ecs ;xar 100' on :;infer I I 2S 5hruhs per 1GU' ox~ c~ntar ® 55°9929
~ I I ~ i I FAX 336 8 I \
irw iN I , 1. Q 867.90 ~ • \ ' I
~ 4' ` ~ CA ~ ~ Civil Eng lC 862.6 862.1 - f \ I NOTE'.'.. DO NOT GRADE OR ALLOW HEAVY
~ ~ z I I ~ I TIN SEWER NITRIFICATION
PARKING L T 7 SPIA ES) ~ $~-a ~ EQUIP~IEN 86ai.a I ~ ~ I
RED ~'~N~ o~T• • ~ ~ s~3. ~ ~ - - - - a• i / AREA. I I ~I
REQUIREMENTS N0. REQ I ~ , ~ s~ a6~~t • ~ w l ~ 1 CANOPY TREE ~ Z L~' 1 ' I° ~ ° l
ACES x - ~ ~ ° PER 12 SP ~ cv wwa I ~ . Z STORY BUIlOING ~ I \ ~ I I I \ ~9~
~ I ~ I ~ 5,2 8 S.F. I I \ I DAMS-MARTIN-P4WELL & ASSOCIATES, INC
~ I , ` 84 - - ~ , - FLOOR 863,Q TC 862.1 TC 862.6 I I ~ i",, s r~, 6415 0~o Pt_arvK Roko
a ; T0~ FL 875. I 0 o ~ II / 1.7 w-, X HIGH POINT, NC 27265
I L" I ~ W + d 1~=- (336i 886-4821 I ~ I - - - - ' Fax (336) 88b-4458 Id,,~~r LANDSCAPE N ~ t
J~ ~ I I ~ I / ~ \ JAMIE M4LER ~C,iy www. P-INC.con
I D: ~ / ~ N ~ e ~ ~ ; I TOWN OF SUIai RFI ~ED. NC SEWER IN DB 5499, Pc 125a - RADFORD PEAR OR WHI TE PINE I ~ I ~ a ~ CANOPY TREES B ~;1y.1''`+ c8 ae ,,r - 4 tha • er ~ ~-NITRIFlCA ON ~ TAX REF. 1-037-906 0 3 ,y~pY ~
30' ~ U ~ ~ z 1 DB 609C, • 1 ~ RAW R W I 4 5 ~ T EF. i-037-9 A- &,04 R""" I AE1~ 'I" NEO Rs-3o UNDERSTORY TREES- CREPE MYRTLE pENR C O'
~ 1 ~ I a ' -r.. 2 RON t ~ I 3o i . rJ LD USE: SFR q SHRUBS- COMMON BOXWOOD 15 625.0± SF
-r-- o so EoP EaP , ~ ~ ~ ~E: S R I ~ TC E U I TBA~K ° ¢ _ ~ TC 62, ( 0.36± AC
- i~,r1KI411IN1 - SI-1 tt Y f~ 861.7 I I I 20 \ 4076
I I B FFER ' \
'~iTNiMT,~~i - TREE ~ .3 _ _ _
i- P . I - - - - - - - - - - I I 140 L.F. TYPE B BUFFER YARD c,~ ~~,4
- ~ ~ ~ \ - - 20 _ - - -1- ~ ~ ~ ~ EQUIREMENTS No. REQUIRED =a~,,g$a,$,,g.+® ~ I I 3 NOPY TREES
~ o - ~ 5 ~ \ I I PER 00 L.F.
~ I RE ~ ~ ~ ~ \ 5 UNDERSTORY TREE r ' I s I ~
ai•erabc width ~ - Rp ° . ~ ~ I Plantings; Zcano •trees r.l€N?' I ~ ~ ~ _ I J , ? , ~ I I ~ 25 SfIRUBS 35
c Py ~ ~ ~ ~ s62.~ 1.7 shrubs per l4~}' ~ ~ b. ~ I 862.6 I 862.1 ~ 1 PER 100 L.F. I I i
'R -F ~ I ~iGU E 6 ~ I \ I ~I ~ ~ s6o.7 I I ~
STREET I'L:AN'i IRIO Y.3 } ~ ~ I i~ 1 ~ ~ I I
~ s .4 I
° ~ I ~ ` ` uP IPI~ LOT 41 SPACES' ® PARK ( ) i I ~ ~
coNSTRU noN ~ 20 DRAINAGE ENTRAN f \ \ ~ / ,REQUIREMENTS N . REQUIRFF.O I
I EASEM NT ~ 1 CANOPY TREE 4 ~ so. L ® vm~T EIP y yt PER 12 SPACES
l• I ~ I I 862.4 t / ~ aai.~s y y i
~ ~ tP• ° ~ • RCP y ''INV IN 24~~ WAL j i2y y 860.05 ~ y y
I ~ I t~ 1 y ' y
I \ 1 192 L.F. ST EET YARD I ~ / y y i y / i y 5,...~
I I \ 4.1 3 \ ° REQUIREMENTS NO. REQUI ED ~ y ° ~~O ~f y~ uP y I'
t ~ ' ° 2 CANOPY TREES I ~ ~ N° ~ F. 4 1 1 ~ o o .
~ ~ ~ 17 SHRUBS 34 ~ ° r Q S3 ~ 23. . A , 1 :2~0• \ \~cA ~r - / GENERAL NOTES
• ~ ~ - ~ ~ ,i _ _ 1 INSTALL GRAVEL AND y j y -
l , PROP. WELL \ 1 LOCATION \ C~. FlLTER eER~i BASIN- ~ ~ ~ 1 IRON PIPES AT ALL CORNERS UNLESS OTHERw~SE NOTED. 1 ~ - )
oe ~ 5 \ MAINTAIN UNTIL y -
q N , #Z}2 5 ,INSTALLATK;~f1S/ ~ 2 CURRENT ZONING: SFR Z12 wv our } E.~-1 ~ / / ~ SSS.dQ
{ IP ~ ~ ~ ~ ~ QAQ \ W ~ LPN ~ FFI BLDG. AND SHERIFF SUBSTATION ,NEIGHBORHOOD ~ W , - 3) LANG USE: MUNICIPAL 0 CE
s64~ _ - - - - ~ pND P , p~~~- 0"IN~ , ~c Rl Rs~ , 3~ O~y~ ~ /
4 ®W 58 p7°W ® ~ EIP - - UP (BY , 4 TAX MAP REFERENCES: ACL 1-037-096A-042 & 043 UP }
_ _o _ uR I f I ~ 5} TOTAL NUMBER OF LOTS: 1
EIP ~ _ ExcELSTOR , ,
~ ~ ~"o~T IuArnwc I, - 869. I F 8„ -CGTT l ~ ~ 6} TOTAL AREA = 1.22E ACRES M HMARK R . T EE G I L PROJEC 7
PROJECT BENCHMARK ~ II ~ PIKE IN UTILITY PALE END 0 ~ ~JI ;`PIPE SPIKE .N urlurr PoEE R LACES: D.B. 609Q, PG. 176 D.B. 3486, PG. 1420 I F ar~N . F .4s' 7} DEED REFE E P~ ® E__V ~ 5 5 5® 2?
~~~i~ r,Cp~_n~r ~ ~ N L I PLAT BOOK 72, PAGE 321
8) EXISTING IMPERVIOUS - 1551.84 S.F. = 0.03E AC.
3i 3 L.F. STREET YARD II /
il REQUIREMENTS N0. REf~l11REO 9 BOUNDARY & TOPOGRAPHIC INFORMATION TAkEN FROM SURVEY I
~ iNV ~r, 3 CANOPY 1REES 8Y LANO SOLUTIONS, P.C. Y SURFACE
~ 6 ae9.a~ PER 100 L.F, RE NOT DISCERPIBLE B 4I 10} UNDERGROUND UTILITIES, WHE APPURTENANCES (MANHOLES, CATCH BASINS, VALVES, ETC.), ARE ~a,~,,
17 SHRUBS 53 N IL SHOV~N PER INFORMATION OBTAINED FROM ENGINEERING PLANS, ~~~~~d a
UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULD BE 2
CONSIDERED APPROXIMATE.
PAVEMENT LEGEND
~ UTILITI EROSION CONTROL AND LIGHT DUTY PVMT. D UTILITY LEGEND
. . -w w w-
PROP. WATER LINE ~ ~ HEAVY DUTY PvMT. • • • • • • • • • • • pROP. SAN. SEWER MANHOLE . 43.654
i S S
CONCRETE & REQ D PROP. SANITARY SEWER LINE Date Description MUG
THICKNESS PROP. STORM DRAIN LINE RON= PROP. CATCH BASIN GENERAL EROSION CONTROL GRADING NOTES:
PROP. YARD INLET 0 12.02.04 ISSUE FOR BIDS
PROP. INLET PROTECTION (WIRE & STONEL) 1. ALL SLOPES SHALL BE SEEDED IMMEDIA TEL Y AFTER REACHING E & STONEL)
0 FINAL GRADE. 12.02.04 ISSUE FOR PERMITS
PROP. INLET PROTECTION BLOCK & GRAVE 1CK GRAVEL) LOCATIONS. FIELD ADJUSTMENTS SHOULD BE 12.13.04 COMMENTS
APPROXIMATE EROSION CONTROL MEASURES INDICATED ARE SHOWN IN TOWN OF SUMRMITS D EXPECTED TO INSURE SEDIMENT BASINS, BERMS, AND OTHER
TEMPORARY CONSTRUCTION ENTRANCE JTRANCE EROS/ON CONTROL FEATURES FUNCTION TO MAXIMUM
EFFICIENCIES.
3. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON
E EXCELSIOR MATTING a THIS PLAN MAY BE REQUIRED TO INSURE NO SEDIMENT
w t LEA VES THE SITE. THE CONTRACTOR IS EXPECTED TO
GRAVEL AND FILTER BERM NOTIFY THE ARCHITECT OR ENGINEER IMMEDIATELY IF
N THEY FEEL ADDI TIONAL MEASURES ARE NEEDED. 4. THE CONTRACTOR MUST COMPLY WITH ALL PROVISIONS
N OF THE NORTH CAROLINA GENERAL STORMWA TER PERM/ T
FOR LAND DISTURBING CONSTRUCTION ACTIVITIES Dates DEC. 21 2004
O : D 5. ANY SOIL BORROW OR WASTE AREAS LOCATED OFF Project No.= 040204
SITE MUST HAVE AN APPROVED EROSION CONTROL
Z J PLAN. Drawn By. DAC
SEQUENCE OF CONSTRUCTION 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA
0 1. OBTAIN GRADING PERMIT UN AL AL HAS BEEN GRANTED BY THE APPROPRIATE Chocked Sys EM APPRO VA
W AGENCIES.
~ 2. INSTALL S/L T FENCE. D a 7 TEMPORARY SLOPE DRAINS ARE TO BE PROVIDED FOR ALL SLOPES CADD Drawings
3 PROVIDE INLET PROTECTION. GREATFR THAN EIGHT (8) FEET HIGH.
4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE(S). U 8. EXISTING CONTOURS - 2' INTERVALS
5. PERFORM EXPLORATORY EXCAVA1701V/POTHOLING TO VERIFY UTILITY LOCATIONS i FINISHED CONTOURS - 2' INTERVALS
6. INSTALL TEMPORARY CONSTRUCTION FENCE, PER APPROPRIATE PHASE OF CONSTRUCTION. 9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER
9 PR0TECTION. CONTRACTOR TO ENSURE TREE PREPARATION (BY OTHERS) W w 7. INSTALL TREE PERFORMED PRIOR TO DEMOLITION OR ANY TYPE OF CONSTRUCTION/EXCAVATION. WITHIN 15 DAYS OF DISRUPTION WHERE FURTHER CONSTRUCTION GRADING AND
a ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD CONDITIONS EXIST
0 HAS BEEN 8, PERFORM DEMOLITION. in UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER, MULCH AND TACK APPLICATION AS SPECIFIED BELOW WILL BE REQUIRED. EROSION CONTROL
W 9. EXCAVATE SUFf-ICIENT TO REROUTE AND INSTALL UTILITIES AND DEEPENED FOOTINGS 10. DEPENDING ON SEASONAL LIMITATIONS AND WHENEVER POSSIBLE, DISTURBED AREAS
/ 10. FINISH SITE WORK. M VE ALL TEMPORARY EROSION CONTROL SHALL BE PERMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA TION METHODS AND MULCH PLAN
11. AFTER ALL AREAS HAVE BEEN STABILIZED, RE O / AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED IN THE PROJECT
to DEVICES N M MANUAL. IN THE ABSENCE OF SUCH SPEC/FICA TONS, USE THE PERMANENT SEEDING SPEC/F/CA TONS NOTED IN THIS PLAN SET. ON THIS SHEET FOR TEMPORARY EROSION
U CONTROL.
Z W
J
W C1.1 Z~
z Sheet of
a z
Q I
D I
I
I
~i
I
I I
I i
0
L,~1~1I~sT~x`~ . a. ~ ec arc
rum T>~~ 1 , JAN 3
+ . A~t~:~u~~lrr w
DENR ~SpTERBPI~
Yf~~
s~TJ~s SI~tU~`B
I
I ~ tic!' ost office box 39355 P
1 I I north Carolina 27438 greensboro,
I ~ `TYPE D PLAIv~'ING YARI3 1 ~ ti~
I ~ l tel 336-282-7171 - 2-7672
I ~ \ ~ ~ S' mimm~m width, Ill' maximum vridth \ ~ ~ " Plautin~ : 2 Understary trees Per lt~i' fax 336 28 QP
1 \ ~ 1S Shrubs Per I00' 1`~'
I ~ \ I SCOPE DOCUMENT
I l \ l I I o° 0 Thin drawYip indicates the general scope of the
I ~ \ 1 300 l.F. TYPE D BUFFERS YARD ~ I 1 project ~ terms of the arcNtectural desiEn con-
I 1 ~8, I IREMENTS , N0: E IRED ,z, I I REQU ~P ~ ~ anti an outYne of meta Q traction. As a scope au~d'litectural elements of cons cats
~ ~ I z uNOERP~TOR EE ~I I s doeimerd, the drawNp does not netmsearih? ~fr~di
_ 1 I _ - - 54 or descrN~e aM work r~ulred for the project s fuM
I -868'-- P L . l ~ _ _ performance and completion. Contractoro, Bub' ~ - _ _ nsible fa ~ ~ Contractors end S s shat be respo
~ providing ~d inst s~ items indicated a / GRAPHIC SCALE
~ SUMMERFIELD FIRE DISTRICT, INC. required by bt~l codes. widnotnt adjustment to Contract Brice. / ~ 20 10 0 20 40
OB 3281, PG 104 I TAX REF. 1-037-906-069 / ~
ZONED RS-30 ~ ~ Con~nnta~ / ~ 1 = 20 FEET
- USE: MUNICIPAL PROPERTY
REGRADE DITgi IN 244,j72.Ot SF THIS AREA AS NEEDED ~ ~ 5.61 ~ AC ~ i ~ r, lwilechanical, Plumb~g, Q~ical En~ineerm~
~`'~'~'~Y TING TREE UNE ~ I EXIS REE UDIE / ~ _ e ; ` - _ _ ..?dDERS9`C)~~' LING T / , " ~ ~ ~ + T'RE~
I / / 5 ~ 1'YY,y~ 1 c ~ ~ E
% T~ TYPED ~ 3~r' ~
I / / BUFF ~ BUFFER YARD SEPTIC TANK ~ ~ + ~ e~ / T12~E i ~ ~ ~ 862.5 ~ ~ - = /
i ~ f 'S7"E / 862.5 ® - ~ EIP - VALLEY ROAD _ _ _ 604 GREEN
.7 296.04' ~ _ ® 1~c1~ 1 - ~ SUITE 200
Afl M ~ M M ~ 47 b ~ ~ NC 27408
~ GREENSBORO, - a s ~ 2~' irllIllrrlSlln, 5~'~ IrIIl?:tIIIi1rC3 NIE~TE.I _ lantino : 3 Canary trees gar 1fl0' cm center P`~DN
~ ~ ~ I o- - L = = _ - - - - . E 336-855-3822 5 Llndesstc~ry crew pe:r 100' on center
. i~ I IoW 5 _ ~ 336-855-9929 ~ 25 Shrubs Iran 100' cIn e~nt.er FAX I I
~ I . I f e ~ . ` I ~
IN`J IN I ~ ~ ~ Q 867.90 ~ 2 h j . ~ I Civil Engineer&~
~ ~ ~ ~p / t~ ~ ~ ~ Z 862.6 862.1 IN K A I ~ I NOTE'.',. DO NOT GRADE OR ALLO E
~ k I I ~ I ~ U/P~fENT IN SEINER NITRIFICATION ~
~ ~ / ~ ~ ~ 86X1.8 PARKING T 7 SPy4 ,ES) ~ ~ ~ N / as~i.a I 1 ~ I a , / AREA.
REO ~ ENV o«,T~ ~ $ - a REQUIREMENTS N0. REQ I ~ 11 I I ~I
867.U2.' •1 W l . 1 CANOPY TREE / ~ z Z ~ I° i I I `i ~ / ~
PER 12 SPACES ~ R„~ PR . 2 STORY BUILDING ~ , ' i N ~ ~ ~ ~ I 5,2 S.F. ~ _ ~ I I I~
~ I a BOT'roM rc as2s ~ FLOOR 863.0 i I I \ DAVIS-MARTIN-POWELL & ASSOCIATES, INC TC 862.6 ~ b415 Oro PLANK Roao
a i ~ ~ T0~ FLOOR 875.0 I I 1 7 HIGH POINT, NC 272b5
o I ~ ~ I I (536) 886-4821
I I~ ~ ~ a / . W. I I ( R & NO S. fAK (336) 886-4458 \ CNRISIOPHER U. Iv10LE LANDaCAP ~ www. a-iNC.con ~ i ~ u i JAMIE MOLER
J~ Q I SEWER (rv DB 5499, Pc ~ 25e ANOPY TREES- BRADFORD PEAR OR WHITE PINE I ~ I a ~ C ~t~ as+r<<
I N ~ ' / T WN OF SU~bi RFI LO. NC O R r ,_NiTRIFiCA ~d - ~ TAX REF. 1-037-906-043 RSTORY TREES- CREPE MYRTLE C 0 I A~ zoNEO Rs ~o UNDE
R 3 5• Z DB 609G, R W J 4 ~ T~ EF. 1-037-9 A- lJ4 Fl m _ ~ ®®e LDQ. ~ usE: 5FR SHRUBS- COMMON BOXWOOD
a : 1 n 30 RON ~ , i _ { I ~ . U zo so' / ~ 1 E25.0± 5F 4• d 5, ~ I TBA~K o • ~ - ~ m
EOP EOP E. S R.,. = T I ~:p_~N~(t~_ c 1~ I ~ 1 ® ~ Y ~a = T 2. f u.36± ar SAL s61.7 I I j 4076
20 \ I FF ~ •
't~ll~ i~r'~ ~ ~ ~ ~ d - • } ~._.,_~iC:9 CA~it?PY I~ I B ER \ LR u I ARD I
;hi[NI?ti4t;,y 'FREE ~ 1.3 _ - - - 140 L.F. TYPE B BUFFER YARD o - I I I ,,,tEsE,~,®,
~ P _I r - - - I ~ IR °xhraast4`°~` - - - ~I` ~ EQUIREMENTS No. REQU EQ
~ I t - - 20 - _ - I ~ I 3 C~INOPY TREES 5
o I o ~ - _w RE ~ . o I ~ A I ~ I PER ' 00 L.F. ~ ~ \ ~ 5 UNDERSTORY TREE ~
a RD ~ I ae
„ ~ < i ~s: ? cane • trees r a€10' I ~ ~ ~ I . lant n~,. Py pe ~ I ~ ~ ~ 25 SHRUBS I I t00 L.F. 35 62.1 2 ~ PER
~ ~ ~ 862.6 .1 62.1 2 r 1hT13~}S PeT LDC ~ I a' ~ ( I I I ~ I ~
FICsURE ~3-~ ~ I ° , v I ~ I 860.7 I ' I ~ / I I
STRFEf ~'I...ANiTTdG Y.~RD y ~ I I ~ I I
1 a .a ~ I ~ 1 J ` uP C" LOT 41 SPACES KIPI a PAR
\ I coNSTRU TtoN ~ 20 DRAINAGE - I ~ ~ REQUIREMENTS N . REQUIREC~
~ EASEM NT ( ~ ' ~ Y TREE ~ ~ . 1 CANOP 4
f; t I I 4 I ~ so, L ® u~T EIP ~ PER 12 SPACES / ~ ~
I 8s2. .i r \ ~r . ass:^s 1 ~ ~ '
24" WAL j ~ ~ ~ aso as 1 ~ _ r ~
I ~ I I \ r
192 L.F. ST EET YAR 1 ~ ~ ~ a.t 3. A
REQUIREMENTS N0. REQUI ED , . I I ~ 'w UP ~ mJ m
2 CANOPY TREES 4 ~ r`~ o x•35 \ ~ / S3 ~
1 ~ SHRUBS 34 rn~ ~ . \ Q r . 3 ,p ~ 210.2. \ ~cA ~i _ GENERAL NOTES - ~ ~ ~ - /
R ~ INSTALL GRAVEL. AND , j ~ '
I ~ PROP. WELL \ ~f ~ LOCATION ~ FlLTER BEI~ BASIN- N PIPES AT ALL CORNERS UNLESS OTHERWISE NOTED. ~ ~ / 1) IRO MAINTAIN UNiiL ~ / ~ j
~ 5 ~WSTALI.ATtON1S~ ~ RRENT ZONING: SFR
o , - #212 ~2~ INV OUT 2} ~ 855.40 P`~ ~ ~ S iERIFF SUBSTATION ,NEIGHBORHOOD
IP ~ ~ Ro Q RI S ~ / 3 LAND USE: MUNICIPAL OFFICE BLDG. AND ~ R W ~ } ~c ~ s1, I~ ~F~ , ~ -
s`6 :ti _ - - _ _ ~~y-~ NpPN , U ~1C DER 4 ~ - - rn RP,O P ~ 0 ~ W p7.,W ~ EIP ~ 'I ~B = - ~ UP Y 0 TAX MAP REFERENCES: ACL 1 037-095A-x)42 & 043 ~B . , uP 4} i
41.6. g3T58 A~ f _ ' - . p f
uP I ~ I 5} TOTAL NUMBER OF LOTS: 1
- EIP ~ EXCELSIOR ~ -our MATTING Imo' 6 TOTAL AREA = 1.22f ACRES RD. D EL FI ER ~ M M 300 7
seg. I , ' ?ROJECT BENCHMARK PROJECT BENCHMARK s~IKE irv u~lurr POLE ED REFERENCES: D.B. 5090, PG. 176 0..3486, PG. 1420
II ~8° -COTTA , , , 7 DE 35 27 N } D IEL - R F E - S - - ~ ~ PLAT BOOK 72, PAGE 321
ELEVATION 873.95 AS~'HALT ^I - I l '
XISTING IMPERVIOUS - 1551.84 S.F. = 0.03 AC. 8) E
- , 313 L.F. STREET YARD ~ II / PHIC INFORMATION TAKEN FROM SURVEY RY & TOPOGRA IEL 9} BOUNDA T
it REQUIREMENTS N0. REQUIRED 7~ BY LAND SOLUTIONS, P.C.
~ iNV ire 3 CANDY TREES ~ 6 A R E RID K A 4917 NDERGROUND UTILITIES, WHERE NOT DISCERNIBLE BY SURFACE 10} U VALVES ETC., ARE
869.81 PER 100 I..F. ~ 17 SHRUBS RTENANCES MANHOLES, CATCH BASINS, ) N PPU D A c IL R
SHOWN PER INFORMATION OBTAINED FROM ENGINEERING PLANS, r UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULD BE 7
CONSIDERED APPROXIMATE.
AVEMENT LEGEND P
D UTILITY LEGEND
CONTROL AND UTILITY EROSION LIGHT DUTY PVMT. .3 . P.
1I PROP. WATER LINE -w w w - 43.3654 3 .6 A F
. I I I n~ n. .rv ntn~T ~ _
IitAV7 uV i t rvm i. r • • • • • I PROP. SAN. SEWLK MANHUl.t W
S S
CONCRETE & REQ D PROP. SANITARY SEWER LINE THICKNESS PROP. STORM DRAIN LINE Issue Date Description
PROP. CATCH BASIN GENERAL EROSION CONTROL GRADING NOTES: ISSUE FOR SIDS
PROP. YARD INLET 0 1. ALL SLOPES SHALL BE SEEDED IMMEDIA TEL Y AFTER REACHING 12.02.04 E & STONEL 12.02.04 ISSUE FOR PERMITS
PROP. INLET PROTECTION (WIRE & STONEL) 1 FINAL GRADE.
PROP. INLET PROTECTION (BLOCK & GRAVE )CK & GRAVEL 2. EROSION CONTROL MEASURES INDICATED ARE SHOWN IN TOWN OF SUMMERFIELD APPROXIMATE LOCATIONS FIELD ADJUSTMENTS SHOULD BE 12.13.04
EXPECTED TO INSURE SEDIMENT BASINS, BERMS, AND OTHER COMMENTS
TEMPORARY CONSTRUCTION ENTRANCE JTRANCE EROSION CONTROL FEA TURFS FUNC77ON TO MAXIMUM
EFFICIENCIES
EXCELSIOR MATTING E J. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE REQUIRED TO INSURE NO SEDIMENT
a LEA VES THE SITE. THE CONTRACTOR IS EXPECTED TO
GRAVEL AND FILTER BERM RIO= NOTIFY THE ARCHITECT OR ENGINEER IMMEDIATELY IF
THEY FEEL ADD177ONAL MEASURES ARE NEEDED.
8 4. THE CONTRACTOR MUST COMPLY W/ TH ALL PROVISIONS
N M OF THE NORTH CAROLINA GENERAL STORMWA TER PERM/ T 2 2004 Dates DEC. r
FOR LAND DISTURBING CONSTRUCTION AC77VIT7ES
0 5. ANY SOIL BORROW OR WASTE AREAS LOCATED OFF- Project No.- 040204 SI TE MUST HA VE AN APPROVED EROSION CON7ROL
PLAN.
Z J
UENCE OF CONSTRUCTION SE Q 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA Drawn By. ' DAC THE APPROPRIATE Chocked y
W 1. OBTAIN GRADING PERMIT. UN17L APPROVAL HAS BEEN GRANTED BY AGENCIES
2. INSTALL SIL T FENCE. MPORARY SLOPE DRAINS ARE TO BE PROVIDED FOR ALL SLOPES
0 a 3. PROVIDE INLET PROTECTION. 7 1E CAQD Drawings GREA 7ER THAN EIGHT (8) FEET HIGH.
v 4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE(S). A TIONS 8. EXISTING CONTOURS - 2' INTERVALS FINISHED CONTOURS - 2' INTERVALS
5 PERFORM EXPLORATORY EXCA VA T/ON/POTHOLING TO VERIFY UTILI TY LOC i
o6. INSTALL TEMPORARY CONSTRUCTION FENCE, PER APPROPRIA IF PHASE OF CONSTRUCTION. 9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER WITHIN 15 DAYS OF DISRUPTION WHERE FURTHER CONS TRUC77ON GRADINIG AND
7 INSTALL TREE PROlFCTlON. CONTRACTOR TO ENSURE TREE PREPARATION (BY OTHERS) ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD CONDITIONS EXIST
HAS BEEN PERFORMED PRIOR TO DEMOLITION OR ANY TYPE OF CONSTRUCTION/EXCAVATION. UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER, MULCH AND TACK APPLICATION AS SPECIFIED BELOW WILL BE REQUIRED. EROSION CONTROL
Ln 8. PERFORM DEMOI.I T70N. `0 SUFFICIENT TO REROUTE AND INSTALL UTILITIES AND DEEPENED FOOTINGS
W 9. EXCAVATE S / 10. FINISH SITE WORK. 10 DEPENDING ON SEASONAL LIMITATIONS AND WHENEVER POSSIBLE, DISTURBED AREAS SHALL BE PfRMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA 77ON METHODS AND MULCH PLAN
~ 11. AFTER ALL AREAS HAVE BEEN STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED IN THE PROJECT MANUAL. IN THE ABSENCE OF SUCH SPEC/FICA 170PJS, USE THE PERMANENT
DEVICES
M W NOTED IN THIS PLAN SET. ON THIS SHEET FOR TEMPORARY EROSION SEEDING SPEC/FICA 1101VS
C7 CONTROL.
Z W
J n. ~ 1~~ , - - 1
W Sheet of
2
0 Z I
Q I
O I
I I I I i i
~:iNDLRSTJRY
I'R TREE
+ + .a. arc ~ ec 8
i
t SHR' SHRLB
~ I \ #Dfl'
post office box 39355
~ l I ~ TYYB T7 PL.~Ik"TING YARD I ( ~ ~
~ greensboro, north Carolina 27438 ~ti
I ( \ "5' minimum width,113' maximum width I / ~ ~ " Pian~n~s : 2 Ustderstc~r~ trees per ItHT' tel 336-282-7171
I \ ~ 113 Shrubs per 1D(t' QP - fax 336 282-7672
\ I V / V ~
I I ~ II \ o`~
I ` 300 L.F. TYPE 0 BUFFERS YARD 1/ D 0 SCOPE DOCUMENT 0
a, , I I I ~ ~ REQUIREMENTS , N0: E (RED
~ I 1 ~ 2 UNDER TOR EE ~ 6 ~P This drawing indicates the general scope of the Q project in terms of the architectural desi~ con-
I F. _ _ ~ cept, bulking drnarreio~ and an outrme of rrmja / ~ ~ , arddtectural ebmenta of constructbn. As a scope
I I -.--868'---- PER 1 F. 54 / ~ _ _ doewnent, the drawing does not neceasarNy ~cate
/ or descr~e aN work required for the project's fuN / ~ \ pertormm~ce and cmmpletion. Contractors, 8~-
SUMMERFIELO FIRE DISTRICT, INC. GRAPHIC SCALE Contractors etb Sup~lers shall be responsible for
DB 3281, PG 104 - I iAX REF. t-037-906-069 ~ ~ proving and i~taing ai items ~cated, or ~ ~ 20 10 0 20 40 required by bcal odes, without adjustment b
ZONED RS-30 ~ \ Contract Prlce.
USE: MUNICIPAL PROPERTY REGRADE OITCH IN 244,372.Ot SF ~ 1 " = 20 FEET
THIS AREA AS NEEDED I 5.61 f AC ~'~o^rWww~ 'm'~ \ Conaultants~ \
~'h~Y~ (STING TREE LINE /
I EX T1NG TREE LINE ~ XIS ~ ~ E 5 ~ ' " _ _ ~,!~ERSZa:~ Mocha ° ing, Electrical Engirree ' ~
I ~ ~ i + TT>~.F:E / TYPED P \ ~ +
i / ~ BI ® f / SEPTIC TANK / BUFFER YARD \ .~.3 ~
® _ 'S7"E ~ 862.' ~ ~ - ~ / 862.5 \ t + v~ 1 fM1 >~.~I~OPY
8 .7 296.04' ~ ~ ~
~ PA - M M ~ _ _ ~ r*1 \ ~ 804 GREE VALLEY ROAD ~ b - 1 Uil i
I I i. ~ - F~ I V - _ q s ` ~~Y>~ ~ ~~R~ SUITE 200
/ I - - ® - i~" ~~,Ir;~u~, sc• m~mt.~: ~V;~rn GREENSBORO NC 27408 ~y ,
a . ~ > o ~ ~ ~ 1oW - Gj , ~ i ~ " :'3antina~s: 3 ~;arc7py trcv~s par ? (3U' ~~n c::nt~r
f IPlV IN ~ . ~ Q i ° _ I ~ v 5 ~1~~~~stti~ ~~~t~er PHONE 338-855-3822 I o ? \ ' \ Shr,abs r;,~r tC}Ct' c.3:r centsr
867.90 ~ ~ ' I I FAX 336-855-9929 \ I ,
~ ~ Cp / ~ ~ ~z I \ 1G 8626 862.1
a NOT'E'.', DO NOT GRADE OR ALLOW hEA VY Civil En I I v I g b~~s
PARKING T (7 SPIA ES ~ ~ ° I ss~i.8 s6XZ.8 \ EQUIPMENT /N SEINER NI TRIFI~CA T10N
REQUIREMENTS N0. REQ (RED •~N~ ~T~ ~ ~ spa. _ ~ ~ _ _ _ N / I I \ I - , I ~ AREA. I I
1 CANOPY TREE ~ 1. ~ ~ PER 12 SPACES ~ c ? ( ' I° i ~ ~ . . I \ i I I I
~ ~0 ~ ~ i FR ~ ~ / N I < 2 STORY BUILDING ~ I I \ I\
n I 5,2 B S.F® ~ ~
a I - ~ 863.® rc 8E I ! ~ a E ~ 875.0 cats I I ~ DAUIS-MARTIN-POWELL & ASSOCIATES, INC
o n , a / 1J I I 6415 OLD PLANK ROAD
~I ~ W 1 ~ I '~~II I ~ I HIGH POINT, NC 27~b5
I i / > I ~ CHRISTOPHER M. MOLER & ~1r11JCt11~E 1y~lE~.7: (334, 88b 4821 u \ JAMIE MOLtR Fax (336) 886 4458
~ , ' ~ I ~ U ~ ~ ~ ~ ' I TOWN OF S~JtiI RFI LD. tiC I 1N DB 5499 P, 1258 www. P-iNC.con _ ~ I P T - F P R R WHI Pl
R/W 30 S' Z i DB 6090 ~ 1 R"'~ R/w I 40 J , _~i _ ~ NITRIFlCA ~ ~ TAx REF. i-o3~-sob-ors CAND Y REFS BRAD ORD EA 0 TE NE I AEA -I.~ ,ii a, =e~,, .a4 Fl zaNEO Rs-~o UNDERSTORY TREES- CREPE MYRTLE of C
20 6 ' RON ~ e n. ~ T~ EF. i -037 ~ A. & .44 , 0 l _ I r .SO _1 ~ ~ EOP EOP _ - I U ~ LDq. ~ usE: sER _ ~ 0
~ E. 5 R ~ 2 TC - N'IhXIt'A~fN1 / - _ SHRUB ~ ~ ~ ` ~ I TBA K 15,s2s a± ;F SHRUBS COMMON BOXWOOD , 2 TC 862. I ~ o ~
'NI~T;';'~ ~ n - 861.7 I ' r 36± Ar a _ j I ffi
~sirr~~;~ _ 1 TTtt~s , ( ( ® I 9 R} I 20' ~ I:AL I B FFER ~ D 4076
~ \ WIDTH 'f" .3 + t + a w P \ - - - I 5 c - - - - I ARD I 2Q~
o - ~ i' I 3~ s C~ V e ~ _ I I 140 L.F. TYPE B BUFFER YARD ~pN Nc~N~v w , A ~ ~r~~ 8
~ t ~ _ _ - - 20 - _ - - ~ ~ ~ ~ ~ IR M No. R IR D ~~itc,.l~ C P _ _ / I EQU E ENTS EQU E w~ttir . ~~fta" ~S E.
W RE ~ _ ' 8' ~I+•;;ra~e wl~t~ I a _ ~ , ~ I 3 NOPY TREES DENS S1A g'f ~F38i Siii°° ~ ~ ~ 5 ~
• ~ ` Plantings: ? Cana ;trees r :lf}()' w ~ • ' ~ RD ° ^ I ~ ~ I I PER 00 L.F. ~ ~ ~ 5 UNDERSTORY TREE
~ g ~ ~ I - l.7 shxubs per IDE? ~ ~ ~ \ I I gsy I ~
FI~SU'R.Eb-F ~ a `I 862.6\ ~1 862.i , ~ I ~ I 862.1 'Z I I ~ ~ 25 SHRUBS ~ PER 100 L.F. 35
ST.REES T'I..~NTTI~G I.~Ri) , ~ I \ I ~ ~ I I I I Sso.7 t
1 \ i I ~ I I t ~ i v I I ~
2.4 ° \ I
CON5IRU T10N \ UP C ~ \ ~ PAR,KI~O" LOT (41 SPACE.) I
ENTRAN I L , : ~ \ 20' DRAINAGE \ ~ - I ,i y -REQUIREMENTS N .REQUIRED
1. ` I I EASEM NT e 1 CANOPY TREE ~ ~ sa. L .p 4
I ~ 862.4 I ` ~ ~ \ ~c cur. ESP , / PER 12 SPACES
~ ~ ~ I 24" WAL ~ °~A ~ _ acF /iNr ire ~ / \o l2 860.05 /
192 L.F. ST EET YARD i ~ 1 / / / 1 i 1 -
REQUIREMENTS N0. REQUI ED I ~ ~ I 4.1 s .o \ N. /
2 CANOPY TREES 4 I \ N. c / ~ .~1„ ~'a.E v L ~ ~ . - i ' ~P
1 ` ( ~ ~ ~N° 17 SHRU9S w~ ~ ~ ° ° ~ ~ fl ~ ~ 31'35 ~ \ a, ,--,o-~'"' UP ~ ~ ~ ' .
34 / ~ . ~ d .m> ; . Q. ~ ( , ~ ~ 0 ~3. A , ~ ~ ~
PROP. 'WELL \ ~ - \ ~0 GENERAL N®TES
1 LOCATION \ ~ INSTALL GRAVEL AND - / FlLTER BERN BARN- ~ / .
erg, ~ ~ - 1 IRON PIPES AT ALL CORNERS UNLESS OTHEF;WISE NOTED. `r MAINTAIN UNTIL P~ - }
2 ~ ~ In . ' I L) #2~ 5 INSTALLATI4N~S / / ~ / #212 ~PtEfE , - iN~ our 2} CURRENT ZONING. SFR
IP ~ \ ~ ~ ~r,QQ P~L~ / / / / 855.40
®'s w - ND~D , PU~~ OBE 41,g® 7.58'07"W ~ ~ EIP ~ Q ~ R 3~ ~Y IC Rj S) , 3 LAND USE: MUNICIPAL OFFICE BLDG. AND >HERIFF SUBSTAT10N ,NEIGHBORHOOD ~ o ~aY
S3 4 ~ - ~ Uf ~uP / 4) TAX MAP REFERENCES. ACL 1-037-096A-042 & 043
I ~ I
EIP ~ _ - EXCELSIOR , - ' ~ _ fi" our AIATiIN6 f~ - 5} TOTAL NUMBER OF LOTS: 1
(PROJECT BENCHMARK 869' I - , ~p!~E iN UTILITY POLE ~ r ~ I) ,~8° -CGTT~. 6 TOTAL AREA = 1.22f ACRES ~ PROJECT OENCHMARK }
_ND 0, ~ _ _ ~ F_F. -Ji~i o~~-~, dSNHALT ~ - - , - ' . - - _ ~ ~ ~ 7300 MIlIIERFIELD RD.
I~ E~tvA~«N -36~.~s' 7} DEED REFERENCES: D.B. 6090, PG. 176 D.B. 3486, PG. 1420 PLAT BOOK 72, PAGE 321 °~®~ie~~ FI N 2735
--~~-I- L
it 313 L.F. STREET YARD / 8) EXISTING IMPERVIOUS - 1551.84 S.F. = 0.036 AC.
\ II REQUIREMENTS N0. REQUIRED 9} BOUNDARY & TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY
3 CANOPY TREES 869.81 PER 100 L.F. 6 BY LAND SOLUTIONS, P.C. I
/ 1 ~ SHRUes 53 10) UNDERGROUND UTILITIES, WHERE NOT DISCERNIBLE BY SURFACE
411 I APPURTENANCES (MANHOLES, CATCH BASINS, VALVES, ETC.), ARE ,T
SHOWN PER INFORMATION OBTAINED FROM ErIGINEERING PLANS, ~ j'`~ I UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULD SE ~
PAVEMENT LEGEND CONSIDERED APPROXIMATE. ~
LIGHT DUTY PvMT. EROSION CONTROL AND UTILIT; D UTILITY LEGEND
-w w w- e ® m _
~ „cA,~, D4,.,~• PROP. WATER LINE -
"GA V 1 V V 1 1 V V M 1. F .....I { • • • • • • • • • • PROP. SAN. SEWER MANHOLE
CONCRETE & RE4'D PROP. SANITARY SEWER LINE - • ® . . ® -W 1%v .IQ,~~ vto 336.643.8654 FAX S S
THICKNESS PROP. STORM DRAIN LINE
PROP. CATCH BASIN
PROP. YARD INLET GENERAL EROSION CONTROL GRADING NOTES: MUG Date Description
PROP. INLET PROTECTION (WIRE & STONEL) E & STONEL 0 1. ALL SLOPES SHALL BE SEEDED IMMEDIA TEL Y AFTER REACHING 12.02.04 ISSUE FOR BIDS
FINAL GRADE. 12.02.04 ISSUE FOR PERMITS
PROP. INLET PROTECTION (BLOCK & GRAVE ICK & GRAVEL) 2. EROSION CONTROL MEASURES INDICATED ARE SHOWN IN
APPROXIMATE LOCATIONS FIELD ADJUSTMENTS SHOULD BE 121304 TOWN OF SUMMERFIELD
TEMPORARY CONSTRUCTION ENTRANCE EXPECTED TO INSURE SEDIMENT BASINS, BERMS, AND OTHER COMMENTS JTRANCE
E EROSION CONTROL FEA TURFS FUNCTION TO MAXIMUM
CL EXCELSIOR MATTING 3. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON
d Emmmm= EFFICIENCIES. THIS PLAN MA Y BE REQUIRED TO INSURE NO SEDIMENT
LEA VES THE SITE THE CONTRACTOR IS EXPECTED TO
GRAVEL ANFILTER M N NOTIFY THE ARCHITECT OR ENGINEER IMMEDIATELY IF
Nj THEY FEEL ADDITIONAL MEASURES ARE NEEDED.
4. THE CONTRACTOR MUST COMPL Y WITH ALL PROVISIONS
OF THE NORTH CAROLINA GENERAL STORMWA TER FERMI T
Z FOR LAND DISTURBING CONSTRUCTION ACTIVITIES Date- DEC. 21 2004
Q J a 5. ANY SOIL BORROW OR WASTE AREAS LOCA TED OFF- SITE MUST HAVE AN APPROVED EROSION CONTROL Project No.= 040204
SEQUENCE OF CONSTRUCTION PLAN.
0 w 1. OBTAIN GRADING PERMIT. Drawn By- DAC
i 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA UN77L APPROVAL HAS BEEN GRANTED BY THE APPROPRIATE Checked Byo EM
°a 2. INSTALL Sk T FENCE. AGENCIES.
3 PROVIDE INLET PROTECTION. 7 TEMPORARY SLOPE DRAINS ARE TO BE PROVIDED FOR ALL SLOPES CADD Drawing
4. INSTALL TEMPORARY CONSTRUCTION ENTRANCES . GREATER THAN EIGHT (8) FEET HIGH.
8. EXISTING CONTOURS - 2' INTERVALS
o5. PERFORM EXPLORA TOR Y EXCA VA 77ON POTHOLING TO VERIFY UTILI TY LOCA TIONS 6. INSTALL TEMPORARY CONSTRUCTION FENCE, PER APPROPRIA 7E PHASE OF CONSTRUCTION. FINISHED CONTOURS - 2' INTERVALS
N 7 INSTALL TREE PROTECTION. CONTRACTOR TO ENSURE TREE PREPARATION BY OTHERS
a m; HAS BEEN PERFORMED PRIOR TC DE'/!). .'7?ON OR ANY TYPE OF CONSTRUCTION/EXCAVATION. 9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER WITHIN 15 DAYS OF DISRUPTION WHERE FURTHER CONS TRUC770N GRADING AND
PERFORM DEMOU770N. M ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD CONDITIONS EXIST
9. EXCA VA TE SUFFICIENT TO REROUTE AND INSTALL U77LI77ES AND DEEPENED FOOTINGS UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER,
a 10. FINISH SITE WORK. MULCH AND TACK APPLICA TION AS SPECIFIED BELOW WILL BE REQUIRED. ER003ION CONTROL
i „ 11. AFIFR ALL AREAS HAVE BEEN STABILIZED, REMOVE ALL IFMPORARY EROSION CONTROL 10. DEPENDING ON SEASONAL LIM1 TA TONS AND WHENE?ER POSSIBLE, DISTURBED AREAS SHALL BE PERMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA 77ON METHODS AND MULCH
DEVICES. M W AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED IN THE PROJECT PLAN
C7 2 MANUAL. IN THE ABSENCE OF SUCH SPECIFICA TONS, USE THE PERMANENT
w SEEDING SPECIFICATIONS NOTED IN THIS PLAN SET ON THIS SHEET FOR TEMPORARY EROSION
J CONTROL.
W
Z
0 2
Q Sheet of
O
I I I
~ I I i i
1
U~~~: t~~r~srOx~
T1~~
+ arc I ec .a.
a
s ~ sxx~ SHRL~
f
I I
I / I \ 1(10'
~ \ f
~ 1 I ~ TYKE D PL~Iv'TING YARD I I I ost office box 39355 P
reensboro north Carolina 27438
~ 1 ~ ` 3' minimum widtla,l0'maximum width I 1 ~ * Planting : ? Understy gees er 100' ~ti 9 ,
I I ~ ~ 18 Shrub4 lrer 10D' - - P tel 336 282 7171 Q
I ~ i ~ \ fax 336-282-7672 1'
I ~ I 1
1 1 300 L.F. TYPED 9UFFER~ YARD II i ~ ~0 0 SCOPE DOCUMENT
a, , I I ~ REQUIREMENTS , NO:~ E UIRED P
~ I I 2 UND TAR EE ~ 6 Q~' Thb drawing hdicates the general scope of the project b terms of the arc~itecturai design con-
I 1 ~ , ` ` Copt, butidin9 ~ and an outline of rta)or
I I __--868'--_-- PER F. 54 ard~tectwual ebments of construction. Aa a aoope ~ ~ ~ - _ document. thb drawing does not necesearNy k>dioate
~ a describe ~ work requked for the projeoNs fuN
SUMMERFIEED FIRE DISTRICT, INC. Ic. ~ \ pertormer~ce and completion. CoMnlotors, 8ub- ~ GRAPHIC SCALE Contractors end S ors shah be responelbb fa
DB 3281, PG 104 - I TAX REF. 1-037-906-069 \ 3 ~ \ 20 10 0 20 40 provk~p and ' aB items t~dicated, impNed a
ZONED RS-30 required by load c~ee, without adjuetmeM to
USE: MUNICIPAL PROPERTY REGRADE DITCH IN__ 244,372.Ot SF ~ \ CoMraot ~
TES ~ NEEDED I n'' 5.61 t AC ~ ,~rvwv~r,~-~^r,~rw,n \ 1~ = 20 FEET \ \ ConeulMMe~
'Y, LING TREE lP•JF: E ~uaF: , / ~ sxRtrB
I E> S / X1S11NG iRE / 5 _ _ _ _ UNDERSTCIRY McOhe Pkn>bin de trical En inee
I TYPED \ ~ + + T~
_ ~ y / B~ ~ BUFFER YARD SEPTiC TANK / \
~ ~ ,57,.E ~ / 862.5 / 862.5 \ 3 1 t ti^ 1~, I CAN \ \ ry } OPY A EP ~ ~ ~ _ ~E
$ .7 296.04' ` -i M - ®
i o `-i~- M- ~ M c-o- - - M ~ cr m
\ 604 GREEN VALLEY ROAD b \ 1 ~ s - - TYPE B PLANTING Y.a,Ri7 SUITE 200
° ~ ~w I . ~ - - _ . . ~ " 25 minimum, 573' maximum width I
C~ e O / o G I ~ 9 r 10~ 5 . - ; ~ \ _ , GREENSBORO NC 27408 I j \ ~ I IanUn~t: 3 Canopy trees pCr 1 W' nn center
'1 ~ Itd'/ IN I ..1, ~ I S Undt:rstcrry trees per 100' on center PHONE 336-855-3822.: ? ~ I \ \ 25 Shrubs per 100' cnx c~entc:r
asz9o ~ , I ~ ~ j ~ I FAX 336°855-9929 j \
~ CA / F ` ~ ~ Z TC 862.6 862.1
~ i~ PARKING T 7 SPCA ES) ~ ~ ~ ~ ; \ 0 NOTE'.', DO NOT GRADE OR ALLOW H AVY I i \ I ~ Chrq Eigk»eriq~
I esh.8 . ssh.a \ ~ EQUIPMENT IN SEW£R N/1R/Fl A 110N
REQUIREMENTS N0. REQ?JIREO odT• ~ ~ ~ aa3. - ~ _ _ a / ~ ~ \ ~ j I \ AREA.
1 CANOPY TREE ~ ,y l ~ PER 12 SPACES ~ _ ? C1 I ' I° ~ ~ ° / I
N ~ R~ PR . 2 STORY ° ~ A f ~ I f3UtL01NG ~ . ~ 5,2 8 S.F. i j I `I ~ ! ~ \
J I ~ Q ~ ~ s~0 FL~R I\ + i I ~
~ 863.® r as2 I a ~ TOE FLOOR 875.0 r as2. ~
~I ~ ~ / Q ~I a , ~ ~ i $61.7 DAVIS-MARTIN-POWEI.L & ASSOCIATES, INC I
Il Z 64 5 OLD PLANK ROAD 4 ~ ~ NIGH POINT, NC 27265 ( A
I ~ I w 1 rF a' I ~ N ~ . ~ / ~ ~ ~ CHRISTOPHER M. MOLER & Cti N~ S: (33b) 886-4821 i,
~ U ~ ~ ~ I TOWN OF SllN1 RFI ED. tiC R/W 30 5 z ~ ~ .1 , ~ w \ JAMIE MOLER FAx (336) 886-4458 t'c ~ SEMIER IN 4 P A DB 5 99, G 1258
RAW ~ 4 ~ ~ DB 6090, I - - ' R"'p ~-NITRIFlCA ~ CANOPY TREES- BRADFORD PEAR OR WHITE PINE www, a-INC.caN Afl? -I~ \ TAX REF. 1-037-906-043 ~
-Y- - -2o so' RON , a i ~ ~ r~ EF. 1 037 ~ a ~ ~ .oa 7S' { Y EOP Epp ~L n 30, I • V ?4 Fl zoNEO R5-3o UNDERSTORY TREES- CREPE MYRTLE ~ a'' 'rlr,
- cit'tXL4!!1N1 1 - _ SHRUB E. S R., ~ I T U ~ LDQ. USE: sFR C 0 = r I TBA K ~ 15,E2s o± sF SHRUBS- COMMON BOXWOOD ~ l ~ o -
t ~i ~ r ~ ® ~ ~ ~a ~ ~ . ~1~~.,,. ~ ~ , ~ ~ , 861.7 ~ 0.36± Ar ~ ~ j p ~ _ ~
'~ffA1YMi,~t TREE I • I I 1 20 \ A B FF 00~ ~ L
;NIDTH , ~ 1.3 ~ ~ p ~ - Q I _ _ _ - - - - ER ~ 1 2 4 7~ pN 3 o t} _ _ _ I ARD I ,
;-o - - - - ~ I ITY s ~ a° _ _ I 1 140 L.F. TYPE 8 BUFFER YARD ~Rau?~
~ ~ 1 ~ - - _ 20'~ ~ o t - _ _ - - - - - ~ I .WA ~RaRt~ F^~G 1 R ~`•-R 4,ue~ ~ ~ ~ o~ ~ I EQUIREMENTS N0. REQUIRED ~ < 0 ,o
I RE - o ~ - _ i ~ w~1D~ Es E. P \ \ ~ 3 NOPY TREES rb~r~ nuo~
° RD ° ~'lantin~s, ? cano • trees . r 1011 w I I ` A ~ PER OO L.F. i ~ 5 UNDERSTORY TREE ~
PY ~ ~ ~ ~ I - 17 shrubs l9er l0()' ~ I ~ I 36~. j
~GIJ'RE 6-~ ~ a ; I I 862.6 •i .1 I ~ I .1 2 ~ ~ ~ 25 SHRUBS 1 ~ 35 I I I PER 100 L.F.
STREET 1~..~1NTII~G Y.~ , ~ ~ I ~ I 8so.7 1 i
I ~ I I ~ I 1 9 f\
8 .4 ~ I ~ \ I v
coNSTRU noN ~ ~ ENTRAN I ~ ~ \ uP , ~ PARKtNC" LOT 41 SPACES v ~ ~
L; ~ ~ 20° DRAINAGE I „ ~ ,,,;i- ~REQUIRE~iENTS N .REQUIRED
I EASEM NT ~s s' ~ 1 CANOPY TRfE
I I 862.4 I 1 ~ 1 / T \ 'Or v&~~r. EIP ~ ~ PER 12 SPACES / ~p ~ 859:'9 ~ i \
I ~ I ~ 24" W,4L ~ ~ cP ~iNV Is 12 R ~ ~
192 L.F. ST EET YARD I ~ ~ j , 860.05 1 ~ i 1 ` ` i
REQUIREMENTS N0. REQUI ED I ~ ~ I 4.i 8 3. \ N. ~ i~ ~ '-o° ~ , ~ i
2 CANOPY TREES I ~ ° °
P 1 F. 4 17 SHRUBS ~ ~ ° s~ r ~ ~ °W ~ 31'35 \ J, o!' UP
34 I - ~ rim ~ 1 ~ . S \ , fem. I 0.~3 ~ °21. \ P~ ~ i
PROP. WELL. ~ ~ \ V - GENERAL NOTES
~l LOCAItON ~ cA ° ° INSTALL GRAVEL AND , / , . FlLTER BERM BASIN- , \ ,
~ MNNTAIN UN11L PIPE % - - 1) IRON PIPES AT ALL CORNERS UNLESS OTHER'tMSE NOTED. ~r~
~ ~ 2125 25 \ INSTALLATK~N 1S / i / l) #21 ~IPt.EfE iNU our 2) CURRENT ZONING: SFR
I ~ ~ ~ ~ ~~gA s64\___ ~~t~ ~~OAQ R~w 5 GRAS ~ ~ ass ao ~ w ~ - ~
~ 8~ h ~ DP ltiG ER ~ 4 ~ w • 7" w ~ ~ _ - R~D~ 0 PUS OTM - ' 1CR~ RS) ~ L OTME ~ 3) LAND USE: MUNICIPAL OFFICE BLDG. AND SHERIFF SUBSTATION ,NEIGHBORHOOD BY -
~6 ~ S37580 . ~ ESP _ ~ ~ tBY PAD uR ~ UP / 4) TAX MAP REFERENCES: ACL 1-037-096A-042 & 043
- UP - - I o / EIP _ EXCELSIOR f I ~ .
~ ~ our MATi1ND - / 5} TOTAL NUMBER OF LOTS: 1
PROJECT BENCHMARK 869. ~ - PIK IN TI ITY POE ~ II S" T -CGTT , ~ , E U L L END OF PROJE~r eENCHMaRK 6) TOTAL AREA = 122f ACRES ;
ELEVATION 873.95' A PHALT 'PIPE S ~ SPIKE IN UTILITY POLE
1~ / EJEVnTION ss5.4s' 7 DEED REFERENCES: D.B. 6090, PG. 176 D.B. 3486 PG. 1420 7300 M ) ME RFIELD R . D
i ~ _ PLAT BOOK 72, PAGE 321 M MERFI ELD N 273 58
II / 313 L.F. STREET YARD 8) EXISTING IMPERVIOUS - 1551.84 S.F. = 0.036 AC.
II \ -T_ REQUIREMENTS N0. REQUIRED 9) BOUNDARY & TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY
~ ~ rw ir, 3 CANDY 1REES f_ \ ~ 869.81 PER 100 L.F. 6 BY LAND SOLUTIONS, P.C. ~'0
/ 17 SHRUBS WN F UMMERFIELD 10) UNDERGROUND UTILITIES, WHERE NOT DISCER~RIBLE BY SURFACE n~
53 APP T 4117 RID UR ENANCES MANHOLES CATCH BASINS VA V T i~~ R ( L ES, E C.), ARE
SHOWN PER INFORMATION OBTAINED FROM ENGINEERING PLANS ~ MME RFIE LD N UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULD BE r
PAVEMENT LEGEND CONSIDERED APPROXIMATE.
273 5
ucHT DUTY PVMT. EROSION CONTROL AND UTILITY UTILITY LEGEND
I PROP. WATER LINE -W -w w w-
HEAVY DUTY PVMT. ' • • • • • • • • • • • • • PROP. SAN. SEWER MANHOLE 33 . 8 . 55
CONCRETE & REQ'D PROP. SANITARY SEWER LINE S s FAX 336.643.8854
THICKNESS PROP. STORM DRAIN LINE Boom=
PROP. CATCH BASIN
PROP. YARD INLET GENERAL EROSION CONTROL GRADING NOTES issue Date Description 0
PROP. INLET PROTECTION WIRE STONEL STONEL 1. ALL SLOPES SHALL BE SEEDED IMMEDIA TEL Y AFTER REACHING 12.02.04 ISSUE FOR 51D8
FINAL GRADE.
PROP. INLET PROTECTION (BLOCK & GRAVEL 'K & GRAVEL) 2. EROSION CONTROL MEASURES INDICATED ARE SHOWN IN 12.02.04 ISSUE FOR PERMITS
APPROXIMATE LOCATIONS. FIELD ADJUSTMENTS SHOULD BE TOWN OF SUMMERFIELD
TEMPORARY CONSTRUCTION EN ANCE EXPECTED TO INSURE SEDIMENT BASINS BERMS AND 0THER 12.13.04 ANCE COMMENTS
E EROSION CONTROL FEA TURES FUNC LION TO MAXIMUM
a EXCELSIOR MATTING
mgmmmmmm EFFICIENCIES 3 ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE REQUIRED TO INSURE NO SEDIMENT
LEAVES THE SITE. THE CONTRACTOR IS EXPECTED TO
8 GRAVEL AND FILTER BERM N NOTIFY THE ARCHITECT OR ENGINEER IMMEDIA TEL Y IF
N wj THEY FEEL ADDITIONAL MEASURES ARE NEEDED.
4. THE CONTRACTOR MUST COMPLY WITH ALL PROVISIONS
0 O OF THE NORTH CAROLINA GENERAL STORMWATER PERMIT
FOR LAND DISTURBING CONSTRUCTION ACTIVITIES Date DEC. 21 2004
z a J 5. ANY SOIL BORROW OR WASTE AREAS LOCATED OFF- SITE MUST HAVE AN APPROVED EROSION CONTROL Project No., 040204
SEQUENCE OF CONSTRUCTION PLAN.
0 W Drawn Sys DAC
1. OBTAIN GRADING PERMIT i 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA UN 77L APPROVAL HAS BEEN GRANTED BY THE APPROPRIATE Chocked By, EM
2. INSTALL SIL T FENCE. a AGENCIES
3. PROVIDE INLET PROTECTION.
4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE(S). 7 TEMPORARY SLOPE DRAINS ARE TO BE PROVIDED FOR ALL SLOPES CADD Drawing GREATER THAN EIGHT (8) FEET HIGH.
5. PERFORM EXPLORA TORY EXCA VA TION POTHOLING TO VERIFY UTILI TY LOCA TIONS
5 INSTALL TEMPORARY CONSTRUCTION FENCE PER APPROPRIATE PHASE OF CONSTRUCTION. . ~ 8. EXISTING CONTOURS - 2' INTERVALS FINISHED CONTOURS - 2' INTERVALS
u 7 INSTALL TREE PROTECTION. CONTRACTOR TO ENSURE TREE PREPARATION (BY OTHERS)
m HAS BEEN PERFORMED PRIOR TO DEMOLI TTON OR ANY TYPE OF CONSTRUCTION/EXCA VA 770N. 9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER WITHIN 15 DAYS OF DISRUPTION WHERE FURTHER CONS TRUC770N GRADING AND
8. PERFORM DEMOLITION. ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD COIVD177ONS EXIST
9. EXCAVATE SUFFICIENT TO REROUTE AND INSTALL UTIL177ES AND DEEPENED FOOTINGS UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER,
Ct 10. FINISH SITE WORK. MULCH AND TACK APPLICATION AS SPECIFIED BELOW WILL BE REQUIRED. EROSION CONTROL
i 11. AFTER ALL AREAS HAVE BEEN STABILIZED, REMOVE ALL 7FMPORARY EROSION CONTROL 0 i 10. DEPENDING ON SEASONAL LIMITATIONS AND WHENEVER POSSIBLE, DISTURBED AREAS SHALL BE PERMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA 77ON METHODS AND MULCH
DEVICES W AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED IN THE PROJECT PLAN
/ MANUAL. IN THE ABSENCE OF SUCH SPEC/FICA PONS, USE THE PERMANENT
z w SEEDING SPEC/F/CA77ONS NOTED IN THIS PLAN SET ON THIS SHEET FOR TEMPORARY EROSION
J CONTROL.
W
z
a z
a
Sheet of
0 1 I I
I 6 ~ ~ 6 ~
I I i
L!NI7ERST~ I:?~I7ERST~RY
TREE TREE D .a.
+ + ar ~ ec c
~~05 SAN 3
ATER U(}ALin
T pENF~ w5TORN~'~ BAN y,~iIANDS AND
SHRUB SHFtU'B
I ~ 1~,
I I I ost office box 39355 P
~ I ~ TYPE I~ PL~Iv~'iNG YARD reensboro, north Carolina 27438
I I I ~ 9
I I ~ ~ ~ S' minimum widda,l0' maximum width tel 336-282-7171 0
I ~ ~ % Piar<tins : 2 Understory trees per 100' QP fax 336-282-7672
I \ ~ 1S Shrubs per 100' ~ ~ I 1ti'
I ~ ~ ' 1 o'~ D UMENT
~ I i ~ ~ ~ 300 L.F. TYPE D BUFFERS YARD SCOPE OC 0 0
I ` I I I ~8 I This drawig indicates the general scope of the
~ ~z• I I REQUIREMENTS , N0: E IRED ~ ~ I 2 UNDER,STDK EE ~P protect ~ terms of the ardatectural design con- Q cept. binding dimeneiorns and an outOne of malOr
I 6 I I arcHtechual elements o1 e~nnettuctlon. As a aoope
I 1 54 ~_---868'- P F. ~ ~ ' ~ document the drawing dose not necntasalrNy irdbate ~ ~ - _ a dest~e N worst regnnked for the proleot's fu1
~ ' ' performance mld completion. Contractors, Sub-
SUMMERFIELD FIRE DISTRICT, INC. / \ Contractors and S ers shall be responsibb fa \ GRAPHIC SCALE
DB 3281, PC 104 provil~ng and ins aN items indicated, rmpNed or required by beat odes, without adjustment to / ` 20 10 0 20 40
I TAX REF. i-037-906-069 ZONED RS-30 / \ ~ Cantract Prbe.
USE: MUNICIPAL PROPERTY / ~ 1 ° = 20 FEET Cons~MMS'
REGRADE DITCH IN 244,372.0± SF ~ sI-~us
THIS AREA AS NEEDED I ~ 5.61 t AC i SINE ~
I ISiING TREE SINE ~ EX / ;iING TREE / / - - • _ U?~IDERST~RY Mechanical, f'Mrrnbing, EIBCtfiC81 Engineering. _ _
I / ~ 5 ~ i ~ + TREE ~ , i TYPED P \ {
I ~ ~ BUFI / r ^v SEPTIC TANK 3C~' I ~ BUFFER YARD \ I + ~ ti ~ E cnNOPY
~ / 862.5 862.5 ` ~ ~ ~ TREE
.7 296.04'
~ M ~o..~ M ~M' M M _ - - - - - - - 604 GREEN VALLEY ROAD r - \ i (xr i
c~ b ` TYPE B PLAI+3TING Y.ARI) SUITE 200 - q S - ~ ~ - - - - _ ' 25' minimum. s~' m~rr,~m W~drh GREENSBORO, NC 27408
~ 9 j ~ _ - -
I v• a ` do _ \ \ ~ t'lantings: 3 Canopy trees per lU0' nn center PHONE 336-855-3822 S Understcxy trees per l (i(1' on center
0 1 1 \ I SS r bs 'c P I ~ 2 It u per !n center FAX 336-855-9929
irw m ss~so I ~ ~ ~ ~ ~ 1~ ° ~ I \ I ~ - 1 \ ~ s
C \ ,A„ ~ ~ ~ CA / H 1C 862.6 862.1 ~
~ ~ ~ 1Z ~ ~Q / 1 ` 1 NOT GRADE OR ALLOW Ht"A VY ch?o engineer NOTE'' • DO ~
PARKING l T 7 SPIA ES ~ ~ ~ ~ ash_s I ~ I ITl?lf1l:A 110N ash.s \ ~Q(I/PMENT IN SEWER N
REQUIREMENTS N0. REQ IRED o~T• ~ / 8~3.I ~ - - - _ . I I \ I / AREA.
86~.Ui. ~ . ~ ~ W ~ l / ~ 4 ,QED I 1 CANOPY TREE ~ Z .s, s ~ I I \I
PER 12 SPACES -4 ~ ~ ~ ~c: I' I ~ ~ ~ / ~ aewa , ~ . 2 STORY BUILDING I `I / ~ ~ I I I v
1 I e I 5,2 8 S.F. / t I
J I 4 BO ~ - Q ~ ~ TC 862•E Tc as2s I DAMS-MARTIN-POWELL a ASSOCIATES, INC
~ I- a i T0~ FLOOR 675. O O ~ ~ ;I i 1.7 I 6415 Oto PLdNK Rojo I I HIGH POINT, NC 27265
I W, I ~ I j ~ I A r~ L+~+ (336) 88b-4821
I ~ QI , > y~ ~ i I 1 P, ~ ~,A CHRISTOPHER M. 1vOLE & ~~~L11PE NO1G1J: Fax (336) 88b•4458 I ~ \ JAMIE MOLER _
I N ~I ~ ~ I e . ~ ~ I ro~~v aP surul RFI o ~c w www. P INC,con j SEWER ~ I A ~ oe 5499, Rc izsa CANOPY' TREES- BRADFORD PEAR OR WHITE PINE
,uw R/W 3 4 5' z ~ DB 6090, • i tiwv ---NITRIFlCA ON ~ TAX REF. 1-037-906-043 i AEt -I~! _ - P MYRTLE a+ ~,1 tl
R W I \ > ~ ~ ~ T~ EF. t-037-9 A-~ ° ~&.9A a Fl m zoNEO Rs 3o UNDERSTORY TREES CRE E C 0 LDQ. USE: sER '
-2o so RON ~ , i ~ ~ 30 . I I U 7~~ EOP EOP ~L ~ \ E' S R . I 2 TC 6: ~ ` 5 r- + - SHRUBS- COMMON BOXWOOD z TC s2.s 1 TBA~K i"~z5.o_ ~E ~ y
861.7 ~ 0,36± Ar _ I I SAL <
WIs~TThe 5~* ,r~ .e n , . o.° . k +'AC ~ > 8' CANOPY N / i ® ~ 20' ~ 4076 B FFER ~
~ ~ + _ ~ ~ ~ ~ ~tTNTMt7~3 n TREE ~ l \ I a a w ~ ~ 1 ARD I
.a..., , P -I o { i° - - - - - - - - - R YARD FNGI NEAR ~ I 140 L.F. TYPE B BUFFE ~
- ' ~ 1 ~ - / ~ - - _ _ _ 20 _ _ -j ~ ~ NT5 No. REQUIRE) '••,~ES E_ P ~ ~ ~ EQUIREME hHlllDti
~ I ~ I 3 O~NOPY TREES
~ w RE G' I ~''a11~~J'il~C;Wli~~3 I a o ° \ ~ ~ ~ PER ~ 00 LF. 5 I I I 1 ~ ~ 5 UNDERSTORY TREE ~
ti ~'lantins: ? cars 'trees er 1E14' w I RD ~ ° ~ ~ I py ~ ~ \ I la ~n~~b~ per ~ I \ ~ ~ , ~ 1 I ae~' 1
~ s ' I I 862.6 ~ ~ j ~ ~ ~ 25 SHRUBS 35 •1 ~ PER 100 L.F.
~GU~,E 6_F ~ I I I I I I I a6o.7 ~
STREET PI..ANTI>'~G Y.~RI) ° ( \ I I ~ I I I ~ j ~ I
\ I ~ s .4 \ I ~ I j
\ I noM \ ~ , ~ uP LOT 41 SPACES ® PARKII'dC" )
coNSTRU l ENTRAN \ 20° DRAINAGE _ L ~ ~ \ j ~REt~11REMENTS N .REQUIRED I ~ s • ~
l.. I EASEM NT ~ ~s 1 CANOPY TREE ~ 4
~ I 862.4 I ~ o ~ E1P ~ PER 12 SPACES ~ Fr . v 9UT. ~ 1 ~ 859:?9 ~ ~ ~
1 e~ . Rya ~ ~INV IN , ~
I ~ I ~ ~ ~ 860.D5 ~ _ i
192 L.F° ST EET YARD I I \ ~ 1 / ~ _ - > ~ / ~ i ~ i .cam
I ~ \ REQUIREMENTS N0. REQUI ED I 4.1 8 ~ o ° • i ' i ~ UP
Y TREES I \ 2 CANOP 4 ~f ~
17 SHRUBS I ~ ~ ° ~ ti 34 1 p . o. ~ ~1
~ ° - v ~ - GENERAL NOTES
~ PROP. WELL \ ~I ~ LOCATION \ 1, INSTALL GRAVEL ANO ~ ~ / , - ' ~ FlLTER BERM BASIN- = y
o I i , _ / 1) IRON PIPES AT ALL CORNERS UNLESS OTHERWISE NOTED. `MAINTAIN UNTIL PIPE
25 ~ INSTALLATION ~S / i 2125 iNU our 2} CURRENT ZONING: SFR
~ ~ N i t1 #21 IP ~ ~ ~ pAQ ~ W ~L~ # ~ ~ ass.ao
ss _ - ~ ~n N R ~C RI RS) \r81 - ~ NpNDA , pp~~ OSNE , ' RI`" 5 ~ 3} LAND USE: MUNICIPAL OFFICE BLDG. AND SHERIFF SUBSTATION ,NEIGHBORHOOD ~C >yR ~ 0~~~ ~ /
~ 4 ~ k' • $'07°W - ~ EiP - I Q -A R 3p `l % A L 1-037-096A-042 & 043 ~ uP ~ / 4) TAX MAP REFERENCES C
UP o "~~j
ElP ~ EXCELSIOR - j- -our MIATTING I, - 5) TOTAL NUMBER OF LOTS: 1
885. I ~ ' PROJECT BENCHMARK ~ II ~ , - PRaJECr eENCHMARK 6} TOTAL AREA = 1.22f ACRES
,n~~ 8" -COTT ~ PIKE IN ~ ,~~TY P6LE END OF ~ ~ PIPE ~ r~ ~ DPI C D R a . - MM IL ERA 300 7
EI L'dA 110N 873.95' ASPHALT II - ~ - ~ _ _ _ _ - ~i ELEvariCN s65.4s' 7) DEED REFERENCES: D.B. 6090, PG. 176 D.B. 3486, PG. 1420 358 C 27 DN FIEL R E PLAT BOOK 72, PAGE •321 ,
/ 8) EXISTING IMPERVIOUS - 1551.84 S.F. = 0.03Ei AC.
II 313 L.F. STREET YARD _ ~ / II REQUIREMENTS N0. REQUIRED 9) BOUNDARY & TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY
\ ~Y \ irro Iri 3 CANOPY TREES IELD RF MME F U WN T BY LAND SOLUTIONS, P.C.
6 / / 864.a~ oER 100 L.F. R R ND UTILITIES WHERE NOT DISCERP~!BLE BY SURFACE UNDE G OU 10 ~1~ 4
17 SHRUBS j / 53 APPURTENANCES (MANHOLES, CATCH BASINS, VALVES, ETC. , ARE
I TAINED FROM Eh GINEERING PL NS LD N F RMATION OB ERFIE PRINO MM SHOWN E ~ UTILITY ENTITIES, SITE PLANS, AND OTHERS. THEY SHOULD 8E
73 8 2 5 CONSIDERED APPROXIMATE.
PAVEMENT LEGEND
.EROSION CONTROL AND UTILITY LIGHT DUTY PVMT. UTILITY LEGEND
- 33.43.8655 H. 6
~ I ~-•-'-1 aRna waTFR I Isle: -w P w w w
HEAVY DUTY PVMT. v PROP. SAN. SEWER MANHOLE
® FAX 336.643.8654 s s
CONCRETE & REQ"D PROP. SANITARY SEWER LINE
LINE Room= THICKNESS PROP. STORM DRAIN Description
PROP. CATCH BASIN ® GENERAL EROSION CONTROL GRADING NOTES sue Date Description 0
PROP. YARD INLET & STONEL) 1. ALL SLOPES SHALL BE SEEDED /MMEDIA TEL Y AFTER REACHING 12.02.04 ISSUE FOR BIDS
PROP. INLET PROTECTION (WIRE & STONEL) 0 FINAL GRADE. 12.02.04 ISSUE FOR PERMITS
,K & GRAVEL) 11 2. EROSION CONTROL MEASURES INDICATED ARE SHONIN IN APPROXIMATE LOCATIONS FIELD ADJUSTMENTS SHOULD BE 12.13.04 TOWN OF SUMMERFIELD
PROP. INLET PROTECTION (BLOCK & GRAVEL COMMENTS
EXPECTED TO INSURE SEDIMENT BASINS, BERMS, AND OTHER IRANCE EROSION CONTROL FEA TURES FUNCTION TO MAXIMUM
TEMPORARY CONSTRUCTION ENTRANCE
E EFFICIENCIES
a EXCELSIOR MATTING 3. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE REQUIRED TO INSURE NO SEDIMENT
~l LEA VES THE S/TE. THE CONTRACTOR IS EXPECTED TO
GRAVEL AND FILTER BERM NOTIFY THE ARCHITECT OR ENGINEER IMMEDIATELY IF
8 N THEY FEEL ADDITIONAL MEASURES ARE NEEDED.
Nj 4. THE CONTRACTOR MUST COMPL Y WITH ALL PROVISIONS
OF THE NORTH CAROLINA GENERAL STORMWATER PERMIT
0 O FOR LAND DISTURBING CONSTRUCTION ACTIVITIES. Dates DEC. 21 2004
Z 5. ANY SOIL BORROW OR WASTF AREAS LOCA7FD Off-- S( T HAVE AN APPROVED EROSION CONTROL Project No.- 040204 1F
Q J PLAN. Drawn Sy- DAC
SEQUENCE OF CONSTRUCTION O
W 1. OBTAIN GRADING PERMIT. 6. NO WORK SHALL BE DONE IN ANY WETLAND AREA UNTIL APPROVAL HAS BEEN GRANTED BY THE APFROPR/A7E Checked Sys EM
i AGENCIES
°a 2. INSTALL SIL T FENCE. 3. PROVIDE INLET PROTECTION. ARE TO BE PROVIDED FOR ALL SLOPES r-cADO DrawIrgs 7 TEMPORARY SLOPE DRAINS
GREA TER THAN EIGHT (8) FEET HIGH.
4. INSTALL TEMPORARY CONSTRUCTION EN7RANCE(S) U
5. PERFORM EXPLORATORY EXCA VA 1101V/P0 THOLING TO VERIFY UTILI TY LOCA TIONS 8. EXISTING CONTOURS - 2' INTERVALS FINISHED CONTOURS - 2' INTERVALS
6. INSTALL TEMPORARY CONSTRUCTION FENCE, APPROPRIA TE PHASE OF CONSTRUCTION. a W 7 INSTALL TREE PROTECTION. CONTRACTOR TO ENSURE TREE PREPARATION (BY OTHERS)
9. ALL DENUDED AREAS ARE TO BE PROVIDED WITH A GROUND COVER WITHIN 15 DA YS OF DISRUPTION WHERE FURTHER CONSTRUCTION GRADING AND
co HAS BEEN PERFORMED PRIOR TO DEMOLITION OR ANY TYPE OF CONS TRUCTION/EXCA VA 770N. a ACTIVITY IS NOT BEING UNDERTAKEN. SHOULD COND/77ONS EXIST
" 8. PERFORM DEM0LI710N. UNFAVORABLE FOR SEEDING OR OTHER INTENDED GROUND COVER,
W 9. EXCA VA TE SUFFICIENT TO REROUTE AND INSTALL UTIL177ES AND DEEPENED FOOTINGS / 10. FINISH SITE WORK. MULCH AND TACK APPLICATION AS SPECIFIED BELOW WILL BE REQUIRED. EROSION CONTROL
9 / 11. AFTER ALL AREAS HAVE BEEN STABILIZED, REM0 VE ALL 7E MPORARY EROSION CONTROL 10. DEPENDING ON SEASONAL LIMITATIONS AND WHENEVER POSSIBLE, DISTURBED AREAS SHALL BE PERMANENTL Y STABILIZED USING SEED MIXES, SOIL PREPARA 77ON METHODS AND MULCH PLAN
AS SHOWN ON THE LANDSCAPING PLAN AND AS SPECIFIED IN THE PROJECT
w DEVICES M W MANUAL. IN THE ABSENCE OF SUCH SPEC/FICA 77CNS, USE THE PERMANENT
U Z SEEDING SPECIFICATIONS NOTED IN THIS PLAN SET ON THIS SHEET FOR TEMPORARY EROSION
CONTROL.
a
W
2
0 Z Sheet of
Q
O I I I
I