Loading...
HomeMy WebLinkAbout20181609 Ver 1_USACE Permit_20190508U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-02188 County: Rockingham U.S.G.S. Quad: NC -Northeast Eden GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Eden Attn: Terry Shelton Address: 308 East Stadium Drive Eden, NC 27288 Size (acres) —11 Nearest Town Eden Nearest Waterway UT to Dry Creek River Basin Roanoke USGS HUC 03010103 Coordinates 36.529597 N, -79.676949 W Location description: The pro*ect area is a corridor within NCDOT Right-of-Wav on the west/north side of US Highway 311/NC Highway 770, extending from its crossing of Dry Creek to approximately 100 linear feet southwest of the North Carolina/Virginia state line. Description of projects area and activity: This verification authorizes the construction of a 20 -inch waterline, consisting of three (3) distinct crossings (proiects): 1) Site 1 (Wetland WD) requires the temporary discharge of dredged or fill material into 0.005 acre of herbaceous wetlands for waterline construction access and installation; 2) Site 4 (Wetland WD) requires the temporary discharge of dredged or fill material into 0.061 acre of herbaceous wetlands for waterline construction access and installation; 3) Site 6 (Stream SC) requires the permanent discharge of fill material into 90 linear feet of stream channel for waterline construction access, installation, and rip rap stabilization. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 11/21/2018, and updated information submitted via email on 4/23/2019, including the enclosed plans entitled "SoVa Mega Site at Berry hill — Phase 1 NC Water" Sheet Nos. Tl, T2, and Cl through C22 dated April 2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at 919-554-4884 Ext. 30or David.E.Bailev2(&usace.armv.mil. Corps Regulatory Official: Expiration Date of Verification: 03/18/2022 Digitally signed by BAILEY.DAVID.E.1379283736 Date: 2019.05.08 11:32:10 -04'00' Date: 05/08/2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http:Hcorpsmapu.usace.q=.mil/cm apex/Vp=136:4:0 Copy furnished: Katherine Shumaker, Dewberry, 551 Piney Forest Road, Danville, Virginia 24540 Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 Determination of Jurisdiction: A. ® There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters, including wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued. Action ID: . Basis For Determination: See the Preliminary Jurisdictional Determination form dated 05/08/2019. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M 15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do oto ct to the determination in this correspondence.** r Corps Regulatory Official: David E. Bailey Date of JD: 05/08/2019 Expiration Date of JD: Not applicable NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: City of Eden (Attn: Attn: Terry Shelton) File Number: SAW -2018-02188 I Date: 05/08/2019 Attached is: See Section below LAPPROVED PROFFERED PERMIT Standard Permit or Letter of ermission A RED PERMIT Standard Permit or Letter of ermission B DENIAL C JURISDICTIONAL DETERMINATION D INARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.giM.mil/Missions/CivilWorks/RegulatolyProgramandPennits.aspx or the Corps regulations at 33 CFR Part 331. a AL AL A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: David E. Bailey CESAD-PDO Raleigh Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 10M 15 3331 Heritage Trade Drive, Suite 105 Atlanta, Georgia 30303-8801 Wake Forest, North Carolina 27587 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to participate in all site investiations. Date: Telephone number: Signature of appellant oragent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 SAW -2018-02188 SPECIAL CONDITIONS 1. No impacts are authorized to streams at crossings identified on the project plans as "Impact Site 2" (Sheet No. C6), "Impact Site 4" (Cascade Creek, Sheet No. C8), "Impact Site 5" (Sheet No. C 10), and "Impact Site 7" (Sheet No. C 17). Impacts to these streams must be avoided through the use of trenchless methods including directional drill or bore and jack, per details on Sheet No. C19. 2. Temporary discharge of excavated or fill material into wetlands and streams will be for the absolute minimum period of time necessary to accomplish the work, and such authorized crossings will be constructed, restored, and seeded per stream and wetland details on Sheet No. C22. 3. When directional boring or horizontal directional drilling under waters of the U.S., including wetlands, the permittee shall closely monitor the project for releases of drilling fluids. Any discharges of drilling fluids into waters of the U.S., including wetlands, shall be reported to the Corps of Engineers, Raleigh Regulatory Field Office and the North Carolina Division of Water Resources within 24 hours. Corps Regulatory Official Expiration Date of Verification: 03/18/2022 Date: 05/08/2019 1 Drawing Index E General Electrical E1 ELECTRICAL LEGEND, GENERAL NOTES, & SITE PLAN E2 ELECTRICAL VALVE VAULT PLAN, DIAGRAMS, & SCHEDULES E3 ELECTRICAL STANDARDS DETAILS C Awl 0 2 3 4 5 ■ City of Eden Rockingham County NC / 1 1 Mega Site a � f i S � 20" VA Wate'rli.n {` a`Pittsylvania Co., VA' nctio � ite NC fes` .� •�-.., � , /- McH^tiTiMingham Co., NC , \ „o, w Fr 16" Eden � Waterline ;p1� N � P ' �'�_ � �� -" 11490 Tntny \d 4 Q21 Airport �� �t r ". %P] - l.• �/ p ° V /— `�' C Waterline 7 Ex. Freedom � Park Tank'0=0 Vicinity Map SCALE: N.T.S. t"IL Al { h t Ill Contacts: OWNER: City of Eden Director of Environmental Services Terry Shelton P.O. Box 70 Eden, NC 27289-0070 PH. (336) 623-2110 FAX (336) 623-4041 TSHELTON@EDENNC.US ENGINEER: Dewberry Leslie Barksdale E.I.T. 551 Piney Forest Road Danville, Virginia 24540 PH. (434) 549-8504 FAX (434) 797-4341 Ibarksdale@dewberry.com SUBMITTAL ❑ PRELIMINARY ❑ APPROVAL BIDDING ❑ CONSTRUCTION ❑ REVISION ❑ RECORD SET NUMBER EDA Project #: 04-01-07214 DENR: H-SRP-D-17-0015WIF-1927 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U Q Z LJJ J Z — J — J Z Z U)= — O w D Q>_WCC cr LJJ op ��U)Q LL. wmQU Q O� LU = _ Q — i� � UZ OQ O C/) z O SEAL ��.........,,• '�, ���pFESS�4�9�-9 ,•�'t SEAL l 17502 KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS T1 COVER SHEET T2 LEGEND ABBREVIATIONS AND GENERAL NOTES Civil LAB CHECKED BY C1 EROSION AND SEDIMENTATION CONTROL PLAN C1.1 TRAFFIC MANAGEMENT PLAN C2 OVERALL WATERLINE LAYOUT C2.1 NC MASTER METER AND CONTROL VALVE VAULT C3 WATERLINE PLAN AND PROFILE C3 WATERLINE PLAN AND PROFILE C4 WATERLINE PLAN AND PROFILE C5 WATERLINE PLAN AND PROFILE C6 WATERLINE PLAN AND PROFILE C7 WATERLINE PLAN AND PROFILE C8 WATERLINE PLAN AND PROFILE D C9 WATERLINE PLAN AND PROFILE C10 WATERLINE PLAN AND PROFILE C11 WATERLINE PLAN AND PROFILE C12 WATERLINE PLAN AND PROFILE C13 WATERLINE PLAN AND PROFILE C14 WATERLINE PLAN AND PROFILE C15 WATERLINE PLAN AND PROFILE C16 WATERLINE PLAN AND PROFILE C17 WATERLINE PLAN AND PROFILE C18 WATERLINE DETAILS C19 WATERLINE AND EROSION & SEDIMENT CONTROL DETAILS C20 EROSION AND SEDIMENT CONTROL DETAILS C21 EROSION AND SEDIMENT CONTROL DETAILS C22 STREAM AND WETLAND DETAILS Electrical E1 ELECTRICAL LEGEND, GENERAL NOTES, & SITE PLAN E2 ELECTRICAL VALVE VAULT PLAN, DIAGRAMS, & SCHEDULES E3 ELECTRICAL STANDARDS DETAILS C Awl 0 2 3 4 5 ■ City of Eden Rockingham County NC / 1 1 Mega Site a � f i S � 20" VA Wate'rli.n {` a`Pittsylvania Co., VA' nctio � ite NC fes` .� •�-.., � , /- McH^tiTiMingham Co., NC , \ „o, w Fr 16" Eden � Waterline ;p1� N � P ' �'�_ � �� -" 11490 Tntny \d 4 Q21 Airport �� �t r ". %P] - l.• �/ p ° V /— `�' C Waterline 7 Ex. Freedom � Park Tank'0=0 Vicinity Map SCALE: N.T.S. t"IL Al { h t Ill Contacts: OWNER: City of Eden Director of Environmental Services Terry Shelton P.O. Box 70 Eden, NC 27289-0070 PH. (336) 623-2110 FAX (336) 623-4041 TSHELTON@EDENNC.US ENGINEER: Dewberry Leslie Barksdale E.I.T. 551 Piney Forest Road Danville, Virginia 24540 PH. (434) 549-8504 FAX (434) 797-4341 Ibarksdale@dewberry.com SUBMITTAL ❑ PRELIMINARY ❑ APPROVAL BIDDING ❑ CONSTRUCTION ❑ REVISION ❑ RECORD SET NUMBER EDA Project #: 04-01-07214 DENR: H-SRP-D-17-0015WIF-1927 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U Q Z LJJ J Z — J — J Z Z U)= — O w D Q>_WCC cr LJJ op ��U)Q LL. wmQU Q O� LU = _ Q — i� � UZ OQ O C/) z O SEAL ��.........,,• '�, ���pFESS�4�9�-9 ,•�'t SEAL l 17502 KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS TITLE COVER SHEET PROJECT NO. 50046462 / 50102913 T 1 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE COVER SHEET PROJECT NO. 50046462 / 50102913 T 1 SHEET NO. OF L NUN wo C M 1 9 q A LEGEND EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION Cl ENDWALL W— WATERLINE ABUTMENT BENCHMARK D BUILDING YH ADDITIONAL � REVISION NUMBER DWL ADJ ADJUSTABLE YARD HYDRANT CENTERLINE EACH FACE 00 CONTOURS CO WATER METER F❑ CABLE (TELEVISION OR ALTERNATE CONC CONCRETE ELEVATION ALUM FIBER OPTIC) CONN CONNECTION 4- FIRE HYDRANT ASSEMBLY ® WELL CONTINUOUS CURB & GUTTER EXTERIOR TESTING & MATERIALS FACE OF CURB FT FEET INSIDE DIAMETER PVI VALVE ASSEMBLY CORRUGATED METAL PIPE STANDARD AWWA CONCRETE WALK OR SLAB MONUMENT ASSOCIATION CF PRESSURE PIPE & FITTINGS ASSY ASSEMBLY CFM CUBIC FEET PER MINUTE APPROX APPROXIMATE CFS PAVEMENT ARV AIR RELEASE VALVE BACK OF CURB ROAD SIGN CUBIC INCH UNIMPROVED OR GRAVEL BSMT SAN. SEWER M.H. & LINE CULV MAILBOX - R/W— - - TREE LINE TREE OR SHRUB -x—J"y� *- -* FENCE & GATE DITCH OR SWALE CREEK / WATERS EDGE .:0.ITI►I CENTERLINE - R/W— - - STREET RIGHT-OF-WAY DIM LIMITS OF DISTURBANCE DIST STORM STRUCTURE & LINE A FLARED END SECTION Cl ENDWALL DIM ABBREVIATIONS. DIST DISTANCE A AIR Cl CAST IRON DR ABUT ABUTMENT CB CATCH BASIN DUCTILE IRON PIPE ADD ADDITIONAL CEM CEMENT DWL ADJ ADJUSTABLE CL CENTERLINE EACH FACE AGGR AGGREGATE CO CLEAN OUT EL ALT ALTERNATE CONC CONCRETE ELEVATION ALUM ALUMINUM CONN CONNECTION EQUIP ASTM AMERICAN STANDARD FOR CONT CONTINUOUS EXT EXTERIOR TESTING & MATERIALS FACE OF CURB FT FEET INSIDE DIAMETER PVI CMP CORRUGATED METAL PIPE STANDARD AWWA AMERICAN WATER WORKS ASSOCIATION CF CUBIC FEET ASSY ASSEMBLY CFM CUBIC FEET PER MINUTE APPROX APPROXIMATE CFS CUBIC FEET PER SECOND BOC BACK OF CURB CU IN CUBIC INCH BSMT BASEMENT CULV CULVERT BO BLOW OFF CV CHECK VALVE BRG BEARING C & G CURB & GUTTER BM BENCH MARK CY CUBIC YARD B BEND DEPT DEPARTMENT BOTT BOTTOM GEN GENERATOR BOB BOTTOM OF BANK GOVT GOVERNMENT BRZ BRONZE DET DETAIL BLDG BUILDING DIA DIAMETER DIM DIMENSION DIST DISTANCE DN DOWN DWG DRAWING DR DRIVE DI DROP INLET DIP DUCTILE IRON PIPE DMH DROP MANHOLE D DRAIN DWL DWELLING EA EACH EF EACH FACE EW EACH WAY, END WALL EOP EDGE OF PAVEMENT EL ELBOW ELEC ELECTRICAL, ELECTRIC ELEV ELEVATION ENGR ENGINEER ENTR ENTRANCE EQUIP EQUIPMENT EX, EXIST. EXISTING EJ EXPANSION JOINT EXT EXTERIOR FOC FACE OF CURB FT FEET FO FIBER OPTIC CABLE UGT UNDERGOUND TELEPHONE UGU UNDERGOUND UTILITY SURVEY TRAVERSE POINTS SUBSURFACE BORING FES FORCEMAIN C.O. FIGURE FIN CLEANOUT G GASLINE OHE OVERHEAD ELECTRIC LINE UGE UNDERGROUND ELECTRIC LINE OHT OVERHEAD UTILITY LINE #_� FLOURESCENT FM POLE, GUY, & ANCHOR © TELEPHONE PEDESTAL FO FIBER OPTIC CABLE UGT UNDERGOUND TELEPHONE UGU UNDERGOUND UTILITY SURVEY TRAVERSE POINTS SUBSURFACE BORING FES FLARED END SECTION FIG FIGURE FIN FINISH FH FIRE HYDRANT FLEX FLEXIBLE FL FLOOR FD FLOOR DRAIN FLOUR FLOURESCENT FM FORCE MAIN FLG FLANGE GPM GALLONS PER MINUTE GALV GALVANIZED GV GATE VALVE GRD GRADE GA GAUGE GPDW GYPSUM DRYWALL HTR HEATER HVAC HEATING VENTILATION MISC & AIR CONDITIONING HT HEIGHT HWY HIGHWAY HOR HORIZONTAL HP HORSEPOWER, HIGH POINT IN INCH ID INSIDE DIAMETER '- GROUND LIGHTS LIGHT POLE GUARD PIPE POST 0 x100.00 SPOT ELEVATION xx SF SILT FENCE ' CD CHECK DAM DV DIVERSION CE CONSTRUCTION ENTRANCE ® CIP CULVERT INLET PROTECTION O ® OP OUTLET PROTECTION O ® IP INLET PROTECTION O PS PERMANENT SEEDING TS TEMPORARY SEEDING LS LEVEL SPREADER ORECPO ROLLED EROSION CONTROL PRODUCT USC UTILITY STREAM CROSSING ID INSIDE DIAMETER INSUL INSULATION INT INTERIOR INV INVERT JB JUNCTION BOX LB POUND LG LENGTH OR LONG LF LINEAR FEET LP LOW POINT LT LEFT MB MAILBOX MH MANHOLE MFR MANUFACTURER MATL MATERIAL MAX MAXIMUM MJ MECHANICAL JOINT MGD MILLION GALLONS PER DAY MIN MINIMUM MISC MISCELLANEOUS ML MIXED LIQUOR NEMA NATIONAL ELECTRIC PP MANUFACTURERS ASSOCIATION NPW NON POTABLE WATER NPR NON POTABLE REUSE WATER NATL NATIONAL N NEW NCDOT NORTH CAROLINA DEPARTMENT RAS OF TRANSPORTATION NIC NOT IN CONTRACT NTS NOT TO SCALE NO NUMBER OC ON CENTER OD OUTSIDE DIAMETER OSHA OCCUPATIONAL SAFETY & SCH HEALTH ACT PB PAPER BOX PVC POLYVINYL CHLORIDE PRV PRESSURE RELIEF VALVE, SHT PRESSURE REDUCING VALVE PL PROPERTY LINE PED PEDESTAL PVMT PAVEMENT PERF PERFORATED PC POINT OF CURVATURE PCC POINT OF COMPOUND PI CURVATURE POINT OF INTERSECTION PP POWER POLE PRC POINT OF REVERSE CURVE PT POINT OF TANGENCY POVC POINT OF VERTICAL CURVE PVI POINT OF VERTICAL INTERSECTION GENERAL NOTES 1. VERTICAL CONTROL FOR THIS PROJECT IS REFERENCED TO VIRGINIA STATE PLANE GRID COORDINATES (SOUTH ZONE) US SURVEY FEET. HORIZONTAL: NAD83 (CORS) BLKV,DOBS,ASUB VERTICAL: NAVD88 AVERAGE COMBINED FACTOR: GROUND TO GRID 0.999987 2. THE CONTRACTOR SHALL COORDINATE ANY CONSTRUCTION ACTIVITY WITH NCDOT AND THE CITY OF EDEN. 3. "IF ARCHEOLOGICAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROCEDURES CODIFIED AT 33 CFR 800.13(B) WILL APPLY AND EDA, THE NORTH CAROLINA STATE HISTORIC PRESERVATION OFFICE, AND THE CATAWBA INDIAN NATION SHALL BE CONTACTED IMMEDIATELY. ARCHEOLOGICAL MATERIALS CONSIST OF ANY ITEMS, FIFTY YEARS OR OLDER WHICH WERE MADE OR USED BY MAN. THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO, STONE PROJECTILE POINTS (ARROWHEADS), CERAMIC SHERDS, BRICKS, WORKED WOOD, BONE AND STONE, METAL AND GLASS OBJECTS, AND HUMAN SKELETAL REMAINS." 4. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 5. CONTRACTOR SHALL UTILIZE MODIFIED PUMP AROUND SETUP IF DEWATERING UTILITY TRENCH IN WETLAND IS REQUIRED. CONTRACTOR SHALL UTILIZE SUMP PUMP, INTAKE HOSE WITH SCREEN, AND APPROVED DEWATERING DEVICE (SILT BAG) TO CHECK DAM. REFERENCE TEMPORARY PUMP AROUND DETAIL SHEET C22 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK. 7. ALL PIPING SHALL HAVE 36" MINIMUM COVER (TYP.) UNLESS OTHERWISE NOTED. 8. CONTRACTOR SHALL FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL CONTACT NC -1 -CALL (1-800-632-4949) 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. 9. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY LOCATION OF AND PREVENT DISTURBANCE OF ANY EXISTING UTILITIES IN WORK AREA, AND PROVIDE IMMEDIATE TEMPORARY SERVICE TO ANY DAMAGED UTILITIES AT THE EXPENSE OF THE CONTRACTOR. ANY EXISTING UTILITIES NOT LOCATED PRIOR TO BEGINNING CONSTRUCTION THAT ARE DAMAGED DURING CONSTRUCTION OR WHICH CONFLICT WITH PROPOSED CONSTRUCTION SHALL BE REPAIRED OR RELOCATED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. 10. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 11. CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING OUTSIDE THE CONSTRUCTION LIMITS. CONTRACTOR SHALL USE EXTREME CAUTION TO PREVENT DISTURBANCE TO THE TREES, SHRUBS, ETC., WHICH ARE IN THE CONSTRUCTION LIMITS AND NOTED TO REMAIN. 12. THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RESIDENT OFFICE (336-634-5644) PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR MUST PROVIDE ALL TRAFFIC SAFETY CONTROLS NECESSARY WHEN WORKING IN OR NEAR NCDOT RIGHT-OF-WAY PER MUTCD & NCDOT ROADWAY STANDARD DRAWINGS LATEST EDITION FOR TRAFFIC CONTROL. 13. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL & VEHICULAR ACCESS TO & FROM ALL DWELLINGS & BUSINESSES DURING CONSTRUCTION. 14. EROSION AND SEDIMENT CONTROL NOTES: A. ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM TO THE LATEST EDITIONS OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. B. CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONSTRUCTION ENTRANCES AT POINTS OF INGRESS AND EGRESS TO PUBLIC RIGHT-OF-WAY, STABILIZE DISTURBED AREAS, AND PROVIDE OTHER MEASURES REQUIRED AS SHOWN ON THE DRAWINGS AND SPECIFIED. C. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT TRACKING ON EXISTING PAVEMENTS. D. CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD STABILIZATION OF ADEQUATE AREA TO ACCOMMODATE CONSTRUCTION VEHICLE PARKING, MATERIAL STORAGE, ETC. AT A LOCATION CONVENIENT TO THE INDIVIDUAL CONSTRUCTION AREAS AND CONSISTENT WITH THE CONSTRUCTION SEQUENCES. E. ANY DISTURBANCE TO EROSION AND SEDIMENTATION CONTROL MEASURES BY OTHER CONTRACTOR(S) SHALL BE REPAIRED AND/OR REPLACED BY THE RESPONSIBLE PARTIES. F. A ROCK CHECK DAM SHALL BE INSTALLED BELOW THE DISTURBED AREA WITHIN DITCH LINES AND/OR WHERE DITCH LINES OUTLETS TO UNDISTURBED AREAS. G. SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL LOCATIONS WHERE DISTURBED AREA DRAINS TOWARD PROPERTY OWNED BY OTHERS AND/OR TOWARD STREAMS. H. ALL PROPOSED STAGING AREAS AND/OR ACCESS ROADS MUST BE INCLUDED WITHIN THE DISTURBED LIMITS. A REVISED PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO START OF LAND DISTURBANCE FOR ANY AREAS OUTSIDE THE CURRENT PERMITTED LIMITS. I. IF AN EQUIPMENT CROSSING IS NEEDED TO GAIN ACCESS ACROSS A STREAM, THE CROSSING SHALL BE CONSTRUCTED AS A BRIDGE (E.G. TIMBER MATS, STEEL, ETC.). THE TEMPORARY BRIDGE SHALL HAVE NO GAPS OR HOLES THAT WOULD ALLOW SEDIMENT TO FALL INTO THE STREAM. J. ON THE RIP -RAP PLACEMENT CONSTRUCTION DETAIL (SHEET C22), THE RIP -RAP SHALL BE EXTENDED ACROSS THE ENTIRE STREAM CHANNEL. ENSURE THE TOP OF THE STONE IS PLACED AT THE SAME ELEVATION AS THE STREAM BED. CLASS I STONE MUST HAVE A MINIMUM THICKNESS OF 20". K. STONE OUTLETS IN SILT FENCE SHALL BE PLACED IN ALL LOW-LYING AREAS AND/OR EVERY 150 LINEAR FEET. THE STONE OUTLETS MUST BE INSTALLED PER THE ATTACHED CONSTRUCTION DETAIL. L. ANNUAL RYE GRASS IS NOT PERMITTED IN THE SEEDING SPECIFICATIONS OF THE STREAM BANK SEEDING SCHEDULE. RYE GRAIN OR WHEAT MAY BE USED INSTEAD. ALL STREAM SEEDING APPLICATION RATES FOR TEMPORARY AND PERMANENT SEEDING MUST ADHERE TO THE NC EROSION AND SEDIMENT CONTROL PLANNING & DESIGN MANUAL 6.11 ON TABLES 6.11.a 6.11.b AND 6.11.c. M. SANDBAG DIKES SHALL HAVE A MINIMUM 3' TOP CREST WIDTH. 15. SWEEP ROAD WAYS DAILY WHERE WORK IS BEING PERFORMED. 16. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DITCHLINES STEEPER THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL ONLY BE REMOVED WHEN AUTHORIZED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES. 18. ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ORIGINAL CONDITION OR BETTER. 19. DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT INTERFERE WITH CONSTRUCTION ARE TO BE RESTORED TO ORIGINAL CONDITION. 20. PAVED DRIVEWAYS, PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN -CUT UNLESS SHOWN OTHERWISE. 21. CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE EXISTING DRIVEWAY CULVERTS INCLUDING HEADWALLS IF INSTALLATION OF NEW WATERLINES) REQUIRE EXCAVATION OF THE EXISTING CULVERTS, IF EXISTING CMP OR RCP CAN BE REMOVED WITHOUT DAMAGE, CONTRACTOR MAY REUSE PIPE. 22. NEW WATERLINE MATERIAL SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, UNLESS SHOWN OTHERWISE ON THE PLANS. 23. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL FITTINGS AND CONNECTIONS, IN ACCORDANCE WITH DETAIL SHEET C19. 24. FOR REVIEW PURPOSES, 2007 NCDOT LIDAR 2' CONTOURS HAVE BEEN OVERLAYED ONTO THE ATTACHED PLAN SHEETS. THE ACCURACY OF THESE CONTOURS ARE NOT GUARANTEED SO THEY SHOULD NOT BE USED FOR ESTIMATING OR CONSTRUCTION PURPOSES. THE LINE PROFILE WAS GENERATED FROM THE ACTUAL SURVEYED TOPOGRAPHIC INFORMATION AND SHOULD THEREFORE BE USED FOR ALL CALCULATIONS. 25. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED. RAD RADIUS REF REFERENCE STA STATION RAS RETURN ACTIVATED SLUDGE STL STEEL RCP REINFORCED CONCRETE PIPE S.S. SANITARY SEWER, STAINLESS STEEL RD ROAD, ROOF DRAIN SSC SECONDARY SCUM REQ'D REQUIRED REV REVISED SCH SCHEDULE RT RIGHT SECT SECTION R/W, ROW RIGHT OF WAY SHT SHEET R RISER STM STORM RS RAW SEWAGE ST STREET SE SECONDARY EFFLUENT STY STORY SIM SIMILAR TD TANK DRAIN SPEC SPECIFICATION TEL TELEPHONE SR STATE ROUTE OR SECONDARY ROAD TEMP TEMPORARY OR TEMPERATURE STD STANDARD THK THICK T & B TOP AND BOTTOM TOB TOP OF BANK TOW TOP OF WALL TDC TURNED DOWN CURB TYP TYPICAL UG UNDERGROUND UL UNDERWRITER'S LABORATORY VERT VERTICAL VC VERTICAL CURVE NCDOT NORTH CAROLINA DEPT OF TRANSPORATION W/ WITH WAS WASTE ACTIVATED SLUDGE WL WATER MAIN Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL 6"680986808, • ESS/p�9�q SEAL 17502 0Tr IIIIIIIIIIIIII120vauW_10 SCALE AS NOTED No. DATE I BY I Description VISIONS TITLE LEGEND ABBREVIATIONS AND GENERAL NOTES PROJECT NO. 50046462 1 501 0291 3 T2 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE LEGEND ABBREVIATIONS AND GENERAL NOTES PROJECT NO. 50046462 1 501 0291 3 T2 SHEET NO. OF 1 9 q a Seem: 0 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 E C SEAL '�,�•nuuq,••• •,.•``�H CAROB SEAL 17502 :1� .,,,•�OTT..EHR�Q,••,. KEY PLAN SCALE 0' 600' 1200' SCALE: 1 " = 600' No. DATE BY Description VISIONS DRAWN BY MWC APPROVED BY RSE CHECKED BY LAB DATE APRIL, 2019 TITLE Overall NC Waterline Layout r"A PROJECT NO. 50046462 / 50102913 C1 SHEET NO. OF U LU Z � J Z > U) — J Z Z Q CE Ir 00 W (D LLJ LU� Q> oQ LLJ�=U > im�� UZ O a �Z U 0 C SEAL '�,�•nuuq,••• •,.•``�H CAROB SEAL 17502 :1� .,,,•�OTT..EHR�Q,••,. KEY PLAN SCALE 0' 600' 1200' SCALE: 1 " = 600' No. DATE BY Description VISIONS DRAWN BY MWC APPROVED BY RSE CHECKED BY LAB DATE APRIL, 2019 TITLE Overall NC Waterline Layout r"A PROJECT NO. 50046462 / 50102913 C1 SHEET NO. OF E 0 C0 II ra U Page 6h-52 April 2015 Typical Traffic Control Non -Stationary Operation on a Two -Lane Roadway Using Flaggers (Figure TTC-24.1) NOTES: Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, and 500'-800' where the posted speed limit is greater than 45 mph. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the flagger station and transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. Generally speaking, motorists should have a clear line of sight from the graphic flagger symbol sign to the flagger. 9 9 P 99 Y 9 99 Option: 3. Where Right -of -Way or geometric conditions prevent the use of 48" x 48" signs. 36" x 36" signs may be used. Standard: 4. Flagging stations shall be located far enough in advance of the work space to permit approaching traffic to reduce speed and/or stop before passing the work space and allow sufficient distance for departing traffic in the left lane to return to the right lane before reaching opposing traffic (see Table 6H-3 on Page 6H-5). 5. The Flagger (W20-7) symbol sign shall stay within 1/2 mile of each flagger. Guidance: 6. Additional Flagger ymbol signs should be placed at 1 h mile intervals and either erected by the approaching flagger, or taken down as the operation proceeds past this point. 7. When a highway -rail crossing exists within or upstream of the transition area and it is anticipated that queues resulting from the lane closure might extend through the highway -rail grade crossing, the temporary traffic control zone should be extended so that the transition area precedes the highway -rail crossing (see Figure TTC-56 for additional information on highway -rail crossing). 8. If the queue of traffic reaches the BE PREPARED TO STOP (W34) sign, then the advance warning signs should be readjusted at greater distances. Standard: 9. All fla ers shall be state certified and have their certification card in their possession when 99 performing flagging duties (see Section 6E.01, Qualifications for Flaggers). 10. A shadow vehicle with at least one amber rotating, flashing or oscillating lights shall be parked 80'-120' in advance of the first work crew. 11. The maximum length of the work area shall be two miles. Revision 1 -4/11/2015 April 201.5 Page 6H-55 Non -Stationary Operation on a Two -Lane Roadway Using Flaggers (Figure TTC-24.1) S3_1rw Z 1x3N xoom avoa L 31ON 33S Qy3HV uvaa ]NYI 3NO L 31014 335 dols 01 038Vd3ad �T 39 L31014 33S - - �T END G20-2 (V) ROAD IkDRK � 5 '8 I. 531014 335 500+ NOIiV_LS 9NI00'd1d ONI INA S ONV 5 1'31ON S31ON 33S 3.33 s A IIA 2 MILES MAX N011V1S ONIOOVHU 014114141'933 -F---80'- 120' SHADOW VEHICLE REQUIRED ° SEE NOTE 10 FLAGGING SEE STATION NOTE 4 SEE NOTES 2 & 5 1111117- 009 009 - SEE NOTES 1 & 5 xaaa ❑vaa 4143 W20-7 SEE NOTE BE PREPARED W3-4 TO STOP SEE NOTE 1 ONE LANE W20-4 ROAD AHEAD SEE NOTE 1 ROAD WORK W21 -V2 NEXT �r z - - - -. MILES 0 Page 6H-52 August 2015 Typical Traffic Control Lane Closure 011 a Two -Lane Roadway Using Flaggers (Figure TTC-23.1) NOTES Guidance: 1. Sign spacing distance should be 350'-500 'where the posted speed limit is 45 mph or less, and 500'-800'wherethe posted speed limit is greater than 45 mph. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the flagger station and transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. Generally speaking, motorists should have a clear line of sight from the graphic flagger symbol sign to the flagger. Option: 3. Where Right -of -Way or geometric conditions prevent the use of 48" x 48" signs, 36" x 36" signs may be used. Standard: 4. Flagging stations shall be located far enough in advance of the work space to permit approaching traffic to reduce speed and/or stop before passing the work space and allow sufficient distance for departing traffic in the left lane to return to the right lane before reaching opposing traffic (see Table 6H-3 on Page 6H-5). 5. All flaggers shall be state certified and have their certification card in their possession when performing flagging duties (see Section 6E.01, Qualifications for Flaggers). 6. Cone spacing shall be based on the posted Speed and the values in Table 6H-4 on Page 6H-6.1 7. A shadow vehicle with at least one high intensity amber rotating, flashing, or oscillating light shall be parked 80'-120' in advance of the first work crew. Option: 8. A supplemental flagger may be required in this area to give advance warning of the operation ahead by slowing approaching traffic prior to reaching the flagger station or queued traffic. Guidance: 9. If the queue of traffic reaches the BE PREPARED TO STOP (W34) sign then the signs, and if used the portable temporary rumble strips (PTRS), should be readjusted at greater distances. 10. When a highway -rail crossing exists within or upstream of the transition area and it is anticipated that queues resulting from the lane closure might extend through the highway -rail grade crossing, the temporary traffic control zone should be extended so that the transition area precedes the highway -rail crossing (see Figure TTC-56for additional information on highway -rail crossings). Standard: 11. At night, flagger stations shall be illuminated, except in emergencies (see Section 6E.08). Option: 12. Cones may be eliminated when using a pilot vehicle operation or when the total roadway width is 20 feet or less. 13. For low-volume situations with short work zones on straight roadways where the flagger is visible to road users approaching from both directions. a single flagger, positioned to be visible to road users approaching from both directions, may be used (see Chapter 6E). Standard: 11. When approved for use, three portable temporary rumble (PTRS) strips shall be installed across the entire travel lane adjacent to the BE PREPARED TO STOP (W34) sign. The portable temporary rumble strips shall be monitored and adjusted as necessary during the work shift to ensure proper placement on the roadway. When the PTRS are installed, the RUMBLE STRIPS AHEAD (W2042 sign shall also be utilized. Revision 1-4/l/2015 April 2015 Page 6H-53 Lane Closure on a Two -Lane Roadway Using Flaggers (Figure TTC-23.1) OV3HV Ndom ` dr OVON OV3HY avoa 3NVI 3140 SdRUS - T sdrals ---- 319KAH dOis 01 ----------- �� - i� RflM pRrL G20-2 (V} 038Vd3ad -- 39 �3, a 500 ± 0 NOI"LV__S �IA09V-Izl �0 50' - 100' O SEE NOTE 4 'c\ 80'- 120' SHADOW VEHICLE REQUIRED SEE NOTE 4 D 0 n_501-1001 o FLAGGER STATION o SEE NOTE 2 0 SEE w NOTE 1 + 1705 VV20-7 UJ SEE )raaMNOV08 �T 1 NOTE 1 BE PREPARED W3-4 SEE TO STOP SEE NOTE 9 1 PORTABLE NOTE 1 TEMPORARY RUBILE1 W20_V26 RUMBLE STRIPS S IPS SEE NOTE 14 SEE NOTE 14 SEE (OPTIONAL) NOTE 1 014E LANE W20-4 - ROAD SEE AHEAD NOTE 1 ROAD i� - WORK W20-1 HEAD 1: Revision 1- 4/ V2015 Posted Speed 0 - 35 mph 36-55 4 5 TRANSPORTATION MANAGEMENT PLAN NOTES 1. THIS TRANSPORTATION MANAGEMENT PLAN (TMP) IS PREPARED FOR PITTSYLVANIA COUNTY FOR THE SOVA MEGA SITE AT BERRY HILL PHASE II NORTH CAROLINA WATER PROJECT. IT IS NOT THE INTENT OF THIS PLAN TO INCLUDE EVERY DETAIL WHICH MUST BE CONSIDERED FOR TRAFFIC CONTROL DURING CONSTRUCTION OF EACH WORK ZONE, BUT TO PROVIDE THE GENERAL GUIDELINES THAT THE CONTRACTOR SHALL FOLLOW WHEN DEVELOPING THE TMP FOR NCDOT APPROVAL. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR SAFE TRAVEL AROUND WORK ZONES IN ACCORDANCE WITH ALL NCDOT REQUIREMENTS. THE ENGINEER DOES NOT ASSUME ANY RESPONSIBILITY FOR THE TRAFFIC CONTROL MEASURES THAT ARE IMPLEMENTED DURING PROJECT CONSTRUCTION. 2. THE WORK AREAS THAT REQUIRE TRAFFIC MANAGEMENT ARE SHOWN ON THE PROJECT AREA MAP ON THIS SHEET. OTHER ROADWAYS MAY BE AFFECTED DUE TO MATERIAL STAGING, TRAPSPORTATION OF MATERIALS, LINE TESTING, UNFORSEEN FIELD CONDITIONS, ETC., AND SHALL BE CONSIDERED FOR WORK AREA PROTECTION AND TRAFFIC MANAGEMENT TECHNIQUES AS REQUIRED. VARIOUS TEMPORARY TRAFFIC CONTROL DETAILS FROM THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 ARE SHOWN ON THIS SHEET. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE WHICH DETAILS APPLY FOR EACH SPECIFIC WORK CONDITION. ADDITIONAL DETAILS MAY BE REQUIRED PRIOR TO CONSTRUCTION BY NCDOT. 3. THE CONTRACTOR SHALL CONTACT NCDOT IN WRITING WITH A WORK SCHEDULE TWO (2) WEEKS PRIOR TO CONSTRUCTION. NCDOT WILL DETERMINE IF POLICE PATROL IS NECESSARY FOR TRAFFIC CONTROL. 4. THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF CONSTRUCTION WITH NCDOT. 5. SIGN SPACING MAY ONLY BE ADJUSTED FOR FIELD CONDITIONS IF AUTHORIZED BY NCDOT. 6. ALL PAVEMENT MARKINGS CONFLICTING WITH TRAFFIC PATTERNS SHALL BE REMOVED AND RESTRIPED AS NECESSARY. PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE NCDOT ROAD AND BRIDGE SPECIFICATIONS. 7. WHEN WORK IS NOT BEING PERFORMED, MATERIALS AND PARKED EQUIPMENT SHALL NOT INTERFERE WITH TRAFFIC. 8. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 AND AS DIRECTED BY NCDOT. WORK SHALL COMPLY WITH ALL REGULATIONS PROVIDED IN THE LAND USE PERMIT. 9. SAFE ACCESS TO ALL EXISTING PUBLIC ROADWAYS SHALL BE MAINTAINED AT ALL TIMES. 10. WORK HOURS SHALL BE APPROVED BY NCDOT PRIOR TO CONSTRUCTION. CONSTRUCTION WORK AFTER DARK IS NOT ANTICIPATED FOR THE PROJECT. HOWEVER, SHOULD CONSTRUCTION CONTINUE AFTER DARK, FLOODLIGHTS SHALL BE UTILIZED WHERE EXISTING LIGHT IS NOT ADEQUATE. THE FLOODLIGHT SHALL NOT CREATE A DISTRACTING GLARE TO DRIVERS. 11. ALL FLAGGERS SHALL BE STATE CERTIFIED AND HAVE THEIR CERTIFICATION CARD IN THEIR POSSESSION WHEN PERFORMING FLAGGING DUTIES. 12. CHANNELLING DEVICES SUCH AS CONES SHALL BE UTILIZED WHERE REQUIRED AND FOLLOW THE WORK AREA PROTECTION MANUAL, REVISION 1 GUIDELINES. 13. ALL EXISTING ROADWAY SIGNAGE SHALL BE MAINTAINED DURING THE LIFE OF THE PROJECT. 14. THIS PROJECT IS CLASSIFIED AS TYPE A, CATEGORY 1. PUBLIC COMMUNICATION PLAN n \� L, Z_ � KING"JAM CO a" demo NCDOT Contact: Jason Julian: 336-520-6060 Local Contact: City of Eden: 336-623-2110 Rockingham County Sheriffs Office: 336-634-3232 Emergency Management EMS: 336-634-3000 State Police Contact: NC State Police D3 Headquarters: 336-334-5621 NC State Police Troop D, District III: 336-634-5606 111 Wilson -Way Road Reidsville, NC 27320 %L • 110 G1.0 JJ RQdE A ' TaPer0 9,920 L WATERLINE f i� ► / , 00, # � 00 r L Vicinity Map `0_0 0 t___I"i Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U z W J z � J J Z Z C�=-O LU Z) Q LV Or-� 0 O O�C�Q LLJ wU W I< CO 1: 3: 1: rQU Q p� LU >� Er Uz OQ p �e � z O SEAL CAR OZ ��a••• �` ����FESS/p�gl9 •,� SEAL ' 17502 � •'•. Is% •`ANG I NES-�''�Q�.'� ,••••STT ..EHR� ,,,,.. KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS MWC mph PTRS Spacing (Center to Center) 5 Feet 8 Feet 4 5 TRANSPORTATION MANAGEMENT PLAN NOTES 1. THIS TRANSPORTATION MANAGEMENT PLAN (TMP) IS PREPARED FOR PITTSYLVANIA COUNTY FOR THE SOVA MEGA SITE AT BERRY HILL PHASE II NORTH CAROLINA WATER PROJECT. IT IS NOT THE INTENT OF THIS PLAN TO INCLUDE EVERY DETAIL WHICH MUST BE CONSIDERED FOR TRAFFIC CONTROL DURING CONSTRUCTION OF EACH WORK ZONE, BUT TO PROVIDE THE GENERAL GUIDELINES THAT THE CONTRACTOR SHALL FOLLOW WHEN DEVELOPING THE TMP FOR NCDOT APPROVAL. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR SAFE TRAVEL AROUND WORK ZONES IN ACCORDANCE WITH ALL NCDOT REQUIREMENTS. THE ENGINEER DOES NOT ASSUME ANY RESPONSIBILITY FOR THE TRAFFIC CONTROL MEASURES THAT ARE IMPLEMENTED DURING PROJECT CONSTRUCTION. 2. THE WORK AREAS THAT REQUIRE TRAFFIC MANAGEMENT ARE SHOWN ON THE PROJECT AREA MAP ON THIS SHEET. OTHER ROADWAYS MAY BE AFFECTED DUE TO MATERIAL STAGING, TRAPSPORTATION OF MATERIALS, LINE TESTING, UNFORSEEN FIELD CONDITIONS, ETC., AND SHALL BE CONSIDERED FOR WORK AREA PROTECTION AND TRAFFIC MANAGEMENT TECHNIQUES AS REQUIRED. VARIOUS TEMPORARY TRAFFIC CONTROL DETAILS FROM THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 ARE SHOWN ON THIS SHEET. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE WHICH DETAILS APPLY FOR EACH SPECIFIC WORK CONDITION. ADDITIONAL DETAILS MAY BE REQUIRED PRIOR TO CONSTRUCTION BY NCDOT. 3. THE CONTRACTOR SHALL CONTACT NCDOT IN WRITING WITH A WORK SCHEDULE TWO (2) WEEKS PRIOR TO CONSTRUCTION. NCDOT WILL DETERMINE IF POLICE PATROL IS NECESSARY FOR TRAFFIC CONTROL. 4. THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF CONSTRUCTION WITH NCDOT. 5. SIGN SPACING MAY ONLY BE ADJUSTED FOR FIELD CONDITIONS IF AUTHORIZED BY NCDOT. 6. ALL PAVEMENT MARKINGS CONFLICTING WITH TRAFFIC PATTERNS SHALL BE REMOVED AND RESTRIPED AS NECESSARY. PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE NCDOT ROAD AND BRIDGE SPECIFICATIONS. 7. WHEN WORK IS NOT BEING PERFORMED, MATERIALS AND PARKED EQUIPMENT SHALL NOT INTERFERE WITH TRAFFIC. 8. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 AND AS DIRECTED BY NCDOT. WORK SHALL COMPLY WITH ALL REGULATIONS PROVIDED IN THE LAND USE PERMIT. 9. SAFE ACCESS TO ALL EXISTING PUBLIC ROADWAYS SHALL BE MAINTAINED AT ALL TIMES. 10. WORK HOURS SHALL BE APPROVED BY NCDOT PRIOR TO CONSTRUCTION. CONSTRUCTION WORK AFTER DARK IS NOT ANTICIPATED FOR THE PROJECT. HOWEVER, SHOULD CONSTRUCTION CONTINUE AFTER DARK, FLOODLIGHTS SHALL BE UTILIZED WHERE EXISTING LIGHT IS NOT ADEQUATE. THE FLOODLIGHT SHALL NOT CREATE A DISTRACTING GLARE TO DRIVERS. 11. ALL FLAGGERS SHALL BE STATE CERTIFIED AND HAVE THEIR CERTIFICATION CARD IN THEIR POSSESSION WHEN PERFORMING FLAGGING DUTIES. 12. CHANNELLING DEVICES SUCH AS CONES SHALL BE UTILIZED WHERE REQUIRED AND FOLLOW THE WORK AREA PROTECTION MANUAL, REVISION 1 GUIDELINES. 13. ALL EXISTING ROADWAY SIGNAGE SHALL BE MAINTAINED DURING THE LIFE OF THE PROJECT. 14. THIS PROJECT IS CLASSIFIED AS TYPE A, CATEGORY 1. PUBLIC COMMUNICATION PLAN n \� L, Z_ � KING"JAM CO a" demo NCDOT Contact: Jason Julian: 336-520-6060 Local Contact: City of Eden: 336-623-2110 Rockingham County Sheriffs Office: 336-634-3232 Emergency Management EMS: 336-634-3000 State Police Contact: NC State Police D3 Headquarters: 336-334-5621 NC State Police Troop D, District III: 336-634-5606 111 Wilson -Way Road Reidsville, NC 27320 %L • 110 G1.0 JJ RQdE A ' TaPer0 9,920 L WATERLINE f i� ► / , 00, # � 00 r L Vicinity Map `0_0 0 t___I"i Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U z W J z � J J Z Z C�=-O LU Z) Q LV Or-� 0 O O�C�Q LLJ wU W I< CO 1: 3: 1: rQU Q p� LU >� Er Uz OQ p �e � z O SEAL CAR OZ ��a••• �` ����FESS/p�gl9 •,� SEAL ' 17502 � •'•. Is% •`ANG I NES-�''�Q�.'� ,••••STT ..EHR� ,,,,.. KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS TITLE TRANSPORTATION MANAGEMENT PLAN PROJECT No. 50046462 / 50102913 C1.1 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE TRANSPORTATION MANAGEMENT PLAN PROJECT No. 50046462 / 50102913 C1.1 SHEET NO. OF E WAJ C 0 1 1 2 North Carolina Division of Energy, Mineral and Land Resources NPDES Stormwater Discharge Permit Technical Bullentin for NCGO10000 Revised Jan. 12, 2017 What is this permit? This is your General Stormwater Permit for Construction Activities, developed to meet federal National Pollutant Discharge Elimination System (NPDES) requirements. It is separate and in addition to your Erosion and Sedimentation Control (E&SC) Plan. Federal regulations adopted by the U.S. Environmental Protection Agency (EPA) and N.C. Environmental Management Commission require an NPDES storm- water permit for your project. In North Carolina, the EPA has delegated authority to administer the NPDES program to the Department of Environment and Natural Resources. The E&SC plan approved by the Division of Energy, Mineral and Land (DEMLR), or a delegated local pro- gram, contains the core erosion control requirements for your project. The NPDES Stormwater General Permit contains additional requirements related to a broader range of water quality issues. These permits are related, but separate. Both contain conditions your project site must meet. Are there new requirements in this permit? This General Permit reflects changes made in the federal regulations effective Feb. 1, 2010, that regulate discharges from construction sites. The federal regulations resulted from litigation decisions that mandated construction activities over a certain size must contain additional measures to reduce the amount of wastes and sediment loading that reach the nation's waters. The Department of Environment and Natural Re- sources established the Construction General Permit Technical Advisory Group to guide the development of this NPDES permit. A draft permit was available for public review in May 2011, and the final permit be- came effective on Aug. 3, 2011. The most notable change in the new permit is a requirement that ground stabilization, such as wheat straw application, be applied within 14 days from the last land -disturbing activity. For steep slopes, that area must be stabilized within 7 days. Please see page 2 of this technical bulletin for more details. Do I need to submit a Notice of Intent to have coverage under this permit? No. Your project is covered by this permit upon approval of an adequate erosion and sedimentation control plan that meets requirements for surface dewatering of basins and ground stabilization timeframes. What does this permit require me to do? You should read and become familiar with the provisions of this permit. Below is a list of the major requirements, with indications where those differ from the previous Construction Stormwater General Permit. Erosion and Sediment Control Plan You must implement the E&SC Plan approved for your project by DEMLR or by a delegated local program. Adherence to that E&SC Plan is an enforceable component of this General Permit. Your E&SC plan will identify areas where the more stringent 7- and 14- day ground stabilization requirements apply. See "Ground Stabilization Requirements" on page 2 of this bulletin. Monitoring and Inspections • You must keep a rain gauge on the project site. • Dedicated demolition and other waste areas and earthen material stockpiles must be located at least 50' from storm drains or streams unless no alternative is feasible (new requirement). • You must inspect all E&SC measures at least once a week and within 24 hours after any storm event greater than a half-inch (during a 24-hour period). You must take immediate corrective action for any device failure. • You must inspect all outlets where stormwater runoff leaves the site and evaluate the effect on near -by streams or wetlands. • Corrective action must be taken if sediment is deposited off-site or into a stream or wetland, or causes a visible increase in turbidity (cloudiness) of any waterbody. • You must keep records of these inspections and any corrective actions taken. ' O n�o�o STORMWATER DISCHARGE: STORM WATER DISCHARGES INTO CASCADE CREEK, DRY CREEK, AND SEVERAL UNNAMED TRIBUTARIES ALL DISCHARGE INTO THE LOWER DAN RIVER WHICH IS IN THE ROANOKE RIVER BASIN U �.►� ~ �r �►%ems_, ,��1��►� _ ®' ' • 3 Operation and Maintenance You must provide the operation and maintenance necessary to maintain optimal performance of stormwater controls. This means you must take corrective action if erosion and sediment control measures are not operating properly. Operation and maintenance includes, but is not limited to: • Regularly cleaning out sedimentation basins. • Stabilizing eroded banks, channels or spillway structures. • Repairing/clearing out inlets and outlets. • Repairing and maintaining storm drainage inlet and outlet protection. • Repairing piping, seepage and mechanical damage. • Repairing silt fence damage. Reporting The self -inspections required by this permit are an opportunity to identify impacts to nearby waters. If you observe sediment that has deposited in a stream or wetland, you must notify the DEMLR regional office within 24 hours and provide written notice within five days (see item #3 on page six of the General Permit). Non-compliance and Fines Projects that violate Stormwater Permit conditions and/or have un -authorized water quality impacts are subject to fines. Civil penalties of up to $25,000 per day for each violation may be assessed. Inspections Staff from DEMLR and local pro -grams with delegated authority will perform random inspections of your project site to ensure compliance with state and federal regulation governing construction activities. That means that your project, if found to be in violation, could potentially be subject to enforcement action by both DEMLR and the local program. The inspections may be routine in nature or the result of a citizen complaint. Ground Stabilization Requirements NEW STABILIZATION TIMEFRAMES SITE AREA DESRCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS O PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES APRIL, 2019 DATE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER SLOPES STEEPER THAN 3:1 7 DAYS THAN 2:1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH v ALL OTHER AREAS WITH 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES SLOPES FLATTER THAN 4:1 Learn more online: Stormwater Permitting: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Regional Office Map: http://deq.nc.gov/contact/regional-offices Still have auestions? Call the DEMLR Reaional Office nearest vour proiect's location: 'Asheville Office (828) 296-4500 Washington Office (252) 946-6481 Fayetteville Office (910) 433-3300 Wilmington Office (910) 796-7215 'Mooresville Office (704) 663-1699 Winston-Salem Office (336) 776-9800 Raleigh Office (919) 791-4200 Central Office (919) 807-6300 2.2% A 4 5 9%. Dewberry' Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 VV U P� Z w Q J z � PITTSYLVANIA CO, VA //�� T J Z Z VJ 1 _ OLL1 ROCKINGHAM CO, N Q>_ w CC:or LJJ o O Lii < LI_ U O CD W== IQ_ �• i M U Z `SOoO Q O 0 Cn U 0 Z 0 D�0 I O SEAL ��•..••...,,• ,. ,y •, 1P oFESS/0 -9 SEAL q� ' a = ,7502 •'s k''' ANG .,,••pTT ENR''•,,. KEY PLAN Hill IRK, QnJ • `� r / to O � a 0 0 . CONSTRUCTION SEQUENCE 1. NOTIFY NCDENR LAND QUALITY SECTION AT (336)-776-9800 PRIOR TO BEGINNING CONSTRUCTION. 1 \ •, - SOVA 2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION "' ' • ` - ` ' 1 'CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. `� I� t•'• ; l `'- _. '` - _ rVj� =` (`'— Jae, , — , 5„y; •' J MEGA 3. INSTALL SILT FENCE, CONSTRUCTION ENTRANCE, ROCK PIPE INLET PROTECTION, AND OTHER MEASURES AS SHOWN ON THE : SITE APPROVED PLAN PRIOR TO ANY LAND DISTURBING ACTIVITIES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. "' �' �� "Zf 4. PURSUANT TO G.S.1 13A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT ,, � - •- CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION—CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED .' ��' ' �•' , . , OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO .. _•: W : �`4 `� �' ! RESTRAIN EROSION. PURSUANT TO G.S.1 13A-57(3),PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ',J �:.., •:... / ,,„ j ACCOMPLISHED FOR ALL DISTURBED AREAS IN ACCORDANCE WITH THE STABILIZATION TIMEFRAMES TABLE. 5. PRIOR TO CROSSING ANY DITCHES OR STREAMS, INSTALL ALL REQUIRED EROSION CONTROL MEASURES. AFTER VEGETATION HAS BEEN ESTABLISHED IN THESE AREAS ALL TEMPORARY MEASURES SHALL BE REMOVED. c aa. • •...,\ �C/ � CO 5. BEGIN EXCAVATION, GRADING AND PIPE INSTALLATION WITHIN LIMITS OF CONSTRUCTION. INSTALL PERMANENT MEASURES, ;1 I Cd OUTLET PROTECTION, AND GRASSING IN SEQUENCE WITH PIPE INSTALLATION AND GRADING AND STABILIZATION. �, ° ' �� •' �•'°y = - - " "''"��Z- 6. DO NOT DISTURB MORE AREA THAN WILL BE COMPLETED IN A DAY'S WORK. ." �.s �_ c°'��; ,� Q elf •_�, ,tlf:fi 7. ALL EXCAVATED AREAS SHALL BE BACKFILLED DAILY. 8. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED. 9. PROVIDE CHECK DAMS OR WATTLES WITHIN DRAINAGE SWALE ALONG WATER MAIN INSTALLATION AND AS DIRECTED BY NC .y o• ,,,,, \ l;�`�10. PURSUANT TO NC GENERAL STATUTE 113A -54.1(e), CONDUCT "SELF INSPECTIONS" OF EROSION CONTROL DEVICES AT _4- VIRGINIA_____ �•. -j - PIT_TS_YLV_AN_IACO_. VA,' � � COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 04B .0131. FORTH CAROLINA - - 'p�T�CS'VA�'� I773Y VANIA CO i��� ROGKINGHAY CU/.�"� -� ;.00KINGHAM CO.;NC� 11. THE CONTRACTOR SHALL MAINTAIN THE DEVICES ACCORDING TO THE LATEST VERSION OF THE NORTH CAROLINA EROSION �% AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 12. ALL TRENCH WATER SHALL BE PUMPED THROUGH A SILT BAG. 13. AFTER THE DISTURBED AREAS ARE STABILIZED, AND WHEN APPROVED BY THE ENGINEER, REMOVE THE TEMPORARY DEVICES . ItyrroN % ��0.. N '9J- k, AND PROPERLY DISPOSE OF THE TRAPPED SEDIMENT. STABILIZE THE AREAS DISTURBED DURING THE REMOVAL OPERATION BY APPLYING SEED AND MULCH ACCORDING TO THE SEEDING SCHEDULE AND THE DITCH PROTECTION SHOWN ON THE DRY CREEK DRAWINGS. 14. CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTFALLS WEEKLY AND AFTER EVERY RAIN EVENT 1/2" OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT DOCUMENTS. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. MAINTAIN a c THESE RECORDS AT THE ON—SITE OFFICE FOR AUDIT. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL • DAN RIVER TEMPORARY EROSION CONTROL DEVICES. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON—SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. ul�Pe . - - - 16. MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY NC DENR LAND QUALITY USGS VICINITY MAP DIVISION PRIOR TO EXECUTION. A COPY OF ALL PERMITS SHALL BE MAINTAINED BY THE CONTRACTOR ON—SITE AT ALL SCALE: 1 "=2000' TI MES. LEGEND WETLANDS v� STREAMS CONTACT INFORMAT19ON FOR ON-SITE EROSION AND SEDIMENT CONTROL MEASURES: TERRY SHELTON PHONE: 1-336-627-1009 EXT. 131 FAX: 1-336-623-3933 AREA OF LAND DISTURBANCE = 4.55± (ACRES) *CONSTRUCTION WILL OCCUR WITHIN A 20' WIDE STRIP TYPICALLY 10' OFF EDGE OF PAVEMENT. E&S LEGEND LIMITS OF DISTURBANCE CDCHECK DAMS ' NC E&S STD. 6.63 CE TEMPORARY STONE CONSTRUCTION ENTRANCE, NC. E&S STD. 6.06 TS TEMPORARY SEEDING, TS NC E&S STD. 6.10 PS PERMANENT SEEDING, �7 NC E&S STD. 6.11 1111 PS WRECP0 SOIL STABILIZATION BLANKETS & MATTING, NC E&S STD. 6.17 SF SILT FENCE, NC E&S STD. 6.62 — SF Clp CULVERT INLET PROTECTION, r NC E&S STD. 6.55 USC UTTILITY 25ROSSING VA E S STD DRAINAGE FLOW ARROW w/ APPROXIMATE SLOPE SCALE 0' 600' 1200' SCALE: 1 " = 600' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 1 2/11/19 MWC PER DEQ COMMENT No. DATE BY Description REVISIONS TITLE Erosion and Sedimentation Control Plan PROJECT NO. 50046462 / 50102913 SHEET NO. C2 OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE Erosion and Sedimentation Control Plan PROJECT NO. 50046462 / 50102913 SHEET NO. C2 OF E 0 0 1 O ----210 Q F M —� IJ/ 7 2 OOMgINA�ION V6 1NR� UL �A�NEAO 6 S�A�IAOVUM-� ROGATION AIR � POINT �EX�F�E�Di H�OH 1NE� �N �ETERM STtAIQ VS of 05 S 2 j � /z69 STA. 122+25, INSTALL AIR RELEASE VALVE @ HIGH POINT (EXACT z6s LOCATION TO BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) Fqo STA. 121+50, INSTALL ANEW FIRE HYDRANT ASSEMBLY 3 CONTRACTOR SHALL INSTALL CLA-VAL SERIES MODEL -136 -AU ELECTRONIC PROGRAMMABLE CONTROL VALVE W/ X102 FLOW LIMITING ASSEMBLY & PILOT SYSTEM COMPONENTS. THIS SETUP SHALL INCLUDE THE FOLLOWING OPTIONS X46A FLOW CLEAN STRAINER, CK2 ISOLATION VALVE, X43 "Y" STRAINER OR APROVED EQUAL. LIQUID FILLED PRESSURE GAGE - 0-100 PSI W/ BRASS PET COCK 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER P CONTRACTOR SHALL \STA. 121+08, INSTALL STA. 121+16, INSTALL INSTALL 12" GV, BOX 20"x10" ECCENTRIC RED. 20" - 22 1/2° BEND AND 12"x2" COMPANION WITH RES. FITTINGS WITH RES. FITTINGS FLG. STA. 121+06, INSTALL 10" GV WITH RES. FITTINGS \-STA. 120+96, NC MASTER METER AND CONTROL VALVE VAULT -ELECTRICAL SERVICE STRUCTURE AND LIGHT POLE -WITH RES. FITTINGS STA. 120+86, INSTALL 12" GV -STA. 120+84, INSTALL 12"x20" ECCENTRIC RED. WITH RES. FITTINGS -AUTOMATIC FLUSHING VALVE REF. DETAIL SHT C2.1. NC - MASTER METER VAULT SITE PLAN SCALE: 1 " = 50' "^'USTABLE PIPE SADDLE SUPPORT ANVIL OR APPROVED EQUAL TCH TO PIPE TO BE SUPPORTED) (USED W/ 4" STANCHION) 1/2", 4" (USED W/ 6" ,NCHION) DIA. G.S. PIPE .-THREADED ROD STANCHION 4"-16" PIPES 6" STANCHION -36" DIA. PIPES OXY ANCHOR BOLTS 3EDDED 6" MIN. PIPE SUPPORT DETAIL NOT TO SCALE 4" THROUGH 36" PIPE FLOWFROM ROM EDEN FLOW FROM EDEN 12" D.I.P. 2" COPPER (SEE NC - MASTER METER AND CONTROL VALVE VAULT DETAIL THIS SHT.) CONTRACTOR SHALL EXTEND PVC DRAIN PIPE FROM HATCH FRAME DRAIN ROUTING ALONG WALL TO 6" ABOVE VAULT BOTTOM. ALUM. LADDER EQUAL TO HALLIDAY SERIES L1 D (FLOOR & HATCH FRAM MOUNTED) W/ PULL UP EXTENSION POST EQUAL TO HALLIDAY SERIES L1 E. (REF. PLAN VIEW FOR PROPER ORIENTATION) PROVIDE POSITIVE DRAINAGE AWAY FROM TOP OF VAULT TYP. ENTIRE STRUCTURE 20"x10" M.J. ECCENTRIC RED. W/ RES. FITTINGS 10" M.J. G.V. W/ RES. - FITTINGS AND BOX NOTE: CONTRACTOR TO PROVIDE ADDITIONAL PIPE SUPPORTS AS NEEDED TO ENSURE ADEQUATE PIPE SUPPORT. PIPE SUPPORTS- (TYP.) REF. DETAIL THIS SHT. 4" WEEP HOLE - (TYP. OF 4) -109-1 LAI 1-1 2" COPPER AM 3'-0" 2" UNION INSULATED HOT BOX 2'-0"H x 3'-0"L / FIBERGLASS WITH STAINLESS STL. HARDWARE AND ANCHORS. 4" D.I.P. 5 GENERAL NOTES: 1. ALL ABOVE GROUND PIPING SHALL HAVE INSULATION AND HEAT TAPE, REF. ELECTRICAL. 2. ALL PIPE IN MASTER METER VAULT, ABOVE GROUND D.I. PIPE FOR FLUSHING ASSEMBLY, AND MISC. CARBON STEEL COMPONENTS SHALL RECEIVE HIGH PERFORMANCE COATING SYSTEM (REF. SPEC. 099600) aLL. O 24 MESH S.S. SCREENED o N o OUTLET U I 00000 cV `° 1'-0" MIN. CLEAR X X X X a PIPE FELT o zw /���• ����� TYP. - � o '\ U 2" COPPER CONTRACTOR SHALL INSTALL DLJ EPDXY COATED BRONZE WATER METER MODEL DLJ 200 2" AND MUELLER / McCULLOUGH EZ -VAULT OR APPROVED EQUAL 6" CLEAN STONE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL N.T.S. CONCRETE COLLAR 4" D. 1. W/ COMPANION FLG. 60" X 48" ALUM. DOUBLE LEAF H2O TRAFFIC RATED DOOR (BY HALLIDAY OR APPROVED EQUAL) TO BE PRECAST IN TOP BY VAULT MANUFACTURER 8" TOP THICKNESS TOP ELEV.=592.00' FLUSH W/ GRADE 8" (TYP.) (0-160 PSI) LIQUID FILLED PRESSURE GAUGE WITH BRASS PET COCK (TYP. OF 2) 1/2" NON -THREADED SAMPLE TAP 10" BOTT. SLAB CLASS I RIP -RAP 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER CENTERLINE=573.90' FLOW TO INDUSTRIAL PARK 12"x12" M.J. TEE W/ RES. FITTINGS CONTRACTOR SHALL INSTALL 12" GV, BOX AND 12"x2" COMPANION FLG. (SEE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL THIS SHT.) FLOW TO INDUSTRIAL PARK -20"x20"x12" M.J. RED. TEE W/ RES. FITTINGS (TYP. 2 OD -20"x12" M.J. ECCENTRIC STA. 119+89, INSTALL RES. FITTINGS -12" M.J. 20" - 22 1/2* BEND I OI O AND BOX WITH RES. FITTINGS WEED BARRIER FABRIC 4'-0" MIN. BORE PIT -D � ELECTRIC LOCATION 12'X25' I Z� J STA. 120+29, INSTALL z I a 20" - 45° BEND J WITH RES. FITTINGS I �' 50 (LF) - 20" D.I.P. TO EXTEND EACH END OF CASING 5'-0" APPROX. STA. 120+30 TO 120+80 RES. FITTINGS REQ'D FROM STA. 119+60 TO 121+40 40 (LF) - 30" DIA. X 0.500 WALL THICKNESS STEEL w�a�Qo� CASING PIPE, TO BE DRY BORE AND JACKED TO EXTEND 5'-0" MIN. BEYOND E.O.P. STA. STA. 120+35 TO 120+75 STA. 120+76, INSTALL 20" - 45' BEND < WITH RES. FITTINGS 0- 2 OOMgINA�ION V6 1NR� UL �A�NEAO 6 S�A�IAOVUM-� ROGATION AIR � POINT �EX�F�E�Di H�OH 1NE� �N �ETERM STtAIQ VS of 05 S 2 j � /z69 STA. 122+25, INSTALL AIR RELEASE VALVE @ HIGH POINT (EXACT z6s LOCATION TO BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) Fqo STA. 121+50, INSTALL ANEW FIRE HYDRANT ASSEMBLY 3 CONTRACTOR SHALL INSTALL CLA-VAL SERIES MODEL -136 -AU ELECTRONIC PROGRAMMABLE CONTROL VALVE W/ X102 FLOW LIMITING ASSEMBLY & PILOT SYSTEM COMPONENTS. THIS SETUP SHALL INCLUDE THE FOLLOWING OPTIONS X46A FLOW CLEAN STRAINER, CK2 ISOLATION VALVE, X43 "Y" STRAINER OR APROVED EQUAL. LIQUID FILLED PRESSURE GAGE - 0-100 PSI W/ BRASS PET COCK 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER P CONTRACTOR SHALL \STA. 121+08, INSTALL STA. 121+16, INSTALL INSTALL 12" GV, BOX 20"x10" ECCENTRIC RED. 20" - 22 1/2° BEND AND 12"x2" COMPANION WITH RES. FITTINGS WITH RES. FITTINGS FLG. STA. 121+06, INSTALL 10" GV WITH RES. FITTINGS \-STA. 120+96, NC MASTER METER AND CONTROL VALVE VAULT -ELECTRICAL SERVICE STRUCTURE AND LIGHT POLE -WITH RES. FITTINGS STA. 120+86, INSTALL 12" GV -STA. 120+84, INSTALL 12"x20" ECCENTRIC RED. WITH RES. FITTINGS -AUTOMATIC FLUSHING VALVE REF. DETAIL SHT C2.1. NC - MASTER METER VAULT SITE PLAN SCALE: 1 " = 50' "^'USTABLE PIPE SADDLE SUPPORT ANVIL OR APPROVED EQUAL TCH TO PIPE TO BE SUPPORTED) (USED W/ 4" STANCHION) 1/2", 4" (USED W/ 6" ,NCHION) DIA. G.S. PIPE .-THREADED ROD STANCHION 4"-16" PIPES 6" STANCHION -36" DIA. PIPES OXY ANCHOR BOLTS 3EDDED 6" MIN. PIPE SUPPORT DETAIL NOT TO SCALE 4" THROUGH 36" PIPE FLOWFROM ROM EDEN FLOW FROM EDEN 12" D.I.P. 2" COPPER (SEE NC - MASTER METER AND CONTROL VALVE VAULT DETAIL THIS SHT.) CONTRACTOR SHALL EXTEND PVC DRAIN PIPE FROM HATCH FRAME DRAIN ROUTING ALONG WALL TO 6" ABOVE VAULT BOTTOM. ALUM. LADDER EQUAL TO HALLIDAY SERIES L1 D (FLOOR & HATCH FRAM MOUNTED) W/ PULL UP EXTENSION POST EQUAL TO HALLIDAY SERIES L1 E. (REF. PLAN VIEW FOR PROPER ORIENTATION) PROVIDE POSITIVE DRAINAGE AWAY FROM TOP OF VAULT TYP. ENTIRE STRUCTURE 20"x10" M.J. ECCENTRIC RED. W/ RES. FITTINGS 10" M.J. G.V. W/ RES. - FITTINGS AND BOX NOTE: CONTRACTOR TO PROVIDE ADDITIONAL PIPE SUPPORTS AS NEEDED TO ENSURE ADEQUATE PIPE SUPPORT. PIPE SUPPORTS- (TYP.) REF. DETAIL THIS SHT. 4" WEEP HOLE - (TYP. OF 4) -109-1 LAI 1-1 2" COPPER AM 3'-0" 2" UNION INSULATED HOT BOX 2'-0"H x 3'-0"L / FIBERGLASS WITH STAINLESS STL. HARDWARE AND ANCHORS. 4" D.I.P. 5 GENERAL NOTES: 1. ALL ABOVE GROUND PIPING SHALL HAVE INSULATION AND HEAT TAPE, REF. ELECTRICAL. 2. ALL PIPE IN MASTER METER VAULT, ABOVE GROUND D.I. PIPE FOR FLUSHING ASSEMBLY, AND MISC. CARBON STEEL COMPONENTS SHALL RECEIVE HIGH PERFORMANCE COATING SYSTEM (REF. SPEC. 099600) aLL. O 24 MESH S.S. SCREENED o N o OUTLET U I 00000 cV `° 1'-0" MIN. CLEAR X X X X a PIPE FELT o zw /���• ����� TYP. - � o '\ U 2" COPPER CONTRACTOR SHALL INSTALL DLJ EPDXY COATED BRONZE WATER METER MODEL DLJ 200 2" AND MUELLER / McCULLOUGH EZ -VAULT OR APPROVED EQUAL 6" CLEAN STONE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL N.T.S. CONCRETE COLLAR 4" D. 1. W/ COMPANION FLG. 60" X 48" ALUM. DOUBLE LEAF H2O TRAFFIC RATED DOOR (BY HALLIDAY OR APPROVED EQUAL) TO BE PRECAST IN TOP BY VAULT MANUFACTURER 8" TOP THICKNESS TOP ELEV.=592.00' FLUSH W/ GRADE 8" (TYP.) (0-160 PSI) LIQUID FILLED PRESSURE GAUGE WITH BRASS PET COCK (TYP. OF 2) 1/2" NON -THREADED SAMPLE TAP 10" BOTT. SLAB CLASS I RIP -RAP 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER CENTERLINE=573.90' FLOW TO INDUSTRIAL PARK 12"x12" M.J. TEE W/ RES. FITTINGS CONTRACTOR SHALL INSTALL 12" GV, BOX AND 12"x2" COMPANION FLG. (SEE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL THIS SHT.) FLOW TO INDUSTRIAL PARK -20"x20"x12" M.J. RED. TEE W/ RES. FITTINGS (TYP. 2 PLACES) -20"x12" M.J. ECCENTRIC RED. W/ RES. FITTINGS -12" M.J. G.V. W/ RES. FITTINGS AND BOX 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL •...........,� ••'••� CAR p ''•• 141 A. SEAL q� 17502 J` FIVG I .,,,,cOTT•.ENR�P••,. KEY PLAN SCALE 0' 2 4' SCALE: 1/2" = V-0" 0' 50' 100' SCALE: 1 " = 50' No. DATE BY Description REVISIONS MWC DRAWN BY U RSE APPROVED BY Q Z � Z APRIL, 2019 DATE Z J J Z ��W Mww� w�a�Qo� < 0- 3z 3: >- 3: (D 1AAAAAAAAAAA UU O a � Z 0 Er SEAL •...........,� ••'••� CAR p ''•• 141 A. SEAL q� 17502 J` FIVG I .,,,,cOTT•.ENR�P••,. KEY PLAN SCALE 0' 2 4' SCALE: 1/2" = V-0" 0' 50' 100' SCALE: 1 " = 50' No. DATE BY Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE NC Master Meter and Control Valve Vault PROJECT NO. 50046462 / 50102913 SHEET NO. C2. 1 OF IDewberz Dewberry Engineers Inc. 551 PINEY FOREST RC DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C SEAL "a...•••••.•. ?Q��FESS/pNgl9 •: SEAL � '. 17502 •=. � •'•`ANG I ND�''•Q'�:: 0Tr EHR�P••,. KEY PLAN C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' 1 2/11/19 MWC PER DEQ COMM No. DATE BY I Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WAT E R L I N E 'LAN AND PROFILE ►ll PROJECT NO. 50046462 / 501021 C3 SHEET NO. OF 1 9 q d F yevil Dewberry' Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C Al 121WdWW_l01 A SCALE C 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' MWC U W Q APPROVED BY Z J z > (n — J Z Z ��W�Wwv �C�Q � �� 3/14/19 W 2pCa PER DWQ COMMENT UQpQ 2/11/19 MWC Q LU DATE BY C� m i UZ OQ p 2 C) z O rr SEAL ��............ ;' /0 SEAL SEAL 17502 ,yGINE�� T 121WdWW_l01 A SCALE C 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 2 3/14/19 MWC PER DWQ COMMENT 1 2/11/19 MWC PER DEQ COMMENT No. DATE BY Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE 20" WATERLINE 'LAN AND PROFILE E PROJECT NO. 50046462 / 50102913 C 4 SHEET NO. OF E C 1 2 3 4 5 i o 13� SF / �V E6 NA. e� X D 12_-- d 0� 0� � ;CONTRACTOR SHALL IMPACT SITE 1 USE TIMBER MATS SCALE: 1"=20' THROUGH WETLANDS 9 9 \ (REF. DET. SHT. C22) 0) IMPACT SIT 1 — Al / b E7 / �Dl Co XYZ9s Ln STA. 134+00, INSTALL 20" ,1 BV WITH RES. FITTINGS �V STA. 135+00, INSTALL FIRE HYDRANT ASSEMBLY PROVIDE STREAM RESTORATION PER DETAILS STA. 135+25 TO 135+35, INSTALL 20' OF STEEL ENCASEMENT (SEE BORING DET. SHT. C19) STA. 135+56, INSTALL 20" BV WITH RES. FITTINGS 565--- 560 555 550 IMPACT'— SITE PACT'SITE 1 530 525 5Co" 20 W � 2� _ U) Z W Z � Q W 515 J J H Co Zw — af O = O + > C7 m Z U) N L� PROVIDE STREAM 1 o RESTORATION PER i DETAILS I I �1 4 STA. 137+93, INSTALL (2) l 20" 45° VERTICAL BENDS _ W/ RES. FITTINGS o i C) 528 80 CURVE ---- S = 26.07 —\ � 5 .06 \ 9� G F vNV� I j / \ 5.28 FM _ —� No E o r l r—� \ / Q URN Us 311/NC 770 i _ s ms`s .9 �F�€GCS--<,_ \,\,� (o INV_ — "f — e �NV_529 / / I 0 4+ w 4 / MP � 'SES � CjF I S lON NI 3 — �s IC II CMP CES STT god o �� to a�S x� MKP q G' BORE PIT \ o 3 a I N :Noy nb , II I I j i w�� cq uNE LOCATION 12'X25' I/ STA. 138+00 INSTALL AIR �• STA. 144+78, INSTALL BORE PIT ; i I I RELEASE VALVE @ HIGH STA. 141 +80, INSTALL AIR 20" 11.25* BEND WITH \ LOCATION 12'X25' I 1 , RELEASE VALVE © HIGH o POINT (EXACT LOCATION TO POINT (EXACT LOCATION TO o RES. FITTINGS zLu zs I a j I I j BE DETERMINED IN FIELD) BE DETERMINED IN FIELD) STA. 145+20, INSTALL O J z/ jo owl I (TURN UP TRACING WIRE) (TURN UP TRACING WIRE) N 20" 11.25* BEND WITH Q C,_ J Im J m i 4 IQ U zl STA. 137+93, INSTALL RES. FITTINGS v wl I w Q w Q , FIRE HYDRANT ASSEMBLY STA. 140+90, INSTALL FIRE ? U I z zl z" z C i HYDRANT ASSEMBLY Q 10' PERMANENT w Q U 150 (LF) - 20 D.I.P. W/ RES. FITTINGS Z EASEMENT C/) I— ' I APPROX. STA. 136+60 TO 138+10 z o Q NOTES: 105 (LF) - 30" DIA. X 0.500 WALL o C 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT THICKNESS STEEL CASING PIPE, TO BE C OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. DRY BORE AND JACKED TO EXTEND 5'-0" z v ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE MIN. BEYOND UTILITY RIGHT-OF-WAY Q il- SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. APPROX. STA. 136+85 TO 137+90 _z o I 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND Q STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR �w DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL I CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 565 1 550 �_ _j 0.500 WALL THICKNESS CASING PIPE, TO JACKED TO EXTE BEYOND UTILITY APP OX. STA. 1 STEEL.Q BE DRY BORE AND D 5'-0" MIN. o IGHT-OF-WAY Q 6+85 TO 137+90 � m __ 560 MAINTAIN MIN. 5'-0"- '-0"545 z N J ¢ 545 STA. 135+00 TO 135+56 NOTES: cc Z SEPARATION BETWEEN AN _j Z J Z Cn 80TT. OF GUIVERT TOP OF ENCASEMENT O W B540 N 561F D.I. REQUIRED 1. WILLIAM GAS LINES ARE SHOWN APPROX. ONLY. X STA. 13.15+25 TO - Q J N �O� W Z J m J m Hw -PROVIDE STREAM 2. CONTRACTOR WILL CROSS 135+3 ALL (n 20' OF O RESTORATION PER PIPELINE STEEL IJa" (/) 555 540 Q ENCASE ENT (SEE $C DETAIL 3. WILLIAMS GAS PERSONNEL MUST BE ON-SITE � D_ co N BORING DET. SHT. O_ W 0_ 535 D-' C19) Q 530 525 5Co" 20 W � 2� _ U) Z W Z � Q W 515 J J H Co Zw — af O = O + > C7 m Z U) N L� PROVIDE STREAM 1 o RESTORATION PER i DETAILS I I �1 4 STA. 137+93, INSTALL (2) l 20" 45° VERTICAL BENDS _ W/ RES. FITTINGS o i C) 528 80 CURVE ---- S = 26.07 —\ � 5 .06 \ 9� G F vNV� I j / \ 5.28 FM _ —� No E o r l r—� \ / Q URN Us 311/NC 770 i _ s ms`s .9 �F�€GCS--<,_ \,\,� (o INV_ — "f — e �NV_529 / / I 0 4+ w 4 / MP � 'SES � CjF I S lON NI 3 — �s IC II CMP CES STT god o �� to a�S x� MKP q G' BORE PIT \ o 3 a I N :Noy nb , II I I j i w�� cq uNE LOCATION 12'X25' I/ STA. 138+00 INSTALL AIR �• STA. 144+78, INSTALL BORE PIT ; i I I RELEASE VALVE @ HIGH STA. 141 +80, INSTALL AIR 20" 11.25* BEND WITH \ LOCATION 12'X25' I 1 , RELEASE VALVE © HIGH o POINT (EXACT LOCATION TO POINT (EXACT LOCATION TO o RES. FITTINGS zLu zs I a j I I j BE DETERMINED IN FIELD) BE DETERMINED IN FIELD) STA. 145+20, INSTALL O J z/ jo owl I (TURN UP TRACING WIRE) (TURN UP TRACING WIRE) N 20" 11.25* BEND WITH Q C,_ J Im J m i 4 IQ U zl STA. 137+93, INSTALL RES. FITTINGS v wl I w Q w Q , FIRE HYDRANT ASSEMBLY STA. 140+90, INSTALL FIRE ? U I z zl z" z C i HYDRANT ASSEMBLY Q 10' PERMANENT w Q U 150 (LF) - 20 D.I.P. W/ RES. FITTINGS Z EASEMENT C/) I— ' I APPROX. STA. 136+60 TO 138+10 z o Q NOTES: 105 (LF) - 30" DIA. X 0.500 WALL o C 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT THICKNESS STEEL CASING PIPE, TO BE C OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. DRY BORE AND JACKED TO EXTEND 5'-0" z v ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE MIN. BEYOND UTILITY RIGHT-OF-WAY Q il- SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. APPROX. STA. 136+85 TO 137+90 _z o I 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND Q STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR �w DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL I CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 565 1 550 132+00 133+00 134+00 135+00 136+00 137+00 138+00 S40pq/N F TO q��/� 25 510 139+00 520 1 505 515 1 500 140+00 w Of E7 J J N U) Z Ln N, O +0) + OLnO14- I -z N 141+00 M� EX. GRADE zLd� :2o z 0 Q "I 20" WATERLIN \ S�I >__�jopF Tp0 Ld + Lr 7 Z Z_ W a- :2 CC W 2 D UJ N Q 2 0 142+00 X� m U W 1.-: U) 0w Z W Q W Q�W 143+00 144+00 550 545 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 �_ _j 0.500 WALL THICKNESS CASING PIPE, TO JACKED TO EXTE BEYOND UTILITY APP OX. STA. 1 STEEL.Q BE DRY BORE AND D 5'-0" MIN. o IGHT-OF-WAY Q 6+85 TO 137+90 � m __ 560 545 n Q z N J ¢ w Z Ld 0 o Q zI'll_ STA. 135+00 TO 135+56 NOTES: cc Z DATE J _j Z J Z Cn w z O W �� N 561F D.I. REQUIRED 1. WILLIAM GAS LINES ARE SHOWN APPROX. ONLY. X (n Q - X� O 0 Q J N �O� W Z J m J m Hw -PROVIDE STREAM 2. CONTRACTOR WILL CROSS THE WILLIAMS GAS Description (n w�QU O RESTORATION PER PIPELINE AT THIS LOCATION. IJa" (/) 555 540 Q Z W $C DETAIL 3. WILLIAMS GAS PERSONNEL MUST BE ON-SITE � D_ co N Q C� Z Co Z O_ W 0_ D D-' Q NLoQ Z � �� O> UZ H— Sm0 O O (D= LOCATION 4. THE MINIMUM OF EACH SEPA LINE. ATION IS 24" AND IT MUT PASS O EITHER OVER OR UNDER ALL GAS LINES PRE ENT. + > +Or +r7 LO 5. THE LINES ARE BEL EVED TO BE 6'-0" DEEP THE 550 535 WATERLINE gT�01, O,oti �- INVERT O BE APPROX. 10'-0" DEP. Qw II rmZ w uj a w ��un �c� �� �_Tj�o_, F A OS/Tj� Co EXTEND FIRE HYDRANT m z — �' Q�Q�zz �z� �3AX �S c��-�o 'SRV o� �� FROM LOW SPOT FOR Z � 545 530 ( (n N U_ S O R F O (n LINE BLOW -OFF o w w J O N (n L� (n > J LL Cn — 0 x`38 00 \ 4' MIN. CO ER a U- 0 O OVER PIPE AT N o ARv's TY . z o 0 540 52 o �m w - 00 Z Zw ¢ � O m z zOfLdof 535 520 Q Q P�nRE PIT - Q L. OCATION \ w�0 L N .d 150 (LF) - 20" D.I.P. W/ RES. LLLZ �;4 30 515 2 m o0_ FITTINGS APPROX STA. 136+TO TO v> _I-Eml - 1. — M 1p , " - o 132+00 133+00 134+00 135+00 136+00 137+00 138+00 S40pq/N F TO q��/� 25 510 139+00 520 1 505 515 1 500 140+00 w Of E7 J J N U) Z Ln N, O +0) + OLnO14- I -z N 141+00 M� EX. GRADE zLd� :2o z 0 Q "I 20" WATERLIN \ S�I >__�jopF Tp0 Ld + Lr 7 Z Z_ W a- :2 CC W 2 D UJ N Q 2 0 142+00 X� m U W 1.-: U) 0w Z W Q W Q�W 143+00 144+00 550 545 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 �_ _j 0.500 WALL THICKNESS CASING PIPE, TO JACKED TO EXTE BEYOND UTILITY APP OX. STA. 1 STEEL.Q BE DRY BORE AND D 5'-0" MIN. o IGHT-OF-WAY Q 6+85 TO 137+90 � m __ o Q CLli „ Q n Q z N J ¢ w Z Ld 0 o Q zI'll_ W cc Z DATE J _j Z J Z Cn w z O W �� N Z PER DWQ COMMENT 2 X (n Q - X� O 0 Q J N �O� W Z J m J m Hw Ll.I Q n Z0 1-- DATE Z Description (n w�QU O �_ p� IJa" (/) 0 Q Z W i � _ � D_ co N Q C� Z Co Z O_ W 0_ OZ D-' Q NLoQ Z � �� O> UZ H— Sm0 O O (D= 0 O + + + + > +Or +r7 LO +Ln + � Ln Qw II rmZ ��un �c� �� �_Tj�o_, II Co Qz <o� �' Q�Q�zz �z� o� �� miaow - ( (n N U_ (n O (n Q J (n J O N (n L� (n > J LL Cn — 132+00 133+00 134+00 135+00 136+00 137+00 138+00 S40pq/N F TO q��/� 25 510 139+00 520 1 505 515 1 500 140+00 w Of E7 J J N U) Z Ln N, O +0) + OLnO14- I -z N 141+00 M� EX. GRADE zLd� :2o z 0 Q "I 20" WATERLIN \ S�I >__�jopF Tp0 Ld + Lr 7 Z Z_ W a- :2 CC W 2 D UJ N Q 2 0 142+00 X� m U W 1.-: U) 0w Z W Q W Q�W 143+00 144+00 550 545 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL ��............ p� /,L . SEAL 17502 i F,yG I NES- .,,••c0 •T. T I:1�'�»_1�1 540 SCALE 0' 50' 100' SCALE: 1 " = 50' 535 VERT. 1 "=5' HORIZ. 1 "=50' 530 525 J �_ _j DRAWN BY H H RSE U Lu LAB Q W �06 Z DATE J N - Z "4- Z Cn O W O W J C4 Cr (n Z PER DWQ COMMENT 2 2/11/19 W�w�� PER DEQ COMMENT 1 Lu MWC REV PER USACE COMMENTS No. DATE BY Description w�QU Q p� i O a � Z U 0 SEAL ��............ p� /,L . SEAL 17502 i F,yG I NES- .,,••c0 •T. T I:1�'�»_1�1 540 SCALE 0' 50' 100' SCALE: 1 " = 50' 535 VERT. 1 "=5' HORIZ. 1 "=50' 530 525 J �_ _j DRAWN BY H H RSE Z Z W LAB mC� ONms2 W �06 APRIL, 2019 DATE N - N� "4- LL H O W O W M C4 Cr (n 04 Of 145+00 510 505 500 146+00 REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C5 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C5 SHEET NO. OF 1 9 _'q d R Dewberry' Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 A A SEAL �..........,•• ,�.•�'�� CARp�•'••.,. ;•' � .•'FESS/p'•. -9 ••; • �� SEAL q� • 17502 =, J` �'•FNG � NES-�•� � ,•••c�T T ..E NR�p,,,,• KEY PLAN 10 SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' z � J z > Z Z Q 3 � op PER DWQ COMMENT WCC 2/11/19 LUor=U PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description Q> Q oQ m � 2 �_ >��>Z U � a 0 U Z 0 rr SEAL �..........,•• ,�.•�'�� CARp�•'••.,. ;•' � .•'FESS/p'•. -9 ••; • �� SEAL q� • 17502 =, J` �'•FNG � NES-�•� � ,•••c�T T ..E NR�p,,,,• KEY PLAN 10 SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C6 SHEET NO. OF 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C6 SHEET NO. OF 1 9 1 d '81991. D e w b e r r also, y Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C SEAL ,,.....••..... ,•,�,.O�,�H CAR p� �� �,,, ESS/p�9lq SEAL 17502 •. 0 0 •...... ..ENR Ed SCALE C 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE E PROJECT NO. 50046462 / 50102913 C 7 SHEET NO. OF 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE E PROJECT NO. 50046462 / 50102913 C 7 SHEET NO. OF E 1 K IMPACT SITE 4 ✓ l I0 l ..- W_ 4 j r-VV-480 �2 ��� I o -------- E gWzxaQ„�_ IIS I " — PIPECROSSIN -- =t -- -47 TW=48 g -—--_ --- --- - - �+6� — — WEI STA • 174+24, INSTALL "' + 20" BV WITH RES. FITTINGS ;,WC2 a_100 STA. 174+25, INSTALL FIRE HYDRANT ASSEMBLY Q 25'x50' STAGING AREA STA. 174+50 I20" 45° VERT. EL. W/ RESTRAINED FITTINGS (EXACT LOCATION TO BE DETERMINED IN FIELD) (TURN UP I TRACING WIRE) (REF. FITTINGS ,�/VC1 z DET'S. SHT. C19) I Q END U G5 ��W�w�0 181+83 (N O I M PACT) w Li - 1 - K IMPACT SITE 4 ✓ l I0 l ..- W_ 4 j r-VV-480 �2 ��� I o -------- E gWzxaQ„�_ IIS I " — PIPECROSSIN -- =t -- -47 TW=48 g -—--_ --- --- - - �+6� — — WEI C V 0 THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 9VV ICHTLIMIT oof >�J EIC OSSING 3 1 4 1 5 c� p=1Z \ D V I / \ WOOD FENCE — —� -e6� i� Aj CABLE FENCE — r i i 89142 — — 17V FMV J �� 15" CMP / — D v i INV=488 1485w A/R� X18T g2 C PZ 111NC 0 AH6+49C - RVEU US3D f J /D CD T R6— — X83+OD -- --.. --;r- - - i Io1 �O BVV 48 119 � -48.93 XS F3 ,\SIF4 1-821 4 5 wo — -- -- � CONTRACTOR SHALL FE EB GIN \WB9� USE TIMBER MATS 174+50 L — `ddl THROUGH WETLANDS 1032 0 (REF. DET. SHT. C22) STA. 181+34 END 20" 45° VERT. EL. W/ 181+83 50'X50' STAGING AREA RESTRAINED FITTINGS (EXACT LOCATION TO BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) (REF. FITTINGS DET'S. SHT. C19) 50'x50' STAGING AREA LIMPACT SITE 4 >,VVB2 ),WB1 Z U N I QI I� 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 yDewberr y' evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 W T 89hWC6 CIPSF-------- "' + ;,WC2 a_100 Lu _1 �NC5 Q ^ Z J UBEGIN add` 174+50 Z 1032 LF ,�/VC1 z XS � ! F F J Q END IMPACT SITE 4 w w -" ,5; G5 ��W�w�0 181+83 (N O I M PACT) w Li PER DEQ COMMENT 1 1/10/19 w w �F5 No. DATE — Description z �SG3 0 ISU w�QU XJ f= p� P � Cif � i z o IMPACT SITE 4 U Z O U aaf �U w � w Z ,XWC2 ,XWC5 N 0 IMPACT SITE 4 NOTES: SCALE: 1"=20' I 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE I MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM C V 0 THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 9VV ICHTLIMIT oof >�J EIC OSSING 3 1 4 1 5 c� p=1Z \ D V I / \ WOOD FENCE — —� -e6� i� Aj CABLE FENCE — r i i 89142 — — 17V FMV J �� 15" CMP / — D v i INV=488 1485w A/R� X18T g2 C PZ 111NC 0 AH6+49C - RVEU US3D f J /D CD T R6— — X83+OD -- --.. --;r- - - i Io1 �O BVV 48 119 � -48.93 XS F3 ,\SIF4 1-821 4 5 wo — -- -- � CONTRACTOR SHALL FE EB GIN \WB9� USE TIMBER MATS 174+50 L — `ddl THROUGH WETLANDS 1032 0 (REF. DET. SHT. C22) STA. 181+34 END 20" 45° VERT. EL. W/ 181+83 50'X50' STAGING AREA RESTRAINED FITTINGS (EXACT LOCATION TO BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) (REF. FITTINGS DET'S. SHT. C19) 50'x50' STAGING AREA LIMPACT SITE 4 >,VVB2 ),WB1 Z U N I QI I� 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 yDewberr y' evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL ��............ CAR01 of SEAL -A: 17502 T 121WdWW_l01 SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' U Lu Q Z J Z Z J Z ��W�w�0 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACECOMMENTS No. DATE BY Description w�QU Q p� m � � i � U Z O a �U Z 0 It SEAL ��............ CAR01 of SEAL -A: 17502 T 121WdWW_l01 SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. OF 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACECOMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. OF 1 9 q d Dewberry'ell, .�;evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C9 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�Wwv �C�Q � W �pCa UQpQ Q LU C� m i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•�•�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C9 SHEET NO. OF 1 9 1 d R '01991. D e w b e r r also, Y Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C 121WdWW_l01 A SCALE C 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' MWC U W Q APPROVED BY Z J z > (n — J Z Z 3 ��W�Wwv �C�Q � �� 2/11/19 W 2pCa PER DEQ COMMENT UQpQ 1/10/19 MWC Q LU DATE BY C� m i UZ OQ p 2 C) z O rr SEAL ��............ ;' /0 SEAL SEAL 17502 ,yGINE�� T 121WdWW_l01 A SCALE C 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE 20" WATERLINE 'LAN AND PROFILE E PROJECT NO. 50046462 / 50102913 C10 SHEET NO. OF 1 9 1 a R Dewberry'ell, .�;evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C 11 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�wwv �C�Q � W �pCa UQpQ Qm LU �O i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•�•�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C 11 SHEET NO. OF 1 9 q a evDewberry' r Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C FM 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C12 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�wwv �C�Q � W �pCa UQpQ Qm LU �O i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•••�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 Ed SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C12 SHEET NO. OF 1 9 q a Dewberry'ell, .�;evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C13 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�Wwv �C�Q � W �pCa UQpQ Q LU C� m i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•�•�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C13 SHEET NO. OF 0 ;;. Dewben ... Dewberry Engineers Inc. 551 PINEY FOREST RC DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C W MWC DRAWN BY I RSE APPROVED BY 7Q LAB C/) DATE APRIL, 2019 Q O CC �W W MWC W LU 2/11/19 MWC U 1 1/10/19 MWC REV PER USACE COMMENTS ErQ LLJ DATE BY Q p Q _I > U OQ p c z I SEAL �.........,,• . oFESS/p' 9 SEAL 17502 .,.coir. KEY PLAN C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 3 3/14/19 MWC PER DWQ COVIN 2 2/11/19 MWC PER DEQ COM 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE E PROJECT NO. 50046462 / 50102! C14 SHEET NO. OF 1 9 1 d Dewberry'ell, .�;evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C15 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�Wwv �C�Q � W �pCa UQpQ Q LU C� m i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•�•�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C15 SHEET NO. OF 1 9 1 d R Dewberry'ell, .�;evil Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C16 SHEET NO. OF U W Q Z J z > (n — J Z Z ��W�Wwv �C�Q � W �pCa UQpQ Q LU C� m i� UZ OQ p U) z O rr SEAL ��............ CAROM ''••.,. .••'•�•�H /0 SEAL SEAL 17502 FNG I T 121WdWW_l01 A SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' C No. I DATE I BY I Description REVISIONS E DRAWN BY APPROVED BY CHECKED BY DATE MWC APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C16 SHEET NO. OF E � To C0 1 1 2 IRAMA/%T C%ITr 7 Ivimi l 7 l ml i ll IYI 11 7. I.,- V I OFF E.O.P. (TYP.) STORM STRUCTURE THROUGHT-537.66 INV = 534.94 15" RCP INV -534,84 STA. 303+19 TO 303+59,- 40 (LF) — 30" X 0.500" WALL THICKNESS STEEL CASING PIPE, TO BE DRY BORE AND JACKED (SEE BORING DET. SHT. C19) 3 1 4 1 5 NOTES: 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL 0,���� CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY ��� REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL �� REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. CONTRACTOR SHALL LOCATE BOTH EXISTING 12" WATERLINES AND TIE—IN EXISTING SERVICES TO NEWER D.I. LINE CLOSEST TO ROAD. EXISTING 12" CAST IRON WATERLINE TO BE ABANDONED IN PLACE. TOP of WL PIPE COORDINATE WITH CITY OF EDEN FOR LOCATION OF METERS, VALVES, AND TOP = 529.06 TIE—INS. BOX CULVERT 9'W x 10'H NV = 527.7' STORM STRUCTURE COLLAPSED THROUGH=538.21 INV=NO ACCESS °a OHF � � /18" GONG. WALE IMPACT SITE 7 TW=53 APPROX. LOCATION OF EX. 16" WATERLINE -------CONTRACTOR TO FIELD LOCATE VERT. AND HORIZ. EX. 16" WATERLINE PRIOR TO CONNECTING NEW 16" WATERLINE. CONTRACTOR SF SHALL TIE—IN TO WITH NEW 16" WATERLINE, 16" TAPPING TEE AND 16" GV, 16"X20" ECCENTRIC INCREASER, (2) 45° BENDS WITH RES. FITTINGS (REF. DET. THIS SHT.) 3A4 STA. 303+76, INSTALL AIR RELEASE VALVE ® HIGH POINT (EXACT LOCATION TO BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) APPROX. LOCATION OF END EX. 16" WATERLINE BEGIN EX. 12" WATERLINE STA. 303+73, INSTALL 20" — 45° BEND WITH RES. FITTINGS STA. 303+63, INSTALL 20" — 45° BEND WITH RES. FITTINGS STA. 303+61, INSTALL FIRE HYDRANT ASSEMBLY 510 505 0111, M m � co M m� MWC DRAWN BY �_ J EXTEND FIRE HYDRANT W 545FROM H J I -1 �_ J H J OW SPOT FOR 545 H� 9N H� H� �wOwC� LINE 6 OW—OFF Z Z Z Z ZQ Z Z Z w U �m (n� (Dm m� No. z w � -m0 z w �wQ-� O U >—zQ IMPACT SITE 7 �Z 00 z w > O TA. 303+07 TO 303+73 O �� 0 Oq 540 EX. GRADE O n z I LL- r7 66LF D.I. REQUIRED n _ I L` r7 m F- Z 540 m wmw o� c � SwLw� b wwW F- U) N m U) N Of V) w U) cV fr N CV Of N Q .- � 0 �. 535 / 535 I�V� MSLO AEI l 530 SLOP T�OARV E 20" WATERLINE 1 \ AP VERT. ROX. LOCA ION OF EX. AND HORIZ. EX. 16" 6" 530 ATERLINE MAINTAIN IN. 5'-0" PRI DR TO CONNECTING NEW 16" SEPARATION B WEEN BOTT WATERLINE. CONTRACTOR SHALL TIE—IN TO 525 OF CREEK A D TOP OF WIT NEW 16" WATERLINE, 15" TAPPING 525 ENCASHMENT TE INC AND 16" G , 16"X20" EASER, (2)'45- BENDS CENTRIC WITH RES. FI INGS (REF. DET. THIS SHT.) STA. 303+19 TO 303+19, 520 40 (LF) — 30" X 0.500" CASING PIPE, TO BED 520 Y BORE AND JACKED (SE BORING DET. SHT. C19) 515 i � 515 510 505 0111, M m � co M m� 510 505 R U GT - Lu \ \ US 311/NC 770 E. MEADOW RD. '-03 \ TJGW- - -_ UGW - - - \\\� + 302+00 303 87 -0-.LL F- N I L-1 Lj SA1 , WA2 30 o SB 1 + �, WA4 + d - 2 X sF O WA SB4 62 + +-}- S13� PROVIDE STR �4M ESTORATION PER I DETAILS IMPACT SITE 7 SCALE:1 "=20' Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 MWC DRAWN BY �_ J I U W J H J H J� -1 �_ J H J m 0 cr H� H� 9N H� H� �wOwC� J Z Z Z Z ZQ Z Z ZQ w U �m (n� (Dm m� No. z w � -m0 z w �wQ-� O U >—zQ w�QUQp� �Z 00 F --: O 4� O0 O �� 0 Oq -rd n q J Z �� p O n I n I LL- r7 2 r7 I L` n _ I L` r7 m F- Z � m wmw o� c � SwLw� b wwW F- U) N m U) N Of V) w U) cV fr N CV Of N Q .- � 0 �. 510 505 R U GT - Lu \ \ US 311/NC 770 E. MEADOW RD. '-03 \ TJGW- - -_ UGW - - - \\\� + 302+00 303 87 -0-.LL F- N I L-1 Lj SA1 , WA2 30 o SB 1 + �, WA4 + d - 2 X sF O WA SB4 62 + +-}- S13� PROVIDE STR �4M ESTORATION PER I DETAILS IMPACT SITE 7 SCALE:1 "=20' Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL �..........,,� CAR pi SEAL 17502 �, '• FNS I NE` •'�0, THRUST BLOCKING KEY PLAN a REF. DET. SHT. C19 EX. 12" ppo a a a o a ° 4 ° 16"x16" TAPPING SLEEVE ° ° ° W/ RES. FITTINGS (REF. DET. SHT. C19) FIELD a ° a VERIFY PIPE TYPE PRIOR a ° TO INSTALLATION AIR RELEASE VALVE — (REF. DET. SHT'S. C18) EX. 16" 50'f REF. SITE PLAN FOR LOCATION AND LAYOUT THIS SHT. 20"x16" ECCENTRIC REDUCER W/ RES. FITTINGS (REF. DET. SHT'S. C19) (2) 20" 90° BENDS W/ RES. FITTINGS (REF. DET. SHT'S. C19) I b NEW 2011 I EX. 16" 16" GATE VALVE W/ RES. FITTINGS AND TRAFFIC RATED BOX (REF. DET. SHT'S. C18 AND C19) THRUST BLOCKING REF. DET. SHT. C19 WATERLINE CONNECTION DETAIL SCALE: 1/2" = 1'-0" THRUST BLOCKING REF. DET. SHT. C19 SCALE 0' 1' 2' 4' SCALE: 1/2" = l'- 0" 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' MWC DRAWN BY RSE U Lu LAB a z DATE J Z Z J 3/14/19 Z PER DWQ COMMENT �}W� 2/11/19 MWC PER DEQ COMMENT Er 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description w�QUQp� Qm� 2 H � �_ c7 �U O ¢ � Z 0 SEAL �..........,,� CAR pi SEAL 17502 �, '• FNS I NE` •'�0, THRUST BLOCKING KEY PLAN a REF. DET. SHT. C19 EX. 12" ppo a a a o a ° 4 ° 16"x16" TAPPING SLEEVE ° ° ° W/ RES. FITTINGS (REF. DET. SHT. C19) FIELD a ° a VERIFY PIPE TYPE PRIOR a ° TO INSTALLATION AIR RELEASE VALVE — (REF. DET. SHT'S. C18) EX. 16" 50'f REF. SITE PLAN FOR LOCATION AND LAYOUT THIS SHT. 20"x16" ECCENTRIC REDUCER W/ RES. FITTINGS (REF. DET. SHT'S. C19) (2) 20" 90° BENDS W/ RES. FITTINGS (REF. DET. SHT'S. C19) I b NEW 2011 I EX. 16" 16" GATE VALVE W/ RES. FITTINGS AND TRAFFIC RATED BOX (REF. DET. SHT'S. C18 AND C19) THRUST BLOCKING REF. DET. SHT. C19 WATERLINE CONNECTION DETAIL SCALE: 1/2" = 1'-0" THRUST BLOCKING REF. DET. SHT. C19 SCALE 0' 1' 2' 4' SCALE: 1/2" = l'- 0" 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 MM MM NCV cW 00 06 00 06 00 06 LO C M co co M co M co M co M Ln Ln m Ln Ln C17 301+00 302+00 303+00 304+00 305+00 305+50 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 MM MM NCV cW 00 06 00 06 00 06 LO C M co co M co M co M co M Ln Ln m Ln Ln C17 301+00 302+00 303+00 304+00 305+00 305+50 SHEET NO. OF GROUND OR STREET SURFACE E AIR VALVE AS DETAILED IN SPECIFICATIONS (SEE NOTE) BALL VALVE TAPERED COUPLING OR CORP. STOP 8" -i OO 4" 12" C r� 1 2 3 4 5 — MANHOLE FRAME & COVER TO BE MODEL USF 385 RING AND J COVER BY U.S. FOUNDRY & MFG. CORP. OR ENGR. APPROVED EQUAL (STAMPED: WATER - CITY OF EDEN - VALVE) ADDITIONAL SECTION OR SPACERS AS REQUIRED 4 VENT PIPE W/ DOWNWARD 3' 2" ELBOW AND SCREEN STD.4'PRECAST NIPPLE FLATTOP MANHOLE I— WATERMAIN V_0" GRAVEL TO TOP OF MAIN o -I i, EEI 4" GRAVEL BASE _ NCDOT NO. 7 OR _ 8 STONE O O '77 NCDOT NO. 7 OR 8 STONE BEDDING PLACE CONC. BLOCK ASTM C-139, OR POUR 12" x 8" CONC. RING FOOTING TO SUPPORT CHAMBER, BUT LEAVE OPENING BELOW PIPE. FILL SPACE INSIDE RING W/ CLEAN GRAVEL FOR DRAINAGE. ELIMINATE CONC. FOOTING IF SOLID ROCK IS ENCOUNTERED. AIR RELEASE VALVE DETAIL NOT TO SCALE NOTES: 1. CONTRACTOR SHALL COORDINATE W/ENGINEER AND OWNER FOR PLACEMENT OF AIR RELEASE VALVES AT ALL LOCATIONS.AIR RELEASE VALVES SHALL BE PLACED BEHIND GUARDRAILS AND DITCHES, AND NOT IN FILL SLOPES OR CUT SLOPES. 2. PROVIDE BASKWASH ACCESSORIES ASSEMBLED TO VALVE CONSISTING OF A 90° EL., A SHUT OFF VALVE, CLEARWATER INLET VALVE, RUBBER SUPPLY HOSE AND QUICK DISCONNECT COUPLINGS. SAW TO NEAT EDGE (TYP.) EXISTING PAVEMENT 0 0 21A OR B 6"MIN. o 0 6" COMPACTED 21A BACKFILL TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT ORIGINAL GRADE WALLS SHALL BE SLOPED — AND/OR SHEETING PROVIDED AS PER OSHA REQUIREMENTS HAND PLACED CAREFULLY — COMPACTED TO 90% DENSITY AT OPTIMUM MOISTURE CONTENT IN 6" LIFTS PLACE STONE UP TO SPRING LINE FOR D.I. OR PVC PIPE 2" MIN. OVERLAY ASPHALT CONCRETE SURFACE COURSE TYPE (SM -2A) EXISTING PAVEMENT TYPE 1 SIZE 21A OR B AGG. COMPACTED TO 100% MAX. DENSITY AT OPTIMUM MOISTURE CONTENT 6" BENCH (TYP.) O.D. PIPE O.D. + 24"(*) .I MIN. TRENCH WIDTH TO SUPPORT TRENCH BOX ASPHALT DRIVEWAY REPAIR DETAIL NOT TO SCALE 6" OR SAME THICKNESS AS EX. CONCRETE DRIVE. WHICHEVER IS GREATER SAW TO NEAT EDGE (TYP.) EXISTING ASPHALT --\ 6" COMPACTED BACKFILL 5000 PSI AIR -ENTRAINED "HIGH -EARLY" CONCRETE 6"x6" W.W.F. EXPANSION JOINT EXISTING CONCRETE 6" BENCH (TYP.) O.D. PIPE MIN. TRENCH WIDTH TO O.D. + 24"(*) ► I SUPPORT TRENCH BOX CONCRETE DRIVEWAY REPAIR DETAIL NOT TO SCALE PIPE SPRING SEE TYP. TRACING WIRE ACCESS BOX DET. FOR TAPE AND WIRE SLOPE AS REQUITED APPROVED BACKFILL PIPE O.D. 4 12" LINE O O 4" IN SOIL p p 6" IN ROCK J t COMPACTED STONE SOIL BEDDING MATERIAL ROCK TRENCH UNDERCUT 24" + O.D. MAX. MINIMUM 6" BELOW do 20" + O.D. MIN. BARREL OF PIPE IN ROCK PIPE LAYING CONDITION NOT TO SCALE *NOTE: USE NO. 25 / NO. 26 STONE FOR BEDDING MATERIAL. NON -TRAFFIC RATED SNAKEPIT TRACER WIRE TERMINATION BOX, INSTALL EVERY 500' (DO NOT INSTALL IN DRIVEWAYS, ROADS, OR HEAVY TRAFFIC AREAS. 2' MIN. I 4' MAX. N 6" MIN. MINIMUM -L AROUND PE PLAN / SECTION \� 6" PIPE 6" /x O.D. TYP. O.D. TYP. NOTES: 1. CONTRACTOR SHALL PROTECT PIPE JOINTS �, 4 \� 6" TYP. AS NECESSARY FOR PORTIONS ENCASED.\� 2. CONTRACTOR SHALL USE VIBRATORY METHOD ` TO ENSURE COMPLETE 4 ��\ PIPE O.D. ENCASEMENT. 3. FLOTATION OF THE PIPE DURING CONCRETE / p PLACEMENT SHALL BE \ D PREVENTED. / 6" TYP. MARKER TAPE 12" ABOVE j .O�MAIN \� 12 AWG TRACER WIRE 3" ABOVE MAIN MAIN TYPICAL TRACING WIRE NOTE: NON -TRAFFIC RATED SNAKEPIT TRACER WIRE TERMINATION BOX AT ACCESS BOX DETAIL EVERY 500' AND/OR TERMINATE INTO NOT TO SCALE AIR RELEASE VALVE BOX vvl Nv. i 1 11 Xvv i vwvi\ TYPE "C" BLOW OFF/ HIDDEN FLUSHING HYDRANT N.T.S. SECTION A -A CARRIER PIPE CONCRETE ENCASEMENT DETAIL NOT TO SCALE 2 COURSES OF BRICK AS SHOWN VALVE BOX CONCRETE COLLAR ON NCDOT R/W RECESS TOP 4" MIN. OTHERWISE, EXISTING OR PROPOSED GRADE 6" (TYP.) j >D , PLAN Dewberry"" WATER MAIN Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 VALVE CAST IRON COVER 3000 PSI 14" CONCRETE (TYP.) COLLAR pP �� d U) z Q J D_ Z 0 0 SCREW TYPE w ADJUSTABLE C.I. VALVE 0 BOX W/ BASE z z cn 1� w 2 MORTAR ~ 0 U) U) SUPPORT BOX W/ MIN. w 2 COURSES OF BRICK z D BOTTOM OF TOP BRICK TO BE EVEN W/ TOP OF BONNET MORTAR BOLT FLANGE JOINT d G DD Y COMPACTED BACKFILL TO ,d . NATURAL GROUND ' d G D CONCRETE SUPPORT SECTION TYPICAL VALVE SETTING DETAIL SCREW TYPE 4'-6" MIN. OR AS SHOWN ON PLANS TO FACE STREET AT 90° ANGLE — 3000 PSI CONC. COLLAR T_ 12" 6„ 18" TYP � d d D D D D T -yx'yX Y ADJUSTABLE C.I. O VALVE BOX w/BASE U) QLu z kIN Q U a- z IR SIZE) DUCTILE OR C.I. MECH. w W JOINT TEE w/6" BRANCH 6" GATE VALVE U) �__ NOT TO SCALE 2-1/2" HOSE CONNECTION EQUAL TO TOWN OR NATIONAL STANDARD BREAK RING - FINISHED GRADE 1/2 CU. YARD NO. 57 STONE ■ ill I M •: >O • OIOIpj�Olp���Ip��O .. • - I ��OI ��O • • N.T.S. SEAL CARO,•••a•••a••,• H •, ?Q��FESS/o�,�19 ,•••� SEAL 17502 KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 C18 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 C18 SHEET NO. OF E DRY BORED & JACKED WELDED STEEL CASING PIPE. 1 2 XR 6" MIN. HRUST LOCK (TYP.) PLAN BENDS N.T.S. 18" MIN.-10"DIA. & LESS 24" MIN.-12"DIA. & GREATER 45° h B'j ° / ° a B SECTION X- X BENDS & TEES N.T.S. II -- -- I r PLAN & ELEV. PLUGS N.T.S. TYP. CONCRETE BLOCKING DETAIL N.T.S. PLAN TEES N.T.S. 10" MIN. P. CONC. THRUST a �16 #4 BARS DLLAR MIN. 2" AS SHOWN TO DISTURBED ° 4T ON 3 SIDES ° TYP. MJ BEND w/ RESTRAINER GLANDS ° 11N. TRENCH BOTTOM j// ,/. UNDISTURBED SOIL (TYP.) NOTES: 1. FOR VERT. BEND DOWN IN EXCESS OF 1 1/4" ANCHORAGE SHALL BE RECOMMENDED BY ENGINEER. 2. FOR VERT. BEND UPWARD, BLOCKING TO BE SIMILAR TO THAT FOR HORZ. BEND. RES. FITTINGS MAY NOT BE SHOWN ON THE PLANS, CONTRACTOR SHALL INSTALL RES. FITTINGS PER ENGINEERS RECOMMENDATION OR SPEC. 333313. 3. GLANDS & BOLTS SHALL BE PROTECTED FROM CONC. WHEN POURING THRUST BLOCKS 4. ALL THRUST BLOCK & SUPPORT CONC. SHALL BE 4,000 psi CONCRETE, REF. SPEC. 033000. SECTION - VERT. BEND N.T.S. 8 BRICK BULKHEAD AT EACH END OF CASING PIPE (WATER TIGHT 6" TYP. GROUT AS REQ'D.) �� i D.I. CARRIER PIPE J (SEE PLANS FOR SIZE) CONC. CRADLE EXTEND FROM END B OF CASING TO FIRST JOINT OF SPIDER SUPPORT & SPACER BY SPIDER MFG. CARRIER PIPE (MIN. 5 LF) INC. DURHAM N.C., OR APPROVED EQUAL (3 REQUIRED PER 18' JOINT OF PIPE) 1/4 CU. YD. CRUSHED STONE @ PROVIDE 3/4" COPPER OR PVC WEEP HOLE C WEEP HOLE IN BULKHEAD @ LOW END OF CASING PIPE, EXTEND INTO CRUSHED STONE. BORING DETAIL (GREATER THAN 4" CARRIER NOT TO SCALE NOTE: CONTRACTOR SHALL INSTALL RESTRAINED FITTINGS THROUGHOUT CASING PIPE TO NEAREST VERTICAL BEND REF. JOINT RESTRAINT TABLE THIS SHT. FOR PIPE LENGTHS REQUIRED TO BE RESTRAINED FROM THE BEND. APPROVED DEWATERING DEVICE (SILT BAG REF. TEMPORARY PUMP AROUND DET. SHT. C22) OR DISCHARGE TO r� L W O r` SECTION A -A NOTES: NOT TO SCALE THE DETAIL IS NOT INTENDED AS FINAL FOR CONSTRUCTION. THE CONTRACTOR IS STILL RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION AND SAFETY PRECAUTIONS AS NECESSARY TO OBTAIN A NCDOT PERMIT PRIOR TO CONSTRUCTION. TYPICAL BORING PIT DETAIL 25' TO CHECK DAM J STEEL SHEETING DISCHARGE HOSES DEWATERING PUMP A NUMBER OF T -BOLTS JACK JACK STEEL PUSH RING PLYWOOD INTAKE HOSE THRUST BLOCK DETAILS GUIDERAILS 350 PSI 6 3 6 PIPE 90° BEND 45° BEND 22 1/2° BEND 11 1/4 BEND TEE 12 8 PLUG SIZE A B A B A B A B A B A B 4' 20" 18" 12" 18" 6" 16" 4" 12" 16" 18" 16" 18" 6" 34" 24" 22" 20" 12" 20" 8" 16" 32" 20" 32" 20" 8" 54" 26" 32" 24" 16" 24" 12" 16" 48" 24" 48" 24" 10" 68" 32" 48" 26" 26" 24" 18" 18" 55" 28" 55" 28" 12" 100" 32" 60" 28" 34" 26" 20" 24" 76" 30" 76" 30" 14" 128" 34" 72" 32" 38" 32" 24" 26" 96" 32" 96" 32" 16" 120" 48" 88" 34" 46" 34" 24" 34" 120" 34" 120" 34" 20" 138" 64" 130" 36" 66" 36" 34" 36" 170" 36" 170" 36" 8 BRICK BULKHEAD AT EACH END OF CASING PIPE (WATER TIGHT 6" TYP. GROUT AS REQ'D.) �� i D.I. CARRIER PIPE J (SEE PLANS FOR SIZE) CONC. CRADLE EXTEND FROM END B OF CASING TO FIRST JOINT OF SPIDER SUPPORT & SPACER BY SPIDER MFG. CARRIER PIPE (MIN. 5 LF) INC. DURHAM N.C., OR APPROVED EQUAL (3 REQUIRED PER 18' JOINT OF PIPE) 1/4 CU. YD. CRUSHED STONE @ PROVIDE 3/4" COPPER OR PVC WEEP HOLE C WEEP HOLE IN BULKHEAD @ LOW END OF CASING PIPE, EXTEND INTO CRUSHED STONE. BORING DETAIL (GREATER THAN 4" CARRIER NOT TO SCALE NOTE: CONTRACTOR SHALL INSTALL RESTRAINED FITTINGS THROUGHOUT CASING PIPE TO NEAREST VERTICAL BEND REF. JOINT RESTRAINT TABLE THIS SHT. FOR PIPE LENGTHS REQUIRED TO BE RESTRAINED FROM THE BEND. APPROVED DEWATERING DEVICE (SILT BAG REF. TEMPORARY PUMP AROUND DET. SHT. C22) OR DISCHARGE TO r� L W O r` SECTION A -A NOTES: NOT TO SCALE THE DETAIL IS NOT INTENDED AS FINAL FOR CONSTRUCTION. THE CONTRACTOR IS STILL RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION AND SAFETY PRECAUTIONS AS NECESSARY TO OBTAIN A NCDOT PERMIT PRIOR TO CONSTRUCTION. TYPICAL BORING PIT DETAIL 25' TO CHECK DAM J STEEL SHEETING DISCHARGE HOSES DEWATERING PUMP A NUMBER OF T -BOLTS JACK JACK STEEL PUSH RING PLYWOOD INTAKE HOSE 4 350 PSI 4 2 GUIDERAILS BORING PIT PLAN NOT TO SCALE - 6" TYP. CLASS B CONC. CRADLE SECTION B -B DIRECTIONAL DRILL PIPING CONNECTION ASSEMBLY DETAIL (TYP.) 3 4 NOTES: 1. THRUST RESTRAINT SHALL BE INSTALLED ON DUCTILE IRON "DIP" AND PVC FORCEMAINS AND WATERLINES IN THE MANNER SHOWN PER THIS DETAIL. SEE STANDARD THRUST BLOCK DETAIL FOR ADDITIONAL RESTRAINT CRITERIA. 2. RESTRAINING DEVICES SHALL CONFORM TO ANSI/AWWA C111/A21.11 AND ANSI/AWWA C153/A21.53 OF LATEST REVISION. 3. COMPACT FITTINGS ARE ACCEPTABLE FOR USE WITH IRON RETAINING GLAND M.J. RESTRAINT. 4. THE MINIMUM LENGTH OF RESTRAINT INDICATED SHALL REQUIRE ALL JOINTS WITHIN THAT DISTANCE BE RESTRAINED. 5. RESTRAINT SYSTEMS SHALL BE INSPECTED AND APPROVED PRIOR TO BACKFILLING. 6. RESTRAINT SYSTEMS MAY VARY BASED UPON THE ENGINEERS DESIGN AS SHOWN ON THE PLAN AND PROFILE SHEETS. 7. MAKE ANY JOINT DEFLECTION NECESSARY BEFORE TORQUING THE T -HEAD BOLTS. 8. TIGHTEN T -HEAD BOLTS, BOTTOM FIRST, THEN TOP, SIDES AND REMAINDER. 9. REPEAT NOTE 1. UNTIL ALL T -BOLTS ARE PROPERLY TOURQED. 10. TIGHTEN TWIST -OFF NUTS SO THAT ALL WEDGES FIRMLY CONTACT PIPE. 11. TIGHTEN TWIST -OFF NUTS IN ALTERNATING MANNER, SHEARING OFF NUTS. 12. MEGALUG, STARGRIP, (OR APPROVED EQUAL) MAY BE RESET OR REUSED BY ASSEMBLY AS DESCRIBED ABOVE AND TORQUE WEDGE BOLTS TO 90 FT LBS. 13. ANY PLACE A RESTRAINED FITTING IS CALLED OUT ON THE DRAWINGS THE ADJOINING PIPE JOINTS SHALL ALSO BE RESTRAINED TO A DISTANCE IN BOTH DIRECTIONS FROM THE DESIGNATED FITTING AS INDICATED IN THIS TABLE. NOMINAL NUMBER OF PIPE SIZE TWIST -OFF (INCHES) NUTS NUMBER OF T -BOLTS RATED PRESSURE 3 2 4 350 PSI 4 2 4 350 PSI 6 3 6 350 PSI 8 4 6 350 PSI 10 6 8 350 PSI 12 8 8 350 PSI 16 12 12 350 PSI 18 12 12 250 PSI 24 16 16 250 PSI 30 20 20 250 PSI 36 1 24 1 24 1 250 PSI 42 1 28 1 28 1 250 PSI TWIST -OFF NUT GAS ET - — J? t �MECHANICALSIDE VIEW FRONT JOINT BELL VIEW EBAA IRON MEGALUG RESTRAINING DEVICE OR APPROVED SUBSTITUTE IRON RETAINING GLAND MA RESTRAINT JOINT RESTRAINT TABLE - PVC RESTRAIN ALL JOINTS WITHIN THESE LENGTHS. (LF EA SIDE OF FITTING) PIPE SIZE (INCHES) 111/4 BEND 22 1/2 BEND 45 BEND 90 BEND DEAD END/ VALVE REDUCER VERT. 45 BEND U/L 6" 4 8 17 41 99 6"x8" 54' 41'/17' 8" 6 11 22 53 129 8"x12" 97' 54722' 12" 8 15 31 73 182 12"x16" 99' 76731' 16" 10 19 39 93 233 16"x20" 99' 97739' 20" 11 22 46 111 282 20"x24" 99' 117'/46' 24" 13 26 53 127 328 - 136'/53' JOINT RESTRAINT TABLE - DIP RESTRAIN ALL JOINTS WITHIN THESE LENGTHS. (LF EA SIDE OF FITTING) PIPE SIZE (INCHES) 111/4 BEND 22 1/2 BEND 45 BEND 90 BEND DEAD END/ VALVE REDUCER VERT. 45 BEND U/L 6" 3 6 13 30 54 6"x8" 54' 23'/13' 8" 4 8 17 39 70 8"x12" 97' 29717' 12" 6 11 23 55 98 12"x16" 99' 41'/23' 16" 7 14 29 69 126 16"x20" 99' 52729' 20" 9 17 35 83 152 20"x24" 99' 63'/35' 24" 10 19 40 96 177 - 73740' CALCULATION CONDITIONS: TRENCH = TYPE 3 SOIL TYPE = ML DEPTH = 3 FEET TEST PRESSURE = 150 PSI SAFETY FACTOR = 2.0 GRADE I x UPPER "U" -{ UPPER 45° 5 FLG. -DERS FELT JCRETE SLAB LOWER LOWER "L" 45° ° a � VERTICAL RESTRAINT L90° EL M.J. W/ CONCRETE BLOCKING (REF. CONCRETE V�ENGINO CNG BLOCKING DET.) AND RES. \_R=S�RP\NEQ BF RE's rH TQ FITTINGS REF. TABLES THIS Ir- gSS E C�PR� S�� C ART �O POLYWRAP PRIOR TO I POURING CONCRETE we p\P /RpN PTFE \RON ,PE C900 OR ucTDI PIPE \R0N p�PE /RoN /P VALVE VALVE FITTING OR DEAD END C900 OR RESTRAIN MJ JOINTS WITH IRON M.J. DI PIPE RESTRAINT RETAINING GLANDS - STARPIPE 3000 SERIES (TYP.) (OR EQUAL) DIP RESTRAINT RESTRAIN MJ JOINTS WITH IRON M.J. STARGRIP SERIES 4000 OR RESTRAINT RETAINING GLANDS - STARPIPE MEGALUG SERIES 2000 PV BY 3100P SERIES (TYP.) (OR EQUAL) EBAA IRON (TYP.) STARPIPE SERIES 1100 (TYP.) (OR EQUAL) ED I R (OR EQUAL) SRP\N �STRAINF� RESTRAINED PIPE DETAIL NOT TO SCALE 3', MIN i 3' MI ONE 20' SECTION HDPE OF DIP 15' MIN SEX. STREAM VARIES TYPICAL DIRECTIONAL DRILL FOR STREAM/WETLAND CROSSINGS DETAIL NOT TO SCALE NCDOT SPECIAL PROVISIONS FOR DIRECTIONAL DRILLING: ONE 20' SECTION OF DIP DIRECTIONAL DRILLING METHODS HAVE NOT BEEN GIVEN STATEWIDE APPROVAL FOR USE ON NCDOT RIGHT OF WAY. UNDER NO CONDITION SHALL JETTING ALONE OR WET BORING WITH WATER OF UTILITY PIPELINES BE ALLOWED. DIRECTIONAL BORING USING JETTING WITH A BENTONITE (OR EQUIVALENT MATERIAL) SLURRY IS APPROVED AT A MINIMUM DEPTH OF TEN (SS 1110') FEET B(ELO))W THE PAVEMENT SURFACE [FIFTEENNE S (15') FEET DIRECTIONAL BELOW BORINGE �FNOT RALLOWED TIAL I�REMBANK FULL CONTROL EN T� ATOERIAL.CEDIRECTIONRLABORING ND FIVE ISSALLOWEDFEET B BEONEATHYEMBANKMETCH NT MATERIAL CREEK BED. NATURALLY OCCURRING SOIL. ANY PARALLEL INSTALLATION UTILIZING THE DIRECTIONAL BORING METHOD SHALL BE MADE AT A MINIMUM DEPTH OF FOUR (4') FEET (COVER) BELOW THE GROUND SURFACE AND OUTSIDE THE THEORETICAL 1:1 SLOPE FROM THE EXISTING EDGE OF PAVEMENT EXCEPT WHERE THE PARALLEL INSTALLATION CROSSES A PAVED ROADWAY. ALL DIRECTIONAL BORES SHALL MAINTAIN TEN (10') FEET MINIMUM (CLEAR) HORIZONTAL DISTANCE FROM THE NEAREST PART OF ANY STRUCTURE, INCLUDING BUT NOT LIMITED TO BRIDGES, FOOTINGS, PIPE CULVERTS OR BOX CULVERTS. ALL DIRECTIONAL BORES SHALL MAINTAIN TEN (10') FEET MINIMUM (CLEAR) VERTICAL DISTANCE FROM THE NEAREST PART OF PIPE CULVERTS OR BOX CULVERTS. DIRECTIONAL BORES ARE NOT ALLOWED BENEATH BRIDGE FOOTINGS, CULVERT WINGWALL FOOTINGS OR RETAINING WALLS. THE TIP OF THE DRILL STRING SHALL HAVE A CUTTER HEAD. DETECTION WIRE SHALL BE INSTALLED WITH NON—FERROUS MATERIAL. ANY CHANGES SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. FOR MULTIPLE CONDUIT INSTALLATIONS (INCLUDING PERPENDICULAR AND PARALLEL INSTALLATIONS), INSTALL CONDUITS WITH FIVE (5') FEET MINIMUM (CLEAR) HORIZONTAL SEPARATION BETWEEN EACH CONDUIT OR INSTALL MULTIPLE CONDUITS WITHIN A SINGLE DUCT. ALL DIRECTIONAL DRILLED PIPING FOR SEWER FORCE MAINS AND WATERLINES SHALL BE A MINIMUM OF SDR -9. AN OVERBORE SHALL NOT BE MORE THAN TWO (2") INCHES GREATER THAN THE DIAMETER OF THE PIPE OR ENCASEMENT. AN OVERBORE EXCEEDING TWO (2") INCHES GREATER THAN THE DIAMETER OF THE PIPE OR ENCASEMENT WILL BE CONSIDERED IF THE ENCROACHMENT AGREEMENT INCLUDES A STATEMENT SIGNED AND SEALED BY A NORTH CAROLINA REGISTERED PROFESSIONAL ENGINEER INDICATING THAT AN OVERBORE IN EXCESS OF TWO (2") INCHES OF THE DIAMETER OF THE PIPE OR ENCASEMENT WILL ARCH AND NO DAMAGE WILL BE DONE TO THE PAVEMENT OR SUB—GRADE. HDPE PIPE INSTALLED BY DIRECTIONAL BORING SHALL NOT BE CONNECTED TO EXISTING PIPE OR FITTINGS FOR ONE (1) WEEK FROM THE TIME OF INSTALLATION TO ALLOW TENSIONAL STRESSES TO RELAX. REINFORCING ANCHOR RING - EBAA IRON WORKS 110OSDB OR APPROVED EQUAL MID -SPAN PIPE RESTRAINT _ TRENCH WALL L -DUCTILE IRON RESTRAINED JOINT FITTING (TYP.) `RESTRAINED JOINT VALVE (TYP.) PVC RESTRAINT PE/ MJ TRANSITION ASSEMBLY DIMJ W/ MEGA LUG CONCRETE THRUST COLLAR ONE SECTION OF DUCTILE IRON PIPE 3/4" RODS 2 PER CONNECTION TRANSITION GASKET - BOLTED STE-EJ COUPLING, ROMAC STYLE 501 OR APPROVED EQUAL FOR TRANSITIONING DUCTILE IRON PIPE TO PVC PIPE TYPICAL DIRECTIONAL DRILL PIPING CONNECTION ASSEMBLY DETAIL NOT TO SCALE CONCRETE THRUST a 4'-0" t� B COLLAR (3,000 P.S.I.) A ANCHOR RING C WATER MAIN a a a nd UNDISTURBED SECTION SOIL NOTE: 6" TO 16" MAINS = 12-N0. 7 BARS CONCRETE THRUST 20" TO 36" MAINS = 12-N0. 8 BARS COLLAR (3,000 P.S.I.) BARS PLACED AS SHOWN WATER TRENCH WALL MAIN TAMPED BACKFILL a a PLAN UNDISTURBED SOIL SCHEDULE PIPE DIAMETER CONCRETE THRUST COLLAR ANCHOR RING RINGS REQUIRED 551 PINEY FOREST ROAD DANVILLE, VA 24540 A B C 6",8",12" 3'-0" 3'_0" 2" ONE 16",18",20" 3'-6" 3'-6" 2" ONE 24" 4'-0" 2" TWO TYPICAL THRUST COLLAR INSTALLATION DETAIL NOT TO SCALE Dewberry Dewberry Engineers Inc. MWC DRAWN BY 551 PINEY FOREST ROAD DANVILLE, VA 24540 RSE APPROVED BY PHONE: 434.797.4497 FAX: 434.797.4341 LAB NCBELS # F-0929 APRIL, 2019 DATE U W Q 1 z MWC J z DATE BY CD J —_ z z O � 0 O ��W� W VJ Q Wv LL W uj< Q O2 C Q Lu i� Uz OQ O z O SEAL ••�.•.•.•.•.•,,�� �,.••`�H CAROl ',*% ;,�•�� 0F ESS l p�9�q•'•��.. • SEAL = 17502 FNc N��. O'c .,,,,c0T ....... 0, 1NW7»_1► SCALE AS NOTED REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 1 2/11/19 MWC ADDED DET. PER DEQ No. DATE BY Description REVISIONS TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 C19 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 C19 SHEET NO. OF E E C 1 Permanent Seeding PS Definition Section 6.11 Controlling runoff and erosion on disturbed areas by establishing perennial vegetative cover with seed. Purpose To reduce erosion and decrease sediment yield from disturbed areas, to permanently stabilize such areas in a manner that is economical, adapts to site conditions, and allows selection of the most appropriate plant materials. Conditions Where Practice Applies Fine -graded areas on which permanent, long-lived vegetative cover is the most practical or most effective method of stabilizing the soil. Permanent seeding may also be used on rough -graded areas that will not be brought to final grade for a year or more. Areas to be stabilized with permanent vegetation must be seeded or planted within 15 working days or 90 calendar days after final grade is reached, unless temporary stabilization is applied. Planning Considerations Vegetation controls erosion by protecting bare soil surfaces from raindrop impact and by reducing the velocity and volume of overland flow. The most common and economical means of stabilizing disturbed soils is by seeding grasses and legumes. The advantages of seeding over other means of establishing plants include the smaller initial cost, lower labor input, and greater flexibility of method. The disadvantages of seeding include: potential for erosion during the establishment stage, the need to reseed areas that fail to establish, seasonal limitations on suitable seeding dates, and a need for water and appropriate temperatures during germination and early growth. The probability of successful plant establishment can be maximized through good planning, knowledge of the soil characteristics (Table 6.11 a), selection of suitable plant materials for the site, good seedbed preparation, adequate liming and fertilization, and timely planting and maintenance. SELECTING PLANT MATERIALS Climate, soils, and topography are the major factors affecting the suitability of plants for a particular site. All three of these factors vary Y widel across North Carolina with the most significant contrasts occurring among the three major 9 9 9 1 physiographic regions of the state --Mountains, Piedmont, and Coastal Plain (Figure 6.11a). To simplify plant selection, a Key to Permanent Seeding Mixtures is presented in Table 6.11 b. To find seeding specifications for a specific site, follow this key through the different steps --region, slope, soil, and maintenance level --to theappropriate seedin number. Seeding mixtures 9 9 recommended here are designed for general use and are well proven in practical field situations Table 6.11a Suitablllty of Soil for Establishment of Low -maintenance Vegetation Criteria Suitability SiTE AREA DESCRIPTION Limiting Factors Good Fair Poor 7 days pH 5.&7.8 4.5-5.5 X4.5 Too add; possible Slopes steeper than 3:1 R 7 days y If slopes are 10' or less in length and are Ai, Mn, Fe toxicity Available �.tD .65-.10 s0.5 Too dry water capacity' All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW zones. Texhare' I, ail, si, d sd, Sid, d so. sic, a Too high in clay Is s Tao high in sand Coarse (310 in) N 5% 15.35 X35 Lg. stones restrict fragments' (r10 In) X3% 3-10 ?70 ;tLige; droughty depth to 40 20-40 X20 Insufficient bedrock On.) � - , roofing depth Salinity (mmhWcm) 5-16 X16 Excess salt 'Sandy day loam (sd), silly day loam (sid), dal' loam (d), sandy loam (d), silt loam (sll). Soamy sand xis), sandy clay (sc). silty dal' (sic), day (c). silt (sl). sand (s). and loan (0, 'Percent by weight Soturca: habena Sods Handibook, USDA -SCS, 1983. Coastal Plain Mountains Piedmont upper Middle Lower Tldewater Figaae 6.11 a Maio *IsbWaWL�a tegk= of Koch C=Lr a dilareg M chrome. sails and wpopraphy 6.11.2 (Tables 6.11c through 6.11v). They are designed to produce maximum stabilization and minimize the amount of maintenance and repair required. Land use is a primary consideration in planning permanent seedings. For this purpose land use, whether residential, industrial, commercial, or recreational, can be divided into two general categories: High -maintenance areas are mowed frequently, limed and fertilized regularly, and either (1) receive intensive use (e.g., athletic fields) or (2) require maintenance to an aesthetic standard (e.g., home lawns). Grasses used for these situations are long-lived perennials that form a tight sod and are fine -leaved and attractive in appearance. They must be well -adapted to the geographic area where they are planted and able to endure the stress of frequent mowing. Sites where high -maintenance vegetative cover is desirable include homes, industrial parks, schools, churches, and recreational areas. Low -maintenance areas are mowed infrequently or not at all, and do not receive lime and fertilizer on a regular basis. Plants must persist with little maintenance over long periods of time. Grass and legume mixtures are favored for these sites because legumes are a source of soil nitrogen. Mixed stands are also more resistant to adverse conditions. Sites suitable for low -maintenance vegetation include steep slopes, stream or channel banks, some commercial properties, and "utility" turf areas such as roadbanks. SEEDBED PREPARATION The soil on a disturbed site must be amended to provide an optimum environment for seed germination and seedling growth. The surface soil must be loose enough for water infiltration and root penetration. The pH (acidity or alkalinity) of the soil must be such that it is not toxic and nutrients are available --preferably between 6.0 and 6.5. Sufficient nutrients --added as fertilizer --must be present. It is as important to add lime as to add fertilizer. Lime is used primarily as a pH, or acidity modifier, but it also supplies calcium and magnesium, which are important plant nutrients. By increasing soil pH, it also makes other nutrients more available to plants. At the same time, it prevents aluminum toxicity by decreasing the solubility of soil aluminum. Many soils in North Carolina are high in aluminum, which stunts plant growth. After seed is in place, it must be protected with a mulch to hold moisture and modify temperature extremes, while preventing erosion during seedling establishment. STEEP SLOPES The operation of equipment is restricted on slopes steeper than 3:1, severely limiting the quality of the seedbed that can be prepared. The soil cannot be sufficiently worked, and amendments cannot be thoroughly incorporated. Provisions for establishment of vegetation on steep slopes can be made during final grading. In construction of fill slopes, for example, the last 4-6 inches might be left uncompacted. A loose, rough seedbed is essential. Large clods and stones provide irregularities that hold seeds and fertilizer. Cut slopes should be roughened (Practice 6.03, Surface Roughening). Where steepness prohibits the use of farm machinery, seeding methods are limited to broadcast or hydroseeding, with hydroseeding giving the most dependable results. Vegetation chosen for these slopes must not require mowing or other intensive maintenance. Using a hydraulic seeder, seed, fertilizer, wood fiber mulch, and a tacking agent can be applied in one operation. Good mulching practices are critical to protect against erosion on steep slopes. When using straw, anchor with netting or asphalt. On slopes steeper than 2:1, a rolled erosion control product may be required to protect the slope. Specifications SEEDBED REQUIREMENTS Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.11 a), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: Enough fine-grained (silt and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 inches of water to 1 inch of soil). Sufficient pore space to permit root penetration. Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. A favorable pH range for plant growth, usually 6.0-6.5. Freedom from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met--i.e., if the existing soil is too coarse, dense, shallow, or acidic to foster vegetation --special amendments are required. The soil conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Topsoiling. SOIL CONDITIONERS In order to improve the structure or drainage characteristics of a soil, the following materials may be added. These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat --Appropriate types are sphagnum moss peat, hypnum moss peat, reed -sedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned in storage piles for at least 6 months after excavation. Sand --clean and free of toxic materials. Vermiculite--horticultural9 rade and free of toxic substances. Rotted manure --stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust --free of stones and debris. Add 6 Ib of nitrogen to each cubic yard. Sludge --Treated sewage and industrial sludges are available in various forms; these should be used only in accordance with local, State, and Federal regulations. SPECIES SELECTION Use the Key to Permanent Seeding Mixtures (Table 6.11 b) to select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of species, including scientific names and characteristics, is given in Appendix 8.02. SEEDBED PREPARATION Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing is performed free of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county Agricultural Extension offices or from NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of final grading. Testing is also done by commercial laboratories. When soil tests are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11 c through 6.11v). Application rates usually fall into the following ranges: Ground agricultural limestone: Light -textured, sandy soils: 1- 1 1/2 tons/acre Heavy -textured, clayey soils: 2-3 tons/acre Fertilizer: Grasses: 800-1200 Ib/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-1200 Ib/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-6 inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slopes less than 3:1). Fill in or level depressions that can collect water. Broadcast seed into a freshly loosened seedbed that has not been sealed by rainfall. SEEDING Seeding dates given in the seeding mixture specifications (Table 6.11c through 6.11v) are designated as "best" or "possible". Seedings properly carried out within the "best" dates have a high probability of success. It is also possible to have satisfactory establishment when seeding outside these dates. However, as you deviate from them, the probability of failure increases rapidly. Seeding on the last date shown under "possible" may reduce chances of success by 30-50%. Always take this into account in scheduling land -disturbing activities. Use certified seed for permanent seeding whenever possible. Certified seed is inspected by the North Carolina Crop Improvement Association. It meets published North Carolina Standards and should bear an official "Certified Seed" label (Figure 6.11 b). Figure 6.11b Label displayed on all North Carolina certified seed. Labeling of non -certified seed is also required by law. Labels contain important information on seed purity, germination, and presence of weed seeds. Seed must meet State standards for content of noxious weeds. Do not accept seed containing "prohibited" noxious weed seed. Inoculate legume seed with the Rhizobium bacteria appropriate to the species of legume (Chapter 3, Vegetative Considerations). Apply seed uniformly with a cyclone seeder, drop -type spreader drill, cultipacker seeder, or hydroseeder on a firm, friable seedbed. When using a drill or cultipacker seeder, plant small grains no more than 1 inch deep, grasses and legumes no more than 1/2 inch. Equipment should be calibrated in the field for the desired seeding rate. When using broadcast -seeding methods, subdivide the area into workable sections and determine the amount of seed needed for each section. Apply one-half the seed while moving back and forth across the area, making a uniform pattern; then apply the second half in the same way, but moving at right angles to the first pass (Figure 6.11 c). Figure 6.11 c Suggested pattern for broadcasting seed and fertilizer (source: NCAES Bulletin AG -69). Cover broadcast seed by raking or chain dragging; then firm the surface with a roller or cultipacker to provide good seed contact. Mulch all plantings immediately after seeding (Practice 6.14, Mulching). HYDROSEEDING Surface roughening is particularly important when hydroseeding, as a roughened slope will provide some natural coverage for lime, fertilizer, and seed. The surface should not be compacted or smooth. Fine seedbed preparation is not necessary for hydroseeding operations; large clods, stones, and irregularities provide cavities in which seeds can lodge. Rate of wood fiber (cellulose) application should be at least 2,000 Ib/acre. Apply legume inoculants at four times the recommended rate when adding inoculant to a hydroseeder slurry. If a machinery breakdown of 1/2 to 2 hours occurs, add 50% more seed to the task, based on the proportion of the slurry remaining. This should compensate for damage to seed. Beyond 2 hours, a full rate of new seed may be necessary. Lime is not normally applied with a hydraulic seeder because it is abrasive. It can be blown onto steep slopes in dry form. A TABLE 6.110 SEEDING NO. 5P FOR: GRASS -LINED CHANNELSP aClICe Standards and 5peCl cations Seeding mixture Specia Rate (Iblacre) Tall fescue 200 (4-5 Ib/1,000 tt2) Nurse plants Between May 1 and Aug. 15 add 1511o/acre Sudangrass or 10lb/acre Ger- man millet. Before May 1, or after Aug. 15, add 40 Iblacre rye (grain). Seeding dates Best: Aug. 25 - Oct, Possible: Feb. -Apr, 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 40 lblacre rye grain and use a channel lining that offers maximum protec- tion. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 Iblacre ground agricultural limestone and 1,000 lb/acre 10.10-10 fertilizer. Operate tillage equipment across the waterway. Mulch Use jute, excelsior matting, or other effective, channel lining material to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 Ib/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they can clog drainage devices. Maintenance Inspect and repair mulch frequently. Refertilize in late winter of the follow- ing year- use soil tests or apply 150 Iblacre 10-10-10. Maw regularly to a height of 2-4 inches, 1Refer to Appendix 8.02for botanical names. 6.11.19 TABLE 6.11 K SEEDING NO. 1 P FOR STEEP �ractice Standards and Specifications SLOPES OR POOR SOILS: LO MAINTENANCE Seeding mixture Speciesl Rate (lb/acre) Tall fescue 100 Sericea lespedeza 30 Kobe lespedeza 10 Seeding notes 1. In Eastern Piedmont add 25 Iblacre Pensacola Bahiagrass or 10 Iblacre common Bermudagrass. Use common Bermudagrass only where it is un- likely to become a pest. 2. After Aug. 15 use unscarified Sericea seed. 3. Where a neat appearance is desired, omit sericea and substitute 40 lb/acre Bahiagrass or 15 Ib/acre Bermudagrass. 4. To extend spring seeding dates into June, add 15 Iblacre hulled Ber- mudagrass. However, it is preferable to seed temporary cover and seed fescue in Sept. Nurse plants Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 Ib/acre Sudangrass. Prier to May 1 or after Aug. 15, add 40 ib/acre rye (grain). Seeding dates Best Possible Fall: Aug. 25 - Sept.15 Aug, 20 - Oct. 25 Late winter: Feb. 15 - Mar- 21 Feb. 1 - Apr. 15 Fall is best for tall fescue and late winter for lespedezas. Overseeding of Kobe Iespedezaover fall -seeded tall fescue is very effective. Use unhulied Bermudagrass seed in fall. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground agricuftural limestone and 1,000 Ib/acre 10-10-10 fertilizer. Mulch Apply 4,000-5,0€10 lb/acre grain straw, or equivalent cover of another suitable mulching material. Anchor mulch by tacking with asphalt, roving, or netting. Netting is the preferred anchoring method on steep slopes. Maintenance Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertil- ize, and mulch damaged areas immediately. 'Refer to Appendix 8.02for botanical names. 3 Temg�r ry seedingTS Section 6.10 Definition Planting rapid -growing annual grasses, small grains, or legumes to provide initial, temporary cover for erosion control on disturbed areas. To temporarily stabilize denuded areas that will not be brought to final grade for a period of more than 21 calendar days. Temporary seeding controls runoff and erosion until permanent vegetation or other erosion control measures can be established. In addition, it provides residue for soil protection and seedbed preparation, and reduces problems of mud and dust production from bare soil surfaces during construction. Conditions Where Practice Applies On any cleared, unvegetated, or sparsely vegetated soil surface where vegetative cover is needed for less than 1 year. Applications of this practice include diversions, dams, temporary sediment basins, temporary road banks, and topsoil stockpiles. Planning Considerations Annual plants, which sprout and grow rapidly and survive for only one season, are suitable for establishing initial or temporary vegetative cover. Temporary seeding preserves the integrity of earthen sediment control structures such as dikes, diversions, and the banks of dams and sediment basins. It can also reduce the amount of maintenance associated with these devices. For example, the frequency of sediment basin cleanouts will be reduced if watershed areas, outside the active construction zone, are stabilized. Proper seedbed preparation, selection of appropriate species, and use of quality seed are as important in this Practice as in Practice 6.11, Permanent Seeding. Failure to follow established guidelines and recommendations carefully may result in an inadequate or short-lived stand of vegetation that will not control erosion. Temporary seeding provides protection for no more than 1 year, during which time permanent stabilization should be initiated. Specifications Complete grading before preparing seedbeds, and install all necessary erosion control practices such as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using a ripper, harrow, or chisel plow. SEEDBED PREPARATION Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose, and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming --Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the 6.10 6 rate of 1 to 1 1/2 tons/acre on coarse-textured soils and 2-3 tons/acre on fine -textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer --Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 Ib/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening --If recent tillage operations have resulted in a loose surface, additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding(Practice 6.03, Surface Roughening). PLANT SELECTIN Select an appropriate species or species mixture from Table 6.10a for seeding in late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. In the Mountains, December and January seedings have poor chances of success. When it is necessary to plant at these times, use recommendations for fall and a securely tacked mulch. SEEDING Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hydroseeder. Use seeding rates given in Tables 6.10a -6.10c. Broadcast seeding and hydroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. MULCHING The use of an appropriate mulch will help ensure establishment under normal conditions, and is essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site conditions include: seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), slopes steeper than 3:1, excessively hot or dry weather, adverse soils (shallow, rocky, or high in clay or sand), and areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). 6.10.2 Practice Standards and Specifications Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow. Protect from traffic as much as possible. References Site Preparation 6.03, Surface Roughening 6.04, Topsoiling Surface Stabilization 6.11, Permanent Seeding 6.14, Mulching Appendix 8.02, Vegetation Tables SPECIAL SLOPE SEEDING SLOPE PROTECTION SHALL REQUIRE IMMEDIATE STABILIZATION OF ALL DENOTED GRADED SLOPES IN ACCORDANCE WITH THE SEEDING SPECIFICATION. STABILIZATION AND SEEDING SHALL OCCUR IMMEDIATELY AFTER THE GRADING OF THE SLOPE. MULCH AND ANCHOR SHALL BE APPLIED AT THE RATE SPECIFIED. SURFACE ROUGHENING FOR CUTS, FILLS, AND GRADED SLOPES MAKE MOWED SLOPES NO STEEPER THAN 2:1 UNLESS INDICATED ROUGHEN THESE AREAS TO SHALLOW GROOVES BY NORMAL TILLING, DISKING, HARROWING, OR USE OF CULTIPACKER-SEEDER MAKE THE FINAL PASS OF ANY SUCH TILLAGE IMPLEMENT ON THE CONTOUR. MAKE GROOVES FORMED BY SUCH IMPLEMENTS CLOSE TOGETHER (LESS THAN 10 INCHES) AND NOT LESS THAN 1 INCH DEEP. ROUGHENING WITH TRACKED MACHINERY LIMIT ROUGHENING WITH TRACKED MACHINERY TO SANDY SOILS TO AVOID UNDUE COMPACTION OF THE SOIL SURFACE. OPERATE TRACKED MACHINERY UP AND DOWN THE SLOPE TO LEAVE HORIZONTAL DEPRESSIONS IN THE SOIL DO NOT BACK -BLADE DURING THE FINAL GRADING OPERATION. SEEDING - IMMEDIATELY SEED, AND MULCH, AND ANCHOR ROUGHENED AREAS TO OBTAIN OPTIMUM SEED GERMINATION AND GROWTH. PERIODICALLY CHECK THE SEEDED SLOPES FOR RILLS AND WASHES. FILL THESE AREAS SLIGHTLY ABOVE THE ORIGIANL GRADE, THEN RESEED AND MULCH AS SOON AS POSSIBLE. NPDES Stomrvrater Discharge Permit for Conatruetton Acllvdres (NCGdt) NCDENR/Division of Water aaality NEW STABILIZATION TIMEFRAMES (Eflrective Aug. 3, 20111 SiTE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS FILTER FABRIC Perimeter dikes, swates, ditches, slopes 7 days None High Quality Water (H QW) Zones 7 days None Slopes steeper than 3:1 R 7 days y If slopes are 10' or less in length and are FAX: 434.797.4341 APRIL, 2019 not steeper than 2:1, 14 days are allowed. R Y OSlopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW zones. TYPICAL STABILIZATION TIMEFRAMES NOT TO SCALE SEEDBED PREPARATIONS 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL MINIMUM 4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A DEPTH OF 6 INCHES. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER DEBRIS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURE LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. (SEE BELOW*) 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING. ANCHOR MULCH AGAINST WIND. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS DURING PLANTING SEASON IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, RE-ESTABLISH FOLOWING ORIGINAL LIME, FERTILIZER, AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENENCE TREATMENT AND FERTILIZER AFTER PERMANENT COVER IS ESTABLISHED. APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) FERTILIZER - 1,000 LBS./ACRE OF 10-10-10 SUPERPHOSPHATE - 500 LBS./ACRE AT 20% ANALYSIS MULCH - 2 TONS/ACRE OF SMALL GRAIN STRAW ANCHOR - ASPHALT EMULSION AT 0.1 GAL/SY (10 GAL/SQ. FT.) 5 Sediment Fence $F XX Definition VARIES 8' MAX. _ 7STAY WIRES MIN. 14 GAUGE ELEVATION STEEL POST Section 6.62 Dewberry' W MWC TO" MIN. WIDTH W < FILTER FABRIC RSE APPROVED BY FILL SLOPE 551 PINEY FOREST ROAD Lu DANVILLE, VA 24540 Iluo-) CGROUND LINE ANCHOR FILTER FAX: 434.797.4341 APRIL, 2019 NCBELS # F-0929 FABRIC MIN. 8" DEEP & 4" FORWARD ALONG X14„ THE TRENCH SECTION Section 6.62 Dewberry' W MWC DRAWN BY W < Dewberry Engineers Inc. RSE APPROVED BY C7 551 PINEY FOREST ROAD Lu DANVILLE, VA 24540 Z PHONE: 434.797.4497 J FAX: 434.797.4341 APRIL, 2019 NCBELS # F-0929 GENERAL NOTES: 1. SILT FENCE SHALL BE INSTALLED OUTSIDE TOE OF EARTHFILL EMBANKMENTS. MAY ALSO BE INSTALLED AROUND ALL STORM DRAIN INLETS, & MANHOLES AS DIRECTED. 2. WIRE SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL HAVE A MAXIMUM MESH SPACING OF 6". 3. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED SECURELY TO THE WIRE. 4. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF SELF -FASTENER ANGLE STEEL TYPE. NOTE: THE FILTER FABRIC SHALL MEET THE FOLLOWING REQUIREMENTS: A) ECS IS NOT LARGER THAN U.S. STANDARD SIEVE NO.30 B) GRAB STRENGTH 90-120 LB MAINTENANCE: 1. INSPECT SILT FENCE ONCE PER WEEK AND AFTER EVERY RAINFALL. 2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR ANY DAMAGE TO FENCE. SILTFENCE SILTFENCE TOP VIEW SILTFENCE-\ �1'-6" MIN. Z - O 2 ' ! - W _J S MAX. PLOr SEDIMENT STRUCTURAL CONTROL STONE STONE CROSS SECTION 4' - VIEW FRONT VIEW DITCHLINE TURNOUT DETAIL N.T.S. 1. NOTE: STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR EROSION CONTROL PURPOSES. 2. SEDIMENT CONTROL STONE SHALL BE NO.5 OR NO. 57 STONE. SEEDING SCHEDULE IN PIEDMONT AREAS SILTFENCE SILTFENCE 1. LIME, SEED AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF MATERIALS TO BE APPLIED PER ACRE: TEMPORARY SEEDING FERTILIZER TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE STRAW MULCH DATE RYE (GRAIN) 120 LBSJACRE 750 LBSJACRE 2000 LBS./ACRE 4000 LBSJACRE JAN. 1 - MAY 1 KOBE LESPEDEZA * 50 LBSJACRE GERMAN MILLET ** 40 LBS./ACRE 750 LBSJACRE 2000 LBSJACRE 4000 LBS./ACRE MAY 1 -AUG. 15 RYE (GRAIN) 120 LBS./ACRE 1000 LBS./ACRE 2000 LBS./ACRE 4000 LBSJACRE AUG. 15 - DEC. 30 PERMANENT SEEDING FERTILIZER *** TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE *** STRAW MULCH DATE TALL FESCUE 200 LBS./ACRE 1000 LBS./ACRE 4000 LBS./ACRE 6000 LBS./ACRE AUG. 20 - OCT. 25 KOBE LESPEDEZA 20 LBSJACRE FEB. 1 -APR. 15 SERICEA LESPEDEZA 60 LBS./ACRE OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBS/ACRE. QUANITIY OF FERTILIZER AND LIME SHALL BE CONFIRMED BY SOILS TEST. 2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. 3. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. 4. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. 5. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. 6. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN UNDISTURBED FOR MORE THAN FIFTEEN (15) WORKING DAYS OR THIRTY (30) CALENDAR DAYS, WHICHEVER IS LESS. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS OF ESTABLISHING FINAL GRADES. PROVIDE PERMANENT SEEDING WITHIN FIFTEEN (15) WORKING DAYS OR SIXTY (60) CALENDAR DAYS, WHICHEVER IS LESS, OF ESTABLISHING FINAL GRADES. SLOPES SHALL BE SEEDED WITHIN TWENTY-ONE (21) CALENDAR DAYS. 7. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION. 8. CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. U Q Z LL1J Z J Z Z <�W� W �0 w�QUQp� a LU �m�� Uz O a � U Z 0 SEAL KEY PLAN SCALE 4.1 .••••�����NC * RIel ////' -.. ••Q�oFESS/p�9� , SEAL 17502 • �NG I N E Qtr • ENR�Q,,,. AS NOTED No. I DATE I BY I Description REVISIONS TITLE EROSION AND SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C20 OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE EROSION AND SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C20 OF E C Rolled erosion Coftol Products ORECPO Section 6.17 Definition Rolled erosion control products are manufactured or fabricated into rolls designed to reduce soil erosion and assist in the growth, establishment and protection of vegetation. Examples of RECP's are blankets, nets, and matting. Purpose Erosion control mats and blankets are intended to protect soil and hold seed and mulch in place on slopes and in channels so that vegetation can become well established. Turf reinforcement mats can be used to permanently reinforce grass in drainage ways during high flows. Nets are made of high tensile material woven into an open net which overlays mulch materials. Blankets are made of interlocking fibers, typically held together by a biodegradable or photodegradable netting (for example, excelsior or straw blankets). They generally have lower tensile strength than nets, but cover the ground more completely. Coir (coconut fiber) fabric comes as both nets and blankets. Conditions Where Practice Applies Rolled Erosion Control Products (RECP's) should be used to aid permanent vegetated stabilization of slopes 2:1 or greater and with more than 10 feet of vertical relief. RECP's should also be used when mulch cannot be adequately tacked and where immediate ground cover is required to prevent erosion damage. RECP's should be used to aid in permanent stabilization of vegetated channels when runoff velocity will exceed 2 ft/sec on bare earth during the 2 -year rainfall event that produces peak runoff. The product selected must have a permissible shear stress that exceeds the shear stress of the design runoff event. Maintenance 1. Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain foll event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover as established. --------------- IN CHANNELS OR SLOPES, ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH. 18" OVERLAP ANCHOR NETTING JOIN STRIPS BY ANCHORING IN A 6" TRENCH. AND OVERLAPPING. MAINTENANCE REQUIREMENTS: 1. CONTRACTOR SHALL INSPECT MULCHES PERIODICALLY, AND AFTER RAINSTORMS CHECK FOR RILL EROSION. WHERE EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR SLOPE GRADE, RESEED, AND REINSTALL MULCH AND JUTE MATTING. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. B. 41\�iJ A. 11v LI -`*_ 7i? - B 10.5" TYPICAL STAPLES NTS 0 PLACE STAPLES 1.5' TO T APART AS REQUIRED TO KEEP THE MAT FIRMLY PRESSED \ INTO THE SOIL. F. PRESS ENDS OF MAT 4" INTO THE SOIL AROUND STRUCTURES AND STAPLE SECURELY. DETAIL FOR STABILIZING CHANNEL WITH EXCELSIOR MAT NOTES: NTS A. BURY THE TOP END OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. B. TAMP THE TRENCH FULL OF SOIL. SECURE WITH A ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. C. OVERLAP -BURY UPPER END OF LOWER STRIP AS IN "A" AND "B". OVERLAP END OF TOP STRIP 4" AND STAPLE. D. EROSION STOP -FOLD OF MAT BURIED IN SILT TRENCH AND TAMPED, DOUBLE ROW OF STAPLES. A CHECK DAM CD DEFINITION SMALL TEMPORARY STONE DAMS CONSTRUCTED ACROSS A DRAINAGEWAY. PURPOSE TO REDUCE EROSION IN A DRAINAGE CHANNEL BY RESTRICTING THE VELOCITY OF FLOW IN THE CHANNEL. CONDITIONS WHERE THIS PRACTICE MAY BE USED AS A TEMPORARY OR EMERGENCY PRACTICE APPLIES MEASURE TO LIMIT EROSION BY REDUCING FLOW IN SMALL OPEN CHANNELS. LIMIT DRAINAGE TO 2 ACRES OR LESS. DO NOT USE CHECK DAMS IN LIVE STREAMS. CONSTRUCTION 1. PLACE STONE AT THE LOCATION SHOWN ON THE PLAN ON A FILTER SPECIFICATIONS FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FT. BEYOND THE DITCH BANKS (FIG. 6.83b) TO KEEP OVERFLOW WATER FROM UNDERCUTTING THE DAM AS IT RE-ENTERS THE CHANNEL. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL DOWNSTREAM FROM THE LOWEST CHECK DAM, CONSIDERING THAT WATER WILL FLOW OVER AND AROUND THE DAM. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT CHANNEL APPURTENANCES, SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS INSTALLING A PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 12" OF NCDOT #5 OR #57 WASHED STONE ro.11z FILTER FABRIC 3 4' TO 6' 2' MAX. AT CENTER CLASS B RIP -RAP 9" MINIMUM 1.5' MIN. �.e°"'. .=b` �.e`e'• �:ego e FILTER FABRIC #57 WASHED STONE NOTES: CROSS-SECTION VIEW 1. ROCK CHECK DAMS SHALL BE INSTALLED IN DITCH LINES IMMEDIATELY BELOW DISTURBED AREAS. 2. HEIGHT AND WIDTH DETERMINED BY EXISTING TOPOGRAPHY. 3. KEY RIP RAP INTO THE DAM FOR STABILIZATION. TYPICAL CHECK DAM DETAIL (TEMPORARY) N.T.S. CROSS SECTION SEEINSETS A AND B CHANNEL BOTTOM WIDTH T<)., o 0 000 00 o O o PLAN VIEW NOTES: 1. USE MINIMUM 12 INCH. DIAMETER CLASS B RIPRAP EXCELSIOR WATTLE. 2. USE 2 FT. WOODEN STAKES WITH A 2 IN. ----------- NOMINAL CROSS SECTION. APRIL, 2019 3. ONLY INSTALL WATTLE TO A HEIGHT IN and disposal of spoil. DITCH SO FLOW WILL NOT WASH AROUND f around the pipe inlet. The stone should be built up higher on THE WATTLE AND SCOUR DITCH SLOPES AND 1 AS DIRECTED. 4. INSTALL A MINIMUM OF 2 UP SLOPE STAKES feet, but also 1 foot lower than the shoulder of the 4 DOWN TAKES AT AN ANGLE PTOSBOTTOM STAKES �\TOD STAPLES 3. A 1 foot thick layer of NC DOT #5 or #57 stone should WEDGE WATTLE OF DITCH. _,7 INSET A INSET B 5. PROVIDE STAPLES OF 0.125 IN. DIAMETER m outside of the stone horseshoe 18 inches below natural STEEL WIRE FORMED INTO A U SHAPE NOT grade. o O LESS THAN 12 IN. IN LENGTH. 6. INSTALL STAPLES APPROXIMATELY EVERY 1 area properly, and stabilize with ground cover. LINEAR FOOT ON BOTH SIDES OF WATTLE Inspect rock pipe inlet protection at least weekly AND AT EACH END TO SECURE IT TO THE and after each significant ('/2 inch or greater) rainfall event SOIL. TYPICAL WATTLE DETAIL (TEMPORARY) NOT TO SCALE sediment has accumulated to one-half the design depth of STEP SEQUENCE Temporary Gravel Construction Entrance/Exit CE Section 6.06 Definition A graveled area or pad located at points where vehicles enter and leave a construction site. Purpose To provide a buffer area where vehicles can drop their mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Practice Applies Wherever traffic will be leaving a construction site and moving directly onto a public road or other paved off-site area. Construction plans should limit traffic to properly constructed entrances. Design Criteria Aggregate Size --Use 2-3 inch washed stone. Dimensions of gravel pad -- Thickness: 6 inches minimum Width: 12 -feet minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50 -feet minimum Location --Locate construction entrances and exits to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. 6.06.1 1 50' MIN. EH FILTER CLOTH- g" MIN.I SIDE ELEVATION EXISTING PAVEMENT 5:1 MOUNTABLE BERM (OPTIONAL) PLAN VIEW Washing --If conditions at the site are such that most of the mud and sediment are not removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade It. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 -inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. References Runoff Conveyance Measures 6.30, Grass -lined Channels Sediment Traps and Barriers 6.60, Temporary Sediment Trap 6.06.2 ❑P TYPICAL INLET/OUTLET PROTECTION NOTE: NOT TO SCALE 1. FOR OUTLET TYPE "B", PLACE RIP -RAP FROM TOP OF BANK TO TOP OF BANK IN RECEIVING CHANNEL. _ o(JO � 1-60yo _ ° (Z50°° O° 000 00 o°0O060 o�o�0000C 00 3Do Do 026080 60800600 W �O°° O° �qo"°°° �°D°�0Q0 0°00 O( PLAN ^�0000� 0 La 11-1 oV8o,u00���SECTION "0 06100r0� d `FILTER LAYER -FILTER FABRIC OR 6" *5 WASHED STONE TYPE A - PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL RIPRAP OUTLET PROTECTION: TING TIENT - FABRIC OR 6" #5 WASHED STONE TYPE B - PIPE OUTLET TO DEFINED CHANNEL ADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL SHALL BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER SHALL CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE AS SPECIFIED IN THE SCHEDULE. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES ONCE PER WEEK AND AFTER EACH RAINFALL EVENT (1/2 INCH OR GREATER) TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. 5 Rock Pipe Inlet Protection CIP - Section 6.55 Definition A horseshoe shaped rock dam structure at a pipe inlet with a sediment storage area around the outside perimeter of the structure. Purpose To prevent sediment from entering, accumulating in and being transferred by a culvert or storm drainage system prior to stabilization of the disturbed drainage area. This practice allows early use of the storm drainage system. Conditions Where Practice Applies Rock pipe inlet protection may be used at pipes with a maximum diameter of 36 inches. This inlet protection may be used to supplement additional sediment traps or basins at the pipe outlet, or used in combination with an excavated sediment storage area to serve as a temporary sediment trap. Pipe inlet protection should be provided to protect the storm drainage system and downstream areas from sedimentation until permanent stabilization of the disturbed drainage area. Do not install this measure in an intermittent or perennial stream. Planning Considerations When construction on a project reaches a stage where culverts and other storm drainage structures are installed and many areas are brought to the desired grade, there is a need to protect the points where runoff can leave the site through culverts or storm drains. Similar to drop and curb inlets, culverts receiving runoff from disturbed areas can convey large amounts of sediment to lakes or streams. Even if the pipe discharges into a sediment trap or basin, the pipe or pipe system itself may clog with sediment. Design Criteria When used in combination with an excavated sediment storage area to serve as a temporary sediment trap, the design criteria for temporary sediment traps must be satisfied. The maximum drainage area should be 5 acres, and 3600 cubic feet of sediment storage per acre of disturbed drainage area should be provided. The minimum stone height should be 2 feet, with side slopes no steeper than 2:1. The stone "horseshoe" around the pipe inlet should be constructed of Class B or Class I riprap, with a minimum crest width of 3 feet. The outside face of the riprap should be coved with a 12 -inch thick layer of #5 or #57 washed stone. In preparing plans for rock pipe inlet protection, it is important to protect the embankment over the pipe from overtopping. The top of the stone should be a minimum of 1 foot below the top of the fill over the pipe. The stone should tie into the fill on both sides of the pipe. The inside toe of the stone should be no closer than 2 feet from the culvert opening to allow passage of high flows. The sediment storage area should be excavated upstream of the rock pipe inlet protection, with a minimum depth of 18 inches below grade. CLASS B RIPRAP RIPRAP HEADWALL �o FZow STORAGE AREA AREAS TO BE DISTURBED PIPE INVERT (CUT, FILLED, ETC.) 1' 2'-1 Filter Berm NC DOT #5 or /57 washed stone INVERT OF PIPE RIPRAP HEADWALL 1' MIN. HEIGHT FROM ROAD SHOULDER C NATURAL \ GROUND Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U Q Z WJ Z J Z Z < >_WCc:W W� w�QUQp� 2 LU a >m0-� Uz O a � U Z 0 SEAL KEY PLAN SCALE CA 110 Q�oFESS/p41- . SEAL 17502 `ANG I NE�-� Qom. ENR�Q,,,. AS NOTED No. I DATE I BY I Description REVISIONS T<)., o 0 000 00 o O o DRAWN BY ti "tow 2 00000 00 �0 RSE CLASS B RIPRAP NCDOT #5 OR #57 WASHED STONE Figure 6.55a Rock pipe inlet protection plan view and CHECKED BY cross-section view Construction Specifications APRIL, 2019 1. Clear the area of all debris that might hinder excavation and disposal of spoil. 2. Install the Class B or Class I riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 11 feet. The minimum height should be 2 feet, but also 1 foot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4. The Y Y sediment storage area should be excavated around the m outside of the stone horseshoe 18 inches below natural m grade. o O 5. When the contributing drainage area has been stabilized, fill depression and establish final grading elevations, compact o O area properly, and stabilize with ground cover. Maintenance Inspect rock pipe inlet protection at least weekly and after each significant ('/2 inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). References Inlet protection 6.52, Block and Gravel Inlet Protection (Temporary) Sediment Trap and Barriers 6.60, Temporary Sediment Trap Surface Stabilization 6.15, Riprap North Carolina Department of Transportation Erosion & Sedimentation Guidelines for Division Maintenance Operation, 1993. Virginia Erosion and Sediment Control Handbook. 1992. STD & SPEC 3.08, Culvert Inlet Protection. pages III -46 - III -51 (Culvert Inlets Sediment Trap). Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U Q Z WJ Z J Z Z < >_WCc:W W� w�QUQp� 2 LU a >m0-� Uz O a � U Z 0 SEAL KEY PLAN SCALE CA 110 Q�oFESS/p41- . SEAL 17502 `ANG I NE�-� Qom. ENR�Q,,,. AS NOTED No. I DATE I BY I Description REVISIONS TITLE EROSION AND SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C21 OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE EROSION AND SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C21 OF E C 0 STD & SPEC 3.25 UTILITY STREAM CROSSING USC NOTE: FOR STREAMS LESS THAN 10' WIDE, CONTRACTOR SHALL USE THE FLUME CROSSING METHOD. FOR STREAMS GREATER THAN 10' IN WIDTH, CONTRACTOR SHALL USE THE COFFERDAM METHOD. REF. EROSION SEDIMENT CONTROL HANDBOOK SECTION 3.25. FLUME PIPE CROSSING 1. CONSTRUCTION SHALL LAST LESS THAN 72 HOURS. 2. THE FLUME PIPE CROSSING MUST BE MADE OPERATIONAL PRIOR TO THE START OF CONSTRUCTIONJ. 3. THE MATERIALS USED (CULVERT(S), STONE AND FILTER FABRIC MUST MEET THE PHYSICAL CONSTRAINTS OF THOSE USED IN VEHICULAR STREAM CROSSING, STD. & SPEC. 3.24 4. A LARGE FLUME PIPE (OR CULVERT) OF AN ADEQUATE SIZE TO SUPPORT NORMAL WATER CHANNEL FLOW (SEE TABLE 3.24-A) SHALL THEN BE INSTALLED IN THE STREAM BED ACROSS THE PORPOSED PIPE LINE TRENCH CENTERLINE. NCDOT #1 COARSE AGGREGATE (MIN. SIZE) OR RIP -RAP SHALL BE PLACED CLOSE TO EACH END OF THE FLUME PIPE SO AS TO DAM OFF THE CREEK FORCING THE WATER TO FLOW THROUGH THE FLUME PIPE (SEE PLATE 3.25-3. 5. THE ENTRAPPED WATER CAN THEN BE PUMPED FROM THE CREEK WITHIN THE DAMMED OFF AREA AND IN THE PROPOESD TRENCH CENTERLINE INTO AN APPROVED DEWATERING STRUCTURE (SEE STD. & SPEC.3.26). THE TRENCH CAN THEN BE DUG UNDER THE FLUME PIPE. AFTER PIPE SECTIONS ARE INSTALLED, THE DITCH WILL BE BACKFILLED AND RESTABLIZATION SHALL BE CARRIED OUT. 6. RESTABILZATION SHALL CONSIST OF THE INSTALLATION OF UNDERGROUND RIP -RAP ON ALL DISTURBED STREAMBANK AREAS (OR ON THE AREA 6 FEET ON BOTH SIDES OF THE CENTERLINE OF THE UTILITY TRENCH, WHICHEVER IS GREATER) WITH SLOPES OF 3:1 OR GREATER. REFER TO STD. & SPEC. 3.19, RIPRAP, FOR INSTALLATION REQUIREMENTS. FOR SLOPES OF 3:1 OR LESS, VEGETATIVE STABILIZATION MAY BE USED, PENDING APPROVAL BY THE PLAN -APPROVING AUTHORITY OR INSPECTION AUTHORITY. STABILIZATION OF IT'S STREAMBED AND BANKS AND THE APPROACH AREAS SHOULD OCCUR IMMEDIATELY FOLLOWING THE ATTAINMENT OF FINAL GRADE. 7. AFTER COMPLETION OF BACKFILLING OPERATION AND RESTORATION OF THE STREAM/CREEK BANKS AND LEVELING OF STREAM BED, THE FLUME PIPE CAN THAN BE REMOVED. THE GRAVEL CAN BE REMOVED OR SPREAD IN THE STREAM BED DEPENDING ON PERMIT REQUIREMENTS. SEDIMENT CONTROL IN APPROACH AREAS SHALL NOT BE REMOVED UNTIL ALL CONSTRUCTION IS COMPLETED IN STREAM/CREEK CROSSING AREA. ALL GROUND CONTOURS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION. FLUME PIPE CR 0 S SING 0 T y EROSION CONTROL B v MEASURES TO BE LOCATED BELOW APPROACH AREAS o o oevv WATER FLOW a o FLUME TEMPORARY SEEDING RECOMMENDATIONS PIPE o v a SPECIES RATE (LBS./ACRE) AUG. 15 - DEC. 31 RYE (GRAIN) 120 JAN. 1 - APR. 15 FLOW _l o .0 EXCAVATED TRENCH A A EROSION CONTROL MEASURES TO BE B LOCATED BELOW APPROACH AREAS PLAN VIEW 8ANK I EXCAVATED TRENCH SECTION "A -A" CREEK BANK CREEK BANK AGGRECATE WATER LEVEL FLUME PIPE PROPOSIM RIPELME SECTION "B -B" 2 3 GENERAL CONSTRUCTION NOTES: 1. GRADING OF THE STREAM BANK SHALL BE CONDUCTED ABOVE THE NORMAL FLOW ELEVATION, WHICH ASSURES NO DISTURBANCE AT OR BENEATH WATER LEVEL. 2. ANY DEPOSITION OF EXCAVATED MATERIALS IN UPLAND AREAS AND ALL EARTHWORK OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER AS TO PREVENT THE EROSION OF THESE MATERIALS AND PRECLUDE THEIR ENTRY INTO STATE WATERS. RESTORED STREAMS SHALL BE PROTECTED FROM SEDIMENTATION FROM DISTURBED BANKS BY THE INSTALLATION OF SILT FENCING OR TEMPORARY EARTHEN BERMS WITH ROCK CHECK OUTLETS ALONG THE TOE OF THE BANK SLOPE ABOVE NORMAL WATER FLOW LEVEL. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE PRIOR TO CLEARING AND GRADING AND SHALL BE MAINTAINED IN GOOD WORKING ORDER TO MINIMIZE IMPACTS TO STATE WATERS IN ACCORDANCE WITH THE CURRENT EDITION OF THE "VIRGINIA EROSION AND SEDIMENTATION HANDBOOK. BANKS SHALL BE IMMEDIATELY STABILIZED PER PLANTING REQUIREMENTS AND SPECIFICATIONS INDICATED ON THESE PLANS. 3. STREAM BANKS TO BE RESTORED SHALL BE GRADED AS SHOWN ON PLANS. 4. EXCAVATION EQUIPMENT WILL AVOID WORKING WITHIN THE STREAM. WHEN THE NEED IS UNAVOIDABLE, DIVERSION DIKES, PORTABLE DAMS AND PUMPS WILL BE UTILIZED. NO EXCAVATION EQUIPMENT WILL BE ALLOWED TO OPERATE WITHIN A FLOWING (LIVE) STREAM. 5. TRENCHES SHALL REMAIN OPEN ONLY DURING WORKING HOURS. TRENCHES WILL NOT BE LEFT OPEN OVER NIGHT 6. A MINIMUM OF THE TOP 6 INCHES OF A TRENCH IN WETLAND AREAS SHALL BE BACKFILLED WITH TOPSOIL FROM THE TRENCH. 7. TIMBER CONSTRUCTION MATS SHALL BE USED FOR OPERATING EQUIPMENT IN WETLAND AREAS TO MINIMIZE COMPACTION. 8. RESTORATION AND SEEDING SHALL BE IMPLEMENTED PER THE PLANTING NOTES AND TABLES ON THIS SHEET. 9. WHILE CROSSING CASCADE CREEK, THE STREAM MAY BE CROSSED UTILIZING A COFFERDAM AND MODIFIED PUMP AROUND OF MAIN CHANNEL. CONTRACTOR SHALL UTILIZE SUMP PUMP WITH A SCREEN ON THE INTAKE HOSE. DISCHARGE HOSE 1' 1' Note: Construct depression with TO CHECK DAM 1 1' base 1' (min) wider than silt bag. SILT BAG TOP VIEW TO CHECK DAM 6" (min) LEVEL GROUND SILT BAG PROFILE VIEW Note: Fill and seed the silt bag depression when pump around operation is completed. SOURCE: Va. DSWC PLATE. 3.25-3 COFFERDAM UTILITY CROSSING 1. CONSTRUCTION SHALL BE PERFORMED IN LOW FLOW PERIODS. 2. CROSSING SHALL BE ACCOMPLISHED IN A MANNER THAT WILL NOT PROHIBIT THE FLOW OF THE STREAM. 3. AS WITH ALL UTILITY LINE CROSSINGS, APPROACH AREAS MUST BE CONTROLLED WITH MEASURES SUCH AS SILT FENCE OR STRAW BALES. 4. REMOVE LARGE ROCKS, WOODY VEGETATION, OR OTHER MATERIAL FROM THE STREAMBED AND BANKS THAT MAY GET IN THE WAY OF PLACING THE RIP -RAP, SANDBAGS, SHEET METAL PILINGS, OR WOOD PLANKS OR INSTALLING THE UTILITY PIPE OR LINE. 5. FORM A COFFERDAM BY PLACING THE RIP -RAP (OR OTHER NON -ERODIBLE MATERIALS) IN A SEMICIRCLE ALONG THE SIDE OF THE STREAM IN WHICH THE UTILITY INSTALLATION WILL BEGIN. IT MUST BE SURROUNDED AND UNDERLAIN WITH FILTER CLOTH AS SHOWN IN PLATE 3.25-4. THE HEIGHT OF AND AREA WITHIN THE DAM WILL DEPEND UPON THE SIZE OF THE WORK AREA AND THE AMOUNT OF STREAM FLOW IS SUCCESSFULLY DIVERTED BY THE COFFERDAM, DEWATER THE WORK AREA AND STABILIZE IT WITH AGGREGATE (NCDOT #57 OR #68 COARSE AGGREGATE) OR SAND. MAKE SURE TO DISCHARGE THE WATER INTO A SEDIMENT TRAPPING DEVICE (SEE DEWATERING STRUCTURE, STD. & SPEC. 3.26). 6. INSTALL THE UTILITY PIPE OR LINE IN HALF THE STREAMBED AS NOTED IN PLATE 3.25-4. REMOVE THE RIP -RAP OR OTHER MATERIALS AND BEGIN PLACING THEM ON THE OTHER SIDE OF THE STREAM. COFFERDAM CROSSING EXISTING STREAM WIDTH W 1/2 W (MIN. RIPRAP OR OTHER NON- ERODIBLE A MATERIAL A (D) TRENCHUNE o W AGGREGATE OR FLOW SAND Of FILTER CLOTH PLAN DEWATERING DEVICE, SEE STD. & SPEC. 3.26 PERIMETERPERIMETER enumro c I _ W _ CONTROLS * (D MINII BE WIDTH (W) OF THE STREAM. SECTION A -A PLATE. 3.25-4 DISCHARGE HOSE LEVEL GROUND TO CHECK DAM PUMPS SHOULD DISCHARGE ONTO A STABLE VELOCITY APPROVED DEWATERING DEVICE (SILT BAG) OR DISCHARGE TO TEMPORARY SEDIMENT TRAP DISCHARGE HOSES P DEWATERING PUMP / FLOW INTAKE HOSE CLEAN WATER DIKE T DIKE .. WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY IMPERVIOUS SHEETING DISSIPATOR MADE OF RIP RAP OR SANDBAGS BASE FLOW + 1 FOOT PLAN VIEW STREAM DIVERSION PUMPS (ALT. - USE THROUGH DIKE GRAVITY PIPING IN LIEU OF PUMP.) INTAKE HOSE FLOW f� - • . SUMP -HOLE OR POOL (12" to 18" DEEP 2' DIA.) WORK AREA (2 FOOT MIN.) NOTE: ESTIMATED MINIMUM PUMP SIZE NEEDED FOR BASE FLOW IS 2" PUMP. CONTRACTOR IS RESPONSIBLE FOR SIZING SECTION A -A PUMP AND MAINTAINING WORK "IN THE DRY". CROSS SECTION OF SANDBAG DIKE NOTE: CONTRACTOR MAY UTILIZE A PORTABLE DAM IN LIEU OF SAND BAGS IF DESIRED. TEMPORARY PUMP AROUND 12' CABLE TIES 12"X12" TIMBER( - CONNECTIONS 12" MAT X. T TIMBER MATTING DETAIL NOT TO SCALE N.T.S. 6" RIP -RAP CLASS I TOP OF BANK ROCK TO BE KEYED OR PUSHED INTO BANK MINIMUM THICKNESS AT TOP - 18" T-0" SLOPE NOT TO EXCEED STREAM BED 1-1 /2 : 1 STABLE GRADE MINIMUM THICKNESS AT T-0 I BOTTOM - 2'-0" MIN. SRIP-RAP PLACEMENT DETAIL NOT TO SCALE NOTES: BIODEGRADABLE EROSION BLANKET 1. BRING THE MATERIAL TO THE STREAM BANKS EDGE BEFORE TERMINATING THE INSTALLATION DETAIL INSTALLATION. TURN THE END UNDER 4" AND STAKE AT 12" INTERVALS. 2. CONTRACTOR SHALL SEED BEFORE EROSION CONTROL BLANKET IS PUT IN PLACE N.T.S. 'L DOWEL PLACE 4 5 PLANTING NARRATIVE THE FIRST STEP OF THIS PLAN INVOLVES THE TEMPORARY SEEDING OF ALL DISTURBED AREAS FOR THE PURPOSE OF PROVIDING A QUICK MEANS OF EROSION AND SEDIMENT CONTROL FOR THE ENTIRE SITE. SEETHE SECTION TITLED "SEEDING" ON THIS SHEET FOR TEMPORARY SEEDING SPECIFICATIONS. BECAUSE THE TEMPORARY SEEDING TYPICALLY ONLY LASTS ONE SEASON, IT IS NECESSARY TO APPLY PERMANENT SEEDING BEFORE THE END OF THE FIRST SEASON. THE PERMANENT SEEDING PROVIDES A MORE PERMANENT VEGETATIVE LAYER OVER ALL DISTURBED AREAS FOR EROSION & SEDIMENT CONTROL PURPOSES AND FOR THE BENEFIT OF HABITAT. REFER TO THE SECTION TITLED "SEEDING" BELOW FOR PERMANENT SEEDING SPECIFICATIONS. THE SEED MIX SPECIFIED WAS CHOSEN TO SPECIFICALLY ADDRESS BOTH EROSION CONTROL AND HABITAT GOALS. SEEDING 1. TEMPORARY SEEDING. A TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING PLANTS. SELECT PLANTS APPROPRIATE TO THE SEASON FROM TABLE 6.10A -C LISTED ON THIS SHEET. THE SEED MIX WAS OBTAINED FROM THE "NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" FOR THE PIEDMONT REGION. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH POLYMER OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. APPLY 2DOO LBS/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE 10-10-10 FERTILIZER. TABLE 6.10A, 6.10B & 6.10C TEMPORARY SEEDING RECOMMENDATIONS PLANTING DATES SPECIES RATE (LBS./ACRE) AUG. 15 - DEC. 31 RYE (GRAIN) 120 JAN. 1 - APR. 15 RYE (GRAIN) 120 WOOLGRASS ANNUAL LESPEDEZA (KOBE) 50 APR. 15 - AUG. 15 GERMAN MILLET 40 * USE WINTER AND SUMMER MIX DUE TO TIME OF YEAR. PERMANENT SEEDING 2. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN THE SEEDING TABLE BELOW. THE SELECTED SEED MIX IS BASED ON THE EXISTING CONDITIONS AND TAKES INTO CONSIDERATION SUN/SHADE TOLERANCE AND HYDROLOGIC TOLERANCE. NOTE THAT THIS MIXTURE IS THE PREFERRED SEED MIX OF SPECIES. IF ANY OF THESE SPECIES ARE NOT AVAILABLE FOR ANY REASON, CONTACT THE RESIDENT ENGINEER FOR SUBSTITUTE SPECIES. SEED MIX RATE SHALL BE 75 POUNDS PER ACRE. APPLY 300 LBS/ACRE 10-10-10 FERTILIZER PERMANENT SEED MIXTURE - STABILIZATION SEED MIX SCIENTIFIC NAME COMMON NAME % OF MIX DACTYLIS GLOMERATA ORCHARDGRASS 5 ANDROPOGON GLOMERATUS BLUESTEM 5 SCIRPUS CYPERINUS WOOLGRASS 5 ELYMUS VIRGINICUS VIRGINIA WILDRYE 5 SORGHASTRUM NUTANS INDIAN GRASS 15 CHASMANTHIUM LATIFOLIUM RIVER OATS 5 PANCIUM CLANDESTINUM DEERTONGUE 30 PANCIUM VIRGATUM SWITCHGRASS 30 2 TOTAL 100 GENERAL PLANTING NOTES: 1. AFTER THE AREA HAS BEEN SEEDED, EROSION CONTROL PROTECTION WILL CONSIST OF STRAW MULCH UNLESS OTHERWISE SPECIFIED. 2. THE SOIL SURFACE SHALL BE SCARIFIED APPROXIMATELY 1 TO 3 INCHES BELOW THE SURFACE PRIOR TO TEMPORARY SEEDING. GENERAL PLANTING NOTES INTRODUCTION 1. THE GOAL OF THE PLANTING PLAN IS TO STABILIZE THE STREAM BANK. 2. TEMPORARY SEEDING AND MATTING OF DISTURBED AREAS SHALL BE REQUIRED TO PROVIDE SEDIMENT AND EROSION CONTROL PURPOSES AND FOR THE BENEFIT OF HABITAT. 3. PERMANENT SEEDING SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN PERMANENT SEEDING MIXTURE PROVIDED HEREIN. IF ANY SPECIES, ON THE PERMANENT SEEDING MIXTURE IS NOT AVAILABLE, CONTACT THE CONSTRUCTION MANAGER FOR SUBSTITUTE SPECIES. THE SEEDING SHALL BE COVERED WITH COIR MATTING BELOW BANKFULL AND STRAW MULCH, OR APPROVED REPLACEMENT, ABOVE BANKFULL TO THE LIMITS OF DISTURBANCE. MULCH IS TO BE SPREAD BY HAND, BLOWER, OR OTHER SUITABLE EQUIPMENT AND ANCHORED INTO THE TOPSOIL WITH POLY DURING BLOWING, OR BY DISCING. 4. BARE ROOT SEEDLINGS, LIVE STAKES OR PLUGS WILL BE PLANTED AFTER THE TEMPORARY SEED MIXTURE HAS BEEN APPLIED. 5. TREES, SHRUBS, LIVE STAKES, BARE ROOT SEEDLINGS AND PLUGS SHALL BE PLANTED IN A MANNER TO ENSURE THEIR SURVIVAL. CONTRACTOR SHALL PLANT INTACT ROOTS, PLANT AT PROPER DEPTH, PROVIDE PROPER BACKFILLING, AND PROVIDE WATERING. 6. PLANT MATERIALS SHALL BE STORED IN A MANNER TO PREVENT DESICCATION OF THE ROOT SYSTEM. PROTECT PLANTS AT ALL TIMES FROM SUN AND DRYING WINDS. PLANTS THAT CAN NOT BE PLANTED IMMEDIATELY SHALL BE KEPT IN THE SHADE AND WELL WATERED. PLANTS NOT PLANTED WITHIN TWO DAYS SHALL BE PROVIDED WITH ADEQUATE IRRIGATION AND ON-SITE PROTECTION FROM THE ELEMENTS. 7. PLANTS SHALL NOT BE HANDLED BY THE STEMS DURING TRANSPORT TO PLANTING SITE OR DURING PLANTING. 8. IF AN EROSION CONTROL BLANKET IS PRESENT, A CIRCULAR OPENING SHALL BE CUT IN THE BLANKET PRIOR TO EXCAVATION OF THE PIT. 9. NON -BIODEGRADABLE MATERIAL SURROUNDING THE EARTHEN BALL OF THE PLAN SHALL BE REMOVED PRIOR TO BACKFILLING OF THE PIT. 10. TO SET THE PLANTS, PREPARE ALIGNMENT OF INDIVIDUAL TREE SAPLINGS PLUMB AND STRAIGHT AND PROVIDE ALLOWANCE FOR SETTLEMENT. 11. BACKFILL THE PLANTING HOLES WITH IN-SITU SOIL MATERIALS REMOVED FOR PLANTING. 12. AFTER BACKFILLING, WATER TO THE POINT OF SOIL SATURATION AND TAMP TO COMPACT THE BACKFILL MIXTURE. ADD EXISTING SOIL TO BRING THE FINAL GRADE IN THE PLANTING HOLE TO THE SURROUNDING SOIL SURFACE. RAKE THE UNUSED SOIL OUTSIDE THE PLANTING HOLES, TAKING CARE NOT TO MOUND THE SOIL OR TO SIGNIFICANTLY ALTER THE EXISTING GRADES. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING 80% SURVIVABILITY THROUGH THE FIRST YEAR AFTER CONSTRUCTION. AS -BUILT, VEGETATIVE MONITORING AND GEOMORPHOLOGICAL MONITORING WILL BE COMPLETED WITHIN 60 DAYS AFTER CONSTRUCTION COMPLETION. 14. TREES, SHRUBS AND LIVE STAKE PLANTING IS TO OCCUR BETWEEN NOVEMBER 15 AND MARCH 15, DURING DORMANCY. LIVE STAKES SHOULD ONLY BE USED WITHIN THE AREA WHERE ADEQUATE DRAINAGE AND SOIL SATURATION WILL INDUCE ADEQUATE ROOT GROWTH. LIVE STAKES SHALL HAVE A MINIMUM DIAMETER OF 1/2 INCHES AND A MINIMUM OF LENGTH 24 INCHES. SOAK THE STAKE FOR 24 HOURS. CUT ENDS AT A 45° ANGLE PRIOR TO INSTALLATION. DRIVE STAKE INTO THE GROUND TO 3/4 OF ITS LENGTH, AT A 45° IN THE DOWNSTREAM DIRECTION. 15. THE SUPPLIER OF ALL SEEDS AND/OR VEGETATION SHALL CERTIFY THAT THE ORIGIN OF THE SEEDS FROM WHICH THE PLANTS OR SEEDS WERE PRODUCED IS FROM HARDINESS ZONES 7A AND 7B, EAST OF TENNESSEE, AND AS DIRECTED BY THE SPECIAL PROVISIONS. 16. ALL PLANTS SHALL BE CONSERVATION GRADE, FIRST CLASS REPRESENTATIVES OF THEIR SPECIES, NURSERY GROWN ACCORDING TO GOOD HORTICULTURE PRACTICES AND GROWN IN A CLIMATE SIMILAR TO THE PROJECT AREA. PLANTS SHALL BE VIGOROUS, HEALTHY AND FREE OF DISEASE, INSECTIVOROUS PESTS, DECAY, INJURIES AND ALL FORMS OF OBJECTIONABLE DISFIGUREMENTS. TRUNKS AND BRANCHES SHALL BE FREE OF CUTS AND ABRASIONS. PLANTS SHALL CONFORM TO ALL ASPECTS OF THE CURRENT EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1) FOR CONSERVATION GRADE PLANT MATERIAL. 17. TREES AND SHRUBS SHALL BE PLANTED ON 10 FT CENTERS. LIVE STAKES SHALL BE PLANTED IN GROUPS WHERE PLANS SHOW ON 4 FT CENTERS. A COMBINATION OF BARE ROOT AND PLUG PLANTS SHOULD BE PLANTED IN CONJUNCTION WITH THE APPLIED WETLAND VARIETY SEED MIX IN ORDER TO CREATE A NATURALIZED STREAM BANK AND TO ESTABLISH ADEQUATE VEGETATIVE COVER TO PREVENT SLOUGHING AND EROSION OF THE BANK. 18. THE SELECTED WETLAND SEED MIX SHALL BE SURFACE SOWN AT THE RATE OF 150 LBS/ACRE TO ALL DISTURBED AREAS ALONG THE EASEMENT. 19. ALL BARE ROOT SEEDLINGS OR PLUGS SHALL BE PLANTED IN SUCH A MANNER AS TO ENSURE THEIR SURVIVAL. THIS SHALL INCLUDE THE PLANTING OF INTACT ROOTS, PLANTING AT PROPER DEPTH, PROPER BACKFILLING AND WATERING. 20. IN AREAS WHERE THE RESTORATION DESIGN REQUIRES SLOPES TO BE CUT BACK AND GRADED, SLOPES SHALL BE SCARIFIED APPROXIMATELY 4 TO 6 INCHES BELOW THE SURFACE PRIOR TO PLANTING. BIODEGRADABLE EROSION CONTROL MAT SHALL BE USED IN ALL AREAS. AN OPENING SHALL BE CUT IN THE MAT FOR EACH PLANTING PRIOR TO INSTALLATION. BARE ROOT SEEDLINGS OR PLUGS SHALL BE PLANTED AND THE ENTIRE AREA SHALL BE TOP DRESSED WITH A WETLAND SEED MIX. 21. BARE ROOT SEEDLINGS OR PEAT POTS THAT ARE TO BE SELECTED FROM THE PLANTING SPECIES LIST ON THIS SHEET SHALL BE PLANTED IN MONOSPECIFIC GROUPS USING A 2 -FOOT ON CENTER SPACING WITHIN THE GROUP TO A MAXIMUM NUMBER OF 50 PLANTS PER GROUP. THE PLANTS TO BE LOCATED NEAREST TO THE BANKFULL ELEVATION SHOULD BE FACULTATIVE WET (FACW). 22. BARE ROOT/PLUG PLANTS DIMENSIONS ARE MAXIMUMS, PLANTINGS SHALL BE RANDOM. Dewberry" .�;,o Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 2 4/12/19 MWC1 REV PER USACE COMMENTS 1 1/10/19 U W No. DATE Q Description z J z J zz Q O � �Uj Lij q w D O W rUj < ` LL ��QU Q p Q Q LU m ~ > oc U z OQ p � z O SEAL �••aa•uu�a KEY PLAN SCALE .•''�40C A Rel ��' ••'•. SS/p�9�q SEAL 17502 ; s, ' NG I NFA` 'Q 11• .••••,.O2;r..E •'RSP,.. AS NOTED REVISIONS DRAWN BY - APPROVED BY CHECKED BY - DATE - TITLE MWC RSE LAB APRIL, 2019 STREAM AND WETLAND DETAILS PROJECT NO. 50046462 / 50102913 C22 SHEET NO. OF 2 4/12/19 MWC1 REV PER USACE COMMENTS 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY - APPROVED BY CHECKED BY - DATE - TITLE MWC RSE LAB APRIL, 2019 STREAM AND WETLAND DETAILS PROJECT NO. 50046462 / 50102913 C22 SHEET NO. OF Action ID Number: SAW -2018-02188 Permittee: City of Eden (Attn: Terry Shelton) County: Rockingham Project Name: City of Eden / SoVA Mega Site at Berry Hill - Phase 1 NC Water / Rockingham / municipal Date Verification Issued: 05/08/2019 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date