Loading...
HomeMy WebLinkAboutNC0026565_Compliance Evaluation Inspection_20190416ROY COOPER Governor MICHAEL S. REGAN secretary LINDA CULPEPPER Director Grant Cheek Town of Ramseur P.O. Box 545 Ramseur, North Carolina 27316 NORTH CAROLINA Environmental Quality April 16, 2019 SUBJECT: Pretreatment Compliance Inspection (PCI) Town of Ramseur NPDES# NCO026565 Randolph County Dear Mr. Cheek: REVE1 V EW DEN V DWR APR 26 2019 Water Resources Fermitting Section On March 19, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Nadine Blackwell, Pretreatment Coordinator for the Town of Ramseur was present for the inspection along with Mr. Terry Lewallen, ORC for the facility. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is categorical. The publicly.owned treatment works (POTW),has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from March 2018 through February 2019. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on December 20, 2017. The HWA was approved on February 8, 2018. The next HWA is due on October 1, 2022. The last Industrial Waste Survey (IWS) was submitted on January 15, 2016. The IWS was approved on March 7, 2016. The next IWS is due on April 1, 2021. D E QNorth Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27103 nroan�caaouw. 336.776.9800 0 The Sewer Use Ordinance (SUO) was approved on October 2, 2015. The Enforcement Response Plan (ERP) was approved on October 2, 2015. The Short Term Monitoring Plan (STMP) was approved on October 2, 2015. STMP File Review The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review The SIU (Matlab, Inc.) was in compliance in 2018. The zinc coating operations has been moved to their Greensboro facility. A review of the file for Matlab, Inc. (#002) revealed that the monitoring data was well organized and compliant. The slug control plan for Matlab, Inc (#002) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. Blackwell maintains an excellent pretreatment program. If you have any questions, please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, Low DoeuSipnod by: 145BIEZ94FA.. Lon T. Snider Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: m `ice Nadine Blackwell - Suez Central Files WSRO Files 1C. NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL WALITV BACKGROUND INFORMATION [Complete Prior To PCI• Review Program Info Database Sheet(s)l 1. Control Authority (POTW) Name: Town of Ramseur 2. Control Authority Representative(s): Nadine Blackwell 3.- Title(s): Pretreatment Coordinator 4. Last Inspection Date: 04/08/18 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: ICIS CODING Main Program Permit Number I N I C 1 0 10 1 216 1516 15 I MM/DD/YY 1 03 1 19 1 19 1 Are Milestone Dates Being Met? ❑ YES ❑ NO 1. Current Number Of Significant Industrial Users SNs)? I' 8. Number of SNs With No IUP, or With an Expired 1UP? 0 9. Number of SNs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SNs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SNs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SNs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SNs in SNC with Pretreatment Schedule? 0 14. Number of SNs on Schedules? 0 15. Current Number Of Categorical Industrial Users CIUs ? 1 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SNs in SNC) Not Put 20. Which Industries are on Compliance Schedules or Orders? For all SNs on an Order, Has a Signed Copy of the Order been sent to the Division? 21., Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? [—]YES ®NO ❑ YES ® NO Limits: Reporting: dished: None ❑ YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO .24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself? 26 27 IfNO to 23 - 26, list violations Should any Pollutants of Concern be Eliminated from'or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal, Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Anal sis A 12/20/2017 ® Yes ❑ No 02/08/2018 ® Yes ❑ No 10/01/2022 Industrial Waste Survey IWS 01/15/2016 ® Yes ❑ No 03/07/2016 ® Yes ❑ No 04/01/2021 Sewer Use Ordinance SUO 09/22/2015 ® Yes ❑ No 10/02/2015 ® Yes ❑ No Enforcement Response Plan RP 09/22/2015 ® Yes ❑ No 1 10/02/2015 ® Yes ❑ No Short Term Monitoring Plan (STMP) 1 09/22/2015 ® Yes ❑ No 1 10/02/2015 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Matlab, Inc. 2. 3. 30. IUP Number 0002 31. Does File Contain Current Permit? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 12/31/2020 33. Categorical Standard Applied I.E. 40 CFR, Etc.) Or N/A 433 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? I ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 36. a. Does the File Contain aSlug/Spill Control Plan? a. ®Yes ❑No a. ❑Yes ❑No a. ❑Yes ❑No b. If No, is One Needed? See Inspection Form from POTW) b. []Yes ❑No b. []Yes ❑No b. ❑Yes []No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan TOMP)? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No Fb.. ❑Yes ❑No a. ❑Yes []Nob. All Issues Resolved? b.❑Yes❑No®N/A ❑Yes❑No❑N/A b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes ❑ No ❑ Yes ❑ No ❑Yes ❑ No its Sampling as Required b IUP, includingflow? 40. Does File Contain POTW Sampling Chain-Of-CustodyForms? ® Yes El No ❑Yes El No El Yes El No 41. During the Most Recent Semi -Annual Period, Did the SILT Complete its ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time? 11 42a. For categorical lUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A file includeprocess/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes0No23 ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No All Limits Non -Compliance from Both POTW and SILT Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A All Re ortin Non-Com liance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c. If applicable, Did POTW resample within 30 days of becoming aware of SILT limit violations in the POTW's sampling of the SIU? c.❑Yes❑No®N/A c.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 46. During the Most Recent Semi -Annual Period, Was the SILT in SNC? ❑ Yes ® No_ ❑ Yes ❑ No 11 ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑No®N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP OVs, Penalties, timing,etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No® ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? I ❑Yes❑No®N/AI ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes®No❑N/A IROYesoNoON/A ❑Yes❑No❑N/A a.❑Yes❑No❑N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No❑N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑NoYes ® ❑Yes El No El Yes El No Requested Information For You? NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 FILE REVIEW COMMENTS: The zinc coating operation at Matlab was moved to their Greensboro facility. INDUSTRY INSPECTION ICIS CODING: Main Pro ram Permit Number MM/DD/YY I I I I I Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: A very well run program Requirements: Recommendations: NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ®NO POTW Rating: Satisfactory X Marginal satisfactory PCI COMPLETED BY: Jim Gonsiewski , OK j,,,oki DATE: �Q E197BNF1M45F... NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3