Loading...
HomeMy WebLinkAboutNCC190216_ESC Approval Submitted_20190508 ROY COOPER f �? Governor 1 MICHAEL S.REGAN Secretary fsu auun ' S.DANIEL SMITH NORTH CAROLINA Interim Director Environmental Quality May 2, 2019 LETTER OF APPROVAL GreenHawk Development, LLC Attn: Jeffrey M. White Manager 1330 Sunday Dr, Suite 105 Raleigh NC, 27607 i RE: Project Name: Woodgrove Subdivision Acres Approved: 99 Project ID: HARNE-2019-076 County: Harnett, City: Chalybeate Springs Address: US 401 & SR 1443 River Basin: Cape Fear Stream Classification: Other Submitted By: Timmons Date Received by LQS: March 26, 2019 Plan Type: New E Dear Mr. White: The subject erosion and sedimentation control plan was approved by default. The Sedimentation Pollution Control Act (hereinafter"Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans)prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 1 I3A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans)period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGOI 0000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG0I. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenx.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOT Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019,a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh D �� North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources E- Fayetteville Regional Office 1 225 Green Street,Suite 714 1 Fayetteville,North Carolina 28301 N09TH CARCLINA oecwft.mofEnvl�nlauel� �/^� 910.433,3300 Letter of Approval Woodgrove Subdivision May 2, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be Dept on file at the job site: I i 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. North Carolina`s Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan,would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. i Sincerely P J Jodi Pace, El Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES Permit Letter of Approval t US Army Public Works Department f March 8, 2019 Page 3 of 3 cc: Sean Hein, Timmons Group (electronic copy) Jay Sikes, Building Inspector (electronic copy) DEMLR- Fayetteville Regional Office File i i f C i