HomeMy WebLinkAboutNCC190113_ESC Approval Submitted_20190426 ROY COOPER
tt>ri rtaijecror Environmental Quality
April 26, 2019
LET'TER OF APPROVAI, WITH MODIFICATIONS
ICATIONS
Harvey point Defense Testing Activity
Attn: Christopher J. Houtz, Director
283S Harvey Point Road
Hertford, NC 27944
RE: Project Name: building 3-7 Demolition - Harvey Point Legacy Buildings Demolition
Acres Approved: 3.3
Project 1D: Perqu-2019-007
County: Perquimans City: Bethel
Address: 2835 Harvey Point Road
River Basin: Pasquotank
Date Received by LQS: April 25, 2019
Submitted By: Deel Engineering, PLLC
Plan Type: New
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan, We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan approval shall expire three (3) years following the date
of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A
NCAC 413 .0129.
As of April 1, 2019 all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above named project. The NOI form may be
accessed at dt�nc.gou�NC."GQ L Please direct questions about the NOI form to Annette Lucas at
Aiiiiei.te.itic t,(,u necletir.(-,av or Paul Clark at Pamul.clark .';ncdeiir. r:, After you submit a complete
and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR
will not charge a fee for coverage under the NC.GO1 permit. however, on or after May 1, 2019, a
$100 fee will be charged annually. "Phis fee is to be sent to the DFMLR Stormwater Central Office
staff in Raleigh.
Title 15A NCAC 413 .01 18(a) and the NCGO I permit require that the following documentation
be kept on file at the job site:
�;�ua bfti C�are�IPn�6.)ra,asvrr�otC hr€#rn�t¢a�po7°frb3t Nl(1o,.a88ty [te�i�d�¢r of�.i�e��aS '��sr�r�l u�triLar�xt i��r>¢attrr��
� } ^r'�Bluaie,�ra>n4frcp¢t��ralC.7f�tA;�^ d't9.S�,�,@uQtm��4 orb ay.gc�.xiE fvl.ti@ � t�r3st��nreta;a�.4„,�,tr.�w'iy(�K�ay.�,s5°r
irZe�+ re� ,a9„ eia,,,wer 'd .'�-iP,4rotW.I
1. The approved E&SC plan as well as any approved deviation.
1 The NCGO I permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I 3A-6 1.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute I I 3A-5 1 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Sincerely,
Samir Durnpor
Regional Engineer
cc w/o enc: Christopher J. Houtz, HPDTA(email)
Craig Blanchard, HPDTA(email)
Andy Deel, PE, Deel Engineering, PLLC
WaRO Division of Water Resources
1. The developer is responsible for the control of sediment on-site. If the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)),
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity,
All sediment storage measures will remain on site and functional until all grading and filial
landscaping of the project is complete (15A NCAC 04B .0113).
2, The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Storinwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S,
Army Corps of Engineers'Jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within
the limits of disturbance, of any land disturbing activity to prevent sediment from
leaving the limits of disturbance,entering existing drainage systems,impacting an on-
site natural watercourse or adjoining property. (NCGS 11.3A-57)
PROJECT INFORMATION SHEET
APPROVAL DATE: Aril 26, 2019
RESPONSIBLE PARTY: Harvey Point Defense Testing Activity
Building 3-7 Demolition - Harvey Point Legacy Buildings
PROJECT NAME: Demolition
COUNTY: Per uimans NO.: Per u-2019-007
OFF-SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON-SITE CONTACT:
ON-SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.N.R.
LAND QUALITY SECTION
ATTN:James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
james.edwards@ncdenr.gov