HomeMy WebLinkAbout20190955 Ver 2_DCM Permit_20190304Carpenter, Kristi
From:
Brittingham, Cathy
Sent:
Monday, March 04, 2019 3:25 PM
To:
Herndon, T. Mason
Cc:
Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil);
Steenhuis, Joanne; Lane, Stephen
Subject:
B-4929, Bridge No. 16, CAMA Permit 60-16, Minor
Modification
Attachments:
B-4929, Topsail Island Bridge Replacement, 60-16
minor modification 2019.pdf
Hello,
Please find attached a Minor Modification of CAMA Major Permit No. 60-16
authorizing the following: (a) placement of approximately 100 linear feet of
riprap along the south bank of the AIWW above normal high water for shoreline
stabilization within the NCDOT Right -of -Way, (b) removal of accumulated
sediments at the end of an existing drainage pipe at Station 40+10-Y1-RT, and
(c) reduction in the elevation of the existing riprapped areas to allow positive flow
at the previously authorized stormwater outfall at Station 42+90-Y 1-LT.
A paper copy will be sent to NCDOT in Castle Hayne.
Please let me or Stephen Lane know if you have any questions or concerns.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator
N.C. Division of Coastal Management
(919) 707-9149 phone
cathv.brittinaham(&ncdenr. aov
Mailing Address:
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Physical Address.
512 North Salisbury Street
Archdale Building
12' Floor, Room 1204G
Raleigh, NC 27604
Please visit hftps://deg.nc.gov/about/divisions/coastal-management/ for more information about the
N.C. Division of Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties
Permit Class
MODIFICATION/MINOR
Permit Number
60-16
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. Department of Transportation, 5501 Barbados Boulevard, Castle Hayne, NC 28429
Authorizing development in Pender County at Topsail Sound and AIWW. Bridge No. 16
on NC-50/NC-210 , as requested in the permittee's application letter dated 2/18/19, including
the attached workplan drawings (3): 1 dated 2/13/19, and 2 dated as received 2/18/19,
This permit, issued on 3/4/19 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) Unless specifically altered herein, this Minor Modification authorizes the following: (a) placement
of approximately 100 linear feet of riprap along the south bank of the AIWW above normal high
water for shoreline stabilization within the NCDOT Right -of -Way, (b) removal of accumulated
sediments at the end of an existing drainage pipe at Station 40+10 -Y 1-RT, and (c) reduction in the
elevation of the existing riprapped areas to allow positive flow at the previously authorized
stormwater outfall at Station 42+90-Y1-LT, all as depicted on the attached workplan drawings.
2) In accordance with commitments made by the permittee, due to the classification of the waters of
Topsail Sound as a Primary Nursery Area, all bottom -disturbing activities shall occur outside the in -
water work moratorium of April 1 to September 30 of any year without prior approval of the N.C.
Division of Coastal Management (DCM), in consultation with the appropriate resource agencies.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
No expiration date, pursuant to GS 136-44.713
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
N.C. Department of Transportation Permit #60-16
Page 2 of 2
ADDITIONAL CONDITIONS
NOTE: The activities authorized by this Minor Modification will permanently impact approximately 48
square feet of 404 Wetlands and will permanently impact approximately 40 square feet of
existing riprapped shoreline below normal high water.
3) The placement of riprap shall be limited to the areas as indicated on the attached workplan drawings.
The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities. It
shall be of a size sufficient to prevent its movement from the approved alignment by wave or current
action. The riprap material shall consist of clean rock or masonry materials such as but not limited to
granite or broken concrete.
4) All excavated materials shall be confined above normal water level and landward of regularly or
irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of
solids into any wetlands or surrounding waters.
5) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown
on the attached workplan drawings or described in the authorized permit application, a permit
modification and/or additional authorization from DCM may be required. The permittee shall contact a
representative of DCM prior to commencement of any such activity for this determination and any
permit modification.
6) This Minor Modification does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.
7) This Minor Modification shall be attached to the original of Permit No. 60-16, which was issued on
5/27/16, as well as the amendment issued on 6/2/16, and all subsequent modifications and letters of
refinement, and copies of all documents shall be readily available on site when a Division representative
inspects the project for compliance.
8) All conditions and stipulations of the active permit remain in force under this Minor Modification unless
altered herein.
NOTE: A minor modification application processing fee of $100 was received by DCM for this project.