HomeMy WebLinkAboutNCC190114_ESC Approval Submitted_20190426Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
April 17, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Progress, LLC
Attention: Bennett V. Deese, Jr., Project Manager
410 Wilmington Street NC15
Raleigh, North Carolina 27601
Project Name: Marshall Steam Station Laydown Area Project
Acres Approved: 5.4
Project ID: CATAW-2019-019
County: Catawba, City: Terrell
Address: 8320 East Highway 150
River Basin: Catawba
Stream Classification: WS-IV, B, CA, Other
Submitted By: Duke Energy Progress, LLC
Date Received by LQS: April 11, 2019
Plan Type: New
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Daeclor
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, no land -disturbing activity has been undertaken,as is required by Title 15A NCAC i i .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGO L Please direct questions about
the NOI form to Annette Lucas at Annette.luca& ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
'' will not charge a fee for coverage under1 permit. However,on or
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff
in Raleigh.
Title 15A NCAC 4B .0 1 18(a) and the NCGO I permit require that the following documentation be kept on file at
the job site:
State of North Carolina ( E nvirunmemal Quality hy, Mineral and Land Resources
Mooresville Regional Office ! 610 East Center Ave Ste 301 Moom-tulle, NC 29115
704 663 1699 T
Letter of Approval with Modifications
Duke Energy Progress, LLC
April 17, 2019
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
d
Tamera Eplin, 'E, CPESC
Assistant Regional Engineer
Land Quality Section
Enclosures:rf
Modifications Required for Approval
NCGOI
McDonnell
Attention: William Goh, R
9400 Ward Parkway
Kansas City, • 64114
Letter of Approval with Modifications
Duke Energy Progress, LLC
April 17, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Marshall Steam Station Laydown Area Project
Project ID: CATAW-2019-019
County: Catawba
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
2. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Additional Comments:
1. This review is for erosion and sediment control only. Approval of this erosion and sediment
control plan does not supersede any requirements or provisions of North Carolina Senate Bill
729, "The Coal Ash Management Act", as amended, the North Carolina Dam Safety Act of
1967, as amended, or any other applicable regulation.
2. The NPDES General Construction Stormwater Permit does not supersede any existing or
potential wastewater and/or industrial stormwater permit requirements, or any other
applicable regulation.