Loading...
HomeMy WebLinkAbout20150955 Ver 2_Surf City Water Work Complete_20190314Carpenter, Kristi From: Meyer, Benjamin C Sent: Thursday, March 14, 2019 10:00 AM To: Herndon, T. Mason Cc: Westphal, Anneliese; Carroll, Trevor K; Steenhuis, Joanne; Lane, Stephen; Shaver, Brad Subject: Surf City Water Work Complete Mason, All of the old bridge structure, cables, debris, and temporary trestle have been removed. We had the NCODT inspection divers review the area to confirm all items on the boat side scan had been addressed. All in -water work is complete except for the additional rip rap to be placed on the island side of the project. Let me know if you need anymore information. Cheers, Ben Meyer Assistant Resident Engineer Division 3- Jacksonville Construction Office NCDOT (910) 467-0524 office (910) 617-1902 cell bcmeyerl@ncdot.gov bmeyer@rkk.com 295B Wilmington Hwy. Jacksonville, NC 28540 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1