Loading...
HomeMy WebLinkAbout310296_Compliance Inspection_20180709Facility Number � O Division of Soil and Water Conservation O Other Agency Inspection Reason for Visit: aloutine` O Complaint O Follow-up O Referral O Emergency O Other A Date of Visit:7aAkrrival Time: Oj�1 Departure Time: T 3 County: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to�I finish We -an to o Feeder Feeder to Finish Farrow to Wean Farrow to Feede Farrow to Finish G. /--. 5 1fC a N Title: Latitude: Phone: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er 9�L $ 7p•JI INon-Layer Other Other 771 Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Assistance 0 Denied Access Region: 73 b-A Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE [-]Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [-]Yes ❑ No NA ❑ NE ❑ Yes NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 21412015 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage tapacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �� L' No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [—]No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): l Z� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q­5�o❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 2rNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [:]Yes []'No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ONo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ONE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes❑NA❑ FE]N NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes NA rNoo ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yese ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑Maps ❑Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE ❑ Waste Application 03wpaldy Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o ❑ NA ❑ N 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE Page 2 of 3 21412015 Continued Facili Number: Q Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ErKo ❑ NA ❑ NE 25. Is thee facility out of compliance with permit conditions related to sludge? If yes, check [—]Yes fNo ❑ NA ❑ NE t9e appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes _ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No E NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes EfNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA e'N� ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ <0 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑'No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes El'No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). �(6✓lJWil - rC�o�c/5 ��/SS��j/ACo��e� 1L_1^ e dtl./ J, P9'�'`l1 o nc�tp,� 0 v Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: i i o 774 %1 ay, O� Date: 711 // y 2/4/2015