Date: April 30, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Lance Rosenberger
Medallion Athletic Products Inc.
150 River Park Road
Mooresville, NC 28117
RE: Project Name: Crossfit 77 Tur Field Installation
Acres Approved with Modifications: L I
Project ID: MVLLE-2019-082
Project Location: PIN 4647348752.000
Submitted By: Kevin E Herring Engineering
Date Received: April 25, 2019
Plan Type: New
Dear Mr. Rosenberger:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no later than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3) years following the date of this approval as is required by
Title 15A NCAC 413.0129 and Section 9.6.6 of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Section 9.6.9 of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Section
14.2.2 of the Iredell County Land Development Code, of our right of periodic inspection to
insure compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
Letter of Approval with Modifications
Crossfit 77 Turf Field Installation
April 30, 2019
Page 2 of 3
inadequate to meet the requirements of the IredelI County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute l I3A-51 through
66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State,
and County water quality laws, regulations, and rules. This approval does not supersede any
other permit or approval.
As of March 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or
after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Please notify us when you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Randall Moore, CESSWI, CFM
Erosion Control Inspector II
Enclosures: Modifications
Fact Sheet on the New NCGOI Permit
Letter of Approval with Modifications
Crossfit 77 Turf Field Installation
April 30, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Crossfit 77 Turf Field Installation
Project ID: MVLLE-2019-082
County: Iredell
Reviewed by: Randall Moore
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
l . Provide a statement from the property owner granting the Financial Responsibility Party
permission to perform the Iand disturbing activity. —RC
2. In the Construction Sequence, call for an initial inspection by Iredell County Staff after
measures are installed and prior to grading beginning onsite. —RC
3. In the Construction Sequence, do not remove measures without Iredell County Staff
permission. —RC
4. Do not use silt fence for inlet protection. Use hardware cloth and stone. Provide detail. —
RC