HomeMy WebLinkAboutNCC190134_NOI Application_20190430Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 4/30/2019 10:32:23 AM (NCG01 NOI Submission)
Approve by Georgoulias, Bethany 4/30/2019 10:55:07 AM (Review- Construction NOI 10509)
• The task was assigned to Georgoulias, Bethany by round robin distribution 4/30/2019 10:32 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 2, 2019 5:00 PM
4/30/2019 10:32 AM
Submit by Georgoulias, Bethany 4/30/2019 10:55:27 AM (Payment Verification - NCG01-2019-0134)
• The task was assigned to Georgoulias, Bethany. The due date is: May 1, 2019 5:00 PM
4/30/2019 10:55 AM
117-8) TiT 7i) it f 1Ii f_T1II a 10141
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * Bainbridge Aviation Crossing
2. County* Wake
3. Highway or Street Aviation Parkway
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township* Morrisville
5. State * NC
6. Zip Code* 25703
7. Latitude * Enter the latitude in decirral degrees
35.8330
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-78.8160
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
05/20/2019
Estimated Construction Project Start Date
10. Date to End*
05/20/2021
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Other
than SFE (1522)
Standard Industrial Gassification for Development
12. Acres to be
10.40
disturbed*
(including off -site borrow and waste areas)
13. Total site area
12.67
(acres)*
14. Post-
7.13
construction
impervious area
(acres) *
NCC Project
NCC-WAKE-201 9-Bain bridge Aviation Crossing
Tracking ID
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Crabtree Creek
Wate rbody* Nbrre of waterbody into which storawater runoff will discharge
15b. Waterbody 27-33-(3.5)
Index No.* NC Waterbody Index Narrber
Stormwater rJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC f No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Bainbridge -Gopher Aviation Crossing Owner, LLC
Name *
2. First Name*
Kevin
ff Corporation, enter Registered Agent First l\brre
3. Last Name *
Keane
ff Corporation, enter Registered Agent Last Barre
4. Permitee E-mail
cpersons@bainbridgere.com
Address*
5. Permittee 919-462-1275
Telephone No.*
6. Permittee Mailing Street Address
Address* 12765 W Forest HII Blvd
Address Line 2
Ste 1307
City
Wellington
Fbstal / Zip Code
33414
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
12765 W Forest HII Blvd
Address Line 2
Ste 1307
City
Wellington
Postal / Zip Code
33414
State / Province / Region
FL
Country
USA
State / Province / Region
FL
Country
USA
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Non -Government
Ownership*
2. Primary Site Sam
Contact - First
Name *
3. Primary Site Durham
Contact - Last
Name *
4. Title
Superintendent
5. Site Contact E-
sdurham@bainbridgere.com
mail Address*
6. Site Contact
979-525-8091
Telephone No.*
7. Organization
Bainbridge Mid -Atlantic Construction, LLC
Name
8. Site Contact
Street Address
Mailing Address*
401 Harrison Oaks Blvd
Address Line 2
Ste 250
City
Cary
Fbstal / Zip Code
27513
State / Province / Fbgion
NC
Country
USA
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 04/05/2019
Approved *
2. E&SC Plan Project SEC-011446-2019
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* Wake County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan SEC-011446-2019_Approval-
Approval S&EConstructionPlan Revie\AChecklist-V.2 WM 4-5- 287.92KB
letter/documentation
19.pdf
Mast be RCF format
6. NOI Certification KK - NOI-Certification- Form- B-GACO. pdf 750.36KB
Form lutist be FDFfornat
This is an Express r No
Review Project* f Yes
E. Certification
North Carolina General Statute 143-215.6B (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
v&119 J0-
Type Name* KEVIN KEANE
Date * 04/30/2019
F. Tracking and COC Info
NOI Tracking No. 10509
NC Reference No. NCG01-2019-0134
Uses 'count_nunber variable (increrrented by SP)
Certificate of NCC190134
Coverage (COC) Uses'count_nunber'variable (increrrented by SF)
No. *
Count Number 134
Sequential nunber for subrrittal that is increrrented by Stored Procedure
COC Year 2019
Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)